![Page 1: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/1.jpg)
HEAD OFFICE DUBAI OFFICE
P O Box: 32410, Sharjah, UAE P O Box: 94360, Dubai, UAE Tel: +971 6 5757701 Fax: +971 6 5757802 Tel: +971 4 3925028 Fax: +971 4 3925638 Email: [email protected] Email: [email protected] Web: www.controlsme.com Web: www.controlsme.com
ENHANCING TECHNOLOGY An ISO 9001:2015, OHSAS 18001:2007 & ISO 14001:2015 Certified Company
COMPANY PROFILE
COMPANY PROFILE
![Page 2: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/2.jpg)
Enhancing Technology Page 2 of 45
SECTION 1
1.1. CORPORATE PROFILE
1.2. CORPORATE ORGANIZATION CHART
1.3. ORGANIZATION'S RESOURCES:
1.3.1. LIST OF MANAGEMENT & NON-MANAGEMENT CATEGORY STAFFS
1.3.2. LIST OF PLANT, MACHINERY, EQUIPMENT & TOOLS
SECTION 2
2.1. PROJECT EXPERIENCE 2.2. CLIENT LIST
2.3. LICENSE, PROFESSIONAL REGISTRATION & MEMBERSHIPSHIP CERTIFICATE
SECTION 3
3.1. MANAGEMENT SYSTEM CERTIFICATIONS
3.1.1. QUALITY - ISO 9001:2015
3.1.2. OCCUPATIONAL HEALTH & SAFETY - BS OHSAS 18001:2007
3.1.3. ENVIRONMENT - ISO 14001:2015
3.2. MANAGEMENT SYSTEM MANUALS
3.2.1. QUALITY (INDEX PAGE ONLY)
3.2.2. HEALTH, SAFETY & ENVIRONMENT (INDEX PAGE ONLY)
![Page 3: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/3.jpg)
Enhancing Technology Page 3 of 45
ABOUT US Controls Middle East LLC (CME) is an Integrated Quality Management System certified company
established in 2008, includes four Divisions and team for our four core services for Clients:
Detailed Engineering, Project Management/Construction, IT Solutions and Trading. CME’s head
quarter is in the Emirates of Sharjah-UAE and branch office in Dubai.
CME excels in Detailed Engineering, Procurement, Projects Management / Construction and
Commissioning of Projects; Electrical, Instrumentation, Control & Automation Systems in Oil &
Gas Projects – Early production facility (EPF), Tank Farm, Petrochemical, Process Skid Packages,
Power Generation, Water Treatment Plants, Port/Jetty and Other Industrial Projects.
Our MEP Division concentrates on infrastructure / commercial buildings projects - Hotels,
Hospitals, High rise building / Towers and Luxury Villas etc. Since inception, CME’s strength is
displayed in its capability to successfully delivering quality services that exceeds the
expectations of our esteemed customers in their complex industrial and commercial projects.
Our IT Division provides business consulting, information technology needs, engineering and
outsourcing solutions to help clients build their enterprise. Networking, system monitoring,
help desk, remote access, and on-site visits deliver proactive, maintenance & preventative
services to keep your Office Automation systems working for you.
CME specializes in the Trading of goods and commodities within the Oil & Gas, Petrochemical,
Power Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process Automation,
Information Technology Projects and Manufacturing industries. CME helps companies reduce
internal procurement expenses and expedite their entire procurement process by leveraging
long-standing relationships with vendors worldwide.
QUALITY POLICY Controls Middle East LLC (CME) will strive to become the leader in Engineering, Project
Management and Construction of Process, Electrical, Instrumentation & Control system
solutions by achieving customer satisfaction through quality service and on time delivery. Our
Quality Policy is defined and strongly driven by the following management principles and
behaviors:
Build a mutually profitable relationship with our customers
Endeavor commitments for quality, and schedule.
Meet and exceed the customer satisfaction within the contractual terms and conditions.
Drive continual improvement and innovation based upon efficient processes, well-defined
measurements, and customer surveys.
Develop staff competencies, creativity, empowerment and accountability through
appropriate development programs, trainings and management involvement and
commitment.
![Page 4: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/4.jpg)
Enhancing Technology Page 4 of 45
WHAT DO WE SPECIALIZE IN? CME's team of industry professionals provide a wide range of services including:
Detailed Engineering
Construction & Project Management
Services for Skids
Process Control & Automation
Testing and Pre-Commissioning
Start-up & Commissioning Assistance
Operations & Maintenance
HVAC
MEP
Renewable Energy
Total IT Solutions
Technical Writing & Training
After sale services
Trading – Procurement & Material supply
OIL & GAS DIVISION CME has extensive experience in fast track projects, such as Electrical, Instrumentation, Control
& Automation and HVAC Systems in Oil & Gas Projects for; Early production facility (EPF), Tank
Farm, Petrochemical, Process Skid Packages, Power Generation, Water Treatment Plants,
Port/Jetty and Other Industrial Projects. Our project teams are comprised of qualified and
experienced professional Project Managers, Engineers, QA/QC, Safety and Construction Staff. It
is the objective of each project team to obtain the best result in terms of cost, quality, safety
and schedule.
The company has a full-fledged Detailed Engineering and Construction team with all required
facilities and has the capability to undertake works for industrial solutions covering small and
medium scale projects in Middle East, Iraq & Africa.
MEP DIVISION MEP division is leading MEP contracting company focuses on Electromechanical works – HVAC,
BMS/Building Automation Systems. Electrical - power distribution systems, lighting, backup
power system (including solar), fire detection and alarm system, small power systems – CCTV,
Access control system, Lighting control, Structured data cabling, Telephone/Public addressing/
Communication systems. Plumbing - cold and hot water, drainage, fire protection, gas,
plumbing and sanitation, rainwater, sewage treatment and swimming pools. Applications - high
rise buildings, shopping malls, offices, public buildings, defense, theatres, schools, banks, power
stations, hotels, manufacturing.
IT DIVISION CME is a multifaceted Technology & Service provider offering end-to-end IT solutions. We offer
Engineering, Network design and installation, hosting, co-location, internet and software
development. We also specialize in virtualization and high-availability solutions, 24/7 network
monitoring and support, business continuity, remote access, cloud solutions and malware
protection that are proven to increase productivity and reduce your total cost of ownership.
We ensure the right data backup and business continuity strategy. Manage critical business
systems and information through a viable IT Infrastructure — and minimize expensive down
time.
![Page 5: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/5.jpg)
Enhancing Technology Page 5 of 45
TRADING DIVISION CME expertize in Procurement & Material supply with a vision of improving the entire
procurement experience for Clients. Timely deliveries of goods have an immediate impact on
reducing costs and increasing Companies revenue. We adopted a prescription for servicing all
facets of the procurement process and offer a systematic purchasing experience with high-end
Customer satisfaction for the Materials & Equipments used in the fields of Oil & Gas,
Petrochemical, Power Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process
Automation, Information Technology Projects and Manufacturing industries.
COMPANY DETAILS
HEAD OFFICE:
Name : Controls Middle East Measurement & Equip Fix LLC
Address : P O Box 32410
Sharjah, United Arab Emirates
Tel : +971 6 5757701
Fax : +971 6 5757802
Email : [email protected]
Website : www.controlsme.com
Bankers : RAK Bank, Sharjah Branch, United Arab Emirates
: Bank of Baroda, Sharjah Branch, United Arab Emirates
DUBAI OFFICE:
Name : Controls Middle East Electromechanical Works LLC
Address : P O Box 94360
Dubai, United Arab Emirates
Tel : +971 4 3925028
Fax : +971 4 3925638
Email : [email protected]
Website : www.controlsme.com
Bankers : Mashreq Bank, Dubai Branch, United Arab Emirates
![Page 6: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/6.jpg)
Enhancing Technology Page 6 of 45
ELECTRICAL WORK
CME provides detailed engineering, procurement & site service teams with experienced
resources within the industry that will provide adequate support for each project till successful
completion. Our craftspeople are trained to execute routine and emergency maintenance of
industrial electrical power systems and equipment. We are prepared to perform new
construction, major shutdowns, capital expansion, plant relocation, and contract maintenance
service to clients across the Middle East, Iraq & Africa.
The services offered as part of for Electrical Construction works for Industrial Projects, which
includes Installation, Testing & Pre-Commissioning of the following items:
Power Transformer
Generator System
Uninterruptible Power Systems
Emergency Power System
Solar Power/Renewable Energy System
Bus Duct & Bus Risers
Medium Voltage Switchgear (MVSG)
Main Distribution Board (MDB)
Motor Control Centers (MCC)
Variable Frequency Drives (VFD)
Soft Starters (SS)
Interior Lightings, Street Lighting & Area Lighting
Power & Control Cabling
Cable Section and Replacement for Faulty Circuits
Earthing & Lightning Protection Systems
Reconstruction & Emergency Restoration
Equipment Relocations, Additions & Alterations
Preventive Power Maintenance Programs
INSTRUMENTATION
CME provides engineering, procurement & site services for Instrumentation covering all types
of systems under Instrumentation, Fire Alarm, Fire & Gas. The activities concentrate on medium
to large scale projects throughout Middle East, Iraq & Africa and provide highly accessible client
support and maintenance resources at short notice, which removes the costs arising out of
client dependency on support from outside the region.
![Page 7: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/7.jpg)
Enhancing Technology Page 7 of 45
The instrumentation activity includes installation, testing, pre-commissionig and maintenance
of the followings:
All types of Instruments & Flow-metering Equipments
Instrumentation Valves & Compression Fittings
Cable support/containment systems (Tray/Trunking/Conduit work)
Impulse Tubing and Pneumatic Hookups
Signal and Instrumentation Cabling
Fire and Gas system
Fire Alarm System
Instrument field Calibration
Loop Testing
Pre-commissioning
Process commissioning assistance
End User Training
PROCESS CONTROL & AUTOMATION
CME provides Engineering, Procurement and Construction of total EPCC of Advanced Process
Control & Automation solutions to both the Industrial and Oil & Gas sector. Also, CME lead a
team with successful track records in delivering Process Control & Automation Project
Management, Fabrication, Installation and Commissioning for Project owners and Operators.
The activities are including;
Detailed Engineering
Panel Building
Remote Monitoring System
System Integration
DCS, PLC System & Programming
HMI, MMI, MIS & Supervisory Control & Data Acquisition System (SCADA)
Conversion of Pneumatic to Electronic computer control systems
Construction & Project Management in;
o Oil & Gas
o Power Generation
o Water Treatment Plants
o Manufacturing Industries
o Other Industrial Projects
![Page 8: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/8.jpg)
Enhancing Technology Page 8 of 45
DETAILED ENGINEERING
ELECTRICAL ENGINEERING
Overall Single Line Diagram
Electrical Load List
Electrical Equipment Location Plan
Overall Cable Tray Routing Layout
Overall Earthing Layout
Overall Earthing Schematic Diagram
Overall Low Voltage Power Cable Schedule
Typical Cable Sizing calculations for LV Power Cables
Typical Cable Sizing calculations for MV Power Cables
Earthing System Calculations
Data Sheet for Electrical Cables and Bulk materials
Area lighting plan
BOM for Electrical Bulk material
INSTRUMENTATION ENGINEERING
Instrument Index
Control System IO List
Technical Specification for Control System
Control System Architecture Diagram
Control System Panel Wiring Diagram
Instrument Loop Diagram
Technical Specification for Fire & Gas Detection System
Layout for Fire & Gas Detection System
Technical Specification for Fire Fighting System
Typical Installation for Instruments, JB's, Control Panels & Cable Trays
Typical Hook-up Diagram
Data Sheet for Valves
Data Sheet for Junction Box
Data Sheet for Instrument & Control Cables
Instrumentation & Control Cables Drum Schedule
Data Sheet for Instruments
Data Sheet for Bulk materials
Instrument & Control Cable Schedule
Cable Block Diagram
JB Termination Diagram
BOM for Instrumentation Bulk materials
![Page 9: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/9.jpg)
Enhancing Technology Page 9 of 45
Testing & pre-commissioning procedures
As-built documentation
System operation & maintenance manuals
SERVICES FOR SKID MOUNTED PACKAGES
CME provides specialized services for skid mounted packages for oil & gas and Petrochemical
Industries. The services include the following support from Design to Commissioning:
Engineering for ON-skid and OFF-skid E&I works
Cable Tray and cable routing and modeling
Instrument location layout
Installation works at fabrication yards
Integration and off-skid works at site
Testing and pre-commissioning
Commissioning support at site
HVAC SYSTEM
Over the years, CME has emerged as an expert in the design, installation and management of
mission critical refrigeration and HVAC systems in Oil & Gas sector, Industrial Project and
infrastructure projects. We specialize in optimizing system performance while reducing the use
of energy and impact on the environment. We focus our expertise on these systems because
they drive nearly half of the energy use and significantly contribute to the carbon footprint for
many of our customers.
CME undertakes following services for HVAC Systems:
DETAILED ENGINEERING
Heat load calculation using Carrier HAP 4.5 software
Detailed duct designing and sizing as per ASHRAE and SMACNA standards
Ventilation/over pressurization calculations for different areas
Preparation of Shop drawings
Preparation of necessary data sheets for submission
Approval from client and consultants
Preparation of method statements ITP and other safety related documents, as built
drawings/project closeout documents.
FABRICATION
Steel and GI ducts
Duct fittings
Structural supports for AC machines
![Page 10: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/10.jpg)
Enhancing Technology Page 10 of 45
SUPPLY, INSTALLATION AND COMMISSIONING
We offer equipment supply, site installation, testing and commissioning services for following
items:
Air conditioning systems including DX type air handling units, package AC units, closed
control AC units, split AC units
Air cooled/water cooled chiller AC and associated systems
Chilled water pumps, thermal storage systems underground/above ground chilled water
piping values & accessories etc.
BMS / HVAC control panels
Duct heaters and variable air volumes (VAV)
Motorized shutoff dampers, blast dampers, pressure relief dampers, motorized fire and
gas damper and volume control dampers
Duct installation and fittings
Grilles, diffusers, exhaust louvers, sand trap louvers, etc.
PLUMBING
We do engineering, supply as per vendor list, install, test and commissioning of drainage
system, sewerage system, water supply system (both cold and hot water system) and water
treatment system in any types of buildings and outdoors. Our technically highly qualified
project managers, engineers and technicians meet the international standards of QA/QC for
plumbing works anywhere in the world.
What we do in plumbing installation works?
Detailed engineering
Proper estimation and selection of accessories for piping works.
Cold and hot water pipe installation through proper routing.
Drainage and sewerage piping installation.
Installation of sum pump and its testing & commissioning.
Installation of water transfer pump and its testing & commission
Installation of water tanks and its testing and commissioning
Installation of water treatment system and its testing and commissioning. Central
water heater installation and its testing and commissioning.
Central solar water heater system and its testing and commissioning.
FIC connection in coordination with local authorities.
Water main connection in coordination with local authorities.
All necessary liaison work with local authorizes for final connections to the building or
outdoors.
![Page 11: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/11.jpg)
Enhancing Technology Page 11 of 45
FIRE PROTECTION SYSTEM
We do complete firefighting, fire detection and alarm system to meet civil defense authority
requirements in UAE.
Design
Detailed Engineering
Procurement
Installation
Testing and Commissioning
will be done as per the civil defense authority requirements. All the materials used for
installation are UL listed and also listed in Vendor list. We have capability to do Piping work and
Cabling work for Firefighting and Fire detection & alarm system for any type of building as per
civil defense approved drawings.
LOW CURRENT SYSTEM
CME is expertise in Building Low current systems like CCTV, Access control system, Lighting
control, Structured data cabling, Communication systems, Public addressing systems, etc.,
Our expert team full fills the requirements of the Client, Consultant and Main Contractor in the
fields of;
Design
Detailed Engineering
Procurement & Material Supply
Installation
Testing & Commissioning
RENEWABLE ENERGY
CME is DEWA (Dubai Electricity and Water Authority) certified Solar Energy Contractor. We
dedicated to advancing the popularization of renewable energy, energy efficiency, sustainable
clean technology and we help in the fight to reduce emissions and provide a cleaner, greener
environment for future generations. To mark this milestone, our R&D and Project Management
Team are up-to-date with exciting inventions and Developments in Green Energy and Energy
Efficiency Technologies. Our Products and Projects are carefully researched and designed to
pinpoint opportunities for return on your investment and profitability provide Customers with
access to the best industrial practices and services.
R&D
Detailed Engineering
Construction & Project Management of;
o Solar PV Plants
o Solar Thermal
o Micro Wind Turbines
o Biomass Gasifier
![Page 12: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/12.jpg)
Enhancing Technology Page 12 of 45
TOTAL IT SOLUTIONS
CME maintains a diverse Project portfolio which targets major Industrial and Commercial
Clients. CME is now at your disposal, on-site PC/Network/Server maintenance or remote
troubleshooting. CME IT Solutions services reduce the baseline expenses and increase
efficiency and reliability at a lower cost. Clients can depend on CME IT Division for any type of
technical support for their Organization. We Specialized in;
IT Infrastructure development – WAN/LAN Design & Installation
Network System Optimization & Maintenance
Spyware/Malware and Virus removal
Office Automation - Document Management System & ERP Solutions
Open Source Solutions & Software development
Voice Over IP (VoIP) Solutions for Business
Cloud Computing, Remote Server and File Access
Windows® and Linux® based server setup
PROJECT MANAGEMENT & TECHNICAL SITE SERVICES
We have experienced Designing Team, Project Managers, Planners, QA/QC Engineers, HSE
Engineers, Material Managers, Electrical & Mechanical Inspectors (including Hazardous area),
Supervisors and Technical Staffs to manage the Projects. We can provide this technical service
independent of the sub-contract, to enable the client flexibility in the choice of the contract.
TESTING & COMMISSIONING
Once the construction team has completed the installations, our technical specialists begin to
test the E&I system and equipments both electrically and functionally. The E&I testing group
use state the art of Instruments to ensure that individual components in Electrical/Instrument
system are meet the latest project design documents issued for construction. This is followed
by functionality testing as per the Project pre-commissioning procedure to ensure the
operation as designed and to ensure safety standards and integrity of the E&I system.
Our specialists rely on their intimate knowledge and understanding of Electrical and
Instrumentation systems to provide customers with start-up assistance and prompt resolution
to problems that may occur. A complete report will be submitted for the end user, detailing all
tests performed as well as any changes to as-built drawings made during the testing and
commissioning of equipments. These original test sheets prove invaluable to the maintenance
planner by forming the nucleus of the maintenance program allowing for convenient tracking
of subsequent tests against the original condition of the equipments. We can provide this
service independent to the I&E installation contract, to enable the client flexibility in the choice
of the contract.
![Page 13: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/13.jpg)
Enhancing Technology Page 13 of 45
TECHNICAL WRITING, MANUAL COMPOSITION & TRAINING
We undertake development of a clear, concise and complete Manual for Operation &
Maintenance (O&M) and HSE. The manuals can be set up to be as comprehensive or as straight
forward as the end user requires.
CME can offer specialized training course designed to meet the end user requirements. These
courses can be arranged both at our offices, at the customer premises or at the manufacturer’s
premises.
AFTER SALES SERVICES
CME offers its clients comprehensive after sales service. A comprehensive maintenance
agreement can be entered into thus providing the customer with priority fault attendance and
also ensures that the equipment undergoes specific periodic maintenance.
TRADING - PROCUREMENT & MATERIAL SUPPLIES
CME leverages core competencies of our Trading division to provide our Customers with global
procurement and material supply services that are unsurpassed in the industry. We execute
sourcing & delivery of products and equipments to Oil & Gas, Petrochemical, Power
Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process Automation,
Information Technology Projects and Manufacturing industries in all over Middle East, Iraq and
Africa and includes following:
Electrical & Instrumentation equipments
E&I Bulk materials, consumables and accessories
HVAC equipment & supplies
Safety & Protection equipments
Our Trading Division offers twin benefits to Clients and Projects by engaging them to meet the
Procurement needs of Projects which CME is undertaken for Management / Construction.
QUALITY ASSURANCE
We implement quality standards that comply with ISO standards and have been approved for
previous oil and gas industry projects. It is the policy and continuing objective of CME to
provide its customers with a service of consistent quality, at a competitive price which will
satisfy the known or stated technical and contractual requirements.
CME is an ISO 9001:2015 standard certified organization and we endeavor to improve
continually all aspects of its business by seeking to achieve a total quality environment, by
monitoring and reviewing its service. The business philosophy of CME is to achieve growth,
based upon a commitment to quality assurance. In order to achieve our objectives, the above
policy statement is supported with a quality system and involves all aspects of the Company’s
![Page 14: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/14.jpg)
Enhancing Technology Page 14 of 45
business. All personnel working with the Company were well aware and appreciate this
continuing commitment to quality.
HSE PROTECTION POLICY
CME is an OHSAS 18001:2007 and ISO 14001:2015 standards certified Organization. The
Company is committed to provide a safe, healthy and secured work place for its employees.
The Company is keen to ensure good communication links are maintained with employees and
sub-contractors and that all affected personnel are informed about our health and safety policy
and the organization and arrangements for carrying it out, together with their own safety
responsibilities prior to starting work. The company policy is defined and strongly driven by the
implementation of following management principles and behaviors:
Prepare and keep up-to-date a Statement of the Company Policy for Health, Safety &
Environment. Ensure that it is brought to the notice of all Employees and Sub-contractors
and are followed.
Set up a system of disciplinary procedures for cases where a breach of this policy occurs or
where duties are not properly carried out. Disciplinary procedures could result in minor
instances of reprimand or warning, and for further breaches: suspension without pay e.g.
for rest of the day, warning of dismissal and dismissal itself.
Training, awareness and capacity building of employees on the en-listed health, safety &
environment standards.
Prevention of pollution to the environment, arisen from our business operation.
Demonstrating the Company's commitment to best HSE practice to employees and
supervisory staff through ongoing attention to detail in all matters of practical application
of current Health, Safety & Environment policy, arrangements, procedures and equipment
and substances.
Continuously monitor and Review both policy and feedback concerning Health, Safety &
Environment procedures and situations in order to identify and implement improvements.
Extend cooperation to clients, stake-holders and local Authorities.
To comply with relevant legal legislation.
![Page 15: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/15.jpg)
Enhancing Technology Page 15 of 45
1.2. CORPORATE ORGANIZATION CHART
HR & ADMIN
Department
Procurement
Department
Director
Business
Development
Director
Projects
QHSE
Deparment
Engineering &
Estimation
Department
Construction
Management
Sales/Marketing
Department
Proposal
Department
ORGANIZATIONAL CHART
BOARD OF DIRECTORS
Accounts
Department
Managing
Director
Projects
Department
Management
Representative
![Page 16: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/16.jpg)
Enhancing Technology Page 16 of 45
1.3. ORGANIZATION’S RESOURCES
1.3.1. LIST OF MANAGEMENT & NON-MANAGEMENT CATEGORY STAFF (As on 31st Dec.2016)
SL NO DESIGNATION QTY
TOP MANAGEMENT
1 Managing Director 1
2 Director - Projects 1
3 Business Development Director 1
MID-LEVEL MANAGEMENT STAFF (CORPORATE)
1 Administration Department 1
2 HR Department 1
3 Accounts Department 1
4 Procurement Department 1
5 Quality Department 1
6 HSE Department 1
7 Sales/Marketing department 1
8 Estimation/Proposal/Planning Department 3
MID-LEVEL MANAGEMENT STAFF (PROJECT/FACILITIES)
1 Engineering Department 19
2 Project Management 6
NON-MANAGEMENT STAFF (SUPERVISORS/TECHNICIANS)
1 Construction Management 140
![Page 17: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/17.jpg)
Enhancing Technology Page 17 of 45
1.3.2. LIST OF PLANT, MACHINERY, EQUIPMENT & TOOLS
DESIGN ENGINEERING TOOL / SOFTWARES
SL NO DESCRIPTION
1 MS Primavera (Project Planning)
2 AUTOCAD (Design)
3 PDMS (Electrical & Instrumentation software)
4 ETAP (Electrical Engineering software)
5 Duct sizer software (HVAC)
6 HAP (HVAC)
LIST OF ELECTRICAL MEASUREMENT DEVICES
SL NO INSTRUMENTS DESCRIPTION QUANTITY
1 Multimeter 19
2 Megger 14
3 Cable ferrule printing machine 1
4 Clamp meter 18
LIST OF HVAC COMMISSIONING DEVICE
SL NO INSTRUMENTS DESCRIPTION QUANTITY
1 Micrometer 1
2 Balometer & Manometer 1
3 Thermal Anemometer 1
4 Pitot tube 1
5 Rotating vane anemometer 1 6 Gauge manifold 1
7 Digital temperature humidity meter 2
LIST OF INSTRUMENT CALIBRATION DEVICES
SL NO INSTRUMENTS DESCRIPTION QUANTITY
1 4-20 mA meter 6
2 Hard communicator 5
3 Pressure calibrator / hand pump (Make - Additel) 2
4 Fluke loop calibrator 2
5 Digital pressure gauge 2
![Page 18: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/18.jpg)
Enhancing Technology Page 18 of 45
CONTENT OF ELECTRICIAN TOOLS KIT
SL NO TOOLS DESCRIPTION SL NO TOOLS DESCRIPTION
1 Measuring Tape 19 Flat Chisel
2 T5 Wire Strippers 20 Allen Key
3 Screwdriver, Heavy Duty 21 Center Punch
4 Screwdriver, Star 22 Adjustable Wrench
5 Diagonal Cutting Pliers, 8” 23 Pipe Wrench
6 Side-cutting Pliers, 10” 24 Flat File
7 Right Angle 25 Square & Round File
8 Stripping Pliers 26 Spirit Level
9 Channel Pliers 27 Crimping Tools Boot Type
10 Nose Pliers 28 Rubber Hammer
11 Ratchet Spanners 29 Hammer – Electricians
12 Spanner Set 30 Hacksaw Frame
13 Monkey Spanner 31 Mini Hacksaw Frame
14 Adjustable Spanner 32 Utility Razor Knife & Blades
15 Spanner Double End 33 Electrical Tape
16 Spanner Ring 34 Line Tester
17 Combination Spanner 35 Line Daury
18 Hex Key Wrench Set 36 Black / white Permanent Marker
TOTAL NO. OF ELECTRICIAN’S TOOLKITS - 80
![Page 19: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/19.jpg)
Enhancing Technology Page 19 of 45
CONTENT OF INSTRUMENT FITTERS / TECHNICIANS TOOL KIT
TOTAL NO. OF INSTRUMENT FITTER’S / TECHNICIAN’S TOOL KIT - 30
NOTE: Appropriate PPE’s (Personnel Protective Equipment) shall be issued to all employees,
upon his nature of the work/activity
SL NO TOOLS DESCRIPTION
SL NO TOOLS DESCRIPTION
1 Tool Pouch and Belt 18 Set of Crescent Wrenches
2 Folding Rule (or 25" tape measure) 19 Flux 477
3 Pair Needle Nose Pliers 20 Set Allen Wrenches to 1/2"
4 Pocket Level 21 Stakon Tool
5 Pair side cutter pliers
22 Set Tap Wrenches
6/32,8/32,10/24,1/2, 1/4-2
6 Pocket Knife 23 Fish Tape Holder
7 Pair Channel Lock Pliers 24 Chalk Line
8 Large Screw Driver 25 Set Nut Drivers
9 Wire skinners 26 Plumb Bob
10 Hammer 27 Pair Tin Snips
11 Hacksaw 28 Keyhole Saw
12 Small Screw Driver 29 Center Punch
13 Medium Screw Driver 30 Cold Chisel (small & large)
14 Rat Tail File 31 1/4" Bender
15 Receptacle Tester (GFI) 32 1/2" Bender
16 1/2" - 2" KO set 33 3/8” Bender
17 Volt/Amp Meter
![Page 20: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/20.jpg)
Enhancing Technology Page 20 of 45
LIST OF HEAVY EQUIPMENT & MACHINERY
SL NO DESCRIPTION OF ITEMS QTY
1 Hand Drilling Machine 26
2 Grinding Machines 4.5’’ 19
3 Grinding Machines 7" 28
4 Generator 25 KVA 1
5 Cable Rollers Adequate
6 Heavy Cable Jack 15 Set
7 Angle Grinder 115MM 21
8 Gear Hammer Drill Machine 15
9 Hole saw cutter 29
10 Crimping tool 4
11 Chop saw cutter 14” 13
12 Passenger Vehicle (12 seats) 2
13 Passenger Vehicle (56 seats) 2
14 Staff Vehicle (4 seats) 4
![Page 21: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/21.jpg)
Enhancing Technology Page 21 of 45
2.1. PROJECT EXPERIENCE
OIL & GAS DIVISION
Name of the Project HEJP - BULK LIQUID TERMINAL IN JAFZA
Client / Nature of Work ENOC - Engineering, Procurement, Construction, Testing and
Commissioning of Electrical & Instrumentation systems for
Loading Bay Pickup coils, Batch controller and High mast lighting
Work Site UAE
Year 2017
Name of the Project STP PLANT
Client / Nature of Work Global Engineering - Engineering, Installation, Testing &
Commissioning of E&I Systems
Work Site UAE – Abu Dhabi
Year 2016
Name of the Project AL TAWEELAH ALUMINA CALCINATION
Client / Nature of Work Outotec
Project Procurement & Material Supply
Work Site UAE – Abu Dhabi
Year 2016
Name of the Project SARB FIELD DEVELOPMENT PROJECT
Client / Nature of Work ADMA / Quality International
Engineering, Installation, Testing & Commissioning of E&I
Systems
Work Site UAE - Hamriyah FZ, Sharjah
Year 2016
Name of the Project E&I WORKS IN TRUCK LOADING BAY
Client / Nature of Work AEGEAN Oil Terminal Corporation / Quality International
Engineering, Installation, Testing & Commissioning of E&I
Systems
Work Site UAE – Fujairah
Year 2016
![Page 22: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/22.jpg)
Enhancing Technology Page 22 of 45
Name of the Project BPGIC OIL TERMINAL PHASE-1
Client / Nature of Work BPGIC / Audex
Engineering, Supply, Installation of HVAC equipment, Duct work
etc. Testing, Commissioning of the HVAC System.
Work Site UAE - Fujairah
Year 2016
Name of the Project UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT EPC-
2
Client / Nature of Work Tozzi Zud / COMART- HUNDAI- ADMA
Detailed Engineering, Installation, Testing & Commissioning of
E&I Systems
Work Site UAE - Hamriya FZ, Sharjah
Year 2015
Name of the Project ZAKUM OIL LINES REPLACEMENT
Client / Nature of Work Al Shabia / GASCO - Detailed Engineering, Installation, testing &
commissioning of E&I Systems
Work Site UAE - Jabel Ali, Dubai
Year 2015
Name of the Project DUGAS EXPANSION
Client / Nature of Work Dugas / Cylingas
Cable laying
Work Site Jabel Ali, Dubai
Year 2015
Name of the Project CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FZ (EPC-2)
Client / Nature of Work Archirodon - Project Procurement & Material Supply
Work Site UAE - Dubai
Year 2015
![Page 23: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/23.jpg)
Enhancing Technology Page 23 of 45
Name of the Project AKZO NOBEL POWER COTTING PLANT
Client / Nature of Work AKZONOBEL / Al Shabia.
Detailed Engineering, Supply of Electrical / Instrumentation
materials, Installation, Testing & Commissiong.
Work Site UAE - Dubai
Year Jun 2014 – May 2015
Name of the Project OIL TERMINAL AT HAMRIYAH FREE ZONE
Client / Nature of Work ADNOC DISTRIBUTION / TAKREER / SINOPEC.
Installation of PLC Panels, Electical systems, Cabling, installation
of HVAC equipment, Duct work etc. Testing, Commissioning of
the HVAC System.
Work Site UAE - Sharjah
Year 2013
Name of the Project E&I WORKS FOR SHELTERS
Client / Nature of Work GASCO / Al Shabia.
E&I Works including installation & testing of Electrical items &
Instruments.
Work Site UAE – Hamriya FZ, Sharjah
Year 2014
Name of the Project PROJECT FALCON- BULK LIQUID TERMINAL IN JAFZA & JETFUEL
PIPELINE TO DIA OF HORIZON JEBEL ALI TERMINAL
LIMITED(HJTL)
Client / Nature of Work ENOC / Punj Lloyd, Detailed (shop drawings) Engineering and
supervision of construction, testing, pre-commissioning of
Electrical & Instrumentation systems
Work Site UAE
Year May 2013 – Aug 2014
![Page 24: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/24.jpg)
Enhancing Technology Page 24 of 45
Name of the Project FMC METERING SKID
Client / Nature of Work KOC / FABTECH
Work Site UAE
Year 2013
Name of the Project GAS FIELD DEVELOPMENT PROJECT SKIDS
Client / Nature of Work GASTECH / FABTECH.
E&I Works for Skid packages including installation & testing of
Electrical items & Instruments.
Work Site UAE
Year 2012
Name of the Project ELECTRICAL WORKS FOR VISEN POLYMERS PLANT
Client / Nature of Work Visen Polymers FZE.
Engineering, supply, site construction, testing and
commissioning Electrical / Instrumentation System for full plant
including tank farm area, storage area, process plant area,
storage facility and office administration block
Work Site UAE
Year Jun 2012 - Aug2014
Name of the Project OIL TERMINAL AT HAMRIYAH FREE ZONE (EPC-1)
Client / Nature of Work ADNOC DISTRIBUTION / TAKREER / SYNOPEC.
Engineering, procurement and Supply of Electrical systems, PLC
Controls, Cable / duct support system, HVAC equipments
Work Site UAE
Year Dec 2012 – May 2014
![Page 25: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/25.jpg)
Enhancing Technology Page 25 of 45
Name of the Project E&I SITE SERVICES FOR GARRAF AREA DEVELOPMENT PROJECT
Client / Nature of Work Petronas / Weatherford / Lakeshore Toltest Corporation.
Installation, site Supervision, testing & commissioning
assistance for electrical & instrumentation works at Garraf
Development Area - Gas Treatment Plant.
Work Site IRAQ - Garraf
Year Dec 2012 – Mar 2014
Name of the Project IRAQ CRUDE OIL EXPORT EXPASION PROJECT
Client / Nature of Work South Oil Company/ Leighton Offshore PTE LTD.
Engineering, procurement, Supply, Installation and supervision
of construction, testing, commissioning / start-up of HVAC
systems for two substations, Electrical / Controls Systems in
Basrah.
Total Project Capacity: 160 Tr
Work Site IRAQ - Basrah
Year April 2012 – Jan 2014
Name of the Project IGD - DAS ISLAND PROJECT
Client / Nature of Work ADGAS / Quality Int’l
Work Site UAE – Hamriya FZ, Sharjah
Year 2012
Name of the Project GASTECH SKIDs
Client / Nature of Work GASTECH / FABTECH
Engineering, Installation, site Supervision, testing &
commissioning assistance for electrical & instrumentation
works
Work Site UAE – Jabel Ali, Dubai
Year 2012
![Page 26: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/26.jpg)
Enhancing Technology Page 26 of 45
Name of the Project STAR ENERY PROJECT
Client / Nature of Work STAR ENERY
Project Material Procurement & Supply
Work Site UAE – Jabel Ali, Dubai
Year 2012
Name of the Project ADGAS INTEGRATED GAS DEVELOPMENT PROJECT
Client / Nature of Work Hyundai Heavy Industries.
Engineering, Construction and testing of E&I works for Pipeline
Bridges, Jackets, HP and LP Flare Towers
Work Site UAE
Year April 2012 to November 2012
Name of the Project ADGAS INTEGRATED GAS DEVELOPMENT PROJECT
Client / Nature of Works Hyundai Heavy Industries.
Site installation and testing of E&I items and equipment for Gas
Trains
Work Site UAE
Year April 2012 to October 2012
Name of the Project VOPAK HORIZON FUJAIRAH LTD. EXPANSION PROJECT PHASE -
VI
Work Site Fujairah, UAE
Year June 2011 – March 2012
Name of the Project PETROFAC INTERNATIONAL CONDENSATE STORAGE FLOATING
ROOF TANK NO. 202 REFURBISHMENT PROJECT
Client Petrofac
Engineering, Procurement & Construction of E&I works for Oil
Storage Tanks including linear heat detection system
Work Site Hamriyah Free Zone, UAE
Year November 2011 to April 2012
![Page 27: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/27.jpg)
Enhancing Technology Page 27 of 45
Name of the Project ABU DHABI MILITARY COMMAND PROJECT
Work Site Abu Dhabi, UAE
Year July 2010 to September 2010
Name of the Project JORDAN REFINERY EXPANSION PROJECT
Work Site Amman, Jordan
Year April 2010 – October 2010
Name of the Project PEARL GTL PROJECT, QATAR
Client / Nature of Work Engineering, Supply, Site Construction & testing of electrical and
instrumentation works associated with LIN Tank.
Work Site QATAR
Year July 2009 – April 2010
Name of the Project ENOC LUBE OIL PLANT, FUJAIRAH
Client / Nature of work ENOC/Concilium/Intron
E&I Installation works, Pre commissioning & commissioning
assistance job for the Tank farm job at ENOC LUBE OIL plant in
Fujairah.
Work Site Fujairah
Year 2009
Name of the Project LPG GAS COMPRESSION PLANT KAZAKHSTAN
Client / Nature of work E&I works for Skid packages including Construction & Testing of
electrical and instrumentation
Work Site UAE
Year February 2009 – July 2009
Name of the Project VOPAK HORIZON FUJAIRAH LTD.
EXPANSION PROJECT PHASE - V
Work Site UAE - Fujairah
Year October 2008 – April 2009
![Page 28: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/28.jpg)
Enhancing Technology Page 28 of 45
Name of the Project UPGRADATION OF EXISTING GAS CONTROL STATION
Work Site Dubai, UAE
Year July 2008 – February 2009
Name of the Project PETROFAC INT’L CONDENSATE STORAGE REFURBISHMENT
PROJECT
Client / Nature of Work Petrofac / CB&I.
Engineering, Procurement & Construction of E&I works for Oil
Storage Tanks including linear heat detection system.
Work Site UAE - Sharjah
Year 2008
Name of the Project LPG RECOVERY PLANT, KHOR MOR, IRAQ
Work Site Belelli Energy Yard, Sharjah UAE
Year March 2008 – December 2008
MEP DIVISION
Name of the Project LA MER – JUMEIRA OPEN BEACH RETAIL
Client / Nature of Work Al Futtaim Carilliom LLC
Installation, Testing & Commissioning of Electrical and Low
current services.
Work Site Jumeira Beach, Dubai
Year 2017
Name of the Project BLUEWATERS HOSPITALITY
Client / Nature of Work James L Williams Middle East
Installation, Testing & Commissioning of Electrical works
including Power cable lying, glanding & termination, Low
current services, etc.
Work Site Bluewater Island, Dubai
Year 2017
![Page 29: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/29.jpg)
Enhancing Technology Page 29 of 45
Name of the Project HOLIDAY INN HOTEL
Client / Nature of Work Al Futtaim Engineering
Detailed Engineering, Installation, Testing & Commissioning of
Electrical works including Power cable lying, glanding &
termination, Low current services, etc.
Work Site Dubai festival city
Year 2016
Name of the Project INTERSUN OFFICE RENOVATION
Client / Nature of Work Naga / Intersun.
Engineering, Procurement, Construction of Electrical, Plumbing
and HVAC works and Testing & Commissioning.
Work Site Jabel Ali, Dubai
Year 2015
Name of the Project OFFICE BUILDING FOR LANDMARK GROUPS
Client / Nature of Work Trans Gulf.
E&I Containments, Works & FO Cable laying & splicing
Work Site Dubai Marina
Year 2015
Name of the Project LV CABLE LAYING – DEWA
Client / Nature of Work DEWA / Scan Power.
LV Cable laying
Work Site Dubai / Various
Year 2015
Name of the Project VICEROY HOTEL, PALM JUMEIRAH
Client / Nature of Work China State Construction Engineering Corporation.
Detailed Engineering, Installation, Testing & Commissioning of
Electrical works including Power cable lying, glanding &
termination, etc.
Work Site Dubai, UAE
Year 2014
![Page 30: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/30.jpg)
Enhancing Technology Page 30 of 45
Name of the Project AL AMAL PSYCHIATRIC HOSPITAL
Client / Nature of Work China State Construction Engineering Corporation.
Detailed Engineering, Installation, Testing & Commissioning of
Electrical works including Power cable lying, glanding &
termination, etc.
Work Site Dubai, UAE
Year August 2014 to December 2014
Name of the Project YAS MALL, YAS ISLAND
Client / Nature of Work VOLTAS Ltd.
Detailed Engineering, Installation, Testing & Commissioning of
Electrical works including Power cable lying, glanding &
termination, etc.
Work Site Abu Dhabi, UAE
Year August 2012 to December 2013
Name of the Project AL RAWABI FARM
Client / Nature of Work Al Rawabi Dairy Farm
Detailed Engineering, Installation, Testing & Commissioning of
Electrical works including Complete substation works.
Work Site Dubai, UAE
Year August 2011 to July 2013
Name of the Project INSTALLATION OF FO CABLE & ACCESSORIES – PHASE 5
Client / Nature of Work Etisalat / Installation & commissioning works including laying &
splicing of FO cables
Work Site UAE
Year September 2009 to January 2010
![Page 31: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/31.jpg)
Enhancing Technology Page 31 of 45
2.2. CLIENT LIST
![Page 32: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/32.jpg)
Enhancing Technology Page 32 of 45
2.3. LICENSE, PROFESSIONAL REGISTRATION & MEMBERSHIPSHIP CERTIFICATE
![Page 33: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/33.jpg)
Enhancing Technology Page 33 of 45
![Page 34: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/34.jpg)
Enhancing Technology Page 34 of 45
![Page 35: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/35.jpg)
Enhancing Technology Page 35 of 45
![Page 36: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/36.jpg)
Enhancing Technology Page 36 of 45
![Page 37: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/37.jpg)
Enhancing Technology Page 37 of 45
![Page 38: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/38.jpg)
Enhancing Technology Page 38 of 45
3.1. MANAGEMENT SYSTEM CERTIFICATIONS
Quality - ISO 9001:2015 (Head Office)
![Page 39: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/39.jpg)
Enhancing Technology Page 39 of 45
Quality - ISO 9001:2015 (Dubai Office)
![Page 40: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/40.jpg)
Enhancing Technology Page 40 of 45
Occupational Health & Safety - BS OHSAS 18001:2007 (Head Office)
![Page 41: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/41.jpg)
Enhancing Technology Page 41 of 45
Occupational Health & Safety - BS OHSAS 18001:2007 (Dubai Office)
![Page 42: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/42.jpg)
Enhancing Technology Page 42 of 45
Environment - ISO 14001:2015 (Head Office)
![Page 43: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/43.jpg)
Enhancing Technology Page 43 of 45
Environment - ISO 14001:2015 (Dubai Office)
![Page 44: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/44.jpg)
Enhancing Technology Page 44 of 45
3.2. MANAGEMENT SYSTEM MANUALS
3.2.1. Quality (INDEX PAGE ONLY)
LIST OF CONTENTS
1. SCOPE
2. APPLICABILITY
3. QMS REFERENCES AND DEFINITIONS
3.1 QMS References
3.2 QMS Definitions
4. QUALITY MANAGEMENT SYSTEM REQUIREMENTS
4.1 General Requirements
4.2 Documentation Requirements
5. MANAGEMENT RESPONSIBILITY
5.1 Management Commitment
5.2 Customer Focus
5.3 Quality Policy
5.4 Planning
5.5 Responsibility, Authority and communication
5.6 Management Review
6. RESOURCE MANAGEMENT
6.1 Provision of Resources
6.2 Human Resources
6.3 Infrastructure
6.4 Work Environment
7. PRODUCT REALIZATION
7.1 Planning of Product Realization
7.2 Customer Related Processes
7.3 Design and Development
7.4 Purchasing
7.5 Production & Service Provision
7.6 Control of Monitoring and Measuring Equipment
8. MEASUREMENT, ANALYSIS AND IMPROVEMENT
8.1 General
8.2 Measurement and Monitoring
8.3 Control of Nonconformity
8.4 Analysis of Data
8.5 Improvement
![Page 45: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values](https://reader031.vdocument.in/reader031/viewer/2022021512/5ae50d7c7f8b9a7b218f304c/html5/thumbnails/45.jpg)
Enhancing Technology Page 45 of 45
3.2.2. Health, Safety & Environment (INDEX PAGE ONLY)
LIST OF CONTENTS
A. Description of the HSE Management System Manual
B. HSE Management System Procedures
1. Scope
2. Reference Publications
3. Terms & Definitions
4. HSE Management Requirements
4.1. General Requirements
4.2. HSE Policy
4.3. Planning
4.3.1. Environmental Aspects, Hazard Identification, Risk Assessment and
Determining Controls
4.3.2. Legal and other Requirements
4.3.3. Objectives ,Targets and Programs
4.4. Implementation and Operations
4.4.1. Resources, Roles, Responsibility, Accountability and Authority
4.4.2. Competence, Awareness and Training
4.4.3. Communications, Participation and Consultation
4.4.4. Documentation
4.4.5. Control of Documents
4.4.6. Operation Control
4.4.7. Emergency Preparedness and Response
4.5. Checking
4.5.1. Performance Measurement and Monitoring
4.5.2. Evaluation of Compliance
4.5.3. Incident Investigation, Nonconformance, Corrective action & Preventive action
4.5.4. Control of Records
4.5.5. Internal Audit
4.6. Management Review
4.7. Appendices
Annexure 1 – HSE Policy
Annexure 2 – Smoking & Substance Abuse Policy
Annexure 3 – Organization Chart
Annexure 4 – HSE Objectives
Annexure 5 – Emergency Contact Numbers.