    PROJECT: G+M COMMERCIAL BUILDING. OWNER : ALI KHALIFA ABDULLA ALATTIYAH & AREA: AL BARSHA 2ND

      KHALID ABDULLA ISMAIL AL MUTAWA PLOT: 376-4694

    CONSULTANT : PALACE ENGINEERING CONSULTANTS

    CIRCUIT SP   RATING-AMPS FAULT PVC/ ECC

    FEEDER  /TP ISO./ MCCB DUTY XLPE 2/4 X 1/2/3/4C SIZE R. PH Y. PH B. PH CON. MAX. DEMAND 1-PH 3-PH 3-PH LV/HV REMARKS

    NUMBER  /4P LBS / MCS KA SWA/PVC 1C mm mm2 1C mm2 KW. KW. KW. KW. KW. ( 1 ) ( 2 ) ( 3 ) CTACB

    LOAD SUMMARY SHEET

      CABLE SIZE CONNECTED LOAD-KW WH METERS (TYPES & NO

    L.V. PANEL 4P 1600 65 2-1c x 150mm2 230.60 229.70 229.70 690.00  621.00  11 1 1600/5A

    11 1 TOTAL (KW)

    KW AT 0.90 TOTAL CONNECTED LOAD ( 3 PH ) KW.

    PROVIDE CT-METER WHEN MAX. DEMAND ---> 100 KW.

    (1) UP TO 60A (2) UP TO 100A (3) 100-200A (4)LV CT……………/…………..A

    (1PHASE) (3PHASE)

    621.00 MAX. DEMAND ( 3 PH ) :

    BY DEWA

    690690.00 

    230.60  690.00 TOTAL CONNECTED LOAD PER PHASE 229.70  621.00 

    DIVERSITY

    229.70 

    [email protected]

    E-930469  28/01/2013

    1 x 1000kVA Transformer with LV Integral meter.

    All the tenant meters are sub-meters to the main meters

  • 8/18/2019 E-930469

    2/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. AREA: AL BARSHA 2ND

    OWNER: ALI KHALIFA ABDULLA ALATTIYAH PLOT: 376-4694

    MDB/SMDB: L.V. PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM

    CIRCUIT/ SP / PVC/* LENGTH ECC

    FEEDERFAULT

    XLPEOF

    SIZE

    DB NO.TP

    F/S MCCBDUTY SWA/

    2/4X1C 2/3/4C CABLE1C

    R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT

    ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}

    INCOMER-1 4P 1600 65 DEWA 2R-1C x 150 230.60 229.70 229.70 690.00  11 1 1600/5A

    MOBILE GEN. PROVISION 4P 1600 65

    OUTGOINGS:- (ACB'S SET @ 0.9)

    SMDB-LL TP 400 35 XLPE 4CX300mm2 1CX150mm2 56.30 59.00 57.50 172.80

    SMDB-SHOP TP 800 35 XLPE 2X4c300mm2 2X1c150mm2 118.30 115.70 117.20 351.20 11

    DB-SS SP 40 35 XLPE 3C x 10mm2 1C X 10mm2 1.00 0.00 0.00 1.00

    SPARE - FUTURE TP 400 35 55.00 55.00 55.00 165.00 FUTURE EXPANSION

    CAPACITOR BANK 500 35 XLPE 2x4C x 150 2x1Cx 70 AUTO STEP 200KVAR

    CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553

      Type of Meter ( Rating of Incomer ) : (1) Up to 60A (2) Up to 100A (3) 125 - 160 A (4) LV CT / A / HV CT / A

    ( 1Phase ) ( 3phase )

      0.90 .     (3 .):     .

       

    & .

    .

    : 30.04.2013

    : TRANSFORMER (1000KVA)   :

    : LV DB/ TRANSF.

     

    Refer landlord letter Ref:.. dated 10/01/2013 for the proposed spare load. Spare/ Future load shall be subject to Dewa's prior approval/

    inspection. Ensure not to propose single motor load more than 50kW.*

    *

  • 8/18/2019 E-930469

    3/38

    PROJECT: G+M COMMERCIAL BUILDING. DETAILS OF CONNECTED LOAD / MAX. DEMAND & KWH METERING AREA: AL BARSHA 2ND

    SMDB: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH PLOT: 376-4694

     FED FROM : LV-PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM

    CIRCUIT/ SP / PVC/* LENGTH ECC

    FEEDERFAULT

    XLPEOF

    SIZE

    DB NO.TP

    F/S MCCBDUTY

    SWA/ 2/4X1C 2/3/4C CABLE 1C R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT

    ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}

    INCOMER TP 400 XLPE 4c x 300mm2 1c x 150mm2 56.30 59.00 57.50 172.80

    OUTGOINGS:- N/A

    DB-TEL TP 40 25 XLPE 4c x 16mm2 1c x 16mm2 3.80 5.80 3.80 13.40

    DB-LL TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 10.50 11.20 11.70 33.40

    JOCKEY PUMP TP 32 25 XLPE 4c x 6mm2 1c x 6mm2 2.00 2.00 2.00 6.00 300mA ELCB, ELS+ALARM

    FIRE PUMP TP 225 25 XLPE 4c x 120mm2 1c x 70mm2 28.00 28.00 28.00 84.00 ELS+ALARM

    DB- SERVICES TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 7.00 7.00 7.00 21.00

    SPARE TP 40 25 5.00 5.00 5.00 15.00 FUTURE

    MDB CONNECTED TO: DEWA LV DB/TRANSF.

    SMDB CONNECTED TO: LV PANEL

    CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553

      ( ) : (1) 60 (2) 100 (3) 125 160 (4) / / /

    ( 1 ) ( 3 )

      (3 .):       1.00 .     .

      :

      & .

     

    STARTER

  • 8/18/2019 E-930469

    4/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. DETAILS OF CONNECTED LOAD / MAX. DEMAND & KWH METERING AREA: AL BARSHA 2ND

    MDB: SMDB-SH (SHOPS) OWNER:ALI KHALIFA ABDULLA ALATTIYAH

    PLOT: 376-4694 FED FROM : LV PANEL CONSULTANT: PALACE ENGINEERING CONSULTANTS LOCATION: GROUND FLOOR - LV ROOM

    CIRCUIT/ SP / PVC/* LENGTH ECC

    FEEDERFAULT

    XLPEOF

    SIZE

    DB NO.TP

    F/S MCCBDUTY

    SWA/ 2/4X1C 2/3/4C CABLE 1C R-PH Y-PH B-PH TOTAL 1.PH. 3.PH. 3.PH CT

    ISO ACB KA PVC mm2 mm2 ( Mtrs. ) mm2 KW KW KW KW {1} {2} {3} {4}

    INCOMER TP 800 XLPE 2X4C x 300mm2 2X1Cx 150mm2 118.30 115.70 117.20 351.20 11

    OUTGOINGS:- N/A

    DB-SH1 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1

    DB-SH2 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1

    DB-SH3 TP 63 25 XLPE 4c x 16mm2 1c x 16mm2 8.90 8.50 8.90 26.30 1

    DB-SH4 TP 100 25 XLPE 4c x 50mm2 1c x 25mm2 16.40 17.40 16.20 50.00 1

    DB-SH5 TP 100 25 XLPE 4c x 50mm2 1c x 25mm2 16.20 16.10 17.70 50.00 1

    DB-SH6 TP 40 25 XLPE 4c x 10mm2 1c x 10mm2 3.13 3.03 3.53 9.70 1

    DB-SH7 TP 40 25 XLPE 4c x 10mm2 1c x 10mm2 3.13 3.03 3.53 9.70 1

    DB-SH8 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 11.13 10.93 10.33 32.40 1

    DB-SH9 TP 100 25 XLPE 4c x 35mm2 1c x 16mm2 15.00 15.10 14.20 44.30 1

    DB-SH10 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 12.90 12.30 12.80 38.00 1

    DB-SH11 TP 80 25 XLPE 4c x 25mm2 1c x 16mm2 13.70 12.30 12.20 38.20 1

    MDB CONNECTED TO: DEWA LV DB/TRANSF.

    SMDB CONNECTED TO: LV PANEL  

    CONTRACTOR: BRIGHT ELECTRICAL WORKS L.L.C, TEL.: 04 - 3856 557 FAX: 04 - 3856 553

      ( ) : (1) 60 (2) 100 (3) 125 160 (4) / / /

    ( 1 ) ( 3 )

      (3 .):     .   0.90 .    .

      :

      & .

     

  • 8/18/2019 E-930469

    5/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. AREA: AL BARSHA 2ND

    DB No: DB-SS PLOT: 376-4694

    FED FROM: L.V. PANEL LOCATION: GROUND FLOOR

    LTG CHAND C. FANEX.

    FAN

    13A

    S/O

    15A

    S/OW/H H/D

    COOKE

    RW' A/C BELL WATER PUMP

    R Y B

    1 C1 10 2.5 2.5 SUBSTATION 4 100 400

    2 C2 SPACE

    3 C3 SPACE

    4 C4 20 4.0 2.5 SUBSTATION 3 200 600

    5 C5 SPACE

    6 C6 SPACE

    1000 1.00 KW

    = 3C X 10 mm2 CU.XLPE/SWA/PVC.SUB MAIN CABLE

    W / UNIT

       4   0   A   S   P  +   N

       I   S   O   L   A   T   O   R

    20A

    100mA 2P

    (SEC. 1)

    20A 30mA

    2P (SEC.

    2)

     

    LOAD DISTRIBUTION SCHEDULE

    [ 1 - Phase ]

    RATING OF

    INCOMER

    RATING

    OF ELCBSL. No.

    CIR

    NO.

    CONNECTED LOADS/POINTS LOAD PER CIRCUITREMARKS

    MCB

    RATIN

    G IN A

    CCT

    WIRE

    SIZE

    mm2

    RCC

    WIRE

    SIZE

    mm2

    ROOM/AREA

     

  • 8/18/2019 E-930469

    6/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-TEL (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH LOCATION: TEL ROOM

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A HAND 15 A   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O DRYER S/O  UNIT

    1 R1 10 2.5 2.5 TEL ROOM   100 200

    2 Y1 SPACE X X

    3 B1 10 SPARE 200 200

    4 R2 20 4 2.5 TEL ROOM 2 200 400 WALL

    4P 5 Y2 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR

    40A 6 B2 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR

    7 R3 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR

    8 Y3 20 4 2.5 TEL ROOM 2 200 400 RAISED FLR

    9 B3 20 SPARE 400 400

    10 R4 20 SPARE 800 800

    11 Y4 20 SPARE 800 800

    30mA 12 B4 20 SPARE 800 800

    13 R5 1,000 

    14 Y5 1 1,000  63A ISOL

    15 B5 1,000 

    16 R6 1,000 

    17 Y6 1 1,000  63A ISOL

    18 B6 1,000 

    19 R7SPACE X X

    20 Y7 32 6 4 GCU-19 1 2200 2,200  UVR+TIMER

    21 B7 SPACE X X

    TOTAL 3.80 5.80 3.80 13.40 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    3000

    TP 20A 4X4 1X4 TEL ROOM 3000

             

                                  

    TP 20A 4X4 1X4 TEL ROOM

     

  • 8/18/2019 E-930469

    7/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SERVICES (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH   LOCATION: GROUND FLOOR - EXTERNAL AREA

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    2 Y1 20 4 2.5EXTERNL

    FLOOD LTG

    1 1000 1,000 

    3 B1 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    4 R2 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    5 Y2 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    6 B2 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    7 R3 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    8 Y3 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    9 B3 20 4 2.5

    EXTERNL

    FLOOD LTG 1 1000 1,000 

    10 R4 20 4 2.5EXTERNL

    FLOOD LTG1 1000 1,000 

    11 Y4 20 SPARE 1000 1,000 

    12 B4 20 SPARE 1000 1,000 

    13 R5 TP 2,000  W/P

    14 Y5 25A 4X6 1X4IRRIGATIONN

    PUMP  6000 2,000  25A ISO

    15 B5 2,000 

    16 R6 20 SPARE 1000 1,000 

    17 Y6 20 SPARE 1000 1,000 

    18 B6 20 SPARE 1000 1,000 

    TOTAL 7.00 7.00 7.00 21.00

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

             

                                        

    EXTERNAL

    FLOOD LIGHTS

    ON

    DECORATIVE

    COLUMNS

     

  • 8/18/2019 E-930469

    8/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-LL (Sh..1...of…2..) (3-Phase) PLOT: 376-4694FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH   LOCATION: GROUND FLOOR - LV ROOM

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 16 2.5 2.5COMMON

    WASHROOM10 4 100 1,400 

    2 Y1 16 2.5 2.5PASSAGE+LV

    RM +PUMPRM11 100 1,100 

    3 B1 16 4.0 4.0 POLE LIGHTS 4 300 1,200  ARMOURED

    4 R2 10 2.5 2.5 ELECT CABIN 2 100 200 

    5 Y2 10 2.5 2.5OPEN

    TERRACE7 100 700 

    6 B2 16 4.0 4.0 POLE LIGHTS 4 300 1,200  ARMOURED

    7 R3 10 2.5 2.5 ROOF 4 200 800  HALOGEN LTG

    8 Y3 10 2.5 2.5 ROOF 4 200 800  HALOGEN LTG

    9 B3 10 2.5 2.5 ROOF 4 200 800  HALOGEN LTG

    10 R4 10 2.5 2.5 ROOF 8 100 800  W/P

    11 Y4 10 SPARE 500 500 

    12 B4 10 2.5 2.5 ROOF 6 100 600  W/P

    13 R5 10 2.5 2.5 EXT. LGT 1 500 500 

    14 Y5 10 2.5 2.5 EXT. LGT 1 500 500 

    15 B5 10 2.5 2.5 EXT. LGT 1 500 500 

    16 R6 10 2.5 2.5 EXT. LGT 1 500 500 

    17 Y6 10 2.5 2.5 EXT. LGT 1 500 500 

    18 B6 10 2.5 2.5 EXT. LGT   500  

    19 R7 10 2.5 2.5 EXT. LGT 1 500 500 

    20 Y7 10 2.5 2.5 EXT. LGT 1 500 500 

    21 B7 10 SPARE 500 500 

    22 R8 10 SPARE 500 500

    23 Y8 10 SPARE 500 500 

    24 B8 10 SPARE 500 500 

    25 R9 20 4.0 2.5

    COMMON

    WASHROOM 1 1200 1,200 

    26 Y9 20 4.0 2.5 L.V.ROOM 2 200 400 

    27 B9 20 4.0 2.5 PUMP ROOM 2 200 400 

    28 R10 20 4 2.5COMMON

    WASHROOM1 1200 1,200 

    29 Y10 20 4 2.5GARBAGE

    ROOM1 200 200  W/P

    30 B10 20 4 2.5     W/P

    CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

             

                                        

    PROVISIONS

    FOR

    EXTERNAL

    LTGS ON

    FRONT

    ELEVATIONS

     

  • 8/18/2019 E-930469

    9/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-LL (Sh..2...of…2..) (3-Phase) PLOT: 376-4694

    FED FROM: SMDB-LL OWNER: ALI KHALIFA ABDULLA ALATTIYAH   LOCATION: GROUND FLOOR - LV ROOM

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    31 R11 20 SPARE 400 400 

    32 Y11 20 4 2.5 ROOF   200 800  W/P

    33 B11 20 4 2.5OPEN

    TERRACE  200 200  W/P

    34 R12 SPACE X X

    35 Y12 32 6 4GCU-21 / PMP

    RM  2200 2,200  UVR+TIMER

    36 B12 32 6 4GCU-20 / LV

    RM  2200 2,200 

    37 R13 TP 1,000 

    38 Y13 20A 4X4 1X4BOOSTER

    PUMP  3000 1,000  ROOF

    39 B13 1,000 

    40 R14 TP 1,500 

    41 Y14 20A 4X4 1X4TRANSFER

    PUMP  4500 1,500  PUMP ROOM

    42 B14 1,500 

    TOTAL 10.50 11.20 11.70 33.40

    CABLE SIZE: 1 X 4C 25 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

             

                                        

     

     

  • 8/18/2019 E-930469

    10/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2NDDB No: DB-SH1, SH2, SH3 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-1,2,3 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 8 100 800 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 2.5 2.5 SHOP 8 100 800 

    4 R2 10 2.5 2.5 SHOP 8 100 800 

    5 Y2 10 2.5 2.5 PANTRY 3 1 100 400 

    6 B2 20 4 2.5 SIGNBOARD 1 1000 1,000 

    7 R3 20 4 2.5 SHOP 3 200 600 

    8 Y3 20 4 2.5 12-U 2 200 400 

    9 B3 32 4 2.5 SHOP 6 200 1,200  RING

    10 R4 20 4 2.5 PANTRY 1 1000 1,000 

    11 Y4 20 4 2.5 TOILET 1 1200 1,200 

    12 B4 20 SPARE 200 200 

    13 R5 1,800 

    14 Y5 1 1,800  UVR+TIMER

    15 B5 1,800 

    16 R6 20 4 2.5 GFCU-1 1 300 300 

    17 Y6

    18 B6

    19 R7 1,800 

    20 Y7 1 1,800  UVR+TIMER

    21 B7 1,800 

    22 R8

    23 Y8 20 4 2.5 GFCU-2 1 300 300 

    24 B8

    25 R9 1,800 

    26 Y9 1 1,800  UVR+TIMER

    27 B9 1,800 

    28 R10

    29 Y10

    30 B10 20 4 2.5 GFCU-3 1 300 300 

    TOTAL 8.90 8.50 8.90 26.30 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    5400

    TP 25A 4X6 1X4 GCU-2 5400

             

                               

             

    TP 25A 4X6 1X4 GCU-1

    TP 25A 4X6 1X4 GCU-3

     

  • 8/18/2019 E-930469

    11/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 4 (Sh..1...of…2...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000 

    2 Y1 16 4.0 2.5 SHOP 11 100 1,100 

    3 B1 16 4.0 2.5 SHOP 11 100 1,100 

    4 R2 16 4.0 2.5 SHOP 11 100 1,100 

    5 Y2 10 SPARE 200 200 

    6 B2 10 2.5 2.5 SHOP 5 2 100 700 

    7 R3 32 4 2.5 SHOP 5 200 1,000  RING

    8 Y3 32 4 2.5 SHOP 5 200 1,000  RING

    9 B3 20 4 2.5 12-U 2 200 400 

    10 R4 20 SPARE 200 200 

    11 Y4 20 4 2.5 PANTRY 1 1000 1,000 

    12 B4 20 4 2.5 WASH 1 1200 1,200 

    13 R5 1,800 

    14 Y5 1 1,800  UVR+TIMER

    15 B5 1,800 

    16 R6 20 4 2.5 GFCU-10 1 300 300 

    17 Y6

    18 B6

    19 R7 1,800 

    20 Y7 1 1,800  UVR+TIMER

    21 B7 1,800 

    22 R8

    23 Y8 20 4 2.5 GFCU-11 1 300 300 

    24 B8

    CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    TP 25A 4X6 1X4 GCU-11 5400

                

                            

                

    TP 25A 4X6 1X4 GCU-10

     

  • 8/18/2019 E-930469

    12/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 4 (Sh..2...of…2...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    25 R9 1,800 

    26 Y9 1 1,800  UVR+TIMER

    27 B9 1,800 

    28 R10

    29 Y10

    30 B10 20 4 2.5 GFCU-12 1 300 300 

    31 R11 1,800 

    32 Y11 1 1,800  UVR+TIMER

    33 B11 1,800 

    34 R12 20 4 2.5 MFCU-1 1 300 300 

    35 Y12

    36 B12

    37 R13 1,800 

    38 Y13 1 1,800  UVR+TIMER

    39 B13 1,800 

    40 R14

    41 Y14 20 4 2.5 MFCU-2 1 300 300 

    42 B14

    43 R15

    44 Y15 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 3500 4500 3500 11.50 kW

    45 B15 ( XLPE/SWA/PVC/CU )

    TOTAL 16.40 17.40 16.20 50.00 kW

    CABLE SIZE: 1 X 4C 50 mm2 CU.XLPE/SWA/PVC + 1 x 1C 25 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    40A TP

    10-

    15KA

    4C 16 1C 16 TO DB - SH4 M

    5400

    TP 25A 4X6 1X4 MCU-1 5400

                

                                        

    TP 25A 4X6 1X4 GCU-12

    TP 25A 4X6 1X4 MCU-2

     

  • 8/18/2019 E-930469

    13/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 4M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: DB-SH 4 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-4 MEZZANINE

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 9 100 900 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 2.5 2.5 SHOP 8 100 800 

    4 R2 10 SPARE 400 400 

    5 Y2 10 2.5 2.5 PANTRY 5 2 100 700 

    6 B2 SPACE X X

    7 R3 20 4 2.5 SHOP 2 200 400 

    8 Y3 20 4 2.5 TOILET 1 1200 1,200 

    9 B3 20 4 2.5 SHOP 3 200 600 

    10 R4 1,800 

    11 Y4 1 1,800  UVR+TIMER

    12 B4 1,800 

    13 R5

    14 Y5

    15 B5 20 4 2.5 MFCU-3 1 300 300 

    TOTAL 3.50 4.50 3.50 11.50 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

             

                         

             

    TP 25A 4X6 1X4 MCU-3

     

  • 8/18/2019 E-930469

    14/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 5 (Sh..1...of…2...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-5 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 16 4.0 2.5 SHOP 11 100 1,100 

    2 Y1 16 4.0 2.5 SHOP 11 100 1,100 

    3 B1 16 4.0 2.5 SHOP 11 100 1,100 

    4 R2 10 SPARE 500 500 

    5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000 

    6 B2 10 2.5 2.5 PANTRY 5 2 100 700 

    7 R3 20 4 2.5 SHOP 4 200 800 

    8 Y3 20 4 2.5 12-U 2 200 400 

    9 B3 32 4 2.5 SHOP 5 200 1,000  RING

    10 R4 20 SPARE 800 800 

    11 Y4 20 4 2.5 PANTRY 1 1000 1,000 

    12 B4 20 4 2.5 WASH 1 1200 1,200 

    13 R5 1,700 

    14 Y5 1 1,700  UVR+TIMER

    15 B5 1,700 

    16 R6 20 4 2.5 GFCU-13 1 300 300 

    17 Y6

    18 B6

    19 R7 1,700 

    20 Y7 1 1,700  UVR+TIMER

    21 B7 1,700 

    22 R8

    23 Y8 20 4 2.5 GFCU-14 1 300 300 

    24 B8

    CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5100

    TP 25A 4X6 1X4 GCU-14. 5100

                

                                        

    TP 25A 4X6 1X4 GCU-13

     

  • 8/18/2019 E-930469

    15/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 5 (Sh..2...of…2...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-5 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    25 R9 1,700  26 Y9 1 1,700  UVR+TIMER

    27 B9 1,700 

    28 R10

    29 Y10

    30 B10 20 4 2.5 GFCU-15 1 300 300 

    31 R11 1,700 

    32 Y11 1 1,700  UVR+TIMER

    33 B11 1,700 

    34 R12 20 4 2.5 MFCU-4 1 300 300 

    35 Y12

    36 B1237 R13 1,700 

    38 Y13 1 1,700  UVR+TIMER

    39 B13 1,700 

    40 R14

    41 Y14 20 4 2.5 MFCU-5 1 300 300 

    42 B14

    43 R15

    44 Y15 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 3900 3500 4900 12.30 kW

    45 B15 ( XLPE/SWA/PVC/CU )

    TOTAL 16.20 16.10 17.70 50.00 kW

    CABLE SIZE: 1 X 4C 50 mm2 CU.XLPE/SWA/PVC + 1 x 1C 25 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5100

    40A TP

    10-

    15KA

    4C 16 1C 16 TO DB - SH5M

    5100

    TP 25A 4X6 1X4 MCU-4 5100

                

                         

                   

    TP 25A 4X6 1X4 GCU-15

    TP 25A 4X6 1X4 MCU-5

     

  • 8/18/2019 E-930469

    16/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 5M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: DB-SH5 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP- 5M

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 9 100 900 

    2 Y1 10 2.5 2.5 SHOP 9 100 900 

    3 B1 10 2.5 2.5 SHOP 9 100 900 

    4 R2 10 SPARE 800 800 

    5 Y2 10 SPARE 200 200 

    6 B2 10 2.5 2.5 PANTRY 5 2 100 700 

    7 R3 20 4 2.5 SHOP 2 200 400 

    8 Y3 20 4 2.5 SHOP 3 200 600 

    9 B3 20 4 2.5 TOILET 1 1200 1,200 

    10 R4 1,800 

    11 Y4 1 1,800  UVR+TIMER

    12 B4 1,800 

    13 R5

    14 Y5

    15 B5 20 4 2.5 MFCU-6 1 300 300 

    TOTAL 3.90 3.50 4.90 12.30 kWCABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

             

                            

          

    TP 25A 4X6 1X4 MCU-6

     

  • 8/18/2019 E-930469

    17/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 6, 7 (TYP) (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-6,7 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 SPARE 800 800 

    4 R2 20 4.0 2.5 12-U 2 200 400 

    5 Y2 20 SPARE 200 200 

    6 B2 32 4 2.5 SHOP 5 200 1,000  RING

    7 R3 1,733 

    8 Y3 1 1,733  UVR+TIMER

    9 B3 1,733 

    10 R4

    11 Y4 20 4 2.5 GFCU-16 1 300 300 

    12 B4

    TOTAL 3.13 3.03 3.53 9.70 kW

    CABLE SIZE: 1 X 4C 10 mm2 CU.XLPE/SWA/PVC + 1 x 1C 10 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5200

             

                                        

    TP 25A 4X6 1X4 GCU-16

     

     

  • 8/18/2019 E-930469

    18/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 8 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-8 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 20 4 2.5 SIGNBOARD 1 1000 1,000 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 SPARE 800 800 

    4 R2 20 SPARE 800 800 

    5 Y2 20 4 2.5 12-U 2 200 400 

    6 B2 20 4 2.5 SHOP 1 200 200 

    7 R3 1,733 

    8 Y3 1 1,733  UVR+TIMER

    9 B3 1,733 

    10 R4

    11 Y4

    12 B4 20 4 2.5 GFCU-18 1 300 300 

    13 R5 1,800 

    14 Y5 1 1,800  UVR+TIMER

    15 B5 1,800 

    16 R6 20 4 2.5 MFCU-7 1 300 300 

    17 Y6

    18 B6

    19 R7

    20 Y7 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 5500 6200 5500 17.20 kW

    21 B7( XLPE/SWA/PVC/CU )

    TOTAL 11.13 10.93 10.33 32.40 kW

    CABLE SIZE: 1 X 4C 25 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5200

    TP 25A 4X6 1X4 MCU-7 5400

             

                                        

    TP 25A 4X6 1X4 GCU-18

    40A TP

    10-

    15KA

    4C 16 1C 16 TO DB - SH8 M

     

     

  • 8/18/2019 E-930469

    19/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 8M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: DB-SH8 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP- 8M

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 8 100 800 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 2.5 2.5 SHOP 8 100 800 

    4 R2 10 2.5 2.5 SHOP 7 100 700 

    5 Y2 10 2.5 2.5 PANTRY 2 1 100 300 

    6 B2 10 SPARE 200 200 

    7 R3 20 4 2.5 SHOP 2 200 400 

    8 Y3 20 4 2.5 WASH 1 1200 1,200 

    9 B3 20 4 2.5 SHOP 3 200 600 

    10 R4 1,800 

    11 Y4 1 1,800  UVR+TIMER

    12 B4 1,800 

    13 R5

    14 Y5 20 4 2.5 MFCU-8 1 300 300 

    15 B5

    16 R6 1,800 

    17 Y6 1 1,800  UVR+TIMER

    18 B6 1,800 

    19 R7

    20 Y7

    21 B7 20 4 2.5 MFCU-9 1 300 300 

    TOTAL 5.50  6.20 5.50 17.20 kW

    CABLE SIZE: 1 X 4C 16 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    TP 25A 4X6 1X4 MCU-9 5400

             

                                  

    TP 25A 4X6 1X4 MCU-8

     

     

  • 8/18/2019 E-930469

    20/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 9 (Sh..1...of…2..) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 9 100 900 

    2 Y1 10 2.5 2.5 SHOP 9 100 900 

    3 B1 10 2.5 2.5 SHOP 9 100 900 

    4 R2 10 SPARE 800 800 

    5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000 

    6 B2 10 SPARE 200 200 

    7 R3 20 4 2.5 SHOP 3 200 600 

    8 Y3 20 4 2.5 12-U 2 200 400 

    30mA 9 B3 20 4 2.5 SHOP 4 200 800 

    10 R4 2,200 

    11 Y4 1 2,200  UVR+TIMER

    12 B4 2,200 

    13 R5 20 4 2.5 GFCU-23 1 300 300 

    14 Y5

    15 B5

    16 R6 2,200 

    17 Y6 1 2,200  UVR+TIMER

    18 B6 2,200 

    19 R7

    20 Y7

    21 B7 20 4 2.5 GFCU-24 1 300 300 

    CABLE SIZE: C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    6600

    TP 25A 4X6 1X4 GCU-24 6600

                

                         

                   

    TP 25A 4X6 1X4 GCU-23

  • 8/18/2019 E-930469

    21/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 9 (Sh..2..of…2..) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKSINCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    22 R8 1,800 

    23 Y8 1 1,800  UVR+TIMER

    24 B8 1,800 

    25 R9 20 4 2.5 MFCU-10 1 300 300 

    26 Y9

    27 B9

    28 R10 1,800 

    29 Y10 1 1,800  UVR+TIMER

    30 B10 1,800  31 R11

    32 Y11 20 4 2.5 MFCU-11 1 300 300 

    33 B11

    34 R12

    35 Y12 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 4100 4500 4000 12.60 kW

    36 B12 ( XLPE/SWA/PVC/CU )

    TOTAL 15.00 15.10 14.20 44.30 kW

    CABLE SIZE: 1 X 4C 35 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    TP 25A 4X6 1X4 MCU-11 5400

                

                         

                   

    TP 25A 4X6 1X4 MCU-10

    40A TP

    10-

    15KA

    4C 16 1C 16 TO DB-SH9 M

     

  • 8/18/2019 E-930469

    22/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 9M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: DB-SH 9 ( GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-9M

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT1 R1 10 2.5 2.5 SHOP 8 100 800 

    2 Y1 10 2.5 2.5 SHOP 8 100 800 

    3 B1 10 2.5 2.5 SHOP 7 100 700 

    4 R2 10 2.5 2.5 SHOP 7 100 700 

    5 Y2 10 2.5 2.5 PANTRY 2 1 100 300 

    6 B2 10 SPARE 200 200 

    7 R3 20 4 2.5 SHOP 2 200 400 

    8 Y3 20 4 2.5 WASH 1 1200 1,200 

    9 B3 20 4 2.5 SHOP 3 200 600 

    10 R4 2,200 

    11 Y4 1 2,200  UVR+TIMER

    12 B4 2,200 

    13 R5

    14 Y5

    15 B5 20 4 2.5 MFCU-12 1 300 300 

    TOTAL 4.10 4.50 4.00 12.60 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    6600         

                      

                

    TP 25A 4X6 1X4 MCU-12

     

     

  • 8/18/2019 E-930469

    23/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 10 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-10 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 9 100 900  2 Y1 10 2.5 2.5 SHOP 9 100 900 

    3 B1 10 2.5 2.5 SHOP 9 100 900 

    4 R2 10 SPARE 800 800 

    5 Y2 20 4 2.5 SIGNBOARD 1 1000 1,000 

    6 B2 SPACE X X

    7 R3 20 4 2.5 12-U 2 200 400 

    8 Y3 20 4 2.5 SHOP 4 200 800 

    30mA 9 B3 20 4 2.5 SHOP 4 200 800 

    10 R4 2,200 

    11 Y4 1 2,200  UVR+TIMER

    12 B4 2,200  13 R5 20 4 2.5 GFCU-25 1 300 300 

    14 Y5

    15 B5

    16 R6 2,200 

    17 Y6 1 2,200  UVR+TIMER

    18 B6 2,200 

    19 R7

    20 Y7

    21 B7 20 4 2.5 GFCU-26 1 300 300 

    22 R8

    23 Y8 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 6100 5200 6400 17.70 kW24 B8 ( XLPE/SWA/PVC/CU )

    TOTAL 12.90 12.30 12.80 38.00 kW

    CABLE SIZE: 1 X 4C 25 mm2 CU.PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    6600

    TP 25A 4X6 1X4 GCU-26 6600

             

                                        

    TP 25A 4X6 1X4 GCU-25

    40A TP

    10-15KA

    4C 16 1C 16 TO DB-SH10 M

     

  • 8/18/2019 E-930469

    24/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 10M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-10 M

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 7 100 700  2 Y1 10 2.5 2.5 SHOP 7 100 700 

    3 B1 10 2.5 2.5 SHOP 8 100 800 

    4 R2 10 SPARE 200 200 

    5 Y2 SPACE X X

    6 B2 10 2.5 2.5 PANTRY 2 1 100 300 

    7 R3 20 4 2.5 SHOP 3 200 600 

    8 Y3 20 4 2.5 SHOP 3 200 600 

    9 B3 20 4 2.5 WASH 1 1200 1,200 

    10 R4 20 4 2.5 PANTRY 1 1000 1,000 

    11 Y4 SPACE X X

    12 B4 20 SPARE 200 200 13 R5 1,800 

    14 Y5 1 1,800  UVR+TIMER

    15 B5 1,800 

    16 R6

    17 Y6

    18 B6 20 4 2.5 MF-FCU-13 1 300 300 

    19 R7 1,800 

    20 Y7 1 1,800  UVR+TIMER

    21 B7 1,800 

    22 R8

    23 Y8 20 4 2.5 MF-FCU-14 1 300 300 

    24 B8

    TOTAL 6.10 5.20 6.40 17.70 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    TP 25A 4X6 1X4 MFCU-14 5400

             

                      

                

    TP 25A 4X6 1X4 MFCU-13

     

     

  • 8/18/2019 E-930469

    25/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 11 (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: MDB-SHOP OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP-11 GF

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W  UNIT

    1 R1 10 2.5 2.5 SHOP 9 100 900  2 Y1 10 2.5 2.5 SHOP 9 100 900 

    3 B1 10 2.5 2.5 SHOP 9 100 900 

    4 R2 20 4 2.5 SIGNBOARD 1 1000 1,000 

    5 Y2 SPACE X X

    6 B2 10 SPARE 200 200 

    7 R3 20 4 2.5 12-U 2 200 400 

    8 Y3 20 4 2.5 SHOP 4 200 800 

    30mA 9 B3 20 4 2.5 SHOP 4 200 800 

    10 R4 2,200 

    11 Y4 1 2,200  UVR+TIMER

    12 B4 2,200 

    13 R5 20 4 2.5 GFCU-27 1 300 300 

    14 Y5

    15 B5

    16 R6 2,200 

    17 Y6 1 2,200  UVR+TIMER

    18 B6 2,200 

    19 R7

    20 Y7

    21 B7 20 4 2.5 GFCU-28 1 300 300 

    22 R8

    23 Y8 FEEDS TO MEZZANINE DB FOR THE SAME SHOP 6700 6200 5600 18.50 kW

    24 B8 ( XLPE/SWA/PVC/CU )

    TOTAL 13.70 12.30 12.20 38.20 kW

    CABLE SIZE: 1 X 4C 25 mm2 XLPE/SWA/PVC .CU + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    6600

    TP 25A 4X6 1X4 GCU-28 6600

             

                         

                   

    TP 25A 4X6 1X4 GCU-27

    40A TP

    10-

    15KA

    4C 16 1C 16 TO DB-SH11 M

     

  • 8/18/2019 E-930469

    26/38

    PROJECT: PROPOSED G+M COMMERCIAL BUILDING. LOAD DISTRIBUTION SCHEDULE AREA: AL BARSHA 2ND

    DB No: DB-SH 11M (Sh..1...of…1...) (3-Phase) PLOT: 376-4694

    FED FROM: DB-SH 11 (GF) OWNER:ALI KHALIFA ABDULLA ALATTIYAH LOCATION: SHOP - 11M

    RATING RATG. SL. CIR MCB CCT ECC CONNECTED LOADS / POINTS LOAD PER

    OF OF No. No. RTG. WIRE WIRE ROOM /  W/ CIRCUIT-W REMARKS

    INCOMER RCCB IN SIZE SIZE AREA EX. SH. 13 A 15 A DP   CU. UNIT R Y B

    A mm² mm² FAN S/O S/O S/O D/W UNIT

    1 R1 10 2.5 2.5 SHOP 7 100 700  2 Y1 10 2.5 2.5 SHOP 7 100 700 

    3 B1 10 SPARE 200 200 

    4 R2 10 2.5 2.5 SHOP 8 100 800 

    5 Y2 10 2.5 2.5 SHOP 8 100 800 

    6 B2 10 2.5 2.5 PANTRY 2 1 100 300 

    7 R3 20 4 2.5 SHOP 3 200 600 

    8 Y3 20 4 2.5 SHOP 3 200 600 

    9 B3 20 4 2.5 WASH 1 1200 1,200 

    10 R4 20 4 2.5 PANTRY 1 1000 1,000 

    11 Y4 20 SPARE 200 200 

    12 B4 SPACE X X13 R5 1,800 

    14 Y5 1 1,800  UVR+TIMER

    15 B5 1,800 

    16 R6

    17 Y6

    18 B6 20 4 2.5 MFCU-15 1 300 300 

    19 R7 1,800 

    20 Y7 1 1,800  UVR+TIMER

    21 B7 1,800 

    22 R8

    23 Y8 20 4 2.5 MFCU-16 1 300 300 24 B8

    TOTAL 6.70 6.20 5.60 18.50 kW

    CABLE SIZE: 1 X 4C 16 mm2 CU.XLPE/SWA/PVC + 1 x 1C 16 mm2 CU.PVC. ECC C.FAN = Ceiling Fan. EX. FAN = Exhaust Fan, SH, S/O = Shaver socket outlet

    W/H = Water Heater, H/D = Hand Dryer, W= Window type & S= Split type.

    5400

    TP 25A 4X6 1X4 MCU-16 5400

             

                                  

    TP 25A 4X6 1X4 MCU-15

     

  • 8/18/2019 E-930469

    27/38

  • 8/18/2019 E-930469

    28/38

       N   E   I   G   H   B   O   U   R

       P   L   O   T  :   3   7   6  -   4   6   9   5

       N   E   I   G   H   B   O   U   R

       P   L   O   T

       3   7   6  -   4   6   9   3

    GROUND FLOORLIMIT

    ±0.00F.G.L

    UP

    GROUND FLOOR

    +0.30F.G.L

    PERGOLA AREA

    SUB STATION

    GARBAGE RM.

    LVROOM

    PUMP.RM

    TEL.ROOM

    GROUND FLOORLIMIT

    FIRST FLOOR LIMIT

    FIRST FLOOR LIMIT

    GROUND FLOORLIMIT

    U/G RCC WATERTANK

    UP

     LIMIT

    +6.97F.F.L

    +5.02F.F.L

    +5.02F.F.L

    +5.02F.F.L

    +0.30F.G.L

    +0.30F.G.L

    TEMPORARY GATE LEVEL =

    +6.90 =±0.00

    TEMPORARY GATE LEVEL =

    +6.90 =±0.00

    TEMPORARY GATE LEVEL =

    +6.90 =±0.00PLOTLIMIT

    S E R V I C E C O R R I D O R (P L O T N O - 376 2515)

    PLOTLIMITPLOTLIMIT

    PLOTLIMIT

    +0.30F.G.L

    +9.02S.S.L

    +9.02S.S.L

    1,427.18 SQ. FT.

    LVROOM

    DB-3 DB-2 DB-1

    DB-10DB-11 DB-9

    DB-5

    DB-4

    DB-6

    DB-7

    LVROOM

    DB-SS

    LVPANEL

        6    1    0

        2    5    5

    514

    320

          B      A      N      K

          C      A      P      A      C      I      T      O      R

    DB-LL   SMDB-LL

    514

    E : 488808.391

    N : 2778044.489

    E : 488833.235

    N : 2778026.275

    UM SUQUIM ROAD SIDE

    514

    SETTINGOUT PLAN

    ELECTRICAL

     ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX:04-3297330 P.O. BOX:

    73888 E-mail: [email protected]

    PROPOSED COMMERCIAL

    BUILDING

     (GROUND + MEZZANINE)

    ALI KHALIFA ABDULLA AL ATTIYAH,KHALID ABDULLAH ISMAIL ALMUTAWA.

    4x18W FLUORESCENT LIGHT RECESSED( HIGH MIRROR TYPE)

    WHITE POLYCARBONATE LAMP HOLDER

    ZINC COATED STEEL POLYSTER POWDER COATED

    W/P 2 X 36W LUMINAIRES, BODYMADE OF

    W/P RECESSED FITTING.2X26W /1X26W

    MIRROR LIGHT 1X18W

    W/P WALL MOUNTED FITTING.2X26W /1X26W

    2-WAY SWITCH

    1-WAY SWITCH

    INTERMEDIATE SWITCH

    GRID SWITCH WITH PHASE BARRIER

    LEGENDS

    W/P BULK HEAD FITTING.2X26W /1X26W

    METAL HALIDE SPOT LIGHT 1X175W

    DECORATIVE POLE LIGHTING 2-2X26W

    BRIGHT ELECTRICAL WORKS LLC

    SHOP DRAWING STATUS

    APPROVED

    APPROVED AS COMMENTED

    REJECTED & RESUBMIT

    BY:

    12U

    13A SINGLE SWITCH SOCKET OUTLET

    13A TWIN SWITCH SOCKET OUTLET

    13A SINGLE SWITCH SOCKET OUTLET

    (WEATHER PROOF)

    FLEXIBLE OUTLET FOR WATER HEATER

    15A SWITCH SOCKET OUTLET

    20A DP SWITCH WITH NEON INDICATOR

    SPN ISOLATOR W/P IP65

    TPN ISOLATOR W/P IP65

    WATER HEATER

    OPTICAL NETWORK TERMINAL

    DISTRIBUTION BOARD

    MAIN DISTRIBUTION BOARD WATER

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

       P   R   O   D   U   C   E   D

       B   Y   A

       N

       A   U   T   O   D   E   S   K

       E   D   U   C   A   T   I   O   N   A   L   P   R   O   D   U   C   T

       P   R   O   D   U   C   E   D   B   Y   A   N   A   U   T   O   D   E   S   K   E   D   U   C   A   T I   O   N   A   L   P   R   O   D   U   C   T

    P R OD U C E D

    BY 

    AN

    A UT  ODE  S K

    E D U C AT I   O

    NAL P R OD U C T 

  • 8/18/2019 E-930469

    29/38

  • 8/18/2019 E-930469

    30/38

  • 8/18/2019 E-930469

    31/38

  • 8/18/2019 E-930469

    32/38

  • 8/18/2019 E-930469

    33/38

  • 8/18/2019 E-930469

    34/38

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

  • 8/18/2019 E-930469

    35/38

    ROOF+9.49

    S.S.L

    ROOF

    +9.49

    S.S.L

    ROOF

    +6.87S.S.L

    CONSULTANTS APPROVAL

    CAT LADDER ASPER

    CONSULTANTS APPROVAL

    CAT LADDER ASPER

    pergola as per 

    consultants approval

    pergola as per 

    consultants approval

     TERRACE BELOW

    +4.92S.S.L

    +9.90S.S.L

    BELOWBUILDINGLINE

    BELOWBUILDINGLINE

    BELOWBUILDINGLINE

    BELOWBUILDINGLINE

    REF. DWG. NO. A-401 REF. DWG. NO. A-401

    REF. DWG. NO.A-401

    REF. DWG. NO.A-401

    REF. DWG. NO.A-401REF. DWG. NO.A-401

    500 GALONLBG SYSTEM

    LBG SYSTEMCONTROL PANEL

    RISER FOR LBG SYSTEMPIPESRISER FOR LBG SYSTEM PIPES RISER FOR LBG SYSTEM PIPES

    RISER FOR LBG SYSTEMPIPES

    RISER FOR LBGSYSTEMPIPES

    RISER FOR LBG SYSTEMPIPES

    RISER FOR LBGSYSTEMPIPES

    RISER FOR LBG SYSTEMPIPES

    LBG MAIN LINESUPPLYLBG MAIN LINESUPPLY

    PLOT LIMIT

    PLOT LIMIT

    3 2 7 - U M M S U Q E I M R O A D

       N   E   I   G   H   B   O   U   R

       P   L   O   T

       N   E   I   G   H   B   O   U   R

       P   L   O   T

    S E R V I C E C O R R I D O R (P L O T N O - 3762515)

    OPEN TERRACE+5.02F.F.L

    PLOT LIMIT

    PLOT LIMIT

    B4-DB-LL

    R3-DB-LL

    R4-DB-LL

    B3-DB-LL

     Y3-DB-LL

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)   (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (ROOF LIGHT)

    (MINARLIGHT)

    (MINARLIGHT)

    (MINARLIGHT)

    (MINARLIGHT)

    (MINARLIGHT)

    ROOF FLOOR

    ELECTRICAL LIGHTING LAYOUT

     ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX:04-3297330 P.O. BOX:

    73888 E-mail: [email protected]

    PROPOSED COMMERCIAL

    BUILDING

     (GROUND + MEZZANINE)

    ALI KHALIFA ABDULLA AL ATTIYAH,KHALID ABDULLAH ISMAIL ALMUTAWA.

    4x18W FLUORESCENT LIGHT RECESSED( HIGH MIRROR TYPE)

    WHITE POLYCARBONATE LAMP HOLDER

    ZINC COATED STEEL POLYSTER POWDER COATED

    W/P 2 X 36W LUMINAIRES, BODYMADE OF

    W/P RECESSED FITTING.2X26W /1X26W

    MIRROR LIGHT 1X18W

    W/P WALL MOUNTED FITTING.2X26W /1X26W

    2-WAY SWITCH

    1-WAY SWITCH

    INTERMEDIATE SWITCH

    GRID SWITCH WITH PHASE BARRIER

    LEGENDS

    W/P BULK HEAD FITTING.2X26W /1X26W

    METAL HALIDE SPOT LIGHT 1X175W

    DECORATIVE POLE LIGHTING 2-2X26W

    BRIGHT ELECTRICAL WORKS LLC

    SHOP DRAWING STATUS

    APPROVED

    APPROVED AS COMMENTED

    REJECTED & RESUBMIT

    BY:

    12U

    13A SINGLE SWITCH SOCKET OUTLET

    13A TWIN SWITCH SOCKET OUTLET

    13A SINGLE SWITCH SOCKET OUTLET

    (WEATHER PROOF)

    FLEXIBLE OUTLET FOR WATER HEATER

    15A SWITCH SOCKET OUTLET

    20A DP SWITCH WITH NEON INDICATOR

    SPN ISOLATOR W/P IP65

    TPN ISOLATOR W/P IP65

    WATER HEATER

    OPTICAL NETWORK TERMINAL

    DISTRIBUTION BOARD

    MAIN DISTRIBUTION BOARD WATER

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

       P   R   O   D   U   C   E   D

       B   Y

       A   N

       A   U   T   O   D   E   S   K

       E   D   U   C   A   T   I   O   N   A   L   P   R   O   D   U   C   T

       P   R   O   D   U   C   E   D   B   Y   A   N   A   U   T   O   D   E   S   K   E   D   U   C   A   T I   O   N   A   L   P   R   O   D   U   C   T

    P R OD U C E D

    BY 

    AN

    A UT  ODE  S K

    E D U C AT I   ONAL P R OD U C T 

    2 WAYSWITCH

    1-WAY SWITCH

    INTERMEDIATESWITCH

    GRIDSWITCH WITHPHASEBARRIER

    LEGENDS

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

  • 8/18/2019 E-930469

    36/38

       N   E   I   G   H

       B   O   U   R

       P   L   O   T  :   3   7   6  -   4   6   9   5

       N   E   I   G   H

       B   O   U   R

       P   L   O   T

       3   7   6  -   4   6   9   3

    GROUNDFLOOR LIMIT

    UP

    GROUNDFLOO R

    PERGOLA AREA

    SUBSTATION

    GARBAGE RM.

    LV ROOM

    PUMP.RM

    TEL.ROOM

    GROUNDFLOOR LIMIT

    FIRSTFLOOR LIMIT

    FIRSTF LOOR LIMIT

    GROUNDFLOO R LIMIT

    U/GRCC WATER TANK

    UP

     LIMIT

    TEMPORARYGATE LEVEL=

    TEMPORARYGATE LEVEL=

    TEMPORARYGATE LEVEL=

    PLOTLIMIT

    S E R V I C E C O R R I D O R (P L O T N O - 376 2515)

    PLOTLIMITPLOTLIMIT

    PLOTLIMIT

    1,427.18 SQ. FT.

    LV ROOM

    DB-3 DB-2 DB-1

    DB-10DB-11 DB-9

    DB-5

    DB-4

    DB-6

    DB-7

    LV ROOM

    DB-SS

    LV PANEL

        6    1    0

        2    5    5

    514

    320

                   B               A               N               K

                   C               A               P               A               C                I               T               O               R

    DB-LL   SMDB-LL

    514

    E : 488808.391

    N : 2778044.489

    E : 488833.235

    N : 2778026.275

    UM SUQUIM ROAD SIDE

    514

    SETTINGOUT PLAN

    ELECTRICAL

     ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX: 04-3297330 P.O. BOX:

    73888 E-mail: [email protected]

    PROPOSED COMMERCIALBUILDING

     (GROUND + MEZZANINE)

    ALIKHALIFA ABDULLAAL ATTIYAH,KHALIDABDULLAHISMAIL ALMUTAWA.

    4x18WFLUORESCENTLIGHT RECESSED(HIGH MIRROR TYPE)

    WHITEPOLYCARBONATELAMPHOLDERZINC COATEDSTEELP OLYSTER POWDER COATED

    W/P2 X 36WLUMINAIRES, BODY MADEOF

    W/PRECESSEDFITTING.2X26W /1X26W

    MIRROR LIGHT1X18W

    W/PWALL MOUNTEDFITTING.2X26W/1X26W

    2-WAY SWITCH

    W/PBULK HEADFITTING.2X26W/1X26W

    METALHALIDESPOT LIGHT1X175W

    DECORATIVEPOLELIGHTING 2-2X26W

    BRIGHT ELECTRICAL WORKS LLC

    SHOP DRAWING STATUS

    APPROVED

    APPROVEDASCOMMENTED

    REJECTED& RESUBMIT

    BY:

    12U

    13A SINGLESWITCHSOCKET OUTLET

    13A TWINSWITCHSOCKET OUTLET

    13A SINGLESWITCHSOCKET OUTLET

    (WEATHER PROOF)

    FLEXIBLEOUTLETFOR WATER HEATER

    15A SWITCHSOCKET OUTLET

    20A DPSWITCH WITHNEON INDICATOR

    SPNISOLATOR W/PIP65

    TPNISOLATOR W/PIP65

    WATER HEATER

    OPTICALNETWORK TERMINAL

    DISTRIBUTIONBOARD

    MAINDISTRIBUTIONBOARD WATER

       P   R   O   D   U   C   E   D

       B   Y

       A   N

       A   U   T   O

       D   E   S   K

       E   D   U   C   A   T   I   O   N   A   L   P   R   O   D   U   C   T

       P   R   O   D   U   C   E   D   B   Y   A   N   A   U   T   O   D   E   S   K   E   D   U   C   A   T I   O   N   A   L   P   R   O   D   U   C   T

    P R OD U C E D

    BY AN

    A UT  ODE  S K

    E D U C AT I   ONAL P R OD U C T 

    S E R V I C E C O R R I D O R (P L O T N O - 3762515)

    3082

    2-WAY SWITCH

    1-WAY SWITCH

    INTERMEDIATESWITCH

    GRIDSWITCH WITHPHASEBARRIER

    LEGENDS

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

  • 8/18/2019 E-930469

    37/38

    PLOTLIMIT

    3 2 7 - U M M S U Q E I M R O A D

       N   E   I   G   H   B   O   U   R

       P   L   O   T

       N   E   I   G   H   B   O   U   R

       P   L   O   T

        5    7    5    5

    3082

    PLOTLIMIT

     6    

     0     5     0    

    936

     2 16 0

    PLOTLIMIT

    SHOP-9SHOP-11

    SHOP-8

    OPEN TERRACE

    SHOP-4

    SHOP-5

    OPENTERRACE

    OPEN TERRACE

           D       N

    WASH

    TOILET

    TOILET

    DN CONSULTANTS APPROVAL

    CATLADDER AS PER

    8' -0"HIGH

    BLOCKWALL

    CONSULTANTS APPROVAL

    CATLADDER AS PER

    pergola above pergola above

     AREA=  AREA=

     AREA=

     AREA=

     AREA=

    620 620 784

        6    0    0

    2030

    2030

    715 700 710

        1    5    7    6

        1    5    7    6

        1    5    5    6

    948

    SHOP-10 AREA=

    TOILETPANTRY TOILET PANTRY 

        1    5    3    3

    TOILETPANTRY 

    535

    535

                                                      

    150 470

    150

        2    1    0

    150

     

       

     

    125

        3    1    5

    45

        1    2    5

        6    0

        9    5

        1    2    5

        8    0

    1530

        4    5    0

        1    5    0

        5    3    0

    535 935

        4    8    5

        6    5    2

    160 145    1    3    5

        1    3    5

    145

        2    8    0

    181

    352606060

        1    5    3    3

        1    3    0    0

        1    3    0    0

    319

        1    4    6

        9    0

        2    0

        2    0

        9    0

        1    4    1

    160

        2    4    6

    130

              2          4          3 

    1     9     5    

    130 170

        2    4    1

    300

        1    2    6    0

    812

        1    0    0 195

    STORE     1    5    0

    PANTRY TOILET

                                                      

    627

    DN 

    160   114 130

    up REF. DWG. NO. A-402

    150

    REF. DWG. NO. A-404

        R    E    F .

        D    W    G .

        N    O .

        A  -    4

        0    4

        3    4    4

        2    3    9

        2    5    4

        4    3    1

        5    2    0

        8    0    3

        6    2    3

        6    7    0

        7    7    3

        7    6    5

    PLOTLIMIT

    dn.

    dn.

    470

        R    E    F .

        D    W    G .

        N    O .

        A  -    4

        0    2

                                                      

        R    E    F .

        D    W    G .

        N    O .

        A  -    4

        0    2

                                                      

        7    1    3

        2    1    7

    DN

    WASHTOILET

    TOILET

                                                      

    150

    160145

        1    6    0

        1    6    0

    145

        3    3    0

    195

    STORE

        R    E    F .

        D    W    G .

        N    O .

        A  -    4

        0    4

     

    SUBSTATION

    IN GR.FLOOR

    LV ROOM

    IN GR.FLOOR

    LV ROOM DETAILS

    SECTIONAL PLANS

     ALACE ENGINEERING CONSULTANTSTEL.: 04-3297727 FAX: 04-3297330 P.O. BOX:

    73888 E-mail: [email protected]

    PROPOSED COMMERCIALBUILDING

     (GROUND + MEZZANINE)

    ALIKHALIFA ABDULLAAL ATTIYAH,KHALIDABDULLAHISMAIL ALMUTAWA.

    4x18WFLUORESCENTLIGHT RECESSED(HIGH MIRROR TYPE)

    WHITEPOLYCARBONATELAMPHOLDERZINC COATEDSTEELP OLYSTER POWDER COATED

    W/P2 X 36WLUMINAIRES, BODY MADEOF

    W/PRECESSEDFITTING.2X26W /1X26W

    MIRROR LIGHT1X18W

    W/PWALL MOUNTEDFITTING.2X26W/1X26W

    W/PBULK HEADFITTING.2X26W/1X26W

    METALHALIDESPOT LIGHT1X175W

    DECORATIVEPOLELIGHTING 2-2X26W

    BRIGHT ELECTRICAL WORKS LLC

    SHOP DRAWING STATUS

    APPROVED

    APPROVEDASCOMMENTED

    REJECTED& RESUBMIT

    BY:

    12U

    13A SINGLESWITCHSOCKET OUTLET

    13A TWINSWITCHSOCKET OUTLET

    13A SINGLESWITCHSOCKET OUTLET

    (WEATHER PROOF)

    FLEXIBLEOUTLETFOR WATER HEATER

    15A SWITCHSOCKET OUTLET

    20A DPSWITCH WITHNEON INDICATOR

    SPNISOLATOR W/PIP65

    TPNISOLATOR W/PIP65

    WATER HEATER

    OPTICALNETWORK TERMINAL

    DISTRIBUTIONBOARD

    MAINDISTRIBUTIONBOARD WATER

       P   R   O   D   U   C   E   D

       B   Y

       A   N

       A   U   T   O

       D   E   S   K

       E   D   U   C   A   T   I   O   N   A   L   P   R   O   D   U   C   T

       P   R   O   D   U   C   E   D   B   Y   A   N   A   U   T   O   D   E   S   K   E   D   U   C   A   T I   O   N   A   L   P   R   O   D   U   C   T

    P R OD U C E D

    BY AN

    A UT  ODE  S K

    E D U C AT I   ONAL P R OD U C T 

  • 8/18/2019 E-930469

    38/38