Enterprise Communication Network

Ray Leung

Ray Leung , and Layer3 working on getting all the Access point reinstalled after the summer renovations at

Cook Middle School. In this particular instance the previous installation penetrations for the Access point

was covered up by the construction crew with sound boards. Arrangements with Layer3 has been made to

come back out to make new penetrations and reinstalling the AP in the band room.

Page 2: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Campus Renovations – Langham Creek HS

Enterprise Communication Networks

Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018

On Wednesday, August 10th, Sani Saqr, Tony Rogers and Mike Raspet continued the finishing touches

on the portables at Langham Creek HS. Above are the “Before” and “After” pictures of Portable 160.

They removed the Hawking switch and installed a managed Cisco switch to support security cameras.

They also cleaned up the maze of network cables. The center picture above shows Sani Saqr and Tony

Rogers troubleshooting a complex configuration issue on one of the Cisco switches.

AfterBefore

Sani Saqr Tony Rogers

Page 3: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Campus Renovations – Langham Creek HS

Enterprise Communication Networks

Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018

On Thursday, August 23rd, Philip Burgess

(Presidio) with Daniel Rojas and Robert

Garcia (Gigabit Technologies) helped Sani

Saqr finish re-installing the network switches in the

two IDF network closets in the renovated vocational

wing at Langham Creek HS. Philip Burgess

Daniel Rojas Robert Garcia

Page 4: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

ECN Operations

Enterprise Communication Networks

Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018

Recently Data Center 3 has experienced unplanned

power outages with service being delivered by

CenterPoint Energy. On Friday, August 24th

additional power supplies were added in both of the

Cisco Catalyst 6807 core routers in DataCenter 3

by Michael Raspet. This will ensure full services

during future disruptive power events.

Mike Rapet

Page 5: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Summer Renovations

Enterprise Communication Networks

Sani Saqr, Network AnalystPosted by: August 17, 2018

To the left is

Daniel Rojas and

Robert Garcia of

Gigabit

Technologies

helping ECN’s

Sani Saqr

reinstall network

equipment at

Owens

Elementary

school. To the

right they are re

installing all of the

network

equipment back

into Truitt middle

school after a

long summer of

major renovations

to both

campuses.

Page 6: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Summer Renovations

Enterprise Communication Networks

Sani Saqr, Network AnalystPosted by: August 24, 2018

Above is ECN’s Sani Saqr and Mike Raspet working

diligently on Tuesday August 21st to complete the

portable city project at Langham Creek High School.

With Mike’s huge help, as well as ECN manager

David Deitsch, Sani was able to finally get all of the

portables setup and running just in time for the

teachers to start setting up their classrooms.

On Thursday August 23rd Sani Saqr was at

Langham Creek re installing network switches that

were removed for summer renovations. With the

help of Phillip Burgess from Presidio and Daniel

Rojas and Robert Garcia from Giagbit and of

course ECN’s own Mike Raspett, everything was

completed on time.

Page 7: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Summer Renovations

Enterprise Communication Networks

David Deitsch, Enterprise Communication Networks ManagerPosted by: August 24, 2018

On Monday August 20th, David Deitsch,

Anna Senties, and Ray Leung of the CIFSD

ECN team met with CFISD Project Managers

Miguel Tamez and Tony Castillo, along with

representatives from TAG Electric.

There had been some discrepancies related to

the placement of Access Points and the

existence of two maps. Together the team

devised a plan to be able to give Moore

Elementary proper wireless coverage before

school starts on August 27th.

Page 8: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Operational Enhancement

Enterprise Communication Networks

David Glennon, Associate Network AnalystPosted by: August 24, 2018

For the week of August 20th – August 24th 911 testing continued with Sampson ES, Millsap ES, Francone ES,

Campbell MS, Matzke ES, Emmott ES, Bang ES, and Gleason ES. During the testing, only 1 ph# 3462777297

associated with Emmott ES had an error passing the correct caller id and physical address. The number was

removed and will be reconfigured correctly prior to returning it to the 911 Emergency dial string

Page 9: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Operational Enhancement

Enterprise Communication Networks

Bradley Mulligan, Associate Network AnalystPosted by: August 24, 2018

On August 24th, Bradley

Mulligan visited the

Lowery Elementary School

to configure the new

portable building network.

A new Cisco 3560 switch

was installed to enable

POE and remote access

for switch management.

While there, Ray Leung

stopped by to install the

wireless for the portable.

The network has been

confirmed as connected

and working.

Page 10: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise

Enterprise Communication Networks

Operational Contributions

Enterprise Communication Networks

Andrew Tran, Senior Network SpecialistPosted by Aug 24, 2018

• Working with Steven Roche ( Firetron ) on resolving time sync issue

between the server and devices at campuses

• Configured DC3 and DC4 Brocade switch ports for the new XtremIO

Storage Controller for Lance Melancon.

• Resolved connectivity issue for AutomatedLogic to webctrl.cfisd.net

• Working with Elizabeth Monte and Cisco TAC to result time issue

between the Core switches and AD servers.

• Resolved connectivity issue to Mylumens.com and my-lumens.com

• Resolved connectivity issue to xfer.classflow.com

• Currently working with Lee Vang on issue of getting error when

importing internet firewalls policies into FortiManager