enterprise communication networks wireless communications · network equipment back into truitt...
TRANSCRIPT
![Page 1: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/1.jpg)
Enterprise Communication Networks
Wireless Communications
August 27, 2018Posted by:
Enterprise Communication Network
Ray Leung
Ray Leung , and Layer3 working on getting all the Access point reinstalled after the summer renovations at
Cook Middle School. In this particular instance the previous installation penetrations for the Access point
was covered up by the construction crew with sound boards. Arrangements with Layer3 has been made to
come back out to make new penetrations and reinstalling the AP in the band room.
![Page 2: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/2.jpg)
Campus Renovations – Langham Creek HS
Enterprise Communication Networks
Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018
On Wednesday, August 10th, Sani Saqr, Tony Rogers and Mike Raspet continued the finishing touches
on the portables at Langham Creek HS. Above are the “Before” and “After” pictures of Portable 160.
They removed the Hawking switch and installed a managed Cisco switch to support security cameras.
They also cleaned up the maze of network cables. The center picture above shows Sani Saqr and Tony
Rogers troubleshooting a complex configuration issue on one of the Cisco switches.
AfterBefore
Sani Saqr Tony Rogers
![Page 3: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/3.jpg)
Campus Renovations – Langham Creek HS
Enterprise Communication Networks
Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018
On Thursday, August 23rd, Philip Burgess
(Presidio) with Daniel Rojas and Robert
Garcia (Gigabit Technologies) helped Sani
Saqr finish re-installing the network switches in the
two IDF network closets in the renovated vocational
wing at Langham Creek HS. Philip Burgess
Daniel Rojas Robert Garcia
![Page 4: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/4.jpg)
ECN Operations
Enterprise Communication Networks
Janette Martinez, Network Infrastructure and CommunicationsPosted by: August 24, 2018
Recently Data Center 3 has experienced unplanned
power outages with service being delivered by
CenterPoint Energy. On Friday, August 24th
additional power supplies were added in both of the
Cisco Catalyst 6807 core routers in DataCenter 3
by Michael Raspet. This will ensure full services
during future disruptive power events.
Mike Rapet
![Page 5: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/5.jpg)
Enterprise Communication Networks
Summer Renovations
Enterprise Communication Networks
Sani Saqr, Network AnalystPosted by: August 17, 2018
To the left is
Daniel Rojas and
Robert Garcia of
Gigabit
Technologies
helping ECN’s
Sani Saqr
reinstall network
equipment at
Owens
Elementary
school. To the
right they are re
installing all of the
network
equipment back
into Truitt middle
school after a
long summer of
major renovations
to both
campuses.
![Page 6: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/6.jpg)
Enterprise Communication Networks
Summer Renovations
Enterprise Communication Networks
Sani Saqr, Network AnalystPosted by: August 24, 2018
Above is ECN’s Sani Saqr and Mike Raspet working
diligently on Tuesday August 21st to complete the
portable city project at Langham Creek High School.
With Mike’s huge help, as well as ECN manager
David Deitsch, Sani was able to finally get all of the
portables setup and running just in time for the
teachers to start setting up their classrooms.
On Thursday August 23rd Sani Saqr was at
Langham Creek re installing network switches that
were removed for summer renovations. With the
help of Phillip Burgess from Presidio and Daniel
Rojas and Robert Garcia from Giagbit and of
course ECN’s own Mike Raspett, everything was
completed on time.
![Page 7: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/7.jpg)
Enterprise Communication Networks
Summer Renovations
Enterprise Communication Networks
David Deitsch, Enterprise Communication Networks ManagerPosted by: August 24, 2018
On Monday August 20th, David Deitsch,
Anna Senties, and Ray Leung of the CIFSD
ECN team met with CFISD Project Managers
Miguel Tamez and Tony Castillo, along with
representatives from TAG Electric.
There had been some discrepancies related to
the placement of Access Points and the
existence of two maps. Together the team
devised a plan to be able to give Moore
Elementary proper wireless coverage before
school starts on August 27th.
![Page 8: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/8.jpg)
Enterprise Communication Networks
Operational Enhancement
Enterprise Communication Networks
David Glennon, Associate Network AnalystPosted by: August 24, 2018
For the week of August 20th – August 24th 911 testing continued with Sampson ES, Millsap ES, Francone ES,
Campbell MS, Matzke ES, Emmott ES, Bang ES, and Gleason ES. During the testing, only 1 ph# 3462777297
associated with Emmott ES had an error passing the correct caller id and physical address. The number was
removed and will be reconfigured correctly prior to returning it to the 911 Emergency dial string
![Page 9: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/9.jpg)
Enterprise Communication Networks
Operational Enhancement
Enterprise Communication Networks
Bradley Mulligan, Associate Network AnalystPosted by: August 24, 2018
On August 24th, Bradley
Mulligan visited the
Lowery Elementary School
to configure the new
portable building network.
A new Cisco 3560 switch
was installed to enable
POE and remote access
for switch management.
While there, Ray Leung
stopped by to install the
wireless for the portable.
The network has been
confirmed as connected
and working.
![Page 10: Enterprise Communication Networks Wireless Communications · network equipment back into Truitt middle school after a long summer of major renovations to both campuses. Enterprise](https://reader034.vdocument.in/reader034/viewer/2022043015/5f37e4676ad0e822750e9a04/html5/thumbnails/10.jpg)
Enterprise Communication Networks
Operational Contributions
Enterprise Communication Networks
Andrew Tran, Senior Network SpecialistPosted by Aug 24, 2018
• Working with Steven Roche ( Firetron ) on resolving time sync issue
between the server and devices at campuses
• Configured DC3 and DC4 Brocade switch ports for the new XtremIO
Storage Controller for Lance Melancon.
• Resolved connectivity issue for AutomatedLogic to webctrl.cfisd.net
• Working with Elizabeth Monte and Cisco TAC to result time issue
between the Core switches and AD servers.
• Resolved connectivity issue to Mylumens.com and my-lumens.com
• Resolved connectivity issue to xfer.classflow.com
• Currently working with Lee Vang on issue of getting error when
importing internet firewalls policies into FortiManager