Task D5: Roads on PeatLead persons: Haraldur Sigursteinsson & Ron Munro
Task description:To demonstrate ROADEX technologies on planned road rehabilitation exercises on roads over peat. To give practical support to local road improvement projects to use the new ROADEX road design methodology for low volume roads on their road networks.
NPP demonstration locations:Ireland (2 projects)
Bog rampart, Ireland
![Page 3: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/3.jpg)
3 reports:
ROADEX II Report, 2005”Dealing with Bearing CapacityProblems on LOw Volume RoadsConstructed on Peat”
ROADEX II Guidelines, 2005-
”Guidelines for the Management ofPeat Slips on the Construction of LowVolume/Low Cost Roads over Peat”
ROADEX III Executive Summary, 2006“Managing Peat Related Problems onLow Volume Roads”
D5 Roads on Peat Demonstrating ROADEX methods
![Page 4: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/4.jpg)
Map the weak sections of road and FOCUS in on them
Understand the processes causing the problems
Innovate - find new ‘fit for purpose’ structures and treatments
The three phases:
D5 Roads on Peat Demonstrating ROADEX methods
![Page 5: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/5.jpg)
GPR, GPS & Video
FWD & GPS
DATA COLLECTION:
• Falling Weight Deflectometer (FWD)• bearing capacity of the road
• Drill core data• road structure verification & quality
• Digital video• pavement condition documentation
• Scanner• Ground Penetrating Radar
• road structures• subgrade soil quality• reasons for road defects
DATA PROCESSING AND ANALYSIS:• ‘Road Doctor’ by Roadscanners Oy
• ArcView
Integrated analysis
D5 Roads on PeatMethod:
![Page 6: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/6.jpg)
D5 Roads on Peat (Ireland) - outline
Project plan:
Initial visit by HS to make working contact and get an understanding of Irish conditions. Preparation of preliminary report on Irish best practice. Discuss how sharing could happen;
Identify demonstration project locations, preferably one strengthening project and one widening project;
Survey with ROADEX methods (FWD, GPR, GPS, video, scanning, etc) to identify the problem areas and formulate solutions. Surveys and interpretation paid by Partners;
Strengthening & widening of road sections on peat. Settlement is a major issue in strengthening and widening roads over peat - to be addressed in ROADEX for the first time. ROADEX to assist in design.
Carry out works by Contractor. Report by ROADEX.
Links with other Tasks:
Input into eLearning task and road widening research for projects involving peat.
![Page 7: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/7.jpg)
D5 Roads on Peat (Ireland) – delivery
November 2010
DoT & NRA agree roads sections to be surveyed:• N56 Drumnaraw to Cashelmore, County Donegal• N59 Newport – Mulranny, County Mayo
March 2011 Survey of the road sections by PMS and Roadscanners
July 2011 Submission of the preliminary reports and “Road Doctor” project files:
August 2011 ROADEX workshop in Carrick-on-Shannon to discuss reports and give feedback
Follow-up
March 2012 Report
![Page 8: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/8.jpg)
ROADEX - demonstration projects in Irelanda) N56 Drumnaraw – Cashelmore, Co Donegal, (10km)b) N59 Newport – Mulranny, Co Mayo, (15km)
Surveys March 2011:
standard GPR survey in both directions
deep GPR survey for presence of peat in both directions
GPR cross-sections at selected locations
laser scanner survey in both directions
FWD survey in one direction at 50m centres
GPR, GPS, laser scanner & video FWD testing
![Page 9: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/9.jpg)
Roads on peat demonstrations in IrelandReports delivered 25 July 2011
N56 Drumnaraw to Cashelmore N59 Newport to Mulranny
![Page 10: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/10.jpg)
PAVEMENT AND STRUCTURE DEPTHSN59 Newport to MulrannyCounty Mayo
Example: N59 Newport – Mulranny
![Page 11: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/11.jpg)
GIS map of SOFT SUBGRADE areas N59 Newport to MulrannyCounty Mayo
Example: N59 Newport – Mulranny
![Page 12: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/12.jpg)
TOTAL RISK CLASSIFICATIONN59 Newport to MulrannyCounty Mayo
N59 Newport – Mulranny
![Page 13: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/13.jpg)
TOTAL RISK CLASSIFICATION N56 Drumnaraw to CashelmoreCounty Donegal
N56 Drumnaraw to Cashelmore
![Page 14: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/14.jpg)
Today:ROADEX workshop 27 October 2011• Presentation of survey results• Discussion• Agree a way forward• Report
![Page 15: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/15.jpg)
Haraldur
![Page 16: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/16.jpg)
ROADEX workshop, ROADEX workshop, 27 October 2011,27 October 2011,
The Landmark Hotel, CarrickThe Landmark Hotel, Carrick--onon--ShannonShannon
D5 Roads on PeatD5 Roads on Peat
![Page 17: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/17.jpg)
Site investigation
![Page 18: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/18.jpg)
Site investigation
![Page 19: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/19.jpg)
Boreholes are normaly
driven at 20 m intervals in peat areas
Drilling carried out using rotation and penetration at constant speed.
The force needed to push the probe down is logged.
Roads on Peat:
Ground Investigation
![Page 20: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/20.jpg)
Roads on Peat
N59 Mayo, 700m section of road on peat from 8150 to 8730
![Page 21: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/21.jpg)
in the field
![Page 22: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/22.jpg)
Roads on Peat
N56 Donegal, pocket of peat at Drumnaraw
![Page 23: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/23.jpg)
and more, much more of something
![Page 24: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/24.jpg)
3m/min
25revs/min
Roads on Peat:Ground Investigation - survey vehicle
![Page 25: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/25.jpg)
New Geothnical drillrig
Tenders documents were opened 25th of Oktober
![Page 26: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/26.jpg)
New Geothnical drillrig
![Page 27: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/27.jpg)
The drillrig shall have at least 3 tons capacity with maximum weight 6 tons. The following reasearchs and drilling methods shall be performable by the drillrig:
•Rotary/pressure drilling in soft soil (n. Dreietrykksondering).
•Cone Penetration Testing CPT
•Sampling with 54 og 76 mm Piston samplers
•Dynamik sounding (Swedish standard)
•Georock drilling, (n. Geosondering)
•Total soil/rock drilling, (n. Totalsondering), combinations drilling in
soft soil and hard rock.
New Geothnical drillrig
![Page 28: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/28.jpg)
CPT drillingCPT drilling
![Page 29: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/29.jpg)
0 200 400 600 800 1000
qt (MPa)
12
11
10
9
8
7
6
5
4
3
2
1
0
Dep
th (m
)
SklholtULF
Layer 4
Layer 1
Layer 2
Layer 3
0 2 4 6 8 10
FR (%)
12
11
10
9
8
7
6
5
4
3
2
1
00 40 80 120 160 200
u2 (MPa)
12
11
10
9
8
7
6
5
4
3
2
1
0
Hydrostaticline
CPT in Peat- result
![Page 30: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/30.jpg)
CPT CPT –– soil classificationsoil classification
Flokkunarkerfi eftir Robertson o.fl. 1986
Nánar: CPT in Geotechnical Practice e. Tom Lunne o.fl.
Flokkað út frá friction við borhulsu.
![Page 31: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/31.jpg)
Roads on Peat:Ground Investigation - Undisturbed peat sampling
75 mm diameter undisturbed can samples from
different peat layers
![Page 32: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/32.jpg)
![Page 33: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/33.jpg)
dzcH
0
MP
M
PP
P
0
0
Settlement calculated as an elastic material, during the preconsolidation stage , Pc, as following:
dzcH
0
0
0ln10
0P
PPmm
PP
P
When dealing with a virgin area:
Roads on peat:
Estimation of settlement – Janbu method
![Page 34: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/34.jpg)
Soil properties
Groundwater tabel
’ =
– 1,0
’ = Pc = P0 + 4 t/m2P0
Stress in soil
![Page 35: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/35.jpg)
Consolidation Behavior of Peat
Time
primary strain
instantaneus strain
secondary strain
εi
εp
εs
Ver
tical
stra
in
εttertiary strain
![Page 36: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/36.jpg)
Stress – strain path
StressPc
Preloaded
Virgin areaVer
tical
stra
in
![Page 37: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/37.jpg)
M t/m2
Stress t/m2
10 - 50
Pc = 1,0 - 5,0m = 5,0 - 7.0
1
m
P’0 P’
P
M = d
/ d
= Constrained modulus m = Coefficient of volume change
Roads on Peat:Estimation of settlement – Janbu method
![Page 38: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/38.jpg)
0 200 400 600 800 1000Water content (%)
0
4
8
12
Mod
ulus
num
ber,
m
100 mm/200 mm sampler100 mm/100 mm sampler75 mm/100 mm sampler120 mm*40 mm/200 mm samplerCRS - 2,52 cm*2,0 cmSkálholtsvegurHringvegur um ÞjórsáJanbu (1970) lower limitJanbu (1970) higher limit
Comparison of Icelandic and Irish peat
![Page 39: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/39.jpg)
Dýpt (m)
Calculation of settelment time
![Page 40: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/40.jpg)
Settelment – time resistant
Forsenda
reikninganna
er
tímamótsstaðan
R, sem
fall af
tíma.
Tímamótstöðutalan
rs
breytist
línulega
en lítið
eftir
að
álagið
er
komið
yfir
á jómfrúarsvæðið
og
því
er
valin
ein
tala
fyrir
langtímasigið.
![Page 41: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/41.jpg)
Calculation of settelment time
Sigtíminn
ákvarðast
af
lekt, lektarleið
og
spennuástandi mýrarinnar. Lekt
mýrarinnar
er
ákveðin
með
mælingum
í
ödometer
og
konsolideringstíminn, tk
, síðan
reiknaður
þannig:
vp C
Dk Tt
2
100t
tpU
Up
= konsolideringsgráðan
gefur
sigið
á
einhverjum ákveðnum
tíma, t, í
hlutfalli
við
sigið
fyrir
tímann
t100
Í
sigreikningum
er
yfirleitt
reiknaður
tíminn
fyrir 30 ‐
50 ‐
70 og
90% af
skammtímasiginu.
![Page 42: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/42.jpg)
Secondary settelment
H = mýrardýpt
25% next 19 years
75% in 1. year
![Page 43: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/43.jpg)
67% á 1. ári
33% á næstu 19
Secondary settelment
![Page 44: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/44.jpg)
Sig vegfyllingar - tími
0
0,5
1
1,5
2
2,5
3
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Initial settlement
After 320 days , settlement 2,62 m
After 1830 days, settlement 2,86 m
1 year 5 year
![Page 45: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/45.jpg)
Road section 510-01 Borgarfjarðarbraut to Vatnshamraleið
Section Fill Peat depth Primary Secondary Total Preload Area Volume width Lengthdepth consolid compress settlement increase of
M m m m m m m m2 m3 30% 50% 70% 90% m hose
9100 0.98 0.80 0.11 0.11 0.22 0.11 1.87 37.49 0.0 0.1 0.2 0.4 0.08 9.49120 2.32 1.40 0.40 0.15 0.55 0.20 6.02 120.41 0.1 0.3 0.5 1.2 0.30 13.59140 3.27 1.70 0.59 0.16 0.74 0.25 9.56 191.16 0.1 0.4 0.8 1.7 0.44 16.39160 2.77 1.50 0.47 0.15 0.62 0.21 7.40 148.06 0.1 0.3 0.6 1.3 0.35 14.89180 2.02 1.50 0.40 0.16 0.56 0.21 5.82 116.36 0.1 0.3 0.6 1.3 0.30 12.69200 2.02 1.20 0.31 0.13 0.45 0.17 4.67 93.37 0.1 0.2 0.4 0.9 0.23 12.69220 1.64 1.60 0.37 0.17 0.55 0.21 5.32 106.38 0.1 0.4 0.7 1.5 0.28 11.49240 1.69 2.90 0.77 0.26 1.03 0.36 10.12 202.35 0.4 1.2 2.3 5.0 0.58 11.69260 1.75 1.70 0.42 0.18 0.60 0.23 5.90 117.99 0.1 0.4 0.8 1.7 0.32 11.79280 1.05 0.50 0.07 0.08 0.15 0.08 1.26 25.17 0.0 0.0 0.1 0.1 0.05 9.79300 2.68 2.50 0.82 0.21 1.03 0.33 12.12 242.33 0.3 0.9 1.7 3.7 0.62 14.59320 1.42 2.90 0.70 0.27 0.97 0.36 9.00 180.00 0.4 1.2 2.3 5.0 0.53 10.89340 1.52 2.60 0.64 0.25 0.89 0.33 8.39 167.82 0.3 0.9 1.9 4.0 0.48 11.19360 1.43 2.90 0.70 0.27 0.97 0.36 9.04 180.85 0.4 1.2 2.3 5.0 0.53 10.89380 1.33 2.40 0.54 0.24 0.78 0.30 7.05 141.01 0.3 0.8 1.6 3.4 0.41 10.59400 1.56 2.40 0.59 0.23 0.82 0.30 7.88 157.52 0.3 0.8 1.6 3.4 0.44 11.2
0.66 6450.98
Cosolidation time in days
Roads on Peat:Predicted settlement summary table
![Page 46: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/46.jpg)
Roads on Peat:Predicted settlement
![Page 47: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/47.jpg)
Extra lift of fill material
Time
Fill
Secondary settelmentStrain
Extra lift = Secondary settelment
Due to settlement expected after the constructions period the hight of fill material should be higher than designed level. This
can be equal to the secondary settelement and even also partly from the consolidations settlement.
![Page 48: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/48.jpg)
Roads on Peat:
Preloading
Preload
preloaded
![Page 49: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/49.jpg)
Preloading – culvert – avoid bumbing
Preloading
Water drain from the peat into drainage canal under the culvert.
![Page 50: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/50.jpg)
Fill on peat- counterweight
It is common that counterweight is needed to avoid failure crack in the peat.
counterweight
Failure path
counterweight, slope 1:7
![Page 51: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/51.jpg)
CONSOIL Hydrostatic Profiler- polyethylene tube with a portable pull-through sensor
on Peat:Measurement of settlement by pressure sensor
![Page 52: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/52.jpg)
on Peat:Tube installation
![Page 53: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/53.jpg)
on Peat:Referencing tube on peat surface
![Page 54: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/54.jpg)
on Peat:Referencing settlement rod
![Page 55: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/55.jpg)
on Peat:settlement tube, no crushed rock around the tube
![Page 56: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/56.jpg)
CONSOIL Hydrostatic Profiler
on Peat:
Measurement of settlement by pressure sensor
![Page 57: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/57.jpg)
CONSOIL Hydrostatic Profiler
on Peat:
Measurement of settlement by pressure sensor
![Page 58: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/58.jpg)
on Peat:Time - settlement records
![Page 59: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/59.jpg)
0
0,5
1
1,5
2
2,5
3
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Initial settlement
After 320 days , settlement 2,62 m
After 1830 days, settlement 2,86 m
1 year 5 year
on Peat:Time - settlement records
![Page 60: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/60.jpg)
Assymetric preloading
on Peat:Settlement records
![Page 61: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/61.jpg)
on Peat:Settlement records
![Page 62: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/62.jpg)
on Peat:First the material are placed on the widening part
Get the unloaded area Get the unloaded area into same settelment into same settelment sequence as the sequence as the prealoded area.prealoded area.
![Page 63: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/63.jpg)
![Page 64: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/64.jpg)
on Peat:Ready for base and pavement, waiting period
![Page 65: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/65.jpg)
on Peat in Ireland:escavation and refill with crushed material
![Page 66: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/66.jpg)
on Peat:widening of existing road, waiting period
![Page 67: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/67.jpg)
on Peat:widening of existing road, waiting period
1 m deep cuting
![Page 68: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/68.jpg)
Unwoven fabric 150 gr/m2
Overlap í
length 0,5 m
Geotextile on Peat
on Peat:
![Page 69: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/69.jpg)
On Peat, thin layer on geotextile, failure
![Page 70: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/70.jpg)
Supporting layer from trees
![Page 71: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/71.jpg)
on Peat:
![Page 72: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/72.jpg)
on Peat:
![Page 73: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/73.jpg)
on Peat:
![Page 74: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/74.jpg)
and some cracks which we don´t have
![Page 75: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/75.jpg)
in our work we meet lot of people
![Page 76: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/76.jpg)
ROADEX workshop, 27 October 2011,The Landmark Hotel, Carrick-on-Shannon
Takk Takk fyrirfyrir
![Page 77: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/77.jpg)
ROADEX workshop, ROADEX workshop, RoadbuildingRoadbuilding on Peaton Peat
practice in Icelandpractice in Iceland
D5 Roads on PeatD5 Roads on Peat
![Page 78: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/78.jpg)
![Page 79: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/79.jpg)
![Page 80: D5 Roads on Peat (in Ireland) - ROADEX Network · Problems on LOw Volume Roads. Constructed on Peat ” ROADEX II Guidelines, 2005-” Guidelines for the Management of Peat Slips](https://reader035.vdocument.in/reader035/viewer/2022071102/5fdba65c43b5ae4ae604ba4a/html5/thumbnails/80.jpg)
N56 Creeslough, Donegal (John Mclaughlin, Director)
Local contact Brian Burke
•Typical structures outside towns:– - 40mm SMA to Clause 942, 60mm of 20mm dbm– - 3-10cm surface dressing, 10-30cm clause 804 crushed rock,
subbase•Typical structure inside towns is 20mm DBM•Road structure is likely to change along the road from HRA, SD, SMA, DBM, etc
•Water cannot escape from the carriageway due to the verges. If there is water sensitive material under the road this will lead to a loss in bearing capacity