PROJECT: G+M COMMERCIAL BUILDING. OWNER : ALI KHALIFA ABDULLA ALATTIYAH & AREA: AL BARSHA 2ND
KHALID ABDULLA ISMAIL AL MUTAWA PLOT: 376-4694
CONSULTANT : PALACE ENGINEERING CONSULTANTS
CIRCUIT SP RATING-AMPS FAULT PVC/ ECC
FEEDER /TP ISO./ MCCB DUTY XLPE 2/4 X 1/2/3/4C SIZE R. PH Y. PH B. PH CON. MAX. DEMAND 1-PH 3-PH 3-PH LV/HV REMARKS
NUMBER /4P LBS / MCS KA SWA/PVC 1C mm mm2 1C mm2 KW. KW. KW. KW. KW. ( 1 ) ( 2 ) ( 3 ) CTACB
LOAD SUMMARY SHEET
CABLE SIZE CONNECTED LOAD-KW WH METERS (TYPES & NO
L.V. PANEL 4P 1600 65 2-1c x 150mm2 230.60 229.70 229.70 690.00 621.00 11 1 1600/5A
11 1 TOTAL (KW)
KW AT 0.90 TOTAL CONNECTED LOAD ( 3 PH ) KW.
PROVIDE CT-METER WHEN MAX. DEMAND ---> 100 KW.
(1) UP TO 60A (2) UP TO 100A (3) 100-200A (4)LV CT……………/…………..A
(1PHASE) (3PHASE)
621.00 MAX. DEMAND ( 3 PH ) :
BY DEWA
690690.00
230.60 690.00 TOTAL CONNECTED LOAD PER PHASE 229.70 621.00
DIVERSITY
229.70
E-930469 28/01/2013
1 x 1000kVA Transformer with LV Integral meter.
All the tenant meters are sub-meters to the main meters
-
8/18/2019 E-930469
2/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. AREA: AL BARSHA 2ND
OWNER: ALI KHALIFA ABDULLA ALATTIYAH PLOT: 376-4694
MDB/SMDB: L.V. PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM
CIRCUIT/ SP / PVC/* LENGTH ECC
FEEDERFAULT
XLPEOF
SIZE
DB NO.TP
F/S MCCBDUTY SWA/
2/4X1C 2/3/4C CABLE1C
R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT
ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}
INCOMER-1 4P 1600 65 DEWA 2R-1C x 150 230.60 229.70 229.70 690.00 11 1 1600/5A
MOBILE GEN. PROVISION 4P 1600 65
OUTGOINGS:- (ACB'S SET @ 0.9)
SMDB-LL TP 400 35 XLPE 4CX300mm2 1CX150mm2 56.30 59.00 57.50 172.80
SMDB-SHOP TP 800 35 XLPE 2X4c300mm2 2X1c150mm2 118.30 115.70 117.20 351.20 11
DB-SS SP 40 35 XLPE 3C x 10mm2 1C X 10mm2 1.00 0.00 0.00 1.00
SPARE - FUTURE TP 400 35 55.00 55.00 55.00 165.00 FUTURE EXPANSION
CAPACITOR BANK 500 35 XLPE 2x4C x 150 2x1Cx 70 AUTO STEP 200KVAR
CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553
Type of Meter ( Rating of Incomer ) : (1) Up to 60A (2) Up to 100A (3) 125 - 160 A (4) LV CT / A / HV CT / A
( 1Phase ) ( 3phase )
0.90 . (3 .): .
& .
.
: 30.04.2013
: TRANSFORMER (1000KVA) :
: LV DB/ TRANSF.
Refer landlord letter Ref:.. dated 10/01/2013 for the proposed spare load. Spare/ Future load shall be subject to Dewa's prior approval/
inspection. Ensure not to propose single motor load more than 50kW.*
*
-
8/18/2019 E-930469
3/38
PROJECT: G+M COMMERCIAL BUILDING. DETAILS OF CONNECTED LOAD / MAX. DEMAND & KWH METERING AREA: AL BARSHA 2ND
SMDB: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH PLOT: 376-4694
FED FROM : LV-PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM
CIRCUIT/ SP / PVC/* LENGTH ECC
FEEDERFAULT
XLPEOF
SIZE
DB NO.TP
F/S MCCBDUTY
SWA/ 2/4X1C 2/3/4C CABLE 1C R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT
ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}
INCOMER TP 400 XLPE 4c x 300mm2 1c x 150mm2 56.30 59.00 57.50 172.80
OUTGOINGS:- N/A
DB-TEL TP 40 25 XLPE 4c x 16mm2 1c x 16mm2 3.80 5.80 3.80 13.40
DB-LL TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 10.50 11.20 11.70 33.40
JOCKEY PUMP TP 32 25 XLPE 4c x 6mm2 1c x 6mm2 2.00 2.00 2.00 6.00 300mA ELCB, ELS+ALARM
FIRE PUMP TP 225 25 XLPE 4c x 120mm2 1c x 70mm2 28.00 28.00 28.00 84.00 ELS+ALARM
DB- SERVICES TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 7.00 7.00 7.00 21.00
SPARE TP 40 25 5.00 5.00 5.00 15.00 FUTURE
MDB CONNECTED TO: DEWA LV DB/TRANSF.
SMDB CONNECTED TO: LV PANEL
CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553
( ) : (1) 60 (2) 100 (3) 125 160 (4) / / /
( 1 ) ( 3 )
(3 .): 1.00 . .
:
& .
STARTER
-
8/18/2019 E-930469
4/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. DETAILS OF CONNECTED LOAD / MAX. DEMAND & KWH METERING AREA: AL BARSHA 2ND
MDB: SMDB-SH (SHOPS) OWNER:ALI KHALIFA ABDULLA ALATTIYAH
PLOT: 376-4694 FED FROM : LV PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM
CIRCUIT/ SP / PVC/* LENGTH ECC
FEEDERFAULT
XLPEOF
SIZE
DB NO.TP
F/S MCCBDUTY
SWA/ 2/4X1C 2/3/4C CABLE 1C R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT
ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}
INCOMER TP 800 XLPE 2X4C x 300mm2 2X1Cx 150mm2 118.30 115.70 117.20 351.20 11
OUTGOINGS:- N/A
DB-SH1 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1
DB-SH2 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1
DB-SH3 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1
DB-SH4 TP 100 25 XLPE 4c x 50mm2 1c x 25mm2 16.40 17.40 16.20 50.00 1
DB-SH5 TP 100 25 XLPE 4c x 50mm2 1c x 25mm2 16.20 16.10 17.70 50.00 1
DB-SH6 TP 40 25 XLPE 4c x 10mm2 1c x 10mm2 3.13 3.03 3.53 9.70 1
DB-SH7 TP 40 25 XLPE 4c x 10mm2 1c x 10mm2 3.13 3.03 3.53 9.70 1
DB-SH8 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 11.13 10.93 10.33 32.40 1
DB-SH9 TP 100 25 XLPE 4c x 35mm2 1c x 16mm2 15.00 15.10 14.20 44.30 1
DB-SH10 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 12.90 12.30 12.80 38.00 1
DB-SH11 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 13.70 12.30 12.20 38.20 1
MDB CONNECTED TO: DEWA LV DB/TRANSF.
SMDB CONNECTED TO: LV PANEL
CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553
( ) : (1) 60 (2) 100 (3) 125 160 (4) / / /
( 1 ) ( 3 )
(3 .): . 0.90 . .
:
& .
-
8/18/2019 E-930469
5/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. AREA: AL BARSHA 2ND
DB No: DB-SS PLOT: 376-4694
FED FROM: L.V. PANEL LOCATION: GROUND FLOOR
LTG CHAND C. FANEX.
FAN
13A
S/O
15A
S/OW/H H/D
COOKE
RW' A/C BELL WATER PUMP
R Y B
1 C1 10 2.5 2.5 SUBSTATION 4 100 400
2 C2 SPACE
3 C3 SPACE
4 C4 20 4.0 2.5 SUBSTATION 3 200 600
5 C5 SPACE
6 C6 SPACE
1000 1.00 KW
= 3C X 10 mm2 CU.XLPE/SWA/PVC.SUB MAIN CABLE
W / UNIT
4 0 A S P + N
I S O L A T O R
20A
100mA 2P
(SEC. 1)
20A 30mA
2P (SEC.
2)
LOAD DISTRIBUTION SCHEDULE
[ 1 - Phase ]
RATING OF
INCOMER
RATING
OF ELCBSL. No.
CIR
NO.
CONNECTED LOADS/POINTS LOAD PER CIRCUITREMARKS
MCB
RATIN
G IN A
CCT
WIRE
SIZE
mm2
RCC
WIRE
SIZE
mm2
ROOM/AREA
-
8/18/2019 E-930469
6/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-TEL (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH LOCATION: TEL ROOM
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A HAND 15 A CU. UNIT R Y B
A mm² mm² FAN S/O S/O DRYER S/O UNIT
1 R1 10 2.5 2.5 TEL ROOM 100 200
2 Y1 SPACE X X
3 B1 10 SPARE 200 200
4 R2 20 4 2.5 TEL ROOM 2 200 400 WALL
4P 5 Y2 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR
40A 6 B2 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR
7 R3 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR
8 Y3 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR
9 B3 20 SPARE 400 400
10 R4 20 SPARE 800 800
11 Y4 20 SPARE 800 800
30mA 12 B4 20 SPARE 800 800
13 R5 1,000
14 Y5 1 1,000 63A ISOL
15 B5 1,000
16 R6 1,000
17 Y6 1 1,000 63A ISOL
18 B6 1,000
19 R7SPACE X X
20 Y7 32 6 4 GCU-19 1 2200 2,200 UVR+TIMER
21 B7 SPACE X X
TOTAL 3.80 5.80 3.80 13.40 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
3000
TP 20A 4X4 1X4 TEL ROOM 3000
TP 20A 4X4 1X4 TEL ROOM
-
8/18/2019 E-930469
7/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SERVICES (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH LOCATION: GROUND FLOOR - EXTERNAL AREA
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
2 Y1 20 4 2.5EXTERNL
FLOOD LTG
1 1000 1,000
3 B1 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
4 R2 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
5 Y2 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
6 B2 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
7 R3 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
8 Y3 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
9 B3 20 4 2.5
EXTERNL
FLOOD LTG 1 1000 1,000
10 R4 20 4 2.5EXTERNL
FLOOD LTG1 1000 1,000
11 Y4 20 SPARE 1000 1,000
12 B4 20 SPARE 1000 1,000
13 R5 TP 2,000 W/P
14 Y5 25A 4X6 1X4IRRIGATIONN
PUMP 6000 2,000 25A ISO
15 B5 2,000
16 R6 20 SPARE 1000 1,000
17 Y6 20 SPARE 1000 1,000
18 B6 20 SPARE 1000 1,000
TOTAL 7.00 7.00 7.00 21.00
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
EXTERNAL
FLOOD LIGHTS
ON
DECORATIVE
COLUMNS
-
8/18/2019 E-930469
8/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-LL (Sh..1...of…2..) (3-Phase) PLOT: 376-4694FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH LOCATION: GROUND FLOOR - LV ROOM
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 16 2.5 2.5COMMON
WASHROOM10 4 100 1,400
2 Y1 16 2.5 2.5PASSAGE+LV
RM +PUMPRM11 100 1,100
3 B1 16 4.0 4.0 POLE LIGHTS 4 300 1,200 ARMOURED
4 R2 10 2.5 2.5 ELECT CABIN 2 100 200
5 Y2 10 2.5 2.5OPEN
TERRACE7 100 700
6 B2 16 4.0 4.0 POLE LIGHTS 4 300 1,200 ARMOURED
7 R3 10 2.5 2.5 ROOF 4 200 800 HALOGEN LTG
8 Y3 10 2.5 2.5 ROOF 4 200 800 HALOGEN LTG
9 B3 10 2.5 2.5 ROOF 4 200 800 HALOGEN LTG
10 R4 10 2.5 2.5 ROOF 8 100 800 W/P
11 Y4 10 SPARE 500 500
12 B4 10 2.5 2.5 ROOF 6 100 600 W/P
13 R5 10 2.5 2.5 EXT. LGT 1 500 500
14 Y5 10 2.5 2.5 EXT. LGT 1 500 500
15 B5 10 2.5 2.5 EXT. LGT 1 500 500
16 R6 10 2.5 2.5 EXT. LGT 1 500 500
17 Y6 10 2.5 2.5 EXT. LGT 1 500 500
18 B6 10 2.5 2.5 EXT. LGT 500
19 R7 10 2.5 2.5 EXT. LGT 1 500 500
20 Y7 10 2.5 2.5 EXT. LGT 1 500 500
21 B7 10 SPARE 500 500
22 R8 10 SPARE 500 500
23 Y8 10 SPARE 500 500
24 B8 10 SPARE 500 500
25 R9 20 4.0 2.5
COMMON
WASHROOM 1 1200 1,200
26 Y9 20 4.0 2.5 L.V.ROOM 2 200 400
27 B9 20 4.0 2.5 PUMP ROOM 2 200 400
28 R10 20 4 2.5COMMON
WASHROOM1 1200 1,200
29 Y10 20 4 2.5GARBAGE
ROOM1 200 200 W/P
30 B10 20 4 2.5 W/P
CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
PROVISIONS
FOR
EXTERNAL
LTGS ON
FRONT
ELEVATIONS
-
8/18/2019 E-930469
9/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-LL (Sh..2...of…2..) (3-Phase) PLOT: 376-4694
FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH LOCATION: GROUND FLOOR - LV ROOM
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
31 R11 20 SPARE 400 400
32 Y11 20 4 2.5 ROOF 200 800 W/P
33 B11 20 4 2.5OPEN
TERRACE 200 200 W/P
34 R12 SPACE X X
35 Y12 32 6 4GCU-21 / PMP
RM 2200 2,200 UVR+TIMER
36 B12 32 6 4GCU-20 / LV
RM 2200 2,200
37 R13 TP 1,000
38 Y13 20A 4X4 1X4BOOSTER
PUMP 3000 1,000 ROOF
39 B13 1,000
40 R14 TP 1,500
41 Y14 20A 4X4 1X4TRANSFER
PUMP 4500 1,500 PUMP ROOM
42 B14 1,500
TOTAL 10.50 11.20 11.70 33.40
CABLE SIZE: 1 X 4C 25 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
-
8/18/2019 E-930469
10/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2NDDB No: DB-SH1, SH2, SH3 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-1,2,3 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 8 100 800
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 2.5 2.5 SHOP 8 100 800
4 R2 10 2.5 2.5 SHOP 8 100 800
5 Y2 10 2.5 2.5 PANTRY 3 1 100 400
6 B2 20 4 2.5 SIGNBOARD 1 1000 1,000
7 R3 20 4 2.5 SHOP 3 200 600
8 Y3 20 4 2.5 12-U 2 200 400
9 B3 32 4 2.5 SHOP 6 200 1,200 RING
10 R4 20 4 2.5 PANTRY 1 1000 1,000
11 Y4 20 4 2.5 TOILET 1 1200 1,200
12 B4 20 SPARE 200 200
13 R5 1,800
14 Y5 1 1,800 UVR+TIMER
15 B5 1,800
16 R6 20 4 2.5 GFCU-1 1 300 300
17 Y6
18 B6
19 R7 1,800
20 Y7 1 1,800 UVR+TIMER
21 B7 1,800
22 R8
23 Y8 20 4 2.5 GFCU-2 1 300 300
24 B8
25 R9 1,800
26 Y9 1 1,800 UVR+TIMER
27 B9 1,800
28 R10
29 Y10
30 B10 20 4 2.5 GFCU-3 1 300 300
TOTAL 8.90 8.50 8.90 26.30 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
5400
TP 25A 4X6 1X4 GCU-2 5400
TP 25A 4X6 1X4 GCU-1
TP 25A 4X6 1X4 GCU-3
-
8/18/2019 E-930469
11/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 4 (Sh..1...of…2...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000
2 Y1 16 4.0 2.5 SHOP 11 100 1,100
3 B1 16 4.0 2.5 SHOP 11 100 1,100
4 R2 16 4.0 2.5 SHOP 11 100 1,100
5 Y2 10 SPARE 200 200
6 B2 10 2.5 2.5 SHOP 5 2 100 700
7 R3 32 4 2.5 SHOP 5 200 1,000 RING
8 Y3 32 4 2.5 SHOP 5 200 1,000 RING
9 B3 20 4 2.5 12-U 2 200 400
10 R4 20 SPARE 200 200
11 Y4 20 4 2.5 PANTRY 1 1000 1,000
12 B4 20 4 2.5 WASH 1 1200 1,200
13 R5 1,800
14 Y5 1 1,800 UVR+TIMER
15 B5 1,800
16 R6 20 4 2.5 GFCU-10 1 300 300
17 Y6
18 B6
19 R7 1,800
20 Y7 1 1,800 UVR+TIMER
21 B7 1,800
22 R8
23 Y8 20 4 2.5 GFCU-11 1 300 300
24 B8
CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 GCU-11 5400
TP 25A 4X6 1X4 GCU-10
-
8/18/2019 E-930469
12/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 4 (Sh..2...of…2...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
25 R9 1,800
26 Y9 1 1,800 UVR+TIMER
27 B9 1,800
28 R10
29 Y10
30 B10 20 4 2.5 GFCU-12 1 300 300
31 R11 1,800
32 Y11 1 1,800 UVR+TIMER
33 B11 1,800
34 R12 20 4 2.5 MFCU-1 1 300 300
35 Y12
36 B12
37 R13 1,800
38 Y13 1 1,800 UVR+TIMER
39 B13 1,800
40 R14
41 Y14 20 4 2.5 MFCU-2 1 300 300
42 B14
43 R15
44 Y15 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 3500 4500 3500 11.50 kW
45 B15 ( XLPE/SWA/PVC/CU )
TOTAL 16.40 17.40 16.20 50.00 kW
CABLE SIZE: 1 X 4C 50 mm2 CU.XLPE/SWA/PVC + 1 x 1C 25 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
40A TP
10-
15KA
4C 16 1C 16 TO DB - SH4 M
5400
TP 25A 4X6 1X4 MCU-1 5400
TP 25A 4X6 1X4 GCU-12
TP 25A 4X6 1X4 MCU-2
-
8/18/2019 E-930469
13/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 4M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: DB-SH 4 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 MEZZANINE
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 9 100 900
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 2.5 2.5 SHOP 8 100 800
4 R2 10 SPARE 400 400
5 Y2 10 2.5 2.5 PANTRY 5 2 100 700
6 B2 SPACE X X
7 R3 20 4 2.5 SHOP 2 200 400
8 Y3 20 4 2.5 TOILET 1 1200 1,200
9 B3 20 4 2.5 SHOP 3 200 600
10 R4 1,800
11 Y4 1 1,800 UVR+TIMER
12 B4 1,800
13 R5
14 Y5
15 B5 20 4 2.5 MFCU-3 1 300 300
TOTAL 3.50 4.50 3.50 11.50 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MCU-3
-
8/18/2019 E-930469
14/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 5 (Sh..1...of…2...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-5 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 16 4.0 2.5 SHOP 11 100 1,100
2 Y1 16 4.0 2.5 SHOP 11 100 1,100
3 B1 16 4.0 2.5 SHOP 11 100 1,100
4 R2 10 SPARE 500 500
5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000
6 B2 10 2.5 2.5 PANTRY 5 2 100 700
7 R3 20 4 2.5 SHOP 4 200 800
8 Y3 20 4 2.5 12-U 2 200 400
9 B3 32 4 2.5 SHOP 5 200 1,000 RING
10 R4 20 SPARE 800 800
11 Y4 20 4 2.5 PANTRY 1 1000 1,000
12 B4 20 4 2.5 WASH 1 1200 1,200
13 R5 1,700
14 Y5 1 1,700 UVR+TIMER
15 B5 1,700
16 R6 20 4 2.5 GFCU-13 1 300 300
17 Y6
18 B6
19 R7 1,700
20 Y7 1 1,700 UVR+TIMER
21 B7 1,700
22 R8
23 Y8 20 4 2.5 GFCU-14 1 300 300
24 B8
CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5100
TP 25A 4X6 1X4 GCU-14. 5100
TP 25A 4X6 1X4 GCU-13
-
8/18/2019 E-930469
15/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 5 (Sh..2...of…2...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-5 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
25 R9 1,700 26 Y9 1 1,700 UVR+TIMER
27 B9 1,700
28 R10
29 Y10
30 B10 20 4 2.5 GFCU-15 1 300 300
31 R11 1,700
32 Y11 1 1,700 UVR+TIMER
33 B11 1,700
34 R12 20 4 2.5 MFCU-4 1 300 300
35 Y12
36 B1237 R13 1,700
38 Y13 1 1,700 UVR+TIMER
39 B13 1,700
40 R14
41 Y14 20 4 2.5 MFCU-5 1 300 300
42 B14
43 R15
44 Y15 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 3900 3500 4900 12.30 kW
45 B15 ( XLPE/SWA/PVC/CU )
TOTAL 16.20 16.10 17.70 50.00 kW
CABLE SIZE: 1 X 4C 50 mm2 CU.XLPE/SWA/PVC + 1 x 1C 25 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5100
40A TP
10-
15KA
4C 16 1C 16 TO DB - SH5M
5100
TP 25A 4X6 1X4 MCU-4 5100
TP 25A 4X6 1X4 GCU-15
TP 25A 4X6 1X4 MCU-5
-
8/18/2019 E-930469
16/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 5M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: DB-SH5 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP- 5M
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 9 100 900
2 Y1 10 2.5 2.5 SHOP 9 100 900
3 B1 10 2.5 2.5 SHOP 9 100 900
4 R2 10 SPARE 800 800
5 Y2 10 SPARE 200 200
6 B2 10 2.5 2.5 PANTRY 5 2 100 700
7 R3 20 4 2.5 SHOP 2 200 400
8 Y3 20 4 2.5 SHOP 3 200 600
9 B3 20 4 2.5 TOILET 1 1200 1,200
10 R4 1,800
11 Y4 1 1,800 UVR+TIMER
12 B4 1,800
13 R5
14 Y5
15 B5 20 4 2.5 MFCU-6 1 300 300
TOTAL 3.90 3.50 4.90 12.30 kWCABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MCU-6
-
8/18/2019 E-930469
17/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 6, 7 (TYP) (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-6,7 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 SPARE 800 800
4 R2 20 4.0 2.5 12-U 2 200 400
5 Y2 20 SPARE 200 200
6 B2 32 4 2.5 SHOP 5 200 1,000 RING
7 R3 1,733
8 Y3 1 1,733 UVR+TIMER
9 B3 1,733
10 R4
11 Y4 20 4 2.5 GFCU-16 1 300 300
12 B4
TOTAL 3.13 3.03 3.53 9.70 kW
CABLE SIZE: 1 X 4C 10 mm2 CU.XLPE/SWA/PVC + 1 x 1C 10 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5200
TP 25A 4X6 1X4 GCU-16
-
8/18/2019 E-930469
18/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 8 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-8 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 SPARE 800 800
4 R2 20 SPARE 800 800
5 Y2 20 4 2.5 12-U 2 200 400
6 B2 20 4 2.5 SHOP 1 200 200
7 R3 1,733
8 Y3 1 1,733 UVR+TIMER
9 B3 1,733
10 R4
11 Y4
12 B4 20 4 2.5 GFCU-18 1 300 300
13 R5 1,800
14 Y5 1 1,800 UVR+TIMER
15 B5 1,800
16 R6 20 4 2.5 MFCU-7 1 300 300
17 Y6
18 B6
19 R7
20 Y7 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 5500 6200 5500 17.20 kW
21 B7( XLPE/SWA/PVC/CU )
TOTAL 11.13 10.93 10.33 32.40 kW
CABLE SIZE: 1 X 4C 25 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5200
TP 25A 4X6 1X4 MCU-7 5400
TP 25A 4X6 1X4 GCU-18
40A TP
10-
15KA
4C 16 1C 16 TO DB - SH8 M
-
8/18/2019 E-930469
19/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 8M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: DB-SH8 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP- 8M
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 8 100 800
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 2.5 2.5 SHOP 8 100 800
4 R2 10 2.5 2.5 SHOP 7 100 700
5 Y2 10 2.5 2.5 PANTRY 2 1 100 300
6 B2 10 SPARE 200 200
7 R3 20 4 2.5 SHOP 2 200 400
8 Y3 20 4 2.5 WASH 1 1200 1,200
9 B3 20 4 2.5 SHOP 3 200 600
10 R4 1,800
11 Y4 1 1,800 UVR+TIMER
12 B4 1,800
13 R5
14 Y5 20 4 2.5 MFCU-8 1 300 300
15 B5
16 R6 1,800
17 Y6 1 1,800 UVR+TIMER
18 B6 1,800
19 R7
20 Y7
21 B7 20 4 2.5 MFCU-9 1 300 300
TOTAL 5.50 6.20 5.50 17.20 kW
CABLE SIZE: 1 X 4C 16 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MCU-9 5400
TP 25A 4X6 1X4 MCU-8
-
8/18/2019 E-930469
20/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 9 (Sh..1...of…2..) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 9 100 900
2 Y1 10 2.5 2.5 SHOP 9 100 900
3 B1 10 2.5 2.5 SHOP 9 100 900
4 R2 10 SPARE 800 800
5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000
6 B2 10 SPARE 200 200
7 R3 20 4 2.5 SHOP 3 200 600
8 Y3 20 4 2.5 12-U 2 200 400
30mA 9 B3 20 4 2.5 SHOP 4 200 800
10 R4 2,200
11 Y4 1 2,200 UVR+TIMER
12 B4 2,200
13 R5 20 4 2.5 GFCU-23 1 300 300
14 Y5
15 B5
16 R6 2,200
17 Y6 1 2,200 UVR+TIMER
18 B6 2,200
19 R7
20 Y7
21 B7 20 4 2.5 GFCU-24 1 300 300
CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
6600
TP 25A 4X6 1X4 GCU-24 6600
TP 25A 4X6 1X4 GCU-23
-
8/18/2019 E-930469
21/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 9 (Sh..2..of…2..) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
22 R8 1,800
23 Y8 1 1,800 UVR+TIMER
24 B8 1,800
25 R9 20 4 2.5 MFCU-10 1 300 300
26 Y9
27 B9
28 R10 1,800
29 Y10 1 1,800 UVR+TIMER
30 B10 1,800 31 R11
32 Y11 20 4 2.5 MFCU-11 1 300 300
33 B11
34 R12
35 Y12 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 4100 4500 4000 12.60 kW
36 B12 ( XLPE/SWA/PVC/CU )
TOTAL 15.00 15.10 14.20 44.30 kW
CABLE SIZE: 1 X 4C 35 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MCU-11 5400
TP 25A 4X6 1X4 MCU-10
40A TP
10-
15KA
4C 16 1C 16 TO DB-SH9 M
-
8/18/2019 E-930469
22/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 9M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: DB-SH 9 ( GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9M
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT1 R1 10 2.5 2.5 SHOP 8 100 800
2 Y1 10 2.5 2.5 SHOP 8 100 800
3 B1 10 2.5 2.5 SHOP 7 100 700
4 R2 10 2.5 2.5 SHOP 7 100 700
5 Y2 10 2.5 2.5 PANTRY 2 1 100 300
6 B2 10 SPARE 200 200
7 R3 20 4 2.5 SHOP 2 200 400
8 Y3 20 4 2.5 WASH 1 1200 1,200
9 B3 20 4 2.5 SHOP 3 200 600
10 R4 2,200
11 Y4 1 2,200 UVR+TIMER
12 B4 2,200
13 R5
14 Y5
15 B5 20 4 2.5 MFCU-12 1 300 300
TOTAL 4.10 4.50 4.00 12.60 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
6600
TP 25A 4X6 1X4 MCU-12
-
8/18/2019 E-930469
23/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 10 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-10 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 9 100 900 2 Y1 10 2.5 2.5 SHOP 9 100 900
3 B1 10 2.5 2.5 SHOP 9 100 900
4 R2 10 SPARE 800 800
5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000
6 B2 SPACE X X
7 R3 20 4 2.5 12-U 2 200 400
8 Y3 20 4 2.5 SHOP 4 200 800
30mA 9 B3 20 4 2.5 SHOP 4 200 800
10 R4 2,200
11 Y4 1 2,200 UVR+TIMER
12 B4 2,200 13 R5 20 4 2.5 GFCU-25 1 300 300
14 Y5
15 B5
16 R6 2,200
17 Y6 1 2,200 UVR+TIMER
18 B6 2,200
19 R7
20 Y7
21 B7 20 4 2.5 GFCU-26 1 300 300
22 R8
23 Y8 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 6100 5200 6400 17.70 kW24 B8 ( XLPE/SWA/PVC/CU )
TOTAL 12.90 12.30 12.80 38.00 kW
CABLE SIZE: 1 X 4C 25 mm2 CU.PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
6600
TP 25A 4X6 1X4 GCU-26 6600
TP 25A 4X6 1X4 GCU-25
40A TP
10-15KA
4C 16 1C 16 TO DB-SH10 M
-
8/18/2019 E-930469
24/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 10M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-10 M
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 7 100 700 2 Y1 10 2.5 2.5 SHOP 7 100 700
3 B1 10 2.5 2.5 SHOP 8 100 800
4 R2 10 SPARE 200 200
5 Y2 SPACE X X
6 B2 10 2.5 2.5 PANTRY 2 1 100 300
7 R3 20 4 2.5 SHOP 3 200 600
8 Y3 20 4 2.5 SHOP 3 200 600
9 B3 20 4 2.5 WASH 1 1200 1,200
10 R4 20 4 2.5 PANTRY 1 1000 1,000
11 Y4 SPACE X X
12 B4 20 SPARE 200 200 13 R5 1,800
14 Y5 1 1,800 UVR+TIMER
15 B5 1,800
16 R6
17 Y6
18 B6 20 4 2.5 MF-FCU-13 1 300 300
19 R7 1,800
20 Y7 1 1,800 UVR+TIMER
21 B7 1,800
22 R8
23 Y8 20 4 2.5 MF-FCU-14 1 300 300
24 B8
TOTAL 6.10 5.20 6.40 17.70 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MFCU-14 5400
TP 25A 4X6 1X4 MFCU-13
-
8/18/2019 E-930469
25/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 11 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-11 GF
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 9 100 900 2 Y1 10 2.5 2.5 SHOP 9 100 900
3 B1 10 2.5 2.5 SHOP 9 100 900
4 R2 20 4 2.5 SIGNBOARD 1 1000 1,000
5 Y2 SPACE X X
6 B2 10 SPARE 200 200
7 R3 20 4 2.5 12-U 2 200 400
8 Y3 20 4 2.5 SHOP 4 200 800
30mA 9 B3 20 4 2.5 SHOP 4 200 800
10 R4 2,200
11 Y4 1 2,200 UVR+TIMER
12 B4 2,200
13 R5 20 4 2.5 GFCU-27 1 300 300
14 Y5
15 B5
16 R6 2,200
17 Y6 1 2,200 UVR+TIMER
18 B6 2,200
19 R7
20 Y7
21 B7 20 4 2.5 GFCU-28 1 300 300
22 R8
23 Y8 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 6700 6200 5600 18.50 kW
24 B8 ( XLPE/SWA/PVC/CU )
TOTAL 13.70 12.30 12.20 38.20 kW
CABLE SIZE: 1 X 4C 25 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
6600
TP 25A 4X6 1X4 GCU-28 6600
TP 25A 4X6 1X4 GCU-27
40A TP
10-
15KA
4C 16 1C 16 TO DB-SH11 M
-
8/18/2019 E-930469
26/38
PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND
DB No: DB-SH 11M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694
FED FROM: DB-SH 11 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP - 11M
RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER
OF OF No. No. RTG. WIRE WIRE ROOM / W/ CIRCUIT-W REMARKS
INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP CU. UNIT R Y B
A mm² mm² FAN S/O S/O S/O D/W UNIT
1 R1 10 2.5 2.5 SHOP 7 100 700 2 Y1 10 2.5 2.5 SHOP 7 100 700
3 B1 10 SPARE 200 200
4 R2 10 2.5 2.5 SHOP 8 100 800
5 Y2 10 2.5 2.5 SHOP 8 100 800
6 B2 10 2.5 2.5 PANTRY 2 1 100 300
7 R3 20 4 2.5 SHOP 3 200 600
8 Y3 20 4 2.5 SHOP 3 200 600
9 B3 20 4 2.5 WASH 1 1200 1,200
10 R4 20 4 2.5 PANTRY 1 1000 1,000
11 Y4 20 SPARE 200 200
12 B4 SPACE X X13 R5 1,800
14 Y5 1 1,800 UVR+TIMER
15 B5 1,800
16 R6
17 Y6
18 B6 20 4 2.5 MFCU-15 1 300 300
19 R7 1,800
20 Y7 1 1,800 UVR+TIMER
21 B7 1,800
22 R8
23 Y8 20 4 2.5 MFCU-16 1 300 300 24 B8
TOTAL 6.70 6.20 5.60 18.50 kW
CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet
W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.
5400
TP 25A 4X6 1X4 MCU-16 5400
TP 25A 4X6 1X4 MCU-15
-
8/18/2019 E-930469
27/38
-
8/18/2019 E-930469
28/38
N E I G H B O U R
P L O T : 3 7 6 - 4 6 9 5
N E I G H B O U R
P L O T
3 7 6 - 4 6 9 3
GROUND FLOORLIMIT
±0.00F.G.L
UP
GROUND FLOOR
+0.30F.G.L
PERGOLA AREA
SUB STATION
GARBAGE RM.
LVROOM
PUMP.RM
TEL.ROOM
GROUND FLOORLIMIT
FIRST FLOOR LIMIT
FIRST FLOOR LIMIT
GROUND FLOORLIMIT
U/G RCC WATERTANK
UP
LIMIT
+6.97F.F.L
+5.02F.F.L
+5.02F.F.L
+5.02F.F.L
+0.30F.G.L
+0.30F.G.L
TEMPORARY GATE LEVEL =
+6.90 =±0.00
TEMPORARY GATE LEVEL =
+6.90 =±0.00
TEMPORARY GATE LEVEL =
+6.90 =±0.00PLOTLIMIT
S E R V I C E C O R R I D O R (P L O T N O - 376 2515)
PLOTLIMITPLOTLIMIT
PLOTLIMIT
+0.30F.G.L
+9.02S.S.L
+9.02S.S.L
1,427.18 SQ. FT.
LVROOM
DB-3 DB-2 DB-1
DB-10DB-11 DB-9
DB-5
DB-4
DB-6
DB-7
LVROOM
DB-SS
LVPANEL
6 1 0
2 5 5
514
320
B A N K
C A P A C I T O R
DB-LL SMDB-LL
514
E : 488808.391
N : 2778044.489
E : 488833.235
N : 2778026.275
UM SUQUIM ROAD SIDE
514
SETTINGOUT PLAN
ELECTRICAL
ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX:04-3297330 P.O. BOX:
73888 E-mail: [email protected]
PROPOSED COMMERCIAL
BUILDING
(GROUND + MEZZANINE)
ALI KHALIFA ABDULLA AL ATTIYAH,KHALID ABDULLAH ISMAIL ALMUTAWA.
4x18W FLUORESCENT LIGHT RECESSED( HIGH MIRROR TYPE)
WHITE POLYCARBONATE LAMP HOLDER
ZINC COATED STEEL POLYSTER POWDER COATED
W/P 2 X 36W LUMINAIRES, BODYMADE OF
W/P RECESSED FITTING.2X26W /1X26W
MIRROR LIGHT 1X18W
W/P WALL MOUNTED FITTING.2X26W /1X26W
2-WAY SWITCH
1-WAY SWITCH
INTERMEDIATE SWITCH
GRID SWITCH WITH PHASE BARRIER
LEGENDS
W/P BULK HEAD FITTING.2X26W /1X26W
METAL HALIDE SPOT LIGHT 1X175W
DECORATIVE POLE LIGHTING 2-2X26W
BRIGHT ELECTRICAL WORKS LLC
SHOP DRAWING STATUS
APPROVED
APPROVED AS COMMENTED
REJECTED & RESUBMIT
BY:
12U
13A SINGLE SWITCH SOCKET OUTLET
13A TWIN SWITCH SOCKET OUTLET
13A SINGLE SWITCH SOCKET OUTLET
(WEATHER PROOF)
FLEXIBLE OUTLET FOR WATER HEATER
15A SWITCH SOCKET OUTLET
20A DP SWITCH WITH NEON INDICATOR
SPN ISOLATOR W/P IP65
TPN ISOLATOR W/P IP65
WATER HEATER
OPTICAL NETWORK TERMINAL
DISTRIBUTION BOARD
MAIN DISTRIBUTION BOARD WATER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P R O D U C E D
B Y A
N
A U T O D E S K
E D U C A T I O N A L P R O D U C T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P R OD U C E D
BY
AN
A UT ODE S K
E D U C AT I O
NAL P R OD U C T
-
8/18/2019 E-930469
29/38
-
8/18/2019 E-930469
30/38
-
8/18/2019 E-930469
31/38
-
8/18/2019 E-930469
32/38
-
8/18/2019 E-930469
33/38
-
8/18/2019 E-930469
34/38
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
-
8/18/2019 E-930469
35/38
ROOF+9.49
S.S.L
ROOF
+9.49
S.S.L
ROOF
+6.87S.S.L
CONSULTANTS APPROVAL
CAT LADDER ASPER
CONSULTANTS APPROVAL
CAT LADDER ASPER
pergola as per
consultants approval
pergola as per
consultants approval
TERRACE BELOW
+4.92S.S.L
+9.90S.S.L
BELOWBUILDINGLINE
BELOWBUILDINGLINE
BELOWBUILDINGLINE
BELOWBUILDINGLINE
REF. DWG. NO. A-401 REF. DWG. NO. A-401
REF. DWG. NO.A-401
REF. DWG. NO.A-401
REF. DWG. NO.A-401REF. DWG. NO.A-401
500 GALONLBG SYSTEM
LBG SYSTEMCONTROL PANEL
RISER FOR LBG SYSTEMPIPESRISER FOR LBG SYSTEM PIPES RISER FOR LBG SYSTEM PIPES
RISER FOR LBG SYSTEMPIPES
RISER FOR LBGSYSTEMPIPES
RISER FOR LBG SYSTEMPIPES
RISER FOR LBGSYSTEMPIPES
RISER FOR LBG SYSTEMPIPES
LBG MAIN LINESUPPLYLBG MAIN LINESUPPLY
PLOT LIMIT
PLOT LIMIT
3 2 7 - U M M S U Q E I M R O A D
N E I G H B O U R
P L O T
N E I G H B O U R
P L O T
S E R V I C E C O R R I D O R (P L O T N O - 3762515)
OPEN TERRACE+5.02F.F.L
PLOT LIMIT
PLOT LIMIT
B4-DB-LL
R3-DB-LL
R4-DB-LL
B3-DB-LL
Y3-DB-LL
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT) (ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(ROOF LIGHT)
(MINARLIGHT)
(MINARLIGHT)
(MINARLIGHT)
(MINARLIGHT)
(MINARLIGHT)
ROOF FLOOR
ELECTRICAL LIGHTING LAYOUT
ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX:04-3297330 P.O. BOX:
73888 E-mail: [email protected]
PROPOSED COMMERCIAL
BUILDING
(GROUND + MEZZANINE)
ALI KHALIFA ABDULLA AL ATTIYAH,KHALID ABDULLAH ISMAIL ALMUTAWA.
4x18W FLUORESCENT LIGHT RECESSED( HIGH MIRROR TYPE)
WHITE POLYCARBONATE LAMP HOLDER
ZINC COATED STEEL POLYSTER POWDER COATED
W/P 2 X 36W LUMINAIRES, BODYMADE OF
W/P RECESSED FITTING.2X26W /1X26W
MIRROR LIGHT 1X18W
W/P WALL MOUNTED FITTING.2X26W /1X26W
2-WAY SWITCH
1-WAY SWITCH
INTERMEDIATE SWITCH
GRID SWITCH WITH PHASE BARRIER
LEGENDS
W/P BULK HEAD FITTING.2X26W /1X26W
METAL HALIDE SPOT LIGHT 1X175W
DECORATIVE POLE LIGHTING 2-2X26W
BRIGHT ELECTRICAL WORKS LLC
SHOP DRAWING STATUS
APPROVED
APPROVED AS COMMENTED
REJECTED & RESUBMIT
BY:
12U
13A SINGLE SWITCH SOCKET OUTLET
13A TWIN SWITCH SOCKET OUTLET
13A SINGLE SWITCH SOCKET OUTLET
(WEATHER PROOF)
FLEXIBLE OUTLET FOR WATER HEATER
15A SWITCH SOCKET OUTLET
20A DP SWITCH WITH NEON INDICATOR
SPN ISOLATOR W/P IP65
TPN ISOLATOR W/P IP65
WATER HEATER
OPTICAL NETWORK TERMINAL
DISTRIBUTION BOARD
MAIN DISTRIBUTION BOARD WATER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P R O D U C E D
B Y
A N
A U T O D E S K
E D U C A T I O N A L P R O D U C T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P R OD U C E D
BY
AN
A UT ODE S K
E D U C AT I ONAL P R OD U C T
2 WAYSWITCH
1-WAY SWITCH
INTERMEDIATESWITCH
GRIDSWITCH WITHPHASEBARRIER
LEGENDS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
-
8/18/2019 E-930469
36/38
N E I G H
B O U R
P L O T : 3 7 6 - 4 6 9 5
N E I G H
B O U R
P L O T
3 7 6 - 4 6 9 3
GROUNDFLOOR LIMIT
UP
GROUNDFLOO R
PERGOLA AREA
SUBSTATION
GARBAGE RM.
LV ROOM
PUMP.RM
TEL.ROOM
GROUNDFLOOR LIMIT
FIRSTFLOOR LIMIT
FIRSTF LOOR LIMIT
GROUNDFLOO R LIMIT
U/GRCC WATER TANK
UP
LIMIT
TEMPORARYGATE LEVEL=
TEMPORARYGATE LEVEL=
TEMPORARYGATE LEVEL=
PLOTLIMIT
S E R V I C E C O R R I D O R (P L O T N O - 376 2515)
PLOTLIMITPLOTLIMIT
PLOTLIMIT
1,427.18 SQ. FT.
LV ROOM
DB-3 DB-2 DB-1
DB-10DB-11 DB-9
DB-5
DB-4
DB-6
DB-7
LV ROOM
DB-SS
LV PANEL
6 1 0
2 5 5
514
320
B A N K
C A P A C I T O R
DB-LL SMDB-LL
514
E : 488808.391
N : 2778044.489
E : 488833.235
N : 2778026.275
UM SUQUIM ROAD SIDE
514
SETTINGOUT PLAN
ELECTRICAL
ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX: 04-3297330 P.O. BOX:
73888 E-mail: [email protected]
PROPOSED COMMERCIALBUILDING
(GROUND + MEZZANINE)
ALIKHALIFA ABDULLAAL ATTIYAH,KHALIDABDULLAHISMAIL ALMUTAWA.
4x18WFLUORESCENTLIGHT RECESSED(HIGH MIRROR TYPE)
WHITEPOLYCARBONATELAMPHOLDERZINC COATEDSTEELP OLYSTER POWDER COATED
W/P2 X 36WLUMINAIRES, BODY MADEOF
W/PRECESSEDFITTING.2X26W /1X26W
MIRROR LIGHT1X18W
W/PWALL MOUNTEDFITTING.2X26W/1X26W
2-WAY SWITCH
W/PBULK HEADFITTING.2X26W/1X26W
METALHALIDESPOT LIGHT1X175W
DECORATIVEPOLELIGHTING 2-2X26W
BRIGHT ELECTRICAL WORKS LLC
SHOP DRAWING STATUS
APPROVED
APPROVEDASCOMMENTED
REJECTED& RESUBMIT
BY:
12U
13A SINGLESWITCHSOCKET OUTLET
13A TWINSWITCHSOCKET OUTLET
13A SINGLESWITCHSOCKET OUTLET
(WEATHER PROOF)
FLEXIBLEOUTLETFOR WATER HEATER
15A SWITCHSOCKET OUTLET
20A DPSWITCH WITHNEON INDICATOR
SPNISOLATOR W/PIP65
TPNISOLATOR W/PIP65
WATER HEATER
OPTICALNETWORK TERMINAL
DISTRIBUTIONBOARD
MAINDISTRIBUTIONBOARD WATER
P R O D U C E D
B Y
A N
A U T O
D E S K
E D U C A T I O N A L P R O D U C T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P R OD U C E D
BY AN
A UT ODE S K
E D U C AT I ONAL P R OD U C T
S E R V I C E C O R R I D O R (P L O T N O - 3762515)
3082
2-WAY SWITCH
1-WAY SWITCH
INTERMEDIATESWITCH
GRIDSWITCH WITHPHASEBARRIER
LEGENDS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
-
8/18/2019 E-930469
37/38
PLOTLIMIT
3 2 7 - U M M S U Q E I M R O A D
N E I G H B O U R
P L O T
N E I G H B O U R
P L O T
5 7 5 5
3082
PLOTLIMIT
6
0 5 0
936
2 16 0
PLOTLIMIT
SHOP-9SHOP-11
SHOP-8
OPEN TERRACE
SHOP-4
SHOP-5
OPENTERRACE
OPEN TERRACE
D N
WASH
TOILET
TOILET
DN CONSULTANTS APPROVAL
CATLADDER AS PER
8' -0"HIGH
BLOCKWALL
CONSULTANTS APPROVAL
CATLADDER AS PER
pergola above pergola above
AREA= AREA=
AREA=
AREA=
AREA=
620 620 784
6 0 0
2030
2030
715 700 710
1 5 7 6
1 5 7 6
1 5 5 6
948
SHOP-10 AREA=
TOILETPANTRY TOILET PANTRY
1 5 3 3
TOILETPANTRY
535
535
150 470
150
2 1 0
150
125
3 1 5
45
1 2 5
6 0
9 5
1 2 5
8 0
1530
4 5 0
1 5 0
5 3 0
535 935
4 8 5
6 5 2
160 145 1 3 5
1 3 5
145
2 8 0
181
352606060
1 5 3 3
1 3 0 0
1 3 0 0
319
1 4 6
9 0
2 0
2 0
9 0
1 4 1
160
2 4 6
130
2 4 3
1 9 5
130 170
2 4 1
300
1 2 6 0
812
1 0 0 195
STORE 1 5 0
PANTRY TOILET
627
DN
160 114 130
up REF. DWG. NO. A-402
150
REF. DWG. NO. A-404
R E F .
D W G .
N O .
A - 4
0 4
3 4 4
2 3 9
2 5 4
4 3 1
5 2 0
8 0 3
6 2 3
6 7 0
7 7 3
7 6 5
PLOTLIMIT
dn.
dn.
470
R E F .
D W G .
N O .
A - 4
0 2
R E F .
D W G .
N O .
A - 4
0 2
7 1 3
2 1 7
DN
WASHTOILET
TOILET
150
160145
1 6 0
1 6 0
145
3 3 0
195
STORE
R E F .
D W G .
N O .
A - 4
0 4
SUBSTATION
IN GR.FLOOR
LV ROOM
IN GR.FLOOR
LV ROOM DETAILS
SECTIONAL PLANS
ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX: 04-3297330 P.O. BOX:
73888 E-mail: [email protected]
PROPOSED COMMERCIALBUILDING
(GROUND + MEZZANINE)
ALIKHALIFA ABDULLAAL ATTIYAH,KHALIDABDULLAHISMAIL ALMUTAWA.
4x18WFLUORESCENTLIGHT RECESSED(HIGH MIRROR TYPE)
WHITEPOLYCARBONATELAMPHOLDERZINC COATEDSTEELP OLYSTER POWDER COATED
W/P2 X 36WLUMINAIRES, BODY MADEOF
W/PRECESSEDFITTING.2X26W /1X26W
MIRROR LIGHT1X18W
W/PWALL MOUNTEDFITTING.2X26W/1X26W
W/PBULK HEADFITTING.2X26W/1X26W
METALHALIDESPOT LIGHT1X175W
DECORATIVEPOLELIGHTING 2-2X26W
BRIGHT ELECTRICAL WORKS LLC
SHOP DRAWING STATUS
APPROVED
APPROVEDASCOMMENTED
REJECTED& RESUBMIT
BY:
12U
13A SINGLESWITCHSOCKET OUTLET
13A TWINSWITCHSOCKET OUTLET
13A SINGLESWITCHSOCKET OUTLET
(WEATHER PROOF)
FLEXIBLEOUTLETFOR WATER HEATER
15A SWITCHSOCKET OUTLET
20A DPSWITCH WITHNEON INDICATOR
SPNISOLATOR W/PIP65
TPNISOLATOR W/PIP65
WATER HEATER
OPTICALNETWORK TERMINAL
DISTRIBUTIONBOARD
MAINDISTRIBUTIONBOARD WATER
P R O D U C E D
B Y
A N
A U T O
D E S K
E D U C A T I O N A L P R O D U C T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P R OD U C E D
BY AN
A UT ODE S K
E D U C AT I ONAL P R OD U C T
-
8/18/2019 E-930469
38/38