Construction Automation
A Six Year Plan in Development
Ron SinghChief of Surveys
Geometronics Manager
Design to Dozer August, 2010
![Page 2: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/2.jpg)
Design to Dozer – Ron Singh2
Engineering Automation
Key Concepts for a
25 Year Time Horizon
![Page 3: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/3.jpg)
3
Disruptive Technologies
A “disruptive technology” is one that requires changes to long standing established processes.
Design to Dozer – Ron Singh
![Page 4: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/4.jpg)
4
Reactive Project-centric
Approach
Design to Dozer – Ron Singh
![Page 5: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/5.jpg)
5
Proactive Data-centric Approach
Design to Dozer – Ron Singh
![Page 6: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/6.jpg)
6
Engineering Automation
DesignAutomation
ConstructionAutomation
SurveyAutomation
Design to Dozer – Ron Singh
![Page 7: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/7.jpg)
7
Engineering Automation
SurveyAutomation
DesignAutomation
ConstructionAutomation
Today’s Topics…
Design to Dozer – Ron Singh
![Page 8: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/8.jpg)
8
Engineering Automation
SurveyAutomation
DesignAutomation
ConstructionAutomation
Inspection
SiteMonitoring
MachineAutomation
MaterialCertification
Surveying
Positioning
Today’s Topics…
Design to Dozer – Ron Singh
![Page 9: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/9.jpg)
9
Major Components of Construction Automation
Inspection Tools Enhanced use of GPS Material Delivery and Certification Remote Construction Site
Monitoring Connected Site Machine Automation Post Construction Surveys
Design to Dozer – Ron Singh
![Page 10: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/10.jpg)
10
Engineering Automation
DesignAutomation
ConstructionAutomation
SurveyAutomation
Inspection
SiteMonitoring
MachineAutomation
MaterialCertification
Surveying
Positioning
Machine Control and
Guidance Systems
Moving On…
Design to Dozer – Ron Singh
![Page 11: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/11.jpg)
11
For The Purpose of This Presentation…
A Machine Guidance system will be considered to be one that uses automation to provide the equipment operator a visual indicator of the position of the cutting edge (blade, bucket, screed, etc) relative to the design surface being constructed.
Design to Dozer – Ron Singh
![Page 12: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/12.jpg)
12
For The Purpose Of This Presentation…
A Machine Control system will be one where the cutting edge of the equipment is fully controlled by automation. The system is connected to and controls the hydraulics while the operator simply drives the equipment and manages the automation.
Design to Dozer – Ron Singh
![Page 13: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/13.jpg)
13
3 Components of Machine Control1. The Design and Resulting Data2. The Machine w/Computer, Sensors,
Hydraulic Control, and Radio3. The Positioning System – GPS, TPS,
Laser, or combination
Design to Dozer – Ron Singh
![Page 14: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/14.jpg)
14
Provides the interface between engineering design and the machine operator
Guidance Systems
Design to Dozer – Ron Singh
![Page 15: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/15.jpg)
15
Types of Guidance Systems
Stakes String Lines Sonic Sensors Lasers GPS Total Stations GPS w/Lasers
Design to Dozer – Ron Singh
![Page 16: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/16.jpg)
16
GPS based machine guidance GPS provides near exact
position of vehicle in “real time” Cab mounted display indicates
position of machine relative to design anywhere on the surface
Equipment operator controls cutting edge
Guidance By GPS
Design to Dozer – Ron Singh
![Page 17: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/17.jpg)
17
Typical Display
Design to Dozer – Ron Singh
![Page 18: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/18.jpg)
18
GPS provides near exact position of vehicle in “real time”
Position of the cutting edge is computed
The hydraulics moves the cutting edge accordingly to match the design surface
Control By GPS
Design to Dozer – Ron Singh
![Page 19: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/19.jpg)
19F
inal Surface
Original Surface
GPS Grading+/- 30 mm or 0.1’
Generally Not By GPS
Guidance/Control by GPS
Design to Dozer – Ron Singh
![Page 20: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/20.jpg)
20
GPS (RTK) derived elevations are:
Somewhat erratic Dependant upon a variety of
factors such as satellite geometry, local deflection of the vertical, etc.
Limited to an accuracy of a few centimeters
Control by Laser Augmented GPS
Design to Dozer – Ron Singh
![Page 21: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/21.jpg)
21
Laser augmented GPS systems delivers a few millimeters of vertical accuracy using conventional lasers capable of working on an inclined plane
Control by Laser Augmented GPS
Design to Dozer – Ron Singh
![Page 22: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/22.jpg)
22
Final Surface
Original Surface
Total Station Grading+/- 5mm or 0.02’
Control by Total Station
Design to Dozer – Ron Singh
![Page 23: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/23.jpg)
23
Control by Total Station
Started in the early 1990’s with robotic motorized total stations that could track a prism mounted on a machine
Could position the prism to high accuracy - equivalent to string lines and lasers
Design to Dozer – Ron Singh
![Page 24: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/24.jpg)
24
Control by Total Station Information from the prism position
could be sent to the machine, which would adjust the hydraulics accordingly.
Design to Dozer – Ron Singh
![Page 25: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/25.jpg)
25
The Ultimate System:
No stakes required No grade checker required Records data for quality control Records data for volume computation Data could be transmitted to engineer,
inspector, or surveyor for “real time” checks
Machine Control
Design to Dozer – Ron Singh
![Page 26: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/26.jpg)
26
Bulk Excavating – Scrapers/Dozers
Design to Dozer – Ron Singh
![Page 27: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/27.jpg)
27
Bulk Excavating – Dozers
Design to Dozer – Ron Singh
![Page 28: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/28.jpg)
28
Concrete Paving
Design to Dozer – Ron Singh
![Page 29: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/29.jpg)
29
Trimming
Design to Dozer – Ron Singh
![Page 30: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/30.jpg)
30
Excavating – Shaping & Compacting
Design to Dozer – Ron Singh
![Page 31: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/31.jpg)
31
Underwater – Riprap Placement
Design to Dozer – Ron Singh
![Page 32: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/32.jpg)
32
Grading
Design to Dozer – Ron Singh
![Page 33: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/33.jpg)
33
Grading
Design to Dozer – Ron Singh
![Page 34: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/34.jpg)
34
Trench Excavation
Design to Dozer – Ron Singh
![Page 35: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/35.jpg)
35
Milling
Design to Dozer – Ron Singh
![Page 36: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/36.jpg)
36
Asphalt Paving
Design to Dozer – Ron Singh
![Page 37: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/37.jpg)
37
Barrier
Design to Dozer – Ron Singh
![Page 38: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/38.jpg)
38
Curbs and Sidewalks
Design to Dozer – Ron Singh
![Page 39: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/39.jpg)
39
The Emerging Role of Operating Engineers
Requires education/training relating to new systems
Pre-qualification or certification Clearly defined role in project
specifications
Design to Dozer – Ron Singh
![Page 40: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/40.jpg)
40
The Role of the Design Engineer 3D coordinate correct designs Build-able and not just bid-able
plans Complete, reliable, and construct-
able digital data – less reliance on “on the grade” design
Available on very short notice for design changes
Design to Dozer – Ron Singh
![Page 41: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/41.jpg)
41
The Role of the Surveyor Establishment of
horizontal and vertical project control
Data management Acquiring and
validating design DTM
Converting DTM to exchange format
Providing exchange format data to contractor
Design to Dozer – Ron Singh
![Page 42: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/42.jpg)
42
The Role of the Surveyor Quality assurance
Validating TIN produced by exchange format data
Re-measure or validate grade
No longer available for design changes
Post Construction Surveys
Design to Dozer – Ron Singh
![Page 43: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/43.jpg)
43
The Role of the Inspector Will continue as today… With less support from surveyors With diminished ability to check
constructed elements for grade, alignment, or width
Will need additional technology to check stake-less construction
Design to Dozer – Ron Singh
![Page 44: Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010](https://reader035.vdocument.in/reader035/viewer/2022062417/551659d6550346b2068b5c2a/html5/thumbnails/44.jpg)
44
Stay Tuned…