EA SEA-WAY Project

2nd Technical Cross Border Working Group (WP5)

Pescara, December 10, 2014

TRT TRASPORTI E TERRITORIO

Page 2: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

Identify investment needs&

pave the way to further investments

WORKING GROUPS

LOCAL WORKING GROUP

Transport Experts & Stakeholders (Local)

Common interest themes:- ICT systems- Safety & Security- New passenger services

LWG will provide INPUT for CBB:- Priorities and investment needs- Share/coordinate common aspect of Pilot Activities

TECHNICAL WORKING GROUP

Transport Experts & Stakeholders (Cross Border)

Common interest themes:- ICT systems- Safety & Security- New passenger services

TWG will provide INPUT for CBB:- Priorities and investment needs- Share/coordinate common aspect of Pilot Activities

Outline Road Maps and Action Plans of the identified priorities of development addressed to integrate and upgrade existing and new transport services/connections across the area among ports/airports/urban areas/tourist destinations

Develop infrastructures in the Adriatic passenger transport system

Foster passenger water transport resulting in a more sustainable and efficient passenger transport

WP 5 ACTIVITIES

CROSS BORDER AGREEMENTS &

STRATEGY

ROAD MAPS&

ACTION PLANS

CROSS BORDER BOARD

governance tool in the Adriatic-Ionian MACRO REGIONInstitutional & Key actors to outline an Adriatic-Ionian SUSTAINABLE PASSENGER TRANSPORT STATEGY

CCB will identify:- priorities- interventions- cross border agreements

Page 3: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

1° TECHNICALWORKING

GROUP

Start the Analysis of the current situation of the port services and major needs

MAY ‘14

1° CROSS BORDER BOARD

General discussion concerning the priorities of the partners

OCTOBER ‘14

2° TECHNICALWORKING

GROUP

- First outcomes of the pps general survey and first idea on the priorities and needs

- Set up of common basic ‘standards’ for services in ports

DECEMBER ‘14

3° TECHNICALWORKING

GROUP

- Inputs for the drafting of the Action Plans

- Proposals for Cross Border Agreements

MARCH ‘15

2° CROSS BORDER BOARD

- First Draft of the Action Plans

- Discussion on the Draft of Cross Border Agreements

JUNE ‘15

4° TECHNICALWORKING

GROUP

- Finalisation of the Action Plans

- Discussion on the Final Cross Border Agreements

SEPTEMBER ‘15

3° CROSS BORDER BOARD

- Final Approval of the Actions Plans

- Signature of the Cross Border Agreements & Strategy

DECEMBER ‘15

WORKING GROUPS TIMELINE (NEXT 12 MONTHS)

Page 4: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES

Brief description of the present status / level of the provided services in your territory / by your organization

Priorities

Needs

Suggest any topics you intend to propose for develop within the theme

INFOMOBILITY

Page 5: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

FB1

FB2

FB4

FB5

FB11

FB7

FB12

FB13

FB1

FB2

FB5

FB13

PASSENGER TERMINAL SERVICES INFOMOBILITY

Page 6: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB1: Friuli Venezia Giulia

Priorities

• To develop congress & fair activities (further investments)

• To implement cruise tourism both as Home Port and Port Of Call (Magazzino 42

requalification)

• To implement embarking/disembarking comfort and security system

• To develop support to maxi yacht activity (also in consideration of local shipyard services)

Needs

• To implement classic services inside the Trieste Terminal Passengers

• To face the impact of traffic flows on city flows

• To improve access to ships for passenger embarking/disembarking

• To increase parking offer

Page 7: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB2: Ravenna Province

Priorities

• To make terminal more efficient and attractive

• To manage the problem of the imbalance between inbound flow and outbound flow

Needs

• To improve connections between the port and its hinterland (improving connections with

road and rail networks).

• To face congestion problems, due to the low number of quays

Page 8: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB4: Dubrovnik Neretva Region

Priorities

• The top priority is to relieve traffic in the old city harbor and the acceptance of the

tender and excursion boats during the summer months, thus creating a deadlock and the

reduced difference of potential accidents.

Needs

• According to the analysis of the characteristics of the vessel on the quay will be allowed

to dock two service boats lenght from 10 to 12 meters.

• It is enabled existing and landscaped pedestrian access for passengers to the eastern

entrance to the city.

Page 9: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB5: Region of Istria

Priorities

• The construction of a new Passenger terminal in the eastern part of the port.

Needs

• The overall development of passenger services considering that at this stage is at a

minimum level.

Page 10: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB7: Ancona Port Authority

Priorities

• Management of passenger and vehicles traffic in the Port of Ancona

• Orienting passengers in incoming/outgoing

• Passenger Assistance in Port

Needs

• Info-point at the train station, in the waiting areas and, in general, for walking passengers

• Improvement of external spaces, in the maritime station, for truck and trailer parking

• Direct link to the highway

• Improvement of port infrastructures, separation of the port traffic flows from local traffic

• Truck driver services: safe parking, improve the welcome services and facilities

• Separation of pedestrian and vehicle flows

• Improving internet services avoiding roaming costs (WI-FI)

Page 11: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB11: University of Ljubljana

Priorities/Needs

• Priority for our situation is building of passenger terminal facilities in order to increase

attractiveness of Port of Koper, making it possible to offer services as Home Port and not

only as Port of Call.

Page 12: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB12: University of Belgrade

Priorities

• Actual priorities could be observed based on SEETO comprehensive network plan. This

plan presents also comparative illustration of different transport networks and theirs

priorities according to improvements, proposed projects and costs:

http://www.seetoint.org/library/multi-annual-plans/

Needs

• Serbia is not on the Adriatic coast so the general conclusion in all sectors should be

defined as a better connectivity. The easiest way to reach this goal is air transport

development within the region. Some initiatives are proposed in the framework of

Danube strategy, priority area PA01b

Page 13: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER TERMINAL SERVICES – FB13: Port of Bar Holding Company

Priorities

• Introducing new passengers lines.

Needs

• Port physical infrastructures with higher draft, favouring the maritime connections and

the port access with the realisation of an extension of the existing quay

Page 14: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

INFOMOBILITY – FB1: Friuli Venezia Giulia

Priorities

• To implement main Infomobility system offers (online, phones, etc)

• To provide tourist info in other languages

Needs

• To implement digital info in access and external waiting areas (terminal, bus and rail

station)

• To improve internet services and interoperable system

Other Topics

• Coordination with other ports/common solutions

• Systematization of digital Info

Page 15: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

INFOMOBILITY – FB2: Ravenna Province

Priorities/Needs

• To better organize the information service on multimodal connections by the cruises and

ferry terminals through info screens, Wi-Fi system, etc. and upgrade the info point

created thanks to Adrimob

• To find a suitable solution to systematize information on multimodal mobility to allow

people organizing their journey without the need to sail inside several different web sites

• To plan common and cross-border information campaign/strategy/tools in order to

informa about the possibility to travel across Adriatic

• There are two other issues which are very ambitious due to complexity and cost, but

recognized as a necessity:

• One-ticket system development and implementation

• Real-time information on passenger transport system development

Page 16: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

INFOMOBILITY – FB5: Region of Istria

Priorities

• The development of passenger infomobility system aiming at sustainable improvement

of competitiveness, fostering attractiveness and making port system more efficient.

Needs

• The development and use of information technologies to support the passenger

infomobility

• To offer tourists and commuters a simple and intuitive tool (public transportation routes,

tourist resorts, museum and entertainment centres)

Page 17: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

INFOMOBILITY – FB13: Port of Bar Holding Company

Priorities

• Better infomobility in our port/city.

Needs

• Route planner

• Real time update of relevant information referred on public transport, bus transport,...

Page 18: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

• Service 1• Service 2• …

SAFETY & SECURITY

PORT SERVICES

MOBILITY (people, cars, trucks, buses, …)

CRUISE SERVICES

INFOMOBILITY

PASSENGER SERVICES

GENERAL SERVICES

Page 19: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER SERVICES

GENERAL SERVICES

• Service 1• Service 2• …• …

Page 20: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER SERVICES

MOBILITY (people, cars, trucks, buses, …)

• Service 1• Service 2• …• …

Page 21: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER SERVICES

SAFETY & SECURITY

• Service 1• Service 2• …• …

Page 22: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

PASSENGER SERVICES

INFOMOBILITY

• Service 1• Service 2• …• …

Page 23: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

CRUISE SERVICES

GENERAL SERVICES

• Service 1• Service 2• …• …

Page 24: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

CRUISE SERVICES

MOBILITY (people, cars, trucks, buses, …)

• Service 1• Service 2• …• …

Page 25: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

CRUISE SERVICES

SAFETY & SECURITY

• Service 1• Service 2• …• …

Page 26: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

CRUISE SERVICES

INFOMOBILITY

• Service 1• Service 2• …• …

Page 27: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

OUTPUT 1: STATUS QUO OF TRIESTE

Quality Quality

PASSEGGER SERVICES Exist HIGH MID LOW

Passenger Terminal X X

Hotel O X

Convention center X X

Toilet facilities X X

Touristic Info Point (light infrastructures: information desks, totem and monitors)

X X

Food and beverage area O X

Shopping center O X

Wi-fi network X X

Wi-fi network freeExposition area X X

Bag storage X X

Medical assistance O X

Services for passengers with reduced mobility Escalator X X

Lift X X

Number of footbridgeFootbridge coveredDuty free areaConveyor beltATM point O X

Foreign exchange O X

Children areaAir conditioning X X

Public telephones X

Green areaWaiting room X X

Stevedores X X

Ship Chandlers X X

LB - Port of Trieste

Page 28: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

OUTPUT 2: NEEDS & PRIORITIES

Priority (years)Priority (years)

PASSEGGER SERVICES 1 - 3 3 - 5 > 5

Passenger Terminal X

HotelConvention centerToilet facilitiesTouristic Info Point (light infrastructures: information desks, totem and monitors)

X

Food and beverage areaShopping centerWi-fi network X

Wi-fi network freeExposition areaBag storage X

Medical assistanceServices for passengers with reduced mobility Escalator X

Lift X

Number of footbridge 1

LB - Port of Trieste

Page 29: EA SEA-WAY Project 2 nd Technical Cross Border Working Group (WP5) Pescara, December 10, 2014 TRT TRASPORTI E TERRITORIO

Thats’ all

Thanks for your attention

Let’s start working together

Tito [email protected]

TRT – Trasporti e Territorio