Discussion Outline
● Congestion management and energy imbalance toolkit overview
● Cost / Benefit analysis
● MIC approval ballot
![Page 3: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/3.jpg)
WECC background
● The WECC Seams Issues Subcommittee (SIS) assignment:
Propose an effective congestion management and imbalance mechanism
No Regional Transmission Organization (RTO) proposal
No full LMP-style market design
![Page 4: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/4.jpg)
What's the problem?
● Not bad today Very little WECC congestion but an increasing burden
for balancing area resources
● Big in the future High penetration of renewables will increase the
balancing burden and will result in less predictable impacts on grid flows
● Proposed solution: A toolkit that mitigates balancing obligations and
manages congested power flows
![Page 5: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/5.jpg)
Increasing Renewable Penetration
● Western Wind and Solar Integration Study Example: If the United States footprint of WECC is at
27% of 2017 load forecast from renewable energy supply, this would be an energy volume of 242,000 GWh per year!
The level of supply in this example could include 69,000 MW of wind resource and 13,000 MW of solar resource
● Regional planning collaborations are established to address power lines and interconnections, but not dispatch operations
● Question: Who will own the operating solution?
Change Drivers
![Page 6: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/6.jpg)
Why a WECC opportunity?
● Capitalize on existing Reliability Coordinator assets and infrastructure
Achieve ability to perform efficient, equitable management of grid reliability
Situational awareness tools help the WECC RC anticipate potential degraded reliability situations; now the industry needs better tools to respond rapidly and efficiently to the operating conditions
![Page 7: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/7.jpg)
Toolkit components – two parts
● #1: Seams coordination tool used by the WECC RC throughout the footprint
Likely accomplished through augmentationof the webSAS tool used by many partiesin the WECC today
● #2: Coordinated economic dispatch capability for congestion and energy imbalance in a subset of the WECC footprint
![Page 8: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/8.jpg)
Background: WECC SIS activity
●The WECC SIS developed a draft high-level design specification for the proposed toolkit The EIS design is based on the SPP regional
market Energy imbalance and redispatch services
Seams tool design coordinates across entire WECC
●The SIS also developed a benefit / cost analysis proposal
![Page 9: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/9.jpg)
WECCSeams coordination between the
independent dispatch areas
CAISOLMP
Market
AESO MarketWECC
Imbalance+
Congestion Redispatch
WECC toolkit development
![Page 10: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/10.jpg)
WECC toolkit development
ProposedWECC EIS Area
WECC Seams Coordinationwith CAISOand AESO
Note – this is not a BalancingArea consolidation.This is an area of coordinated dispatchoperations.
![Page 11: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/11.jpg)
WECCSeams coordination between the independent dispatch areas
CAISOLMP
Market
AESOMarket
3rd Party “A”
Imbalance+
Congestion Redispatch
3rd Party “B”
Imbalance+
Congestion Redispatch
3rd Party “n”
Imbalance+
Congestion Redispatch
(Still includes new WECC seams coordination tool)
Alternative: Non-WECC imbalance
![Page 12: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/12.jpg)
Alternative: Non-WECC ImbalancePotential 3rd
party EIS Areas
WECC Seams Coordinationwith CAISOand AESOand each3rd-party EIS
Note – these areas are for illustration of the potential proliferation of seams coordinating parties.
![Page 13: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/13.jpg)
Seams Tool Proposal
●Augment webSAS and UFAS capabilities Ensure comparable treatment for
transmission service curtailments Foundation for effective seams
coordination across the interconnection
13
![Page 14: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/14.jpg)
EIS Tool Proposal
●Provide energy imbalance service and redispatch service Security-Constrained Economic
Dispatch via dynamic setpoints Function is integrated with a new
Seams Coordination Tool (augmented webSAS/UFMP)
![Page 15: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/15.jpg)
Transmission Provider Impacts
●Balancing generation and load Replace some local OATT services with
a new regional service Schedule 4 Energy Imbalance Schedule 9 Generator Imbalance
●Regional transmission fee collected for EIS delivery service
●Transmission providers keep their own OATTs
![Page 16: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/16.jpg)
Balancing Area Impacts
● Participating Balancing Areas (BAs) contract with the toolkit operator to assign the reliability standards compliance role
● BA scheduled interchange is adjusted continuously as internal generator dispatch setpoints are updated by the regional security-constrained dispatch Sum of internal generator adjustments equals
adjusted scheduled interchange at BA level
![Page 17: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/17.jpg)
WECC Impacts
●Use existing tools as foundation State Estimator Contingency Analysis Optimal Power Flow Software
●Potential new division of WECC organization to provide toolkit operations
![Page 18: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/18.jpg)
Some details about the toolkit…
![Page 19: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/19.jpg)
Priority of Toolkit Flows
●Proposal: the EIS redispatch and energy imbalance flows will be evaluated with a curtailment priority of zero In other words, toolkit flows are not
allowed to cause curtailment of any tagged OASIS transactions or any firm network service flow
![Page 20: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/20.jpg)
Flow “types”
BA#1
BA#3
BA#2
G11L1
G31
L2
Delivery from G11 to L1 is an untagged flow*.
Delivery from G21 and from G31 to L2 is are tagged flow using ETAG, note differencesin businesses practicescompared to BA#1!
G21
![Page 21: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/21.jpg)
Flow impact representation
●Self-scheduled
●ETAG
●EIS Gen setpoint
●EIS Demand value
System POR System POD
Tariff POR Tariff POD
Gen node MW Aggregate load
Aggregate gen System POD
![Page 22: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/22.jpg)
Flow impact evaluation: terms
● Definitions:● System POR – all dispatchable generation resources
scaled in balancing area● System POD – all LSE load served in balancing area● Tariff POR – Specific generator source points identified
in OASIS● Tariff POD – Specific load interconnection or system
POD delivery points in OASIS● Gen node – specific generator modeled by EIS state
estimator● Aggregate load – all load eligible for EIS settlement● Aggregate gen – all generation eligible for EIS
settlement
![Page 23: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/23.jpg)
Notes: No displacement of same priority transactions except Firm. Firm curtails pro-rata.
Loading
Deck
The EIS flows use unloadedline capabilityor else cause counterflowon a binding constraint
Priority 3 - ND
Priority 4 - NW
Priority 1 - NS
Priority 5 - NM
Priority 6 - NN
Priority 7 - F
Flowgate Loading
Priority 2 - NH
Priority 0 – EIS Flow Impacts
Unloading
Avoid Overflow
Curtailment priority coordination concept:
![Page 24: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/24.jpg)
Determining imbalance market flows
Total MWFlow on
Flowgate A
WECC EISDispatch
Untagged
CAISO
AESO
WECC EISDispatch
Flowgate A
Seams coordination tool calculates all components of flow on grid Element “A”
Tagged
![Page 25: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/25.jpg)
TotalFlow on
Flowgate A
WECC EISDispatch
Untagged
Tagged
Flowgate MW limit
In this example EIS flows for imbalance are within the line loading limit
Includes MW contributions onFlowgate A from all WECC participants.
This EIS MW amount is limited so as not to cause congestion.
![Page 26: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/26.jpg)
TotalFlow on
Flowgate A
Tagged and untagged flow contributions abovebinding limit – identified with a curtailment obligation
Untagged
Tagged
Flowgate MWbinding limit
In this example EIS flows offset the flow components that have a curtailment obligation
WECC EIS dispatch offsets the identified curtailment obligations
Includes MW contributions onFlowgate A from all WECC participants.
![Page 27: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/27.jpg)
Operation Timeline and Activity for the WECC EIS Toolkit
Schedule Day-Ahead & Up-to 30 minutes prior toOperating Hour
Real-time Dispatch Post-Operating
time
Forecast andunit CommitGeneratorsself-scheduleGenerators voluntary submitoffersDSM resources voluntary submitoffersPrepare and finalize pre-dispatch schedules
Perform security-constrained economic dispatch to keep balanceProvide redispatchif any congestionoccursSend dispatchset points togeneratorsCoordinate anycontingencyreserve deploymentsWith EIS dispatch
Market Participant: WECC EIS Market Operator:Gather meterdata to supportsettlementsProvide settlement statementand invoices
Transmission Provider:
Provide meterdata to supportsettlements
![Page 28: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/28.jpg)
Some open design issues…
Full development after benefit/cost study is completed
![Page 29: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/29.jpg)
WECC Toolkit Funding
● Seams coordination tool: cost allocated to all entities in WECC footprint A Reliability Coordinator tool with traditional
WECC funding Costs to support EIS role are allocated to EIS
● Energy Imbalance Service (EIS) tool: cost allocated only to participating transmission customers Tool development and operation costs
recovered from EIS participants
![Page 30: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/30.jpg)
Areas for detailed development
●Harmonize with UFMP process Reliability fallback Coordinated phase-shifter
operations
●Transmission losses for EIS delivery
![Page 31: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/31.jpg)
Energy Imbalance & Redispatch
![Page 32: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/32.jpg)
Toolkit Component 1
Congestion Management
![Page 33: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/33.jpg)
Toolkit: Congestion management
● Today: Only six “Qualified Paths” in the entire WECC for congestion coordination Assumptions used in today’s UFMP method
could be improved:o System intact topology assumption is used
o During congestion, the “intact” assumptionmay be in error – line outages contribute to congestion!
o Currently use a seasonal case assumption(two updates per year) and zonal approximationsfor source/sink
Future: Increase congestion coordination on all relevant grid components
![Page 34: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/34.jpg)
Current congestion process
● What happens if the transmission owner or reliability coordinator sees a potential overload?
● Initiate the UFMP - if the element is a WECC Qualified Path
● Or – Transmission Owner manages the issue locally using their own accommodation or tariff curtailments
![Page 35: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/35.jpg)
Current congestion process
● If the limiting element is “local”, there is no WECC method to ensure loop flow impacts of lower service priority are curtailed prior to curtailing the higher priority use
● And even if the limiting element is a Qualified Path, there is no process to differentiate the priority of the external loop flow contributions
![Page 36: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/36.jpg)
Energy Imbalance
Toolkit Component 2
![Page 37: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/37.jpg)
Today’s energy imbalance
●Each BA sets aside resources to provide balancing service
As BA variability increases, the amount of flexible dispatch margin set aside by each BA increases, along with corresponding costs
![Page 38: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/38.jpg)
Toolkit proposal – Energy imbalance
● Real-time energy imbalance transactions occur on unused transmission capability
Regional balancing pool eliminates the limitations of the balancing area boundary and scheduling deadlines
EIS provides multi-party dispatch coordination with 5-minute setpoint adjustments
● Replaces OATT Schedules 4 and 9 on participating transmission provider systems
![Page 39: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/39.jpg)
Energy Imbalance Service - EIS
● EIS creates a holistic solution● For example: bilateral dynamic scheduling
only moves the problem● Bilateral dynamic scheduling does not
capture the aggregate diversity benefit It does establish infrastructure that could be used
by an EIS
● EIS captures aggregate diversity benefit
![Page 40: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/40.jpg)
Benefit / Cost
Analysis Plan
Evaluating the toolkit
![Page 41: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/41.jpg)
Timeline goals
● Stage 1: Benefit/cost analysis
Plan: begin in 2010, or early in 2011, depending on funding
Duration: ~5-7 months
Result: Information for an EIS toolkit “go” or “no-go” decision by WECC Stakeholders and Board of Directors
![Page 42: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/42.jpg)
Timeline goals
● Stage 2: If “Go” = Project development activity
Prepare mid-level design specification(s)
Prepare regulatory, organizational and funding plans
Duration: 1 – 1.5 years
Result: Ready to arrange vendors and proceed to implementation of the EIS market and seams coordination tool
![Page 43: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/43.jpg)
Timeline goals
● Stage 3: Project implementation activity EIS software and settlements Requisite tariff filings Market testing pre-launch Initiate EIS operations Duration: TBD Result: functioning regional toolkit for
redispatch and energy imbalance services
![Page 44: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/44.jpg)
Q/A items
![Page 45: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/45.jpg)
Some Questions and Answers
● Why the SPP Model instead of other models? Low cost of implementation (see next slide) Retain existing practices to large extent
Bilateral and self-schedule options No regional unit commitment No “must-offer” requirement
Demonstrated existing design as compared with a blue-sky alternative
![Page 46: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/46.jpg)
Source: December 2009 MISO Board of Directors Finance Committee Report
WECC will need to establish a cost allocation for the development of the toolkit.This slide compares the cost per MWH of end-use load for some of the ISO/RTOs in North America. The WECC already has some foundational work complete with the state estimator and contingency analysis software.
![Page 47: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/47.jpg)
Some Questions and Answers
● How would the EIS be funded? Capital – the financing method will be
determined as part of the mid-level specification process if the benefit/cost analysis leads to a “go” decision
Ongoing – the admin/operating costs for the EIS are proposed to be recovered in a fee allocated to EIS energy settlement volume
![Page 48: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/48.jpg)
Some Questions and Answers
● Would this be an expansion of WECC’s scope? Yes. The benefit/cost analysis can likely be
funded under WECC’s existing structure, but the EIS Operator function would have to be in a separate division of the organization
EIS operation is not a NERC Regional Entity function
![Page 49: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/49.jpg)
Some Questions and Answers
● What pieces would be voluntary? Transmission provider participation in the EIS
But in or out of the EIS footprint, the seams coordination tool would be used throughout WECC
For transmission customers of EIS transmission providers, participation in EIS settlements is mandatory (just like Schedule 4 is mandatory under current OATT) Voluntary offer from participating generators to provide
redispatch Customer may avoid EIS settlement by matching actual to
scheduled delivery
![Page 50: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/50.jpg)
Some Questions and Answers
● How would this be coordinated with the UFMP? The UFMP process would need to be revised
to coordinate with the EIS process COPS revision Curtailments on the basis of transmission service
priority Administrative fallback if insufficient voluntary
redispatch capability is available to EIS tool
![Page 51: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/51.jpg)
END
![Page 52: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/52.jpg)
Reference and Discussion
Materials
Overview of EIS Concepts
![Page 53: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/53.jpg)
EIS concepts
● Majority of grid delivery remains traditional self-schedule or bilateral dispatch
● For example in the SPP EIS: 90% of the energy delivery continues under
self-schedule and ETAG mechanisms 10% uses voluntary offers to manage
congestion and supply energy imbalanceo Percentage increasing
![Page 54: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/54.jpg)
EIS concepts
●The EIS-style design provides for real-time dispatch operation only
●Schedules against which imbalance service is calculated must be provided to the EIS Operator by a deadline prior to the operating hour
![Page 55: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/55.jpg)
EIS concepts
●Unit commit decisions remain with individual utility / generators The option to offer resources for economic dispatch to
the EIS remains with the generator owner.
Not a must-offer requirement as exists in full-LMP-based RTO markets.
Just like today, each load-serving entity must bring sufficient available resources to real-time operations to meet their load obligation
![Page 56: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/56.jpg)
EIS concepts
● The EIS design does not require Balancing Area consolidation, as demonstrated by SPP's experience
● EIS does create a diversity benefit for balancing ACE Diversity benefits are achieved under the
proposed EIS design with the added benefit of a security-constrained evaluation of the pseudo-tie transfers
Energy balances are settled financially rather than through adjustments to inadvertent
![Page 57: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/57.jpg)
EIS concepts
● The WECC EIS design leverages the existing investment in WECC Reliability Coordinator Infrastructure Makes use of existing State Estimator and
Contingency Analysis software already in-use as well WECC-owned (but currently unused) optimal power flow software
![Page 58: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/58.jpg)
END
![Page 59: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/59.jpg)
WECC Unscheduled Flow Mitigation Procedure (UFMP)
Curtailment Priority Example
Example Discussion
![Page 60: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/60.jpg)
UFMP curtailment: ExampleBase assumptions
TP ATP B TP C
TP D
TP E TP F TP GTP H
TP J TP K
Diagram Key:
“TP ‘n’” = TransmissionProvider “n”
Line T1 in “TP J” is the limiting element in the Path.
Etag from G1-L1 usesTSR J-K
Etag from G2-L2 usesTSR A-D
Etag from G3-L3 uses TSR E-H
G1 L1
G2
G3
L2
L3
T1
![Page 61: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/61.jpg)
UFMP example: TSR assumptions(TSR = Transmission Service Request)
TP ATP B TP C
TP D
TP E TP F TP GTP H
TP J TP K
Diagram Key:
Etag from G1-L1 usesTSR J-K (Firm* service)
Etag from G2-L2 usesTSR A-D (Firm* service)
Etag from G3-L3 uses TSR E-H (Non-firm** service)
G1 L1
G2
G3
L2
L3
T1
* Firm= Firm Curtailment Priority F7; **Non-firm= Non-firmHourly Curtailment Priority N2
F7 F7
F7F7F7
F7
N2N2 N2
N2
![Page 62: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/62.jpg)
UFMP example: Assume T1 is a qualified path
TP ATP B TP C
TP D
TP E TP F TP GTP H
TP J TP K
G1 L1
G2
G3
L2
L3
T1
Diagram Key:
Etag from G1-L1 is aScheduled Flow on T1
Etag from G2-L2 is anUnscheduled Flow on T1
Etag from G3-L3 is anUnscheduled Flow on T1
The purpose of the “flow”illustration is only to showimpact on T1. Clearly theflow distributesthroughout the grid based on physics.
![Page 63: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/63.jpg)
UFMP example: Assume TSR A-D and TSR E-H have same % TDF on Qualified Path T1
TP ATP B TP C
TP D
TP E TP F TP GTP H
TP J TP K
Discussion: Under UFMP today, TSR A-D and TSR E-H wouldboth be curtailed at the samestep and by the same amount.Also TSR J-K would curtail (accommodate) to permit some continuation of TSR E-H.
In other words, the UFMP is not able to differentiatebetween the F7 externalflow and the N2 externalflow. And UFMP compels F7Accommodation of N2.
The proposed EIS would instead curtail all N2 flow impacts on the limiting element prior to F7 cutsor F7 redispatch.
G1 L1
G2
G3
L2
L3
T1
![Page 64: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/64.jpg)
Energy Imbalance Service (EIS)
EIS Discussion Examples
![Page 65: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/65.jpg)
What is “Imbalance Energy”?● Imbalance energy (or Energy Imbalance) is the
difference between what actually happens for each generator and load location, and what they prearranged through schedules.
Energy Imbalance = Actual Production/Usage – Scheduled Production/Usage
● Asset owners instructed to move their generation output based on offer curves while maintaining reliability and balance (matching generation to load).
● The amount of increase or decrease in generation is paid for by the asset owner needing the energy.
![Page 66: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/66.jpg)
What is the “Energy Imbalance Service”?
● EIS is the dollar amount associated with the imbalance energy.
● EIS is calculated by taking the amount of Energy Imbalance and multiplying by the price at a specific point on the energy grid.
Energy Imbalance Service = Imbalance Energy x Locational Imbalance Price (LIP)
![Page 67: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/67.jpg)
What is the “SPP Energy Imbalance Service” Market?
● Provides asset owners the infrastructure to offer resources into a marketplace for providing Energy Imbalance.
● SPP is responsible for accounting and financially settling all EIS amounts. SPP remains revenue neutral
● Does not supersede any MP’s obligations with respect to any other capacity or ancillary service obligations. Control Areas (CA) and asset owners will continue to use the same procedures used
today to manage capacity adequacy, reserves, and other reliability-based concerns.● All asset owners must register with the SPP
EIS market.
![Page 68: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/68.jpg)
Imbalance Energy ExampleImbalance (Gen A) = (-90 MWh Actual) – (-100 MWh Scheduled)
Imbalance (Gen A) = 10 MWh
Imbalance (Load B) = (90 MWh Actual) – (100 MWh Scheduled)
Imbalance (Load B) = -10MWh
Notice that even though the system was in balance (generation matched load), by definition there was an imbalance at each location. Actual and Scheduled were not equal.
Actual minus
Scheduled
Actual minus
Scheduled
Note: Generation Injections are (-) and Load Withdrawals are (+) as viewed from an SPP settlement reference frame for EIS.
![Page 69: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/69.jpg)
Settling an Imbalance Financially
Suppose the following:
LIP @ (Gen A) = $30/MWh
LIP @ (Load B) = $40/MWh
The resulting charges would be:
EIS (Gen A) = $30/MWh x 10 MWh = $300 (MP pays SPP)
EIS (Load B) = $40/MWh x -10 MWh = -$400 (SPP pays MP)
● The net imbalance is zero (generation equaled load), but there is a net payment of $100 ($300+(-$400)) to Load B because of different prices at different points in the system.
NOTE: A (+) EIS indicates that SPP will receive payment from the Participant (a charge)A (-) EIS indicates that SPP will pay out to the Participant (a credit)
![Page 70: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/70.jpg)
EIS Tariff Activity & Misc Info
Tariff Discussion
![Page 71: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/71.jpg)
WECC Toolkit Funding
● Seams coordination tool: cost to all entities in WECC footprint A Reliability Coordinator tool with traditional
WECC funding Costs to support EIS role are allocated to EIS
● Energy Imbalance Service (EIS) tool: cost to participating transmission owner’s network and point-to-point customers Tool development and operation costs
recovered from EIS participants
![Page 72: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/72.jpg)
Impact on transmission revenues
● An additional aspect to the WECC development option is protecting transmission revenues
● Participating transmission owners could provide inputs into a rate design for the EIS adder
● Possible rate design goals Hold harmless from present HN2 revenue levels, with
annual true-up mechanism Establish potential for increased revenues based on
successful utilization of the EIS toolkit Note – transmission providers retain their own tariffs
for all non-EIS transmission service
![Page 73: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/73.jpg)
Umbrella EIS tariff proposed
● EIS service only for real-time imbalance and redispatch
● Replace some service sold under current OATT Replace Schedules 4 and 9 (imbalance service)
for all participating transmission providers Recover EIS market development and admin
costs through a fee levied against the EIS settlement volumes
Recover revenues for participating transmission providers to replace lost sales of hourly non-firm (priority 2) transmission service
![Page 74: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/74.jpg)
Rough Estimate of EIS Admin/Tool
● SPP EIS market clears 10% of the demand in the region
● The SPP EIS all-in cost recovery is $0.20/MWH● Estimate of WECC EIS cost is under
development● Similar costs and volumes for US-WECC
footprint excluding CAISO would yield very roughly estimated $0.50/MWH of EIS settlement volume (i.e. applied to both purchase MWH and sales MWH)
Assume WECC US-non-California annual energy volume of 543,200,000 MWH/yr (from WWSIS 2017 fcst) Assume 50,000,000 MWH EIS Demand Cleared/yr The $50M/yr revenue would fund an operation far larger than SPP, and WECC already has sunk costs that would contribute to the
EIS operation
Initial Tariff Cost Recovery Assumptions
![Page 75: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/75.jpg)
Rough Estimate of TRRF
● The tariff proposal would recoup lost revenue through an EIS Transmission Revenue Recovery Fee that would be distributed to participating transmission providers
● Estimate of fee in development, but the flat “hurdle rate” could be built into the SCED more simply than a path-based transmission cost recovery method
Initial Tariff Cost Recovery Assumptions
![Page 76: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/76.jpg)
Policy of WGA Task Force
● WGA task force on grid utilization DOE funding award of ~$12M Policy promoting “technological and
institutional improvements that minimize the cost of integrating variable renewable generation while maintaining system reliability”
![Page 77: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/77.jpg)
77 77
Incurred Avoided Trade Benefit$286 Million - $ 393 Million = $ 107 Million
Actual 2007 SPP Results
7,560 GWh@ $38 /MWh
7,560 GWh@ $52 /MWh
Detail Transactional Calculation = $103 Million
ValidatesDetailCalculation
![Page 78: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/78.jpg)
Example: SPP Contract w. Balancing AreasTransfers compliance responsibility
● Scheduled and Actual Interchange: INT-002, -003 and -004; BAL-006
● EIS Market: IRO-006; BAL-006; INT-002, -003
● Dynamic Scheduling and Inadvertent Interchange: BAL-005, -006
● Balancing Authority Area Control and Performance: BAL-001, -002, 003; TOP-002; EOP-001
● Data Exchange: TOP-002, -005
● Ancillary Services: Section 3 of Open Access Tariff
● Emergency Operations: EOP-002, -003, -008
Future Tariff Group Contract Issue:
![Page 79: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/79.jpg)
END
![Page 80: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/80.jpg)
MIC Discussion Materials
Supplementary to WECC Joint Committee Meeting Presentation
![Page 81: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/81.jpg)
Benefit / Cost Analysis Plan
● Independent benefit and cost calculations Benefit Method 1: Production cost model of
WECC Benefit Method 2: Renewable integration cost
reduction model for footprint Cost Estimate with system design
consultants, WECC staff and stakeholders
● WECC staff and stakeholders roll-up the elements into an overall report
![Page 82: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/82.jpg)
Benefit Method 1
● Production cost analysis Simulate stand-alone vs. coordinated
balancing area operations with renewables
● WWSIS analysis at 27% annual renewable energy in WECC showed a $2B/yr. benefit using this method
● Goal: to make use of WECC VGS study already funded with PNNL for this effort
![Page 83: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/83.jpg)
Benefit Method 2
● Renewable integration cost analysis Simulate stand-alone vs. coordinated
balancing area operations with renewables, but evaluate only on a statistical basis regarding unit commitment costs needed for integration
● Goal – use an independent method to evaluate the results obtained by method 1
![Page 84: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/84.jpg)
Cost Analysis
● Use consultants, WECC staff and stakeholders to estimate the capital and operating costs associated with WECC-side development Recognize existing WECC assets Recognize new division requirement for
WECC organization
● Also estimate stakeholder-side and balancing area readiness costs
![Page 85: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/85.jpg)
Analysis report preparation
● The aggregate report and analysis of the benefit/cost segments will be prepared by WECC staff and stakeholders. Consultants may be retained to assist with report preparation
● Aggregate not-to-exceed cost is anticipated at $450,000 for the B/C plan Substantial discount possible however, based
on potential task methods
![Page 86: Efficient Dispatch Toolkit Proposal Stephen Beuning Xcel Energy, Director of Market Operations 3/11/10](https://reader036.vdocument.in/reader036/viewer/2022062511/55150e17550346a87d8b4960/html5/thumbnails/86.jpg)
Motion for MIC consideration
● “The SIS recommends that the MIC advance to the Board of Directors for approval a plan to fund and conduct a cost/benefit analysis regarding the development and implementation of an Energy Imbalance System in the Western Interconnection.”