Dynamic Late Merge Control Concept For Work Zones On Rural Freeways. Conventional Merge TCP. Basic Approaches Early Merge Late Merge. Early Merge. Static Dynamic. Indiana Lane Merge. Indiana Lane Merge. Conventional Merge. Forced Merges. Indiana: 0.4/hour Conventional: 20/hour. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

1

Dynamic Late Merge Control Concept

For

Work Zones

On

Rural Freeways

Page 2: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

2

Page 3: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

3

SPEEDLIMIT

75FINES

DOUBLED

RIGHT LANE

CLOSED 1 MILE

RIGHT LANE

CLOSED 1/2 MILE

REDUCED

SPEEDAHEAD

ROADWORK

2 MILES

FINES FORSPEEDING

DOUBLED INWORK ZONES

ENDROAD WORK

Thank YouDrive Safely

FLASHINGARROW PANEL

SPEEDLIMIT

75FINES

DOUBLED

SPEEDLIMIT

75

SPEEDLIMIT

55FINES

DOUBLED

Conventional Merge TCP

Page 4: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

4

Page 5: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

5

Page 6: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

6

Page 7: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

7

Page 8: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

8

Basic Approaches

• Early Merge

• Late Merge

Page 9: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

9

Early Merge

• Static

• Dynamic

Page 10: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

10

Page 11: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

11

Page 12: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

12

Page 13: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

13

Page 14: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

14

Indiana Lane Merge

Page 15: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

15

Page 16: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

16

Conventional Merge

Indiana Lane Merge

Page 17: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

17

Forced Merges

• Indiana: 0.4/hour

• Conventional: 20/hour

Page 18: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

18

Capacity

• Indiana: 1540 pcph

• Conventional: 1460 pcph

Page 19: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

19

Late Merge

Page 20: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

20

Page 21: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

21

USE BOTH LANES

TO MERGE POINT

ROADWORK

1 MILES

LEFT LANECLOSED 1/2 MILE

50MPH

CMS

45MPH

LEFT LANECLOSED 1500 FT

40MPH

LEFT LANECLOSED 1000 FT

40MPH

FlashingArrow Board

MERGE HERE

TAKE YOUR TURN

Page 22: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

22

Conventional Merge

Late Merge

Page 23: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

23

Conventional Merge

Late Merge

Page 24: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

24

Page 25: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

25

Page 26: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

26

Page 27: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

27

Page 28: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

28

Conclusions• Early & Late Merge Performed Better

Than Conventional Merge

• Lower Volumes:

Early Merge May Be Safer

• Higher Volumes:

Late Merge May Be Safer

& More Efficient

Page 29: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

29

LEDLIGHTS

(SOLAR POWERED)

VEHICLESENSOR ON BACK

EACH SENSOR CONTROLS THENEXT UPSTREAM SIGN'S FLASHERS

DETECTED ZONE FOR

STATION 2

DETECTED ZONE FOR

STATION 3

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

DETECTED ZONE FOR

STATION 1

LEFT LANE RESTRICTION(WORK ZONE)

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

USE BOTH LANES TO

MERGE POINT

WHENFLASHING

Dynamic Late Merge

Page 30: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

30

Page 31: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

31

Operational Issue

Page 32: Dynamic Late Merge Control Concept For Work Zones On Rural Freeways

32

Research Needed

• Volume Thresholds for Transition Between Early & Late Merge

• Driver Information Needs

• Warrants for Implementation