SPEEDLIMIT
75FINES
DOUBLED
RIGHT LANE
CLOSED 1 MILE
RIGHT LANE
CLOSED 1/2 MILE
REDUCED
SPEEDAHEAD
ROADWORK
2 MILES
FINES FORSPEEDING
DOUBLED INWORK ZONES
ENDROAD WORK
Thank YouDrive Safely
FLASHINGARROW PANEL
SPEEDLIMIT
75FINES
DOUBLED
SPEEDLIMIT
75
SPEEDLIMIT
55FINES
DOUBLED
Conventional Merge TCP
![Page 4: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/4.jpg)
4
![Page 5: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/5.jpg)
5
![Page 6: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/6.jpg)
6
![Page 7: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/7.jpg)
7
![Page 8: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/8.jpg)
8
Basic Approaches
• Early Merge
• Late Merge
![Page 9: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/9.jpg)
9
Early Merge
• Static
• Dynamic
![Page 10: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/10.jpg)
10
![Page 11: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/11.jpg)
11
![Page 12: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/12.jpg)
12
![Page 13: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/13.jpg)
13
![Page 14: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/14.jpg)
14
Indiana Lane Merge
![Page 15: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/15.jpg)
15
![Page 16: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/16.jpg)
16
Conventional Merge
Indiana Lane Merge
![Page 17: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/17.jpg)
17
Forced Merges
• Indiana: 0.4/hour
• Conventional: 20/hour
![Page 18: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/18.jpg)
18
Capacity
• Indiana: 1540 pcph
• Conventional: 1460 pcph
![Page 19: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/19.jpg)
19
Late Merge
![Page 20: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/20.jpg)
20
![Page 21: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/21.jpg)
21
USE BOTH LANES
TO MERGE POINT
ROADWORK
1 MILES
LEFT LANECLOSED 1/2 MILE
50MPH
CMS
45MPH
LEFT LANECLOSED 1500 FT
40MPH
LEFT LANECLOSED 1000 FT
40MPH
FlashingArrow Board
MERGE HERE
TAKE YOUR TURN
![Page 22: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/22.jpg)
22
Conventional Merge
Late Merge
![Page 23: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/23.jpg)
23
Conventional Merge
Late Merge
![Page 24: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/24.jpg)
24
![Page 25: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/25.jpg)
25
![Page 26: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/26.jpg)
26
![Page 27: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/27.jpg)
27
![Page 28: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/28.jpg)
28
Conclusions• Early & Late Merge Performed Better
Than Conventional Merge
• Lower Volumes:
Early Merge May Be Safer
• Higher Volumes:
Late Merge May Be Safer
& More Efficient
![Page 29: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/29.jpg)
29
LEDLIGHTS
(SOLAR POWERED)
VEHICLESENSOR ON BACK
EACH SENSOR CONTROLS THENEXT UPSTREAM SIGN'S FLASHERS
DETECTED ZONE FOR
STATION 2
DETECTED ZONE FOR
STATION 3
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
DETECTED ZONE FOR
STATION 1
LEFT LANE RESTRICTION(WORK ZONE)
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
USE BOTH LANES TO
MERGE POINT
WHENFLASHING
Dynamic Late Merge
![Page 30: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/30.jpg)
30
![Page 31: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/31.jpg)
31
Operational Issue
![Page 32: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways](https://reader035.vdocument.in/reader035/viewer/2022070410/568146a4550346895db3bf35/html5/thumbnails/32.jpg)
32
Research Needed
• Volume Thresholds for Transition Between Early & Late Merge
• Driver Information Needs
• Warrants for Implementation