SSMP LOcaTiON MaP-M2PP-121-d-GPh-8056
SiTE cONTEXT PLaN-M2PP-121-d-GPh-8101
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 7
rOad SEcTiONSaS ShOWN
aS ShOWN
M2PP-121-d-GPh-8501
10 m
Existing Ground
10m
10m
5m
5m
FEN
CE
15m
15m
15 m
20 m
CS2 -CROSS SECTION-THROUGH EXPRESSWAY
CS1 - CROSS SECTION-WETLAND 6
ScaLE - 1:100@a1 - 1:200@a3 FaciNG NOrTh
ScaLE - 1:250@a1 - 1:500@a3 FaciNG NOrTh
MassedPlantingMP
riparian Planting riparian Planting Wetland Mitigation Planting
Wetland Mitigation Planting
riparian Planting riparian Planting
Massed Plantingwith Tree Enrichment
Otaihanga Northern Wetlandc .Northbound Expressway Southbound ExpresswaySwalecWB
3mOtaihanga Kanuka
refer condition G.41 c) i) 4.c
ON
TiN
UE
S B
ELO
W
cO
NTiN
UE
S a
BO
VE
WWTP drain
WWtP drain
WWTP drainNorthern Tributary
WTTP drainSouthern Tributary
dUNE FOrM TO BE rETaiNEd
PriVaTE LaNd
LEGEND
ROAD SSMP SHEET (ROAD)
SSMP BOUNDARY CURRENT SSMP SHEET (ROAD)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4
SSMP 6SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 5
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
Median
SSMP LOcaTiON MaP-M2PP-121-d-GPh-8056 SiTE cONTEXT PLaN-M2PP-121-d-GPh-8102
cS1
cS2
cS1
cS2
cS1 cS1
SIGHT LINE
1.0M
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
1:4 PM Friday 7 March 2014
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 8
LONG SEcTiONSaS ShOWN
aS ShOWN
M2PP-121-d-GPh-8401
cS2 -
cS1
GraSS VErGE
BridGE SPaN
10 m
15 m
CS1 - CROSS SECTIONAL ELEVATION-OTAIHANGA RD
CS2-CROSS SECTIONAL ELEVATION-ABUTMENT
FaciNG WEST ScaLE - 1:200@a3
FaciNG NOrTh ScaLE - 1:200@a3
OTaihaNGa LOcaL rOad
MaSSEd PLaNTiNGMaSSEd PLaNTiNG
SiTE cONTEXT PLaN-M2PP-121-d-GPh-8301SSMP LOcaTiON MaP-M2PP-121-d-GPh-8056
cWBiNTErSEcTiON WiTh
EXiSTiNG accESS TracKcWB 3.0M
rETaiNEd VaLUEd TErrESrriaL VEGETaTiON
cWB cONTiNUES NOrTh
GaBiON WaLL-SEE ShEET 14 dETaiL ShEET
5 m
aBUTMENT WiNG WaLL
aBUTMENT WiNG WaLL
cWB
GraVEL ShOULdEr & cONNEcTiON TO EXiSTiNG accESS TracK
MaTEriaL a MaTEriaL B
BridGE BarriEr: PrEcaST cONcrETE WiTh 2 cOaTS WhiTE KiEM cOaTiNG & aNTi GraFFiTi PrOTEcTiON-PENdiNG SaMPLE PaNEL aPPrOVaL
BridGE aBUTMENT: PrEcaST cONcrETE PaNEL WiTh iNLayEd OTaKi PEB 40MM STONE aNd MaTT GraFFiTi PrOTEcTiON-PENdiNG SaMPLE PaNEL aPPrOVaL
MaTEriaL a
MaTEriaL a
MaTEriaL B
MaTEriaL B
SaFE hiT POST
GaBiON WaLL-SEE ShEET 14 dETaiL ShEET
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
1:4 PM Friday 7 March 2014
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 9
BridGE ViEWNTS
NTS
M2PP-121-d-GPh-8801
PROPOSED SITUATION AFTER 10 YEARS
LEGEND
ROAD SSMP SHEET (ROAD)
SSMP BOUNDARY CURRENT SSMP SHEET (ROAD)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4
SSMP 6SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 5
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
VS1-ViSUaLiSaTiON-OTaihaNGa OVErPaSS-LOOKiNG EaST
SSMP LOcaTiON MaP-M2PP-121-d-GPh-8056 SiTE cONTEXT PLaN-M2PP-121-d-GPh-8301
LEGEND
ROAD SSMP SHEET (ROAD)
SSMP BOUNDARY CURRENT SSMP SHEET (ROAD)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4
SSMP 6SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 5
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
cWB
M 2 P P P R O P O S E D A L I G N M E N T
NB2 NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
NB2a NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 10
NOiSE WaLL LOcaTiONSM2PP-121-d-GPh-8601
PLaN OF NOiSE WaLL aNd GaBiON WaLL LOcaTiONSPLaN OF NOiSE WaLL aNd GaBiON WaLL LOcaTiONS
NOrTh BOUNd
SOUTh BOUNd
NB1-TL4, F-ShaPE BarriEr
NB2a-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE. BacKFiLLEd ON OUTSidE TO 1M aBOVE carriaGEWay LEVEL
NB2-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE
dESiGNaTiON LiNE
dESiGNaTiON LiNE
PLaN OF NOiSE WaLL aNd GaBiON WaLL LOcaTiONS
cWB
cWB
dESiGNaTiON LiNE
dESiGNaTiON LiNE
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
1:4 PM Friday 7 March 2014
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 11
NOiSE WaLL LOcaTiONS1:25
1:50
M2PP-121-d-GPh-8602
LEGEND
ROAD SSMP SHEET (ROAD)
SSMP BOUNDARY CURRENT SSMP SHEET (ROAD)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4
SSMP 6SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 5
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
SSMP LOcaTiON MaP
GaBiON WaLLS. rEFEr TO draWiNGS Pd1 aNd Pd2 ON 8605 dETaL ShEET
OTaihaNGa rd
NB1 NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
NB1 NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
NB1-TL4, F-ShaPE BarriEr
NB2a-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE. BacKFiLLEd ON OUTSidE TO 1M aBOVE carriaGEWay LEVEL
NB2-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE
M 2 P P P R O P O S E D A L I G N M E N T
NOrTh BOUNd
SOUTh BOUNd
Pd1
Pd2
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BM2PP-121-d-GPh-8603
LEGEND
ROAD SSMP SHEET (Road)
SSMP BOUNDARY CURRENT SSMP SHEET (Road)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4SSMP 5
SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 6
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
SSMP 5 & 6 - ShEET 12NOiSE WaLL LOcaTiONS
PLaN OF NOiSE WaLL aNd GaBiON WaLL LOcaTiONS
cWB
NB1 NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
M 2 P P P R O P O S E D A L I G N M E N T
NOrTh BOUNd
SOUTh BOUNd
NB1-TL4, F-ShaPE BarriEr
NB2a-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE. BacKFiLLEd ON OUTSidE TO 1M aBOVE carriaGEWay LEVEL
NB2-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE
dESiGNaTiON LiNE
dESiGNaTiON LiNE
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
B1:25
1:50
M2PP-121-d-GPh-8604SSMP 5 & 6 - ShEET 13
NOiSE WaLL LOcaTiONS
cWB
LEGEND
ROAD SSMP SHEET (Road)
SSMP BOUNDARY CURRENT SSMP SHEET (Road)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4SSMP 5
SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 6
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
NB1 NOiSEWaLL. rEFEr TO 8606 dETaiL ShEET
PLaN OF NOiSE WaLL aNd GaBiON WaLL LOcaTiONS
WAIKANAE RIVER
M 2 P P P R O P O S E D A L I G N M E N TNOrTh BOUNdSOUTh BOUNd
NB1-TL4, F-ShaPE BarriEr
NB2a-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE. BacKFiLLEd ON OUTSidE TO 1M aBOVE carriaGEWay LEVEL
NB2-2.0M hiGh, cONcrETE, iNcOrPOraTiNG F-ShaPE PrOFiLE
dESiGNaTiON LiNE
dESiGNaTiON LiNE
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 14GaBiON WaLL dETaiLS
M2PP-121-d-GPh-8605
M2PP-121-d-GPh-8301
MaTEriaLiTy SaMPLES
PD1-TYPICAL GABION BARRIER PD2-TYPICAL GABION BARRIER
CS1-CROSS SECTION CWB GABION CS2-CROSS SECTION CWB GABION
cS1
-
cS2 -
2000
1000
0
LOcKaBLE & rEMOVaBLE BOLLard WiTh SaFETy rEFLEcTOr
LOcKaBLE & rEMOVaBLE BOLLard WiTh SaFETy rEFLEcTOr
PEdESTrEaN drOP crOSSiNG WiTh TacTiLE PaVErS aNd dirEcTiONaL PaVErS
2000MMX1000MMX500MM (75MMX75MM) WELdEd MESh GaBiON caGE FiLLEd WiTh 100-150MM OTaKi PEBBLE
LEGEND
ROAD SSMP SHEET (ROAD)
SSMP BOUNDARY CURRENT SSMP SHEET (ROAD)
PARCEL BOUNDARIES
CONSTRUCTION BOUNDARY
SSMP SHEET (BRIDGE)
CURRENT SSMP SHEET (BRIDGE)
SSMP 1
SSMP 2SSMP 3
SSMP 4
SSMP 6SSMP 7 SSMP 8
SSMP 9
SSMP 10
SSMP 11
SSMP 5
PO
PLA
R A
VE
MCKAY’SCROSSING
PEKA PEKA
RA
UM
ATI R
D
IHA
KA
RA
ST
KA
PATI
RD
MA
ZEN
GA
RB
RD
OTA
IHN
AG
A R
D
WA
IKA
NA
E R
IVE
R
TE M
OA
NA
RD
SM
ITH
FIE
LD R
D
SSMP LOcaTiON MaP-M2PP-121-d-GPh-8056
Pd1
Pd2
M2PP-121-d-GPh-8301
cONcrETE PaViNG
WELdEd MESh GaBiON caGE FiLLEd WiTh 100X150MM OTaKi PEBBLE
WELdEd MESh GaBiON caGE FiLLEd WiTh 100X150MM OTaKi PEBBLE
aBUTMENT WiNGWaLL
aBUTMENT WiNGWaLL
SaFE hiT POST
OTaihaNGa rOad
cWB
cWB
500MM
1000MM
LOcKaBLE rEMOVaBLE BOLLard
MaiNTaNaNcE VEhicLE drOP KErB
crOSSiNG LiGhT-7M STrEET LiGhT
cWB LiGhT-5.5M
cWB SiGNaGE-rEFEr TO ShEET 17
cWB SiGNaGE-rEFEr TO ShEET 17
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 15 NOISE WALL NB1 M2PP-121-d-GPh-8606
1100MM
ELEVATION 1 - NOISE WALL NB1(TL4)- EXPRESSWAY SIDESECTION A - NOISE WALL NB1 (TL4)
VISUALISATION RESIDENTIAL SIDEVISUALISATION EXPRESSWAY SIDE
ELEVATION 2 - NOISE WALL NB1 (TL4)- RESIDENTIAL SIDE
ScaLE - 1:25@a3
GraSS
GraSS
MOWN GraSS
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
MOWN GraSS
EXPrESSWay SidErESidENTiaL SidE
cWB
cWB
TL4 Fair FacEd cONcrETE EXPrESSWay BarriEr TL4 Fair FacEd cONcrETE
EXPrESSWay BarriEr
a-
900
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 16 NOISE WALL NB2 & NB2A - 2M M2PP-121-d-GPh-8607
MaTEriaLiTy/FiNiShES/EXaMPLES
ELEVATION 1 - NOISE WALL NB2 & NB2A - EXPRESSWAY SIDE
SECTION A - NOISE WALL NB2 & NB2A - 2M
VISUALISATION-RESIDENTIAL SIDEVISUALISATION-EXPRESSWAY SIDE (NB2 ONLY)
NB2
NB2a
NB2
NB2a
ELEVATION 2 - NOISE WALL NB2 & NB2A - RESIDENTIAL SIDE
NB2
6.0M TRANSITION
NB2
NB2a
NB2a
GraSSMOWN GraSS
cWBcWB
GraSS
MOWN GraSS
EXPOSEd aGGrEGaTE
Fair FacEd cONcrETE FiNiSh aNd GraFFiTi PrOTEcTiON.
PaTTErN hidES JOiNTS BETWEEN SEcTiONS OF BarriEr
EXPrESSWay SidErESidENTiaL SidE
EXPrESSWay SidErESidENTiaL SidE
BacKFiLL FOLLOWS NOiSEWaLL TOP EdGE WiTh 1100 VErTicaL OFFSET
ThE PaiNTEd SEcTiON OF PaTTErN iS cO-OrdiNaTEd WiTh ThE GrOUTEd cOUNTErSUNK BOLTS FOr EaSE OF MaSKiNG
GrOUNdLiNE BEyONd-BacKFiLL FOLLOWS NOiSEWaLL TOP EdGE WiTh 1100 VErTicaL OFFSET
1100MM
NB2a GrOUNd LEVEL
NB2 GrOUNd LEVEL
900MM BaNd OF LiNEar PaTTErN FrOM FOrM LiNEr, Fair FacEd cONcrETE FiNiSh
TL4 Fair FacEd cONcrETE EXPrESSWay BarriEr TO FrONT
a-
a-
TOP OF EMBaNKMENT ShOWN daShEd
EXPrESSWay LEVEL ShOWN daShEd BEyONd
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
iNdicaTiVE PLaNTiNG-FOr FULL PLaNTiNG EXTENT rEFEr TO ShEETS 29, 30, 31, 32
+
INTERSECTION TYPE C - LOCAL ROAD CROSSING - OTAIHANGA ROAD
Destination
Destination
Destination
Destination
50 m
CD
AD1
AD1ID
60 m
Destination
Destination
Destination
Destination
GW ID+
+
50 m
20 m
50 m
AD1
AD2 CD
AD2
Otaihanga Road
Prop
osed
M2P
P Al
ignm
ent
PrOPOSEd cWB aLiGNMENT
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
1:4 PM Friday 7 March 2014
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 17cWB SiGNaGE PLaN
1:500
1:1000
M2PP-121-d-GPh-8902
EXISTING LOCAL ACCESS TRACK
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted:
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
DE
TA
IL D
ES
IGN
(D
ET
)
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
1:4 PM Friday 7 March 2014
-
A
B
19.09.13
20.12.13
PRELIMINARY ISSUE
FOR CERTIFICATION
-
BSSMP 5 & 6 - ShEET 18
cWB SiGN TyPE SUMMaryNTS
NTS
M2PP-121-d-GPh-8901
AI - ADVANCED INFO SIGNS
BE - BEGINNING AND ENDING SIGNS
AD01 - ADVANCED DIRECTION SIGN - ON LOCAL ROAD APPROACHING CWB
AD - ADVANCED DIRECTION - ON CWB
ID - INTERSECTION DIRECTION
CD - CONFIRMATION DIRECTION
LOCAL ROAD INTERSECTION SIGNS
CycleRoute
Kapiti
CycleRoute
KapitiCycleRoute
Kapiti
858 728
905 DOUBLE SIDED
190
190
190
925 728
750
858
DOUBLE SIDED
190
190
150
190
728 924
750
858
DOUBLE SIDED
190
150
190
190
728 905
858
DOUBLE SIDED
190
190
190
492
329
360
328
328
307492
329
433
375
858
190
522
190
190
578
300
550
300
550
300
550
BEGINS ENDS
400400
600
600
125
125
400400
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted: 27 Nov 2013 09:05 a.m.
M2PP
-47P
-D-S
KT-0
001.D
WG
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
A FOR INFORMATION ILM2PP-47P-D-SKT-0001 A
WAIKANAE RIVER CROSSINGCWB SIGNAGE LAYOUT
SKETCH1:10
1:20
IL 18.11.13IL 18.11.13
NOT FOR CONSTRUCTIONDRAFT ONLY
FOR INFORMATIONNOT FOR CONSTRUCTION
SIGN ARRANGEMENT 2-241:10
SIGN ARRANGEMENT 2-251:10
SIGN ARRANGEMENT 2-261:10
SIGN ARRANGEMENT 2-281:10
SIGNS 2-39, 2-40, 2-41, 2-421:10
SIGN 2-271:10
SIGN 2-291:10
NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM
THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.
SIGN ARRANGEMENT 2-301:10
SIGN 2-341:10
SIGNS 2-43, 2-451:10
SIGNS 2-44, 2-461:10
SIGN 2-311:10
SIGN 2-321:10
SIGN 2-331:10
SIGN 2-231:10
858 728
905 DOUBLE SIDED
190
190
190
925 728
750
858
DOUBLE SIDED
190
190
150
190
728 924
750
858
DOUBLE SIDED
190
150
190
190
728 905
858
DOUBLE SIDED
190
190
190
492
329
360
328
328
307492
329
433
375
858
190
522
190
190
578
300
550
300
550
300
550
BEGINS ENDS
40040060
0
600
125
125
400400
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted: 27 Nov 2013 09:05 a.m.
M2PP
-47P
-D-S
KT-0
001.D
WG
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.
Construction*
By Chk
EXPRESSWAY
0mm
30
10
20
40
A3 R
EPRO
DUCT
ION
SCAL
E
50
60
20
40
80
100
0mm
A1 R
EPRO
DUCT
ION
SCAL
E
A FOR INFORMATION ILM2PP-47P-D-SKT-0001 A
WAIKANAE RIVER CROSSINGCWB SIGNAGE LAYOUT
SKETCH1:10
1:20
IL 18.11.13IL 18.11.13
NOT FOR CONSTRUCTIONDRAFT ONLY
FOR INFORMATIONNOT FOR CONSTRUCTION
SIGN ARRANGEMENT 2-241:10
SIGN ARRANGEMENT 2-251:10
SIGN ARRANGEMENT 2-261:10
SIGN ARRANGEMENT 2-281:10
SIGNS 2-39, 2-40, 2-41, 2-421:10
SIGN 2-271:10
SIGN 2-291:10
NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM
THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.
SIGN ARRANGEMENT 2-301:10
SIGN 2-341:10
SIGNS 2-43, 2-451:10
SIGNS 2-44, 2-461:10
SIGN 2-311:10
SIGN 2-321:10
SIGN 2-331:10
SIGN 2-231:10
Destination
Destination
Destination
Destination
Destination
Destination
Destination
Destination
AT START OF ROUTE.INCLUDES:• MAP & INFO• LENGTH & DURATION OF RIDE / WALK
BE - Begins/Ends Signs are used to indicate the start and/or end point of a cycle route. They will include route specific information. Route Begins Signs should be installed on the left hand side of the CWB immediately beyond or adjacent to any advance information sign or at a logical starting point for the cycle route.
ID - The Intersection Direction Sign is located at or as near as possible to the actual intersection. Should include both Information about the destination and the distance.
Multiple sighs and destinations to be on one post
CD - The Confirmation Direction Sign is used to confirm the direction/destination of travel after an intersection it is intended to provide assurance to cyclists. The CD sign features a straight ahead arrow and should include both Information about the destination and the distance.
As a general rule of thumb, these signs should be installed; between 20-50m beyond an intersection where an Advance Direction Sign has been used and should generally be visible from that intersection;
Cyclists should see a CD sign at least every 15-30 minutes of typical cyclist travel, or every 5-10 km.
LR + GW - Local road (LR) and Giveway (GW) signs should to be used where the CWB crosses a local road. These are to be located at or as near as possible to the actual intersection. Where possible the LR should be kept to one per intersection and be able to be read by people on either side of the intersection. Both the LR and GW should share the same post and or be incorporateted onto an existing post.
AI - Advance Information Signs are not an essential requirement for public access tracks or cycle routes, nor are they standardised in terms of their design and layout. These signs may, if desired and appropriate, be installed at or near the start point of the route to provide detailed information, such as a map and information about the length and duration to ride etc. These signs should be clearly visible from the road, allowing cyclists and pedestrians a safe place to stop clear of the roadway or cycleway to read the information.
AD - The purpose of the Advance Direction Sign is to give cyclists prior warning, to enable them to make decisions and, if necessary, place themselves in the best position to make any change in direction required before they reach the intersection. These signs should be used in any situation where the cyclist could easily miss making a required turn at an approaching intersection.
To occur 40-60m in advance of an intersection and should only include Information about the destination, not the distance.
AD - The purpose of the Advance Direction Sign is to give cyclists prior warning, to enable them to make decisions and, if necessary, place themselves in the best position to make any change in direction required before they reach the intersection. These signs should be used in any situation where the cyclist could easily miss making a required turn at an approaching intersection.
To occur 40-60m in advance of an intersection and should only include Information about the destination, not the distance.
TYPICAL SIGN TYPES: