HEAD OFFICE DUBAI OFFICE P O Box: 32410, Sharjah, UAE P O Box: 94360, Dubai, UAE Tel: +971 6 5757701 Fax: +971 6 5757802 Tel: +971 4 3925028 Fax: +971 4 3925638 Email: [email protected] Email: [email protected] Web: www.controlsme.com Web: www.controlsme.com ENHANCING TECHNOLOGY An ISO 9001:2015, OHSAS 18001:2007 & ISO 14001:2015 Certified Company COMPANY PROFILE COMPANY PROFILE

Upload: vuongminh

Post on 29-Apr-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

HEAD OFFICE DUBAI OFFICE

P O Box: 32410, Sharjah, UAE P O Box: 94360, Dubai, UAE Tel: +971 6 5757701 Fax: +971 6 5757802 Tel: +971 4 3925028 Fax: +971 4 3925638 Email: [email protected] Email: [email protected] Web: www.controlsme.com Web: www.controlsme.com

ENHANCING TECHNOLOGY An ISO 9001:2015, OHSAS 18001:2007 & ISO 14001:2015 Certified Company

COMPANY PROFILE

COMPANY PROFILE

Page 2: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 2 of 45

SECTION 1

1.1. CORPORATE PROFILE

1.2. CORPORATE ORGANIZATION CHART

1.3. ORGANIZATION'S RESOURCES:

1.3.1. LIST OF MANAGEMENT & NON-MANAGEMENT CATEGORY STAFFS

1.3.2. LIST OF PLANT, MACHINERY, EQUIPMENT & TOOLS

SECTION 2

2.1. PROJECT EXPERIENCE 2.2. CLIENT LIST

2.3. LICENSE, PROFESSIONAL REGISTRATION & MEMBERSHIPSHIP CERTIFICATE

SECTION 3

3.1. MANAGEMENT SYSTEM CERTIFICATIONS

3.1.1. QUALITY - ISO 9001:2015

3.1.2. OCCUPATIONAL HEALTH & SAFETY - BS OHSAS 18001:2007

3.1.3. ENVIRONMENT - ISO 14001:2015

3.2. MANAGEMENT SYSTEM MANUALS

3.2.1. QUALITY (INDEX PAGE ONLY)

3.2.2. HEALTH, SAFETY & ENVIRONMENT (INDEX PAGE ONLY)

Page 3: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 3 of 45

ABOUT US Controls Middle East LLC (CME) is an Integrated Quality Management System certified company

established in 2008, includes four Divisions and team for our four core services for Clients:

Detailed Engineering, Project Management/Construction, IT Solutions and Trading. CME’s head

quarter is in the Emirates of Sharjah-UAE and branch office in Dubai.

CME excels in Detailed Engineering, Procurement, Projects Management / Construction and

Commissioning of Projects; Electrical, Instrumentation, Control & Automation Systems in Oil &

Gas Projects – Early production facility (EPF), Tank Farm, Petrochemical, Process Skid Packages,

Power Generation, Water Treatment Plants, Port/Jetty and Other Industrial Projects.

Our MEP Division concentrates on infrastructure / commercial buildings projects - Hotels,

Hospitals, High rise building / Towers and Luxury Villas etc. Since inception, CME’s strength is

displayed in its capability to successfully delivering quality services that exceeds the

expectations of our esteemed customers in their complex industrial and commercial projects.

Our IT Division provides business consulting, information technology needs, engineering and

outsourcing solutions to help clients build their enterprise. Networking, system monitoring,

help desk, remote access, and on-site visits deliver proactive, maintenance & preventative

services to keep your Office Automation systems working for you.

CME specializes in the Trading of goods and commodities within the Oil & Gas, Petrochemical,

Power Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process Automation,

Information Technology Projects and Manufacturing industries. CME helps companies reduce

internal procurement expenses and expedite their entire procurement process by leveraging

long-standing relationships with vendors worldwide.

QUALITY POLICY Controls Middle East LLC (CME) will strive to become the leader in Engineering, Project

Management and Construction of Process, Electrical, Instrumentation & Control system

solutions by achieving customer satisfaction through quality service and on time delivery. Our

Quality Policy is defined and strongly driven by the following management principles and

behaviors:

Build a mutually profitable relationship with our customers

Endeavor commitments for quality, and schedule.

Meet and exceed the customer satisfaction within the contractual terms and conditions.

Drive continual improvement and innovation based upon efficient processes, well-defined

measurements, and customer surveys.

Develop staff competencies, creativity, empowerment and accountability through

appropriate development programs, trainings and management involvement and

commitment.

Page 4: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 4 of 45

WHAT DO WE SPECIALIZE IN? CME's team of industry professionals provide a wide range of services including:

Detailed Engineering

Construction & Project Management

Services for Skids

Process Control & Automation

Testing and Pre-Commissioning

Start-up & Commissioning Assistance

Operations & Maintenance

HVAC

MEP

Renewable Energy

Total IT Solutions

Technical Writing & Training

After sale services

Trading – Procurement & Material supply

OIL & GAS DIVISION CME has extensive experience in fast track projects, such as Electrical, Instrumentation, Control

& Automation and HVAC Systems in Oil & Gas Projects for; Early production facility (EPF), Tank

Farm, Petrochemical, Process Skid Packages, Power Generation, Water Treatment Plants,

Port/Jetty and Other Industrial Projects. Our project teams are comprised of qualified and

experienced professional Project Managers, Engineers, QA/QC, Safety and Construction Staff. It

is the objective of each project team to obtain the best result in terms of cost, quality, safety

and schedule.

The company has a full-fledged Detailed Engineering and Construction team with all required

facilities and has the capability to undertake works for industrial solutions covering small and

medium scale projects in Middle East, Iraq & Africa.

MEP DIVISION MEP division is leading MEP contracting company focuses on Electromechanical works – HVAC,

BMS/Building Automation Systems. Electrical - power distribution systems, lighting, backup

power system (including solar), fire detection and alarm system, small power systems – CCTV,

Access control system, Lighting control, Structured data cabling, Telephone/Public addressing/

Communication systems. Plumbing - cold and hot water, drainage, fire protection, gas,

plumbing and sanitation, rainwater, sewage treatment and swimming pools. Applications - high

rise buildings, shopping malls, offices, public buildings, defense, theatres, schools, banks, power

stations, hotels, manufacturing.

IT DIVISION CME is a multifaceted Technology & Service provider offering end-to-end IT solutions. We offer

Engineering, Network design and installation, hosting, co-location, internet and software

development. We also specialize in virtualization and high-availability solutions, 24/7 network

monitoring and support, business continuity, remote access, cloud solutions and malware

protection that are proven to increase productivity and reduce your total cost of ownership.

We ensure the right data backup and business continuity strategy. Manage critical business

systems and information through a viable IT Infrastructure — and minimize expensive down

time.

Page 5: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 5 of 45

TRADING DIVISION CME expertize in Procurement & Material supply with a vision of improving the entire

procurement experience for Clients. Timely deliveries of goods have an immediate impact on

reducing costs and increasing Companies revenue. We adopted a prescription for servicing all

facets of the procurement process and offer a systematic purchasing experience with high-end

Customer satisfaction for the Materials & Equipments used in the fields of Oil & Gas,

Petrochemical, Power Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process

Automation, Information Technology Projects and Manufacturing industries.

COMPANY DETAILS

HEAD OFFICE:

Name : Controls Middle East Measurement & Equip Fix LLC

Address : P O Box 32410

Sharjah, United Arab Emirates

Tel : +971 6 5757701

Fax : +971 6 5757802

Email : [email protected]

Website : www.controlsme.com

Bankers : RAK Bank, Sharjah Branch, United Arab Emirates

: Bank of Baroda, Sharjah Branch, United Arab Emirates

DUBAI OFFICE:

Name : Controls Middle East Electromechanical Works LLC

Address : P O Box 94360

Dubai, United Arab Emirates

Tel : +971 4 3925028

Fax : +971 4 3925638

Email : [email protected]

Website : www.controlsme.com

Bankers : Mashreq Bank, Dubai Branch, United Arab Emirates

Page 6: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 6 of 45

ELECTRICAL WORK

CME provides detailed engineering, procurement & site service teams with experienced

resources within the industry that will provide adequate support for each project till successful

completion. Our craftspeople are trained to execute routine and emergency maintenance of

industrial electrical power systems and equipment. We are prepared to perform new

construction, major shutdowns, capital expansion, plant relocation, and contract maintenance

service to clients across the Middle East, Iraq & Africa.

The services offered as part of for Electrical Construction works for Industrial Projects, which

includes Installation, Testing & Pre-Commissioning of the following items:

Power Transformer

Generator System

Uninterruptible Power Systems

Emergency Power System

Solar Power/Renewable Energy System

Bus Duct & Bus Risers

Medium Voltage Switchgear (MVSG)

Main Distribution Board (MDB)

Motor Control Centers (MCC)

Variable Frequency Drives (VFD)

Soft Starters (SS)

Interior Lightings, Street Lighting & Area Lighting

Power & Control Cabling

Cable Section and Replacement for Faulty Circuits

Earthing & Lightning Protection Systems

Reconstruction & Emergency Restoration

Equipment Relocations, Additions & Alterations

Preventive Power Maintenance Programs

INSTRUMENTATION

CME provides engineering, procurement & site services for Instrumentation covering all types

of systems under Instrumentation, Fire Alarm, Fire & Gas. The activities concentrate on medium

to large scale projects throughout Middle East, Iraq & Africa and provide highly accessible client

support and maintenance resources at short notice, which removes the costs arising out of

client dependency on support from outside the region.

Page 7: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 7 of 45

The instrumentation activity includes installation, testing, pre-commissionig and maintenance

of the followings:

All types of Instruments & Flow-metering Equipments

Instrumentation Valves & Compression Fittings

Cable support/containment systems (Tray/Trunking/Conduit work)

Impulse Tubing and Pneumatic Hookups

Signal and Instrumentation Cabling

Fire and Gas system

Fire Alarm System

Instrument field Calibration

Loop Testing

Pre-commissioning

Process commissioning assistance

End User Training

PROCESS CONTROL & AUTOMATION

CME provides Engineering, Procurement and Construction of total EPCC of Advanced Process

Control & Automation solutions to both the Industrial and Oil & Gas sector. Also, CME lead a

team with successful track records in delivering Process Control & Automation Project

Management, Fabrication, Installation and Commissioning for Project owners and Operators.

The activities are including;

Detailed Engineering

Panel Building

Remote Monitoring System

System Integration

DCS, PLC System & Programming

HMI, MMI, MIS & Supervisory Control & Data Acquisition System (SCADA)

Conversion of Pneumatic to Electronic computer control systems

Construction & Project Management in;

o Oil & Gas

o Power Generation

o Water Treatment Plants

o Manufacturing Industries

o Other Industrial Projects

Page 8: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 8 of 45

DETAILED ENGINEERING

ELECTRICAL ENGINEERING

Overall Single Line Diagram

Electrical Load List

Electrical Equipment Location Plan

Overall Cable Tray Routing Layout

Overall Earthing Layout

Overall Earthing Schematic Diagram

Overall Low Voltage Power Cable Schedule

Typical Cable Sizing calculations for LV Power Cables

Typical Cable Sizing calculations for MV Power Cables

Earthing System Calculations

Data Sheet for Electrical Cables and Bulk materials

Area lighting plan

BOM for Electrical Bulk material

INSTRUMENTATION ENGINEERING

Instrument Index

Control System IO List

Technical Specification for Control System

Control System Architecture Diagram

Control System Panel Wiring Diagram

Instrument Loop Diagram

Technical Specification for Fire & Gas Detection System

Layout for Fire & Gas Detection System

Technical Specification for Fire Fighting System

Typical Installation for Instruments, JB's, Control Panels & Cable Trays

Typical Hook-up Diagram

Data Sheet for Valves

Data Sheet for Junction Box

Data Sheet for Instrument & Control Cables

Instrumentation & Control Cables Drum Schedule

Data Sheet for Instruments

Data Sheet for Bulk materials

Instrument & Control Cable Schedule

Cable Block Diagram

JB Termination Diagram

BOM for Instrumentation Bulk materials

Page 9: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 9 of 45

Testing & pre-commissioning procedures

As-built documentation

System operation & maintenance manuals

SERVICES FOR SKID MOUNTED PACKAGES

CME provides specialized services for skid mounted packages for oil & gas and Petrochemical

Industries. The services include the following support from Design to Commissioning:

Engineering for ON-skid and OFF-skid E&I works

Cable Tray and cable routing and modeling

Instrument location layout

Installation works at fabrication yards

Integration and off-skid works at site

Testing and pre-commissioning

Commissioning support at site

HVAC SYSTEM

Over the years, CME has emerged as an expert in the design, installation and management of

mission critical refrigeration and HVAC systems in Oil & Gas sector, Industrial Project and

infrastructure projects. We specialize in optimizing system performance while reducing the use

of energy and impact on the environment. We focus our expertise on these systems because

they drive nearly half of the energy use and significantly contribute to the carbon footprint for

many of our customers.

CME undertakes following services for HVAC Systems:

DETAILED ENGINEERING

Heat load calculation using Carrier HAP 4.5 software

Detailed duct designing and sizing as per ASHRAE and SMACNA standards

Ventilation/over pressurization calculations for different areas

Preparation of Shop drawings

Preparation of necessary data sheets for submission

Approval from client and consultants

Preparation of method statements ITP and other safety related documents, as built

drawings/project closeout documents.

FABRICATION

Steel and GI ducts

Duct fittings

Structural supports for AC machines

Page 10: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 10 of 45

SUPPLY, INSTALLATION AND COMMISSIONING

We offer equipment supply, site installation, testing and commissioning services for following

items:

Air conditioning systems including DX type air handling units, package AC units, closed

control AC units, split AC units

Air cooled/water cooled chiller AC and associated systems

Chilled water pumps, thermal storage systems underground/above ground chilled water

piping values & accessories etc.

BMS / HVAC control panels

Duct heaters and variable air volumes (VAV)

Motorized shutoff dampers, blast dampers, pressure relief dampers, motorized fire and

gas damper and volume control dampers

Duct installation and fittings

Grilles, diffusers, exhaust louvers, sand trap louvers, etc.

PLUMBING

We do engineering, supply as per vendor list, install, test and commissioning of drainage

system, sewerage system, water supply system (both cold and hot water system) and water

treatment system in any types of buildings and outdoors. Our technically highly qualified

project managers, engineers and technicians meet the international standards of QA/QC for

plumbing works anywhere in the world.

What we do in plumbing installation works?

Detailed engineering

Proper estimation and selection of accessories for piping works.

Cold and hot water pipe installation through proper routing.

Drainage and sewerage piping installation.

Installation of sum pump and its testing & commissioning.

Installation of water transfer pump and its testing & commission

Installation of water tanks and its testing and commissioning

Installation of water treatment system and its testing and commissioning. Central

water heater installation and its testing and commissioning.

Central solar water heater system and its testing and commissioning.

FIC connection in coordination with local authorities.

Water main connection in coordination with local authorities.

All necessary liaison work with local authorizes for final connections to the building or

outdoors.

Page 11: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 11 of 45

FIRE PROTECTION SYSTEM

We do complete firefighting, fire detection and alarm system to meet civil defense authority

requirements in UAE.

Design

Detailed Engineering

Procurement

Installation

Testing and Commissioning

will be done as per the civil defense authority requirements. All the materials used for

installation are UL listed and also listed in Vendor list. We have capability to do Piping work and

Cabling work for Firefighting and Fire detection & alarm system for any type of building as per

civil defense approved drawings.

LOW CURRENT SYSTEM

CME is expertise in Building Low current systems like CCTV, Access control system, Lighting

control, Structured data cabling, Communication systems, Public addressing systems, etc.,

Our expert team full fills the requirements of the Client, Consultant and Main Contractor in the

fields of;

Design

Detailed Engineering

Procurement & Material Supply

Installation

Testing & Commissioning

RENEWABLE ENERGY

CME is DEWA (Dubai Electricity and Water Authority) certified Solar Energy Contractor. We

dedicated to advancing the popularization of renewable energy, energy efficiency, sustainable

clean technology and we help in the fight to reduce emissions and provide a cleaner, greener

environment for future generations. To mark this milestone, our R&D and Project Management

Team are up-to-date with exciting inventions and Developments in Green Energy and Energy

Efficiency Technologies. Our Products and Projects are carefully researched and designed to

pinpoint opportunities for return on your investment and profitability provide Customers with

access to the best industrial practices and services.

R&D

Detailed Engineering

Construction & Project Management of;

o Solar PV Plants

o Solar Thermal

o Micro Wind Turbines

o Biomass Gasifier

Page 12: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 12 of 45

TOTAL IT SOLUTIONS

CME maintains a diverse Project portfolio which targets major Industrial and Commercial

Clients. CME is now at your disposal, on-site PC/Network/Server maintenance or remote

troubleshooting. CME IT Solutions services reduce the baseline expenses and increase

efficiency and reliability at a lower cost. Clients can depend on CME IT Division for any type of

technical support for their Organization. We Specialized in;

IT Infrastructure development – WAN/LAN Design & Installation

Network System Optimization & Maintenance

Spyware/Malware and Virus removal

Office Automation - Document Management System & ERP Solutions

Open Source Solutions & Software development

Voice Over IP (VoIP) Solutions for Business

Cloud Computing, Remote Server and File Access

Windows® and Linux® based server setup

PROJECT MANAGEMENT & TECHNICAL SITE SERVICES

We have experienced Designing Team, Project Managers, Planners, QA/QC Engineers, HSE

Engineers, Material Managers, Electrical & Mechanical Inspectors (including Hazardous area),

Supervisors and Technical Staffs to manage the Projects. We can provide this technical service

independent of the sub-contract, to enable the client flexibility in the choice of the contract.

TESTING & COMMISSIONING

Once the construction team has completed the installations, our technical specialists begin to

test the E&I system and equipments both electrically and functionally. The E&I testing group

use state the art of Instruments to ensure that individual components in Electrical/Instrument

system are meet the latest project design documents issued for construction. This is followed

by functionality testing as per the Project pre-commissioning procedure to ensure the

operation as designed and to ensure safety standards and integrity of the E&I system.

Our specialists rely on their intimate knowledge and understanding of Electrical and

Instrumentation systems to provide customers with start-up assistance and prompt resolution

to problems that may occur. A complete report will be submitted for the end user, detailing all

tests performed as well as any changes to as-built drawings made during the testing and

commissioning of equipments. These original test sheets prove invaluable to the maintenance

planner by forming the nucleus of the maintenance program allowing for convenient tracking

of subsequent tests against the original condition of the equipments. We can provide this

service independent to the I&E installation contract, to enable the client flexibility in the choice

of the contract.

Page 13: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 13 of 45

TECHNICAL WRITING, MANUAL COMPOSITION & TRAINING

We undertake development of a clear, concise and complete Manual for Operation &

Maintenance (O&M) and HSE. The manuals can be set up to be as comprehensive or as straight

forward as the end user requires.

CME can offer specialized training course designed to meet the end user requirements. These

courses can be arranged both at our offices, at the customer premises or at the manufacturer’s

premises.

AFTER SALES SERVICES

CME offers its clients comprehensive after sales service. A comprehensive maintenance

agreement can be entered into thus providing the customer with priority fault attendance and

also ensures that the equipment undergoes specific periodic maintenance.

TRADING - PROCUREMENT & MATERIAL SUPPLIES

CME leverages core competencies of our Trading division to provide our Customers with global

procurement and material supply services that are unsurpassed in the industry. We execute

sourcing & delivery of products and equipments to Oil & Gas, Petrochemical, Power

Generation, MEP, HVAC, Water Treatment, Renewable Energy, Process Automation,

Information Technology Projects and Manufacturing industries in all over Middle East, Iraq and

Africa and includes following:

Electrical & Instrumentation equipments

E&I Bulk materials, consumables and accessories

HVAC equipment & supplies

Safety & Protection equipments

Our Trading Division offers twin benefits to Clients and Projects by engaging them to meet the

Procurement needs of Projects which CME is undertaken for Management / Construction.

QUALITY ASSURANCE

We implement quality standards that comply with ISO standards and have been approved for

previous oil and gas industry projects. It is the policy and continuing objective of CME to

provide its customers with a service of consistent quality, at a competitive price which will

satisfy the known or stated technical and contractual requirements.

CME is an ISO 9001:2015 standard certified organization and we endeavor to improve

continually all aspects of its business by seeking to achieve a total quality environment, by

monitoring and reviewing its service. The business philosophy of CME is to achieve growth,

based upon a commitment to quality assurance. In order to achieve our objectives, the above

policy statement is supported with a quality system and involves all aspects of the Company’s

Page 14: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 14 of 45

business. All personnel working with the Company were well aware and appreciate this

continuing commitment to quality.

HSE PROTECTION POLICY

CME is an OHSAS 18001:2007 and ISO 14001:2015 standards certified Organization. The

Company is committed to provide a safe, healthy and secured work place for its employees.

The Company is keen to ensure good communication links are maintained with employees and

sub-contractors and that all affected personnel are informed about our health and safety policy

and the organization and arrangements for carrying it out, together with their own safety

responsibilities prior to starting work. The company policy is defined and strongly driven by the

implementation of following management principles and behaviors:

Prepare and keep up-to-date a Statement of the Company Policy for Health, Safety &

Environment. Ensure that it is brought to the notice of all Employees and Sub-contractors

and are followed.

Set up a system of disciplinary procedures for cases where a breach of this policy occurs or

where duties are not properly carried out. Disciplinary procedures could result in minor

instances of reprimand or warning, and for further breaches: suspension without pay e.g.

for rest of the day, warning of dismissal and dismissal itself.

Training, awareness and capacity building of employees on the en-listed health, safety &

environment standards.

Prevention of pollution to the environment, arisen from our business operation.

Demonstrating the Company's commitment to best HSE practice to employees and

supervisory staff through ongoing attention to detail in all matters of practical application

of current Health, Safety & Environment policy, arrangements, procedures and equipment

and substances.

Continuously monitor and Review both policy and feedback concerning Health, Safety &

Environment procedures and situations in order to identify and implement improvements.

Extend cooperation to clients, stake-holders and local Authorities.

To comply with relevant legal legislation.

Page 15: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 15 of 45

1.2. CORPORATE ORGANIZATION CHART

HR & ADMIN

Department

Procurement

Department

Director

Business

Development

Director

Projects

QHSE

Deparment

Engineering &

Estimation

Department

Construction

Management

Sales/Marketing

Department

Proposal

Department

ORGANIZATIONAL CHART

BOARD OF DIRECTORS

Accounts

Department

Managing

Director

Projects

Department

Management

Representative

Page 16: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 16 of 45

1.3. ORGANIZATION’S RESOURCES

1.3.1. LIST OF MANAGEMENT & NON-MANAGEMENT CATEGORY STAFF (As on 31st Dec.2016)

SL NO DESIGNATION QTY

TOP MANAGEMENT

1 Managing Director 1

2 Director - Projects 1

3 Business Development Director 1

MID-LEVEL MANAGEMENT STAFF (CORPORATE)

1 Administration Department 1

2 HR Department 1

3 Accounts Department 1

4 Procurement Department 1

5 Quality Department 1

6 HSE Department 1

7 Sales/Marketing department 1

8 Estimation/Proposal/Planning Department 3

MID-LEVEL MANAGEMENT STAFF (PROJECT/FACILITIES)

1 Engineering Department 19

2 Project Management 6

NON-MANAGEMENT STAFF (SUPERVISORS/TECHNICIANS)

1 Construction Management 140

Page 17: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 17 of 45

1.3.2. LIST OF PLANT, MACHINERY, EQUIPMENT & TOOLS

DESIGN ENGINEERING TOOL / SOFTWARES

SL NO DESCRIPTION

1 MS Primavera (Project Planning)

2 AUTOCAD (Design)

3 PDMS (Electrical & Instrumentation software)

4 ETAP (Electrical Engineering software)

5 Duct sizer software (HVAC)

6 HAP (HVAC)

LIST OF ELECTRICAL MEASUREMENT DEVICES

SL NO INSTRUMENTS DESCRIPTION QUANTITY

1 Multimeter 19

2 Megger 14

3 Cable ferrule printing machine 1

4 Clamp meter 18

LIST OF HVAC COMMISSIONING DEVICE

SL NO INSTRUMENTS DESCRIPTION QUANTITY

1 Micrometer 1

2 Balometer & Manometer 1

3 Thermal Anemometer 1

4 Pitot tube 1

5 Rotating vane anemometer 1 6 Gauge manifold 1

7 Digital temperature humidity meter 2

LIST OF INSTRUMENT CALIBRATION DEVICES

SL NO INSTRUMENTS DESCRIPTION QUANTITY

1 4-20 mA meter 6

2 Hard communicator 5

3 Pressure calibrator / hand pump (Make - Additel) 2

4 Fluke loop calibrator 2

5 Digital pressure gauge 2

Page 18: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 18 of 45

CONTENT OF ELECTRICIAN TOOLS KIT

SL NO TOOLS DESCRIPTION SL NO TOOLS DESCRIPTION

1 Measuring Tape 19 Flat Chisel

2 T5 Wire Strippers 20 Allen Key

3 Screwdriver, Heavy Duty 21 Center Punch

4 Screwdriver, Star 22 Adjustable Wrench

5 Diagonal Cutting Pliers, 8” 23 Pipe Wrench

6 Side-cutting Pliers, 10” 24 Flat File

7 Right Angle 25 Square & Round File

8 Stripping Pliers 26 Spirit Level

9 Channel Pliers 27 Crimping Tools Boot Type

10 Nose Pliers 28 Rubber Hammer

11 Ratchet Spanners 29 Hammer – Electricians

12 Spanner Set 30 Hacksaw Frame

13 Monkey Spanner 31 Mini Hacksaw Frame

14 Adjustable Spanner 32 Utility Razor Knife & Blades

15 Spanner Double End 33 Electrical Tape

16 Spanner Ring 34 Line Tester

17 Combination Spanner 35 Line Daury

18 Hex Key Wrench Set 36 Black / white Permanent Marker

TOTAL NO. OF ELECTRICIAN’S TOOLKITS - 80

Page 19: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 19 of 45

CONTENT OF INSTRUMENT FITTERS / TECHNICIANS TOOL KIT

TOTAL NO. OF INSTRUMENT FITTER’S / TECHNICIAN’S TOOL KIT - 30

NOTE: Appropriate PPE’s (Personnel Protective Equipment) shall be issued to all employees,

upon his nature of the work/activity

SL NO TOOLS DESCRIPTION

SL NO TOOLS DESCRIPTION

1 Tool Pouch and Belt 18 Set of Crescent Wrenches

2 Folding Rule (or 25" tape measure) 19 Flux 477

3 Pair Needle Nose Pliers 20 Set Allen Wrenches to 1/2"

4 Pocket Level 21 Stakon Tool

5 Pair side cutter pliers

22 Set Tap Wrenches

6/32,8/32,10/24,1/2, 1/4-2

6 Pocket Knife 23 Fish Tape Holder

7 Pair Channel Lock Pliers 24 Chalk Line

8 Large Screw Driver 25 Set Nut Drivers

9 Wire skinners 26 Plumb Bob

10 Hammer 27 Pair Tin Snips

11 Hacksaw 28 Keyhole Saw

12 Small Screw Driver 29 Center Punch

13 Medium Screw Driver 30 Cold Chisel (small & large)

14 Rat Tail File 31 1/4" Bender

15 Receptacle Tester (GFI) 32 1/2" Bender

16 1/2" - 2" KO set 33 3/8” Bender

17 Volt/Amp Meter

Page 20: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 20 of 45

LIST OF HEAVY EQUIPMENT & MACHINERY

SL NO DESCRIPTION OF ITEMS QTY

1 Hand Drilling Machine 26

2 Grinding Machines 4.5’’ 19

3 Grinding Machines 7" 28

4 Generator 25 KVA 1

5 Cable Rollers Adequate

6 Heavy Cable Jack 15 Set

7 Angle Grinder 115MM 21

8 Gear Hammer Drill Machine 15

9 Hole saw cutter 29

10 Crimping tool 4

11 Chop saw cutter 14” 13

12 Passenger Vehicle (12 seats) 2

13 Passenger Vehicle (56 seats) 2

14 Staff Vehicle (4 seats) 4

Page 21: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 21 of 45

2.1. PROJECT EXPERIENCE

OIL & GAS DIVISION

Name of the Project HEJP - BULK LIQUID TERMINAL IN JAFZA

Client / Nature of Work ENOC - Engineering, Procurement, Construction, Testing and

Commissioning of Electrical & Instrumentation systems for

Loading Bay Pickup coils, Batch controller and High mast lighting

Work Site UAE

Year 2017

Name of the Project STP PLANT

Client / Nature of Work Global Engineering - Engineering, Installation, Testing &

Commissioning of E&I Systems

Work Site UAE – Abu Dhabi

Year 2016

Name of the Project AL TAWEELAH ALUMINA CALCINATION

Client / Nature of Work Outotec

Project Procurement & Material Supply

Work Site UAE – Abu Dhabi

Year 2016

Name of the Project SARB FIELD DEVELOPMENT PROJECT

Client / Nature of Work ADMA / Quality International

Engineering, Installation, Testing & Commissioning of E&I

Systems

Work Site UAE - Hamriyah FZ, Sharjah

Year 2016

Name of the Project E&I WORKS IN TRUCK LOADING BAY

Client / Nature of Work AEGEAN Oil Terminal Corporation / Quality International

Engineering, Installation, Testing & Commissioning of E&I

Systems

Work Site UAE – Fujairah

Year 2016

Page 22: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 22 of 45

Name of the Project BPGIC OIL TERMINAL PHASE-1

Client / Nature of Work BPGIC / Audex

Engineering, Supply, Installation of HVAC equipment, Duct work

etc. Testing, Commissioning of the HVAC System.

Work Site UAE - Fujairah

Year 2016

Name of the Project UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT EPC-

2

Client / Nature of Work Tozzi Zud / COMART- HUNDAI- ADMA

Detailed Engineering, Installation, Testing & Commissioning of

E&I Systems

Work Site UAE - Hamriya FZ, Sharjah

Year 2015

Name of the Project ZAKUM OIL LINES REPLACEMENT

Client / Nature of Work Al Shabia / GASCO - Detailed Engineering, Installation, testing &

commissioning of E&I Systems

Work Site UAE - Jabel Ali, Dubai

Year 2015

Name of the Project DUGAS EXPANSION

Client / Nature of Work Dugas / Cylingas

Cable laying

Work Site Jabel Ali, Dubai

Year 2015

Name of the Project CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FZ (EPC-2)

Client / Nature of Work Archirodon - Project Procurement & Material Supply

Work Site UAE - Dubai

Year 2015

Page 23: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 23 of 45

Name of the Project AKZO NOBEL POWER COTTING PLANT

Client / Nature of Work AKZONOBEL / Al Shabia.

Detailed Engineering, Supply of Electrical / Instrumentation

materials, Installation, Testing & Commissiong.

Work Site UAE - Dubai

Year Jun 2014 – May 2015

Name of the Project OIL TERMINAL AT HAMRIYAH FREE ZONE

Client / Nature of Work ADNOC DISTRIBUTION / TAKREER / SINOPEC.

Installation of PLC Panels, Electical systems, Cabling, installation

of HVAC equipment, Duct work etc. Testing, Commissioning of

the HVAC System.

Work Site UAE - Sharjah

Year 2013

Name of the Project E&I WORKS FOR SHELTERS

Client / Nature of Work GASCO / Al Shabia.

E&I Works including installation & testing of Electrical items &

Instruments.

Work Site UAE – Hamriya FZ, Sharjah

Year 2014

Name of the Project PROJECT FALCON- BULK LIQUID TERMINAL IN JAFZA & JETFUEL

PIPELINE TO DIA OF HORIZON JEBEL ALI TERMINAL

LIMITED(HJTL)

Client / Nature of Work ENOC / Punj Lloyd, Detailed (shop drawings) Engineering and

supervision of construction, testing, pre-commissioning of

Electrical & Instrumentation systems

Work Site UAE

Year May 2013 – Aug 2014

Page 24: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 24 of 45

Name of the Project FMC METERING SKID

Client / Nature of Work KOC / FABTECH

Work Site UAE

Year 2013

Name of the Project GAS FIELD DEVELOPMENT PROJECT SKIDS

Client / Nature of Work GASTECH / FABTECH.

E&I Works for Skid packages including installation & testing of

Electrical items & Instruments.

Work Site UAE

Year 2012

Name of the Project ELECTRICAL WORKS FOR VISEN POLYMERS PLANT

Client / Nature of Work Visen Polymers FZE.

Engineering, supply, site construction, testing and

commissioning Electrical / Instrumentation System for full plant

including tank farm area, storage area, process plant area,

storage facility and office administration block

Work Site UAE

Year Jun 2012 - Aug2014

Name of the Project OIL TERMINAL AT HAMRIYAH FREE ZONE (EPC-1)

Client / Nature of Work ADNOC DISTRIBUTION / TAKREER / SYNOPEC.

Engineering, procurement and Supply of Electrical systems, PLC

Controls, Cable / duct support system, HVAC equipments

Work Site UAE

Year Dec 2012 – May 2014

Page 25: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 25 of 45

Name of the Project E&I SITE SERVICES FOR GARRAF AREA DEVELOPMENT PROJECT

Client / Nature of Work Petronas / Weatherford / Lakeshore Toltest Corporation.

Installation, site Supervision, testing & commissioning

assistance for electrical & instrumentation works at Garraf

Development Area - Gas Treatment Plant.

Work Site IRAQ - Garraf

Year Dec 2012 – Mar 2014

Name of the Project IRAQ CRUDE OIL EXPORT EXPASION PROJECT

Client / Nature of Work South Oil Company/ Leighton Offshore PTE LTD.

Engineering, procurement, Supply, Installation and supervision

of construction, testing, commissioning / start-up of HVAC

systems for two substations, Electrical / Controls Systems in

Basrah.

Total Project Capacity: 160 Tr

Work Site IRAQ - Basrah

Year April 2012 – Jan 2014

Name of the Project IGD - DAS ISLAND PROJECT

Client / Nature of Work ADGAS / Quality Int’l

Work Site UAE – Hamriya FZ, Sharjah

Year 2012

Name of the Project GASTECH SKIDs

Client / Nature of Work GASTECH / FABTECH

Engineering, Installation, site Supervision, testing &

commissioning assistance for electrical & instrumentation

works

Work Site UAE – Jabel Ali, Dubai

Year 2012

Page 26: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 26 of 45

Name of the Project STAR ENERY PROJECT

Client / Nature of Work STAR ENERY

Project Material Procurement & Supply

Work Site UAE – Jabel Ali, Dubai

Year 2012

Name of the Project ADGAS INTEGRATED GAS DEVELOPMENT PROJECT

Client / Nature of Work Hyundai Heavy Industries.

Engineering, Construction and testing of E&I works for Pipeline

Bridges, Jackets, HP and LP Flare Towers

Work Site UAE

Year April 2012 to November 2012

Name of the Project ADGAS INTEGRATED GAS DEVELOPMENT PROJECT

Client / Nature of Works Hyundai Heavy Industries.

Site installation and testing of E&I items and equipment for Gas

Trains

Work Site UAE

Year April 2012 to October 2012

Name of the Project VOPAK HORIZON FUJAIRAH LTD. EXPANSION PROJECT PHASE -

VI

Work Site Fujairah, UAE

Year June 2011 – March 2012

Name of the Project PETROFAC INTERNATIONAL CONDENSATE STORAGE FLOATING

ROOF TANK NO. 202 REFURBISHMENT PROJECT

Client Petrofac

Engineering, Procurement & Construction of E&I works for Oil

Storage Tanks including linear heat detection system

Work Site Hamriyah Free Zone, UAE

Year November 2011 to April 2012

Page 27: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 27 of 45

Name of the Project ABU DHABI MILITARY COMMAND PROJECT

Work Site Abu Dhabi, UAE

Year July 2010 to September 2010

Name of the Project JORDAN REFINERY EXPANSION PROJECT

Work Site Amman, Jordan

Year April 2010 – October 2010

Name of the Project PEARL GTL PROJECT, QATAR

Client / Nature of Work Engineering, Supply, Site Construction & testing of electrical and

instrumentation works associated with LIN Tank.

Work Site QATAR

Year July 2009 – April 2010

Name of the Project ENOC LUBE OIL PLANT, FUJAIRAH

Client / Nature of work ENOC/Concilium/Intron

E&I Installation works, Pre commissioning & commissioning

assistance job for the Tank farm job at ENOC LUBE OIL plant in

Fujairah.

Work Site Fujairah

Year 2009

Name of the Project LPG GAS COMPRESSION PLANT KAZAKHSTAN

Client / Nature of work E&I works for Skid packages including Construction & Testing of

electrical and instrumentation

Work Site UAE

Year February 2009 – July 2009

Name of the Project VOPAK HORIZON FUJAIRAH LTD.

EXPANSION PROJECT PHASE - V

Work Site UAE - Fujairah

Year October 2008 – April 2009

Page 28: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 28 of 45

Name of the Project UPGRADATION OF EXISTING GAS CONTROL STATION

Work Site Dubai, UAE

Year July 2008 – February 2009

Name of the Project PETROFAC INT’L CONDENSATE STORAGE REFURBISHMENT

PROJECT

Client / Nature of Work Petrofac / CB&I.

Engineering, Procurement & Construction of E&I works for Oil

Storage Tanks including linear heat detection system.

Work Site UAE - Sharjah

Year 2008

Name of the Project LPG RECOVERY PLANT, KHOR MOR, IRAQ

Work Site Belelli Energy Yard, Sharjah UAE

Year March 2008 – December 2008

MEP DIVISION

Name of the Project LA MER – JUMEIRA OPEN BEACH RETAIL

Client / Nature of Work Al Futtaim Carilliom LLC

Installation, Testing & Commissioning of Electrical and Low

current services.

Work Site Jumeira Beach, Dubai

Year 2017

Name of the Project BLUEWATERS HOSPITALITY

Client / Nature of Work James L Williams Middle East

Installation, Testing & Commissioning of Electrical works

including Power cable lying, glanding & termination, Low

current services, etc.

Work Site Bluewater Island, Dubai

Year 2017

Page 29: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 29 of 45

Name of the Project HOLIDAY INN HOTEL

Client / Nature of Work Al Futtaim Engineering

Detailed Engineering, Installation, Testing & Commissioning of

Electrical works including Power cable lying, glanding &

termination, Low current services, etc.

Work Site Dubai festival city

Year 2016

Name of the Project INTERSUN OFFICE RENOVATION

Client / Nature of Work Naga / Intersun.

Engineering, Procurement, Construction of Electrical, Plumbing

and HVAC works and Testing & Commissioning.

Work Site Jabel Ali, Dubai

Year 2015

Name of the Project OFFICE BUILDING FOR LANDMARK GROUPS

Client / Nature of Work Trans Gulf.

E&I Containments, Works & FO Cable laying & splicing

Work Site Dubai Marina

Year 2015

Name of the Project LV CABLE LAYING – DEWA

Client / Nature of Work DEWA / Scan Power.

LV Cable laying

Work Site Dubai / Various

Year 2015

Name of the Project VICEROY HOTEL, PALM JUMEIRAH

Client / Nature of Work China State Construction Engineering Corporation.

Detailed Engineering, Installation, Testing & Commissioning of

Electrical works including Power cable lying, glanding &

termination, etc.

Work Site Dubai, UAE

Year 2014

Page 30: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 30 of 45

Name of the Project AL AMAL PSYCHIATRIC HOSPITAL

Client / Nature of Work China State Construction Engineering Corporation.

Detailed Engineering, Installation, Testing & Commissioning of

Electrical works including Power cable lying, glanding &

termination, etc.

Work Site Dubai, UAE

Year August 2014 to December 2014

Name of the Project YAS MALL, YAS ISLAND

Client / Nature of Work VOLTAS Ltd.

Detailed Engineering, Installation, Testing & Commissioning of

Electrical works including Power cable lying, glanding &

termination, etc.

Work Site Abu Dhabi, UAE

Year August 2012 to December 2013

Name of the Project AL RAWABI FARM

Client / Nature of Work Al Rawabi Dairy Farm

Detailed Engineering, Installation, Testing & Commissioning of

Electrical works including Complete substation works.

Work Site Dubai, UAE

Year August 2011 to July 2013

Name of the Project INSTALLATION OF FO CABLE & ACCESSORIES – PHASE 5

Client / Nature of Work Etisalat / Installation & commissioning works including laying &

splicing of FO cables

Work Site UAE

Year September 2009 to January 2010

Page 31: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 31 of 45

2.2. CLIENT LIST

Page 32: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 32 of 45

2.3. LICENSE, PROFESSIONAL REGISTRATION & MEMBERSHIPSHIP CERTIFICATE

Page 33: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 33 of 45

Page 34: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 34 of 45

Page 35: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 35 of 45

Page 36: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 36 of 45

Page 37: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 37 of 45

Page 38: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 38 of 45

3.1. MANAGEMENT SYSTEM CERTIFICATIONS

Quality - ISO 9001:2015 (Head Office)

Page 39: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 39 of 45

Quality - ISO 9001:2015 (Dubai Office)

Page 40: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 40 of 45

Occupational Health & Safety - BS OHSAS 18001:2007 (Head Office)

Page 41: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 41 of 45

Occupational Health & Safety - BS OHSAS 18001:2007 (Dubai Office)

Page 42: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 42 of 45

Environment - ISO 14001:2015 (Head Office)

Page 43: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 43 of 45

Environment - ISO 14001:2015 (Dubai Office)

Page 44: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 44 of 45

3.2. MANAGEMENT SYSTEM MANUALS

3.2.1. Quality (INDEX PAGE ONLY)

LIST OF CONTENTS

1. SCOPE

2. APPLICABILITY

3. QMS REFERENCES AND DEFINITIONS

3.1 QMS References

3.2 QMS Definitions

4. QUALITY MANAGEMENT SYSTEM REQUIREMENTS

4.1 General Requirements

4.2 Documentation Requirements

5. MANAGEMENT RESPONSIBILITY

5.1 Management Commitment

5.2 Customer Focus

5.3 Quality Policy

5.4 Planning

5.5 Responsibility, Authority and communication

5.6 Management Review

6. RESOURCE MANAGEMENT

6.1 Provision of Resources

6.2 Human Resources

6.3 Infrastructure

6.4 Work Environment

7. PRODUCT REALIZATION

7.1 Planning of Product Realization

7.2 Customer Related Processes

7.3 Design and Development

7.4 Purchasing

7.5 Production & Service Provision

7.6 Control of Monitoring and Measuring Equipment

8. MEASUREMENT, ANALYSIS AND IMPROVEMENT

8.1 General

8.2 Measurement and Monitoring

8.3 Control of Nonconformity

8.4 Analysis of Data

8.5 Improvement

Page 45: COMPANY PROFILE - controlsme.com · Preparation of method statements ITP and other safety related ... thermal storage systems underground/above ground chilled water piping values

Enhancing Technology Page 45 of 45

3.2.2. Health, Safety & Environment (INDEX PAGE ONLY)

LIST OF CONTENTS

A. Description of the HSE Management System Manual

B. HSE Management System Procedures

1. Scope

2. Reference Publications

3. Terms & Definitions

4. HSE Management Requirements

4.1. General Requirements

4.2. HSE Policy

4.3. Planning

4.3.1. Environmental Aspects, Hazard Identification, Risk Assessment and

Determining Controls

4.3.2. Legal and other Requirements

4.3.3. Objectives ,Targets and Programs

4.4. Implementation and Operations

4.4.1. Resources, Roles, Responsibility, Accountability and Authority

4.4.2. Competence, Awareness and Training

4.4.3. Communications, Participation and Consultation

4.4.4. Documentation

4.4.5. Control of Documents

4.4.6. Operation Control

4.4.7. Emergency Preparedness and Response

4.5. Checking

4.5.1. Performance Measurement and Monitoring

4.5.2. Evaluation of Compliance

4.5.3. Incident Investigation, Nonconformance, Corrective action & Preventive action

4.5.4. Control of Records

4.5.5. Internal Audit

4.6. Management Review

4.7. Appendices

Annexure 1 – HSE Policy

Annexure 2 – Smoking & Substance Abuse Policy

Annexure 3 – Organization Chart

Annexure 4 – HSE Objectives

Annexure 5 – Emergency Contact Numbers.