EA SEA-WAY Project
2nd Technical Cross Border Working Group (WP5)
Pescara, December 10, 2014
TRT TRASPORTI E TERRITORIO
Identify investment needs&
pave the way to further investments
WORKING GROUPS
LOCAL WORKING GROUP
Transport Experts & Stakeholders (Local)
Common interest themes:- ICT systems- Safety & Security- New passenger services
LWG will provide INPUT for CBB:- Priorities and investment needs- Share/coordinate common aspect of Pilot Activities
TECHNICAL WORKING GROUP
Transport Experts & Stakeholders (Cross Border)
Common interest themes:- ICT systems- Safety & Security- New passenger services
TWG will provide INPUT for CBB:- Priorities and investment needs- Share/coordinate common aspect of Pilot Activities
Outline Road Maps and Action Plans of the identified priorities of development addressed to integrate and upgrade existing and new transport services/connections across the area among ports/airports/urban areas/tourist destinations
Develop infrastructures in the Adriatic passenger transport system
Foster passenger water transport resulting in a more sustainable and efficient passenger transport
WP 5 ACTIVITIES
CROSS BORDER AGREEMENTS &
STRATEGY
ROAD MAPS&
ACTION PLANS
CROSS BORDER BOARD
governance tool in the Adriatic-Ionian MACRO REGIONInstitutional & Key actors to outline an Adriatic-Ionian SUSTAINABLE PASSENGER TRANSPORT STATEGY
CCB will identify:- priorities- interventions- cross border agreements
1° TECHNICALWORKING
GROUP
Start the Analysis of the current situation of the port services and major needs
MAY ‘14
1° CROSS BORDER BOARD
General discussion concerning the priorities of the partners
OCTOBER ‘14
2° TECHNICALWORKING
GROUP
- First outcomes of the pps general survey and first idea on the priorities and needs
- Set up of common basic ‘standards’ for services in ports
DECEMBER ‘14
3° TECHNICALWORKING
GROUP
- Inputs for the drafting of the Action Plans
- Proposals for Cross Border Agreements
MARCH ‘15
2° CROSS BORDER BOARD
- First Draft of the Action Plans
- Discussion on the Draft of Cross Border Agreements
JUNE ‘15
4° TECHNICALWORKING
GROUP
- Finalisation of the Action Plans
- Discussion on the Final Cross Border Agreements
SEPTEMBER ‘15
3° CROSS BORDER BOARD
- Final Approval of the Actions Plans
- Signature of the Cross Border Agreements & Strategy
DECEMBER ‘15
WORKING GROUPS TIMELINE (NEXT 12 MONTHS)
PASSENGER TERMINAL SERVICES
Brief description of the present status / level of the provided services in your territory / by your organization
Priorities
Needs
Suggest any topics you intend to propose for develop within the theme
INFOMOBILITY
FB1
FB2
FB4
FB5
FB11
FB7
FB12
FB13
FB1
FB2
FB5
FB13
PASSENGER TERMINAL SERVICES INFOMOBILITY
PASSENGER TERMINAL SERVICES – FB1: Friuli Venezia Giulia
Priorities
• To develop congress & fair activities (further investments)
• To implement cruise tourism both as Home Port and Port Of Call (Magazzino 42
requalification)
• To implement embarking/disembarking comfort and security system
• To develop support to maxi yacht activity (also in consideration of local shipyard services)
Needs
• To implement classic services inside the Trieste Terminal Passengers
• To face the impact of traffic flows on city flows
• To improve access to ships for passenger embarking/disembarking
• To increase parking offer
PASSENGER TERMINAL SERVICES – FB2: Ravenna Province
Priorities
• To make terminal more efficient and attractive
• To manage the problem of the imbalance between inbound flow and outbound flow
Needs
• To improve connections between the port and its hinterland (improving connections with
road and rail networks).
• To face congestion problems, due to the low number of quays
PASSENGER TERMINAL SERVICES – FB4: Dubrovnik Neretva Region
Priorities
• The top priority is to relieve traffic in the old city harbor and the acceptance of the
tender and excursion boats during the summer months, thus creating a deadlock and the
reduced difference of potential accidents.
Needs
• According to the analysis of the characteristics of the vessel on the quay will be allowed
to dock two service boats lenght from 10 to 12 meters.
• It is enabled existing and landscaped pedestrian access for passengers to the eastern
entrance to the city.
PASSENGER TERMINAL SERVICES – FB5: Region of Istria
Priorities
• The construction of a new Passenger terminal in the eastern part of the port.
Needs
• The overall development of passenger services considering that at this stage is at a
minimum level.
PASSENGER TERMINAL SERVICES – FB7: Ancona Port Authority
Priorities
• Management of passenger and vehicles traffic in the Port of Ancona
• Orienting passengers in incoming/outgoing
• Passenger Assistance in Port
Needs
• Info-point at the train station, in the waiting areas and, in general, for walking passengers
• Improvement of external spaces, in the maritime station, for truck and trailer parking
• Direct link to the highway
• Improvement of port infrastructures, separation of the port traffic flows from local traffic
• Truck driver services: safe parking, improve the welcome services and facilities
• Separation of pedestrian and vehicle flows
• Improving internet services avoiding roaming costs (WI-FI)
PASSENGER TERMINAL SERVICES – FB11: University of Ljubljana
Priorities/Needs
• Priority for our situation is building of passenger terminal facilities in order to increase
attractiveness of Port of Koper, making it possible to offer services as Home Port and not
only as Port of Call.
PASSENGER TERMINAL SERVICES – FB12: University of Belgrade
Priorities
• Actual priorities could be observed based on SEETO comprehensive network plan. This
plan presents also comparative illustration of different transport networks and theirs
priorities according to improvements, proposed projects and costs:
http://www.seetoint.org/library/multi-annual-plans/
Needs
• Serbia is not on the Adriatic coast so the general conclusion in all sectors should be
defined as a better connectivity. The easiest way to reach this goal is air transport
development within the region. Some initiatives are proposed in the framework of
Danube strategy, priority area PA01b
PASSENGER TERMINAL SERVICES – FB13: Port of Bar Holding Company
Priorities
• Introducing new passengers lines.
Needs
• Port physical infrastructures with higher draft, favouring the maritime connections and
the port access with the realisation of an extension of the existing quay
INFOMOBILITY – FB1: Friuli Venezia Giulia
Priorities
• To implement main Infomobility system offers (online, phones, etc)
• To provide tourist info in other languages
Needs
• To implement digital info in access and external waiting areas (terminal, bus and rail
station)
• To improve internet services and interoperable system
Other Topics
• Coordination with other ports/common solutions
• Systematization of digital Info
INFOMOBILITY – FB2: Ravenna Province
Priorities/Needs
• To better organize the information service on multimodal connections by the cruises and
ferry terminals through info screens, Wi-Fi system, etc. and upgrade the info point
created thanks to Adrimob
• To find a suitable solution to systematize information on multimodal mobility to allow
people organizing their journey without the need to sail inside several different web sites
• To plan common and cross-border information campaign/strategy/tools in order to
informa about the possibility to travel across Adriatic
• There are two other issues which are very ambitious due to complexity and cost, but
recognized as a necessity:
• One-ticket system development and implementation
• Real-time information on passenger transport system development
INFOMOBILITY – FB5: Region of Istria
Priorities
• The development of passenger infomobility system aiming at sustainable improvement
of competitiveness, fostering attractiveness and making port system more efficient.
Needs
• The development and use of information technologies to support the passenger
infomobility
• To offer tourists and commuters a simple and intuitive tool (public transportation routes,
tourist resorts, museum and entertainment centres)
INFOMOBILITY – FB13: Port of Bar Holding Company
Priorities
• Better infomobility in our port/city.
Needs
• Route planner
• Real time update of relevant information referred on public transport, bus transport,...
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
• Service 1• Service 2• …
SAFETY & SECURITY
PORT SERVICES
MOBILITY (people, cars, trucks, buses, …)
CRUISE SERVICES
INFOMOBILITY
PASSENGER SERVICES
GENERAL SERVICES
PASSENGER SERVICES
GENERAL SERVICES
• Service 1• Service 2• …• …
PASSENGER SERVICES
MOBILITY (people, cars, trucks, buses, …)
• Service 1• Service 2• …• …
PASSENGER SERVICES
SAFETY & SECURITY
• Service 1• Service 2• …• …
PASSENGER SERVICES
INFOMOBILITY
• Service 1• Service 2• …• …
CRUISE SERVICES
GENERAL SERVICES
• Service 1• Service 2• …• …
CRUISE SERVICES
MOBILITY (people, cars, trucks, buses, …)
• Service 1• Service 2• …• …
CRUISE SERVICES
SAFETY & SECURITY
• Service 1• Service 2• …• …
CRUISE SERVICES
INFOMOBILITY
• Service 1• Service 2• …• …
OUTPUT 1: STATUS QUO OF TRIESTE
Quality Quality
PASSEGGER SERVICES Exist HIGH MID LOW
Passenger Terminal X X
Hotel O X
Convention center X X
Toilet facilities X X
Touristic Info Point (light infrastructures: information desks, totem and monitors)
X X
Food and beverage area O X
Shopping center O X
Wi-fi network X X
Wi-fi network freeExposition area X X
Bag storage X X
Medical assistance O X
Services for passengers with reduced mobility Escalator X X
Lift X X
Number of footbridgeFootbridge coveredDuty free areaConveyor beltATM point O X
Foreign exchange O X
Children areaAir conditioning X X
Public telephones X
Green areaWaiting room X X
Stevedores X X
Ship Chandlers X X
LB - Port of Trieste
OUTPUT 2: NEEDS & PRIORITIES
Priority (years)Priority (years)
PASSEGGER SERVICES 1 - 3 3 - 5 > 5
Passenger Terminal X
HotelConvention centerToilet facilitiesTouristic Info Point (light infrastructures: information desks, totem and monitors)
X
Food and beverage areaShopping centerWi-fi network X
Wi-fi network freeExposition areaBag storage X
Medical assistanceServices for passengers with reduced mobility Escalator X
Lift X
Number of footbridge 1
LB - Port of Trieste
Thats’ all
Thanks for your attention
Let’s start working together
Tito [email protected]
TRT – Trasporti e Territorio