SUBSEA PIPELINES&ASSOCIATED FACILITIES . SUBSEA PIPELINES SPECIALIST SKILLS . ONSHORE RECEPTION FACILITIES . ELECTRONIC DOCUMENT MANAGEMENT SYSTEM .

NOISE&VIBRATION TESTING . COMPUTER AIDED ENGINEERING.

2-2-02, Jalan Medan PB1 Medan PB1 Pusat Bandar Bangi

43650, Bandar Baru Bangi Selangor, WEST MALAYSIA

www.ecoprasinos.com Tel : +603-89273485 Fax: +603-89273486

E-mail: [email protected]

ECOPRASINOS ENGINEERING

SDN BHD

COMPANY PROFILE

2013

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

was founded to provide the most responsive, pragmatic total product and

Subsea And Pipeline Engineering solution of the highest quality, with total commitment both timely and at

the most optimum cost for every project we undertake. We are full Consultant Engineer providing

comprehensive array of engineering services from the smallest and simplest to the largest and most

complex projects. So whether it is specialist technical advice or total Consultation that you need,

Ecoprasinos is pleased to be of service.

Ecoprasinos is a wholly Malaysian Bumiputra owned company incorporated on 24 August 2009. The

company is a full Consultant Engineer providing comprehensive array serving both private and public sector

clients. The diversity of Ecoprasinos's expertise enables the organisation to provide comprehensive

professional service for large and small, as well as simple and complex to a diverse global clientele.

This Company Profile establishes Ecoprasinos’s credentials for providing engineering support services on

Subsea and Pipeline Projects Worldwide. Ecoprasinos is ideally suited to provide these engineering support

services because Ecoprasinos has the:

• Experienced People

• Technical Capability

• Track Record

• Local Knowledge

• Project Systems

to deliver a best-in-class result for the work contemplated.

COMPANY PROFILE I FORWARD

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Contents

This document represents an overview of EcoPrasinos Engineering Sdn Bhd company profile and track records.

Section 1 provides company information on EcoPrasinos’s company structure and office location. Section 2 details of our technical expertise Section 3 contains of our resources. Section 4 presents about system and technical database applied. Section 5 provides a track record of our projects Section 6 provides projects profile involved

1. Company Information Company Details Company Accreditation 2. Services Subsea Pipeline and Associated Facilities Specialist Skills Onshore Reception Facilities Electronic Document Management System Vibration 3. Resources Engineering Office Facilities 4. System & Technical Database Technical Database Hardware and Software 5. Track Record Subsea and Pipeline Projects 6. Project Profile

COMPANY PROFILE I INTRODUCTION

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Company Details

COMPANY PROFILE

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Company Details

Name Of Establishment

:

Ecoprasinos Engineering Sdn Bhd

Principal Activity

: Subsea And Pipeline Engineering Consultancy

Date Of Incorporation

: 24th August 2009

Company Registration No.

: 869657-U

Registered Address

: 2-2-02, Jalan Medan PB 1 Medan PB 1, Pusat Bandar Bangi 43650 Bandar Baru Bangi Selangor, Malaysia

Tel : +60-3-89273485

Fax : +60-3-89273486

E-Mail Address

: [email protected] [email protected]

General Manager : Dr.Azlina Binti Abu Nahar

Staff

: Directors – 2 Sn Engineers – 6 Engineers - 6 Pipeline Designer – 1 Pipeline Drafters - 2 Admin – 3

Company Banker : Maybank Islamic Berhad (787435-M) IBS CPI Bandar Baru Bangi

No.789, Jalan 9/9C, 43650 Bandar Baru Bangi, Selangor, Malaysia

COMPANY PROFILE I COMPANY INFORMATION

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I COMPANY INFORMATION

Company Accreditation

Companies Commission of Malaysia

EcoPrasinos is a wholly Malaysian Bumiputra

owned company incorporated on 24th August

2009 with registration number 869657-U.

Registered with Board of Engineer Malaysia

EcoPrasinos Engineering Sdn Bhd is registered

with Board of Engineer Malaysia with certificate

number 1102-06000-PE-11121. The Board of

Engineers Malaysia (BEM) is a statutory body

constituted under the Registration of Engineers

Act 1967. It was formed in 23rd August 1972.

Quality Management System Quality

EcoPrasinos Engineering operates a Quality

Management System that has been

independently assessed and approved by

Lloyd’s Register Quality Assurance and is

accredited to BS EN ISO 9001:2008 and MS

ISO9001:2008. The certificate number is KLR

6009203.

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I COMPANY ACCREDITATION

Registered with Kastam Diraja Malaysia

EcoPrasinos Engineering Sdn Bhd is registered

with Kastam Diraja Malaysia with certificate

number W24-CP-11000030/201.

Registered with Ministry of Finance

EcoPrasinos Engineering Sdn Bhd is registered

with Ministry of Finance with certificate number

465-02032206.

Registered with Petronas

EcoPrasinos Engineering Sdn Bhd has been

approved by Petronas to provide pipeline

engineering consultant services with license

number L-869657-U.

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Services

COMPANY PROFILE

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Subsea Pipelines and Associated Facilities EcoPrasinos has established core teams of

subsea and pipeline engineers to service clients

in this region. This group has extensive

experience in the design and project management

of all aspects of subsea systems.

For offshore pipeline projects, EcoPrasinos is

able to provide field-proven expertise in:

• Design of Submarine pipeline Systems for Preliminary and detailed design

• Pipeline Steady State Analysis

• Pipeline Route Selection

• Wall Thickness and Material Grade Selection

• Pipeline On-Bottom Stability Analysis

• Pipeline Free Span Analysis

• Pipeline End Expansion Analysis

• Platform risers

• Riser VIV Analysis

• Riser Hanger Flange and Clamp Design

• Shore crossings

• Pipeline crossings

• Subsea pipeline end facilities.

• Bottom roughness study

• Subsea Intervention Study

• Pipeline lateral and upheaval buckling study

• Project Specifications

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Subsea Pipelines Specialist Skills

The EcoPrasinos’s Engineering provides

engineering expertise across a wide range of

subsea and pipeline applications including:

• Subsea satellite wells, production templates, jumpers and manifolds

• Pipeline end manifolds, distribution skids, isolation valve skids and control pods/systems

• Subsea Dynamic risers

• Subsea umbilicals and cables

• Driverless installation systems

• Interfaces with floating production systems

• Tow-installed lines and templates

• Rigid and flexible riser systems

EcoPrasinos's capabilities in each of these areas

allows us to consider all options and to apply the

most economic and flexible solution to the subsea

aspects of project developments.

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Onshore Reception Facilities

EcoPrasinos technical team has in-depth

experience of all aspects - engineering,

procurement, construction and management – of

onshore pipelines. This includes pipeline for the

treatment of hydrocarbon gases and liquids both

for upstream facilities and for downstream

petrochemical projects. Many onshore

developments are phased over an extended

period. Upgrades, such as the addition of

compression facilities, are planned for

implementation during later field life. Major

unplanned upgrades can also be necessary to

resolve operating change, such as, wellstream

compositions and the allowable concentration of

effluent contaminants.

The skills in the EcoPrasinos’s technical team

group allow the following issues to be addressed:

• Site selection

• Pipeline Steady State Analysis

• Routing study

• Pipeline material selection

• Design Onshore pipeline system for Preliminary and detailed design

• Onshore Pipeline Stress Analysis

• Road/ River/ Canal/ Agriculture Crossing

• Upheaval and lateral buckling

• Pipeline intervention and Mitigation for buckling

• Pipeline Installation Engineering

• Onshore reception facilities

• Pig trap design

• Risk Assessment

• Specifications

• Protection and stabilization

• Design of Cathodic Protection System

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Electronic Document Management System

EcoPrasinos Engineering Sdn Bhd is Petro IT implementation partner which holds the sole license of

EDMS for Malaysia market. As an experienced engineering consultant company for oil and gas industry,

EcoPrasinos has the expertise to provide the man power, knowledge and technical support for the

software implementation.

Petro IT is actually an organization providing specialized Electronic Document Management Solutions

and Services to the Hydrocarbon sector. Strong Oil and Gas domain expertise coupled with an

exemplary software development team has led us to create focused and purpose built solutions.

EDMS is a computer system or suite of programs designed to store and track electronic documents and

other media. Stated simply, electronic document management is the management of “paperwork”

electronically rather than with paper. The solution proposed will be developed on Microsoft’s SharePoint

2010 content management system.

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Noise and Vibration Engineering Testing

At EcoPrasinos Engineering Sdn Bhd, we can

provide testing solutions and expertise in

following areas to our customers:

Rotating Machinery Testing

• Fixed Sampling

• Order Tracking

• Running Mode Analysis

Structural Testing

• Shaker Testing

• Impact Testing

• Stepped Sine and Normal Modes

• Modal Analysis

• Modal Design

• MIMO FRF measurement

Acoustic Testing

• Sound Quality

• Jury Testing

• Pass By Noise Measurement

• Acoustic Intensity

• Acoustic Holography

• Transfer Path Analysis

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SERVICES

Computer Aided Engineering

At EcoPrasinos Engineering Sdn Bhd, we provide

CAE solutions and also expertise in following areas

to our customers:

Noise Vibration Harshness (NVH) Modeling & Analysis

Vibro-Acoustic Modeling

Normal Modes Analysis

Acoustic

Frequency Response

Vibro-Acoustic Modeling

Durability Modeling & Analysis

Static Stress Analysis

Non Linear Stress Analysis

Fatigue Analysis

Thermal Modeling & Analysis

Computational Fluid Dynamics (CFD) Modeling & Analysis

Component Modeling and Analysis

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Resources

COMPANY PROFILE

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I RESOURCES

Engineering Office

The engineering of Subsea and Pipeline Projects

will be carried out from EcoPrasinos’s design

offices at Bangi, Selangor, Malaysia. For special

projects, where unique expertise are required,

affiliates / alliance with specialist from United

Kingdom, Houston and France may work together

to provide clients with the best of EcoPrasinos’s

resources. EcoPrasinos’s engineering office

layouts comprise a mixture of open plan office

space as well as a number of individual and

shared offices. Office accommodation for Client

personnel can be provided as required

Facilities

EcoPrasinos and it affiliates / alliance are linked

through a global IT internet and are fully equipped

with modern facilities including computers,

facsimiles, modems, internet connection to ensure

efficient communication client offices and within

the affiliates offices if necessary.

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

System & Technical Database

COMPANY PROFILE

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SYSTEM & TECHNICAL DATABASE

Technical Database

EcoPrasinos’s extensive experience team member in designing offshore pipelines means that we can

bring an extensive set of relevant technical specifications and guidelines built up over many years. Below

is part of typical international standards that we commonly use for the design of offshore pipelines.

Det Norske Veritas (DNV)

• DNV OS-F101

Submarine Pipeline Systems

• DNV RP E305

On-Bottom Stability Design of Submarine Pipelines

American Society of Mechanical Engineers (ASME)

• ASME B31.4

Liquid Transportation Systems for Hydrocarbons, Liquid

Petroleum Gas, Anhydrous Ammonia and Alcohols.

• ASME B31.8

Gas Transmission and Distribution Piping Systems

American Petroleum Institute (API)

• API Spec 5L

Specification for Line Pipe

International Organization for Standardization (ISO)

• ISO 13623

Petroleum and natural gas industries Pipeline transportation systems

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

COMPANY PROFILE I SYSTEM & TECHNICAL DATABASE

Hardware and Software

IT Infrastructure and Connectivity

EcoPrasinos has in place a global IT network.

This network connects all of EcoPrasinos’s

affiliate / alliances together, as well as offering

secure remote access via the internet. Prime

operating environment is the Microsoft Platform

for both Client and server, with all core systems

being accessible via a browser interface.

Software and Systems

EcoPrasinos uses a Microsoft Operating Platform

and the MS office suite of office administration

software. As a major engineering and project

management services provider, EcoPrasinos

uses all industry standard technical and

management software packages. A list of the

more commonly used applications is included

below.

Listed below are the software capabilities of the

subsea / pipelines group:

Process Engineering Software

Pipeline/ Subsea Engineering Software

Structural Engineering Software

Administration/Project Control Software

Drafting Software

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

TRACK RECORD

COMPANY PROFILE

EC

OP

RA

SIN

OS E

NG

IN

EE

RIN

G S

DN

BH

D –

TH

E J

OU

RN

EY

YEA

R 2

00

9

YEA

R 2

011

YEA

R 2

010

YEA

R 2

012

YEA

R 2

013

On

sho

re P

ipe

line

Bas

ic

Engi

ne

eri

ng

De

sign

Fo

r G

ols

han

An

d F

ird

ow

si

Fie

ld D

eve

lop

men

t In

Ir

an

PO

GC

/MM

C

De

c 2

00

9 –

Feb

20

10

FEED

Fo

r M

alik

ai D

ee

p

Wat

er

Pro

ject

SS

PC

/MM

C-A

MEC

Ja

n 2

01

0 –

May

20

10

De

sign

An

d E

ngi

ne

eri

ng

Serv

ice

s Fo

r Sa

mar

ang

Re

-De

velo

pm

ent

Pro

ject

SP

MT/

MM

C O

&G

M

ay –

De

cem

be

r 2

01

0

JDA

Blo

ck B

-17

De

velo

pm

ent

Pro

ject

Ph

ase

-2 D

eve

lop

men

t C

arig

ali P

TTEP

Co

mp

any

Sdn

B

hd

(C

PO

C)

/ M

MC

O&

G

No

v 2

01

0–M

arch

20

11

Pro

visi

on

Fo

r En

gin

ee

rin

g W

ork

s A

nd

Te

chn

ical

Su

pp

ort

Fo

r TC

OT

Zero

Fla

rin

g P

roje

ct, P

etr

on

as

Car

igal

i-P

MO

P

etr

on

as C

arig

ali /

MM

C O

&G

D

ec

20

10

– J

un

e 2

01

1

Pro

visi

on

Of

Engi

ne

eri

ng

Re

visi

t Se

rvic

es

For

ERB

We

st

De

velo

pm

en

t P

roje

ct

Pe

tro

nas

Car

igal

i / M

MC

O&

G

May

20

11

Co

nce

ptu

al A

nd

FEE

D F

or

Sem

aran

g R

ed

eve

lop

me

nt

Ph

ase

2 (

PC

SB)

Pe

tro

nas

Car

igal

i / M

MC

O&

G

Au

g 2

01

0–A

ug

20

11

Pro

visi

on

Of

Po

st-F

EED

De

sign

Fo

r D

21

De

velo

pm

en

t P

roje

ct

Pe

tro

nas

Car

igal

i / M

MC

O&

G

July

– S

ep

t 2

01

1

Pro

visi

on

Of

FEED

Se

rvic

es

An

d

De

tail

De

sign

Se

rvic

es

(Op

tio

nal

) Fo

r Te

man

a R

ed

eve

lop

me

nt

Pro

ject

P

etr

on

as C

arig

ali /

MM

C O

&G

Se

pt

20

11

-Feb

20

12

Engi

ne

eri

ng

De

sign

Fo

r 2

km O

f M

alik

ai P

ipe

line

At

KB

B A

pp

roac

h

Sab

ah S

he

ll P

etr

ole

um

Co

. Ltd

. /

MM

C O

&G

N

ov

20

11

- M

ar 2

01

2

Fro

nt

End

En

gin

ee

rin

g &

De

sign

Fo

r P

erm

as F

ield

Su

bst

ruct

ure

, To

psi

de

A

nd

Pip

elin

e

Mu

rph

y /

MM

C O

&G

M

ar 2

01

2- J

ul 2

01

2

Pro

visi

on

Of

The

Fro

nt

End

En

gin

ee

rin

g D

esi

gn F

or

An

gsi

Ch

em

ical

En

han

ced

Oil

Re

cove

ry

(CEO

R)

Pro

ject

P

etr

on

as C

ari G

ali S

dn

Bh

d /

MM

C

O&

G

Jul 2

01

2 -

Oct

20

12

Pro

visi

on

Of

FEED

Se

rvic

es

For

D

alak

Pip

elin

e P

roje

ct

Pe

tro

nas

Car

igal

i / M

MC

O&

G

July

- N

ov

20

12

Ch

amp

ion

Wat

er

Flo

od

B

run

ei S

he

ll /

Pri

nci

pia

Asi

a P

acif

ic

Engi

ne

eri

ng

20

Se

pt

- 5

Oct

20

12

Pro

visi

on

Of

Fro

nt

End

En

gin

ee

rin

g D

esi

gn S

erv

ice

s Fo

r SK

O P

ipe

line

s A

nd

Fac

iliti

es

Re

juve

nat

ion

Pro

ject

Fo

r P

etr

on

as C

arig

ali S

dn

Bh

d,

Sara

wak

Op

era

tio

ns

Pe

tro

nas

Sar

awak

Op

era

tio

n

De

c 2

01

2 -

May

20

13

Sou

th A

cis

Oil

and

Gas

De

velo

pm

en

t P

roje

ct D

eta

iled

En

gin

ee

rin

g M

UR

PH

Y S

araw

ak/S

abah

Oil

Co

.,

Ltd

/Wo

od

Gro

up

Ke

nn

y Sd

n B

hd

1

4 F

eb

– 8

Mac

20

13

2-2

-02,

Jala

n M

edan P

B1

Tam

an M

edan P

B1

43650,

Bandar

Baru

Bangi

Sela

ngor,

WE

ST

MA

LA

YS

IA

ww

w.e

copra

sin

os.c

om

Te

l: +

603-8

9273485

Fa

x:

+603-8

9273486

E-m

ail:

bd@

ecopra

sin

os.c

om

Pro

viso

n o

f P

re-f

ron

t e

nd

En

gin

ee

rin

g D

esi

gn a

nd

fro

nt

en

d K

L En

gin

ee

rin

g D

esi

gn S

erv

ice

s fo

r P

FLN

G T

ie-I

n P

roje

ct

Pe

tro

nas

Car

igal

i / M

MC

O&

G

Mac

– M

ay 2

01

3

De

taile

d D

esi

gn E

ngi

ne

eri

ng

Dra

win

g A

nd

Lif

tin

g A

nal

ysis

Fo

r R

ise

r G

uar

d

Pro

ject

M

urp

hy

/ TL

Off

sho

re S

dn

. Bh

d. /

C

SD M

arin

e E

ngi

ne

erin

g Se

rvic

es

Sdn

. Bh

d.

3 A

pri

l – 2

May

20

13

De

taile

d E

ngi

ne

eri

ng

De

sign

Se

rvic

es

For

Dal

ak P

ipe

line

Pro

ject

P

etr

on

as C

arig

ali /

MM

C O

&G

Ju

ly –

Oct

ob

er

20

13

Bu

nga

Pak

ma

De

velo

pm

ent

Co

nce

ptu

al A

nd

Fro

nt

End

En

gin

ee

rin

g D

esi

gn (

Fee

d)

Talis

man

Mal

aysi

a Li

mit

ed

/MM

C

O&

G

Oct

20

13

– D

ec

20

13

De

velo

pm

en

t o

f O

mb

ak B

iru

Sat

u

Pip

ela

y B

arge

O

mb

ak M

arin

e G

rou

p S

dn

Bh

d/P

T R

eka

yasa

Ind

ust

ri

Oct

20

13

– D

ec

20

13

 

SUBSEA AND PIPELINES PROJECTS

Project

Owner/Client Date Scope Of Work

Onshore Pipeline Basic Engineering Design For Golshan And Firdowsi Field Development In Iran

POGC/MMC Dec 2009 – Feb 2010

Basic Engineering Design For The Development Of The Golshan And Firdowsi Fields. Establish On-Shore Pipeline Route Selection Study, On-Shore Pipeline Mechanical Stress Design Study, On-Shore Pipeline Installation Engineering And On- Shore Pipeline Route Selection Drawings. The Onshore Pipeline Project Comprises Of Five (5) Different Pipe Sizes.

FEED For Malikai Deep Water Project

SSPC/MMC- AMEC

Jan 2010 – May 2010

FEED For 10-Inch And 8-Inch Flowlines. Establish The Following Deliverables;

• Flowline And Riser System Basis • Flowline Route Selection Study • Flowline Stability Analysis • Flowline Mechanical Analysis • Flowline End Expansion Analysis • Flowline & Riser Internal Corrosion

Study • Flowline & Riser External Corrosion

Coating Study • Flowline & Riser Cathodic Protection

Design • Thermal Insulation Design • Flowline Lateral, Upheaval Buckling,

Walking • Flowline Spanning Analysis • Bottom Roughness Analysis • Design Of Buckle Arrestors • Flowline Crossing Design • Flowline Intervention Design • Pipe Soil Interaction Study • Steel Centenary Riser Design

Design And Engineering Services For Samarang Re- Development Project

SPMT/MMC O&G

May 2010 – December 2010

Engaged In Project Execution Planning,Monitoring And Control Of Design Work, Communication With Petronas Personnel And Project Team Members And Management. Review, Audited, Approved Technical Reports. Attended Weekly Progress Meetings With Project Personnel, Client Representatives, Resolved Technical And Management Issues.

 

Project

Owner/Client Date Scope Of Work

JDA Block B-17 Development Project Phase-2 Development

Carigali PTTEP Company Sdn Bhd (CPOC) / MMC O&G

Nov 2010 – March 2011

Phase-2 Development Involves Three Satellite Wellhead Platforms (Namely MDE, MDF And JKB) In Bock B-17 Gas Field. Phase-2 Development Plan Also Involves Installation Of Subsea Pipelines To Gather Production From Three Satellite Wellhead Platforms. Production Receiving Facility Shall Also Be Installed An Existing JKA Platform And MDPP Under Phase 2 Development. FEED For Intrafield Pipelines Which Are:

• 18” Multiphase FWS From JKB To JKA

• 18” Multiphase FWS From MDE To MDPP

• 18” Multiphase FWS From MDF To MDE

Provision For Engineering Works And Technical Support For TCOT Zero Flaring Project, Petronas Carigali-PMO

Petronas Carigali / MMC O&G

Dec 2010 – June 2011

The Main Objective Of The Project Is To Eliminate The Continuous Operational Flaring At TCOT And Reduce Plant Emissions By Retrieving The Flared Gases. This Is Inline With PETRONAS’s Obligation To Reduce Green House Gas (GHG) As Outlined By Corporate HSE. Detailed Design Of The 6-Inch Flare Gas Pipeline Of Following Activities:

• Prepare Onshore Pipeline Design Basis

• Prepare Onshore Pipeline Route Study Report

• Prepare Onshore Pipeline Specifications

• Prepare Onshore Pipeline ITB Package

• Prepare Onshore Pipeline Engineering Calculation For Authority Approval

• Prepare Engineering Drawings

Provision Of Engineering Revisit Services For ERB West Development Project

Petronas Carigali / MMC O&G

May 2011

The Targets For The Erb West Development Are To Have Zero Flaring, Increased Productions And Increase Reserve Recovery Factor By The End Of Project Completion. Detailed Design Of Risk Assessment Of Pipeline Protection Against Accidental External Loads.

 

Project

Owner/Client Date Scope Of Work

Conceptual And FEED For Samarang Redevelopment Phase 2 (PCSB)

Petronas Carigali / MMC O&G

Aug 2010 – Aug 2011

Samarang Redevelopment Phase 2 Project Consists Of Upgrading And Modification Work On The Existing Facilities As Preparation Of The Remaining Infill Drilling And To Cater Additional Production Output. There Will Be Also Development Of New Facilities For Implementation Of Enhance Oil Recovery (EOR) And To Facilitate The Production Increase. Conceptual And FEED Consists Of Six (6) Intrafield Pipelines One (1) Subsea Cable Which Are:

• 14” LP Gas From SMP-C To SMP-A • 6” Water Injection Line From SMP-B

To SMJT-E • 6” Gas Injection Line From SMG-A To

SMW-B • 10” FWS Line From SMJT-D To SMP-

C • 10” FWS Line From SMJT-F To

SMJT-C • 16” LP Gas From SMP-B To SMG-A • Subsea Cable From SMG-A To

SMW-B

Provision Of Post- FEED Design For D21 Development Project

Petronas Carigali / MMC O&G

July 2011 – Sept 2011

Post-FEED For 10-Inch Full Well Stream Line From D21JT-A And D35R-A Platform. Responsible For The Following Deliverables;

• Riser Design • Pipeline External Corrosion Protection

Design • Pipeline Material Specifications • Pipeline Material Selection & Wall

Thickness Calculation

Provision Of FEED Services And Detail Design Services (Optional) For Temana Redevelopment Project

Petronas Carigali / MMC O&G

Sept 2011-Feb 2012

FEED Services And Detail Design Services (Optional) For Temana Redevelopment Project Consists Of:

• 8-Inch FWS Line From TEJT-D To TEK-A

• 6-Inch LP Gas Line From TEJT-T To TEJT-D

• 8-Inch Water Injection Line From TEWIM To TEJT-D

• 6-Inch Water Injection Line From TEJT-D To TEJT-C

• 6-Inch Water Injection Line From TEJT-C To TEJT-W

• 8-Inch Water Intake Line From TEWI To TEWIM

 

Project

Owner/Client Date Scope Of Work

Engineering Design For 2km Of Malikai Pipeline At KBB Approach

Sabah Shell Petroleum Co. Ltd. / MMC O&G

Nov 2011 -Mar 2012

Engineering Design For 2km Of Malikai Pipeline At KBB Approach Consists Of:

• Pipeline Mechanical Analysis • Pipeline Stability Analysis • Pipeline Spanning Analysis • Pipeline End Expansion Analysis • Kebabangan Riser Tie-In Spool

Analysis • Pipeline Material Take-Off (MTO)

Detailed Engineering Design for Dalak Pipeline Project

Petronas Carigali/MMC Oil & Gas

Mar 2012 - Julai 2012

FEED Services And Detail Design Services (Optional) For Permas Field Substructure, Topside And Pipeline Consists Of:

• Pipeline & Riser Design Premise • Pipeline & Riser Mechanical Design • Pipeline & Riser Route Selection • Study • Pipeline Stability Design • Pipeline & Riser External Corrosion • Protection Design • Pipeline End Expansion Design • Riser Design

Provision Of The Front End Engineering Design For Angsi Chemical Enhanced Oil Recovery (CEOR) Project

Petronas Cari Gali Sdn Bhd / MMC O&G

Jul 2012 - Oct 2012

Provision Of The Front End Engineering Design For Angsi Chemical Enhanced Oil Recovery (CEOR) Project Consists Of:

• Flexible Pipeline & Riser Design Basis • Flexible Pipeline Route Selection • Flexible Pipeline Specification • Specification For Flexible Pipeline • Specification For Flexible Pipe End • Connector • Specification For Pipe Fittings • Specification For Bend Restrictor • Specification For Bend Stiffener • Specification For I-Tube Clamps • Specification For Flexible Pipeline • Pulling Head • Specification For Hang Off Collar • Specification For Sacrificial Anode • Specification For Bolts, Nuts And • Gasket • Riser Design, Analysis And Study • Flexible Riser Static And Dynamic

Analysis • Flexible Riser Static Analysis • Flexible Pipeline Material Take-Off

(MTO) • Flexible Pipeline Failure Mechanism

And Mitigation Study

 

Project

Owner/Client Date Scope Of Work

• Integrity Review Of The Existing Angsi Water Injection Pipelines

• Flexible Pipeline And Riser Installation Feasibility Study & Laying Analysis

Provision Of Services For Pipeline Project FEED Dalak

Petronas Carigali / MMC O&G

July - Nov 2012

FEED Services For 16-Inch Gas Pipeline From SSGT Tee-Off To GRT-2 For Dalak Pipeline Project. Responsible For The Following Deliverables :

• Pipeline Route Selection & Optimization Study

• Pipeline External Corrosion Mitigation Studies

• Pipeline Spanning Analysis • Pipeline In-Situ Stress Analysis • Pipeline Road Crossing Design • Pipeline Drop Object Analysis • Marine Hazards Study • Preliminary Pipeline Installation

Feasibility Study • Pipeline Material Take-Off • Preliminary Pipeline Cost Estimate • Specification • Pipeline Shore Approach Design • Pipeline Pigging Philosophy

Champion Flood Water

Brunei Shell / Principia Asia Pacific Engineering

20 Sept - 5 Oct 2012

To Provide For Drafting Support Services For Champion Water Flood Project. The Drafting Support Services Include:

• To Draw In CAD The Separation Concrete-Mattresses At The Crossing Locations In The Alignment Sheet Drawings (Nos 29 Dwgs)

• To Allocate Details Information Of Each Crossings In The Alignment Sheet Dwgs.

• To Check The Crossing Angle In Line With The Tabulation Table That Will Be Given By Principia Upon Start Work

• To Allocate The Stability Concrete- Mattresses With The Provided Separation And Check That The Mattresses Will Not Coincide At The Sag Bend Of The Umbilical Or Crossing Location.

 

Project

Owner/Client Date Scope Of Work

Provision Of Front End Engineering Design Services For SKO Pipelines And Facilities Rejuvenation Project For Petronas Carigali Sdn Bhd, Sarawak Operations

Petronas Sarawak Operation/MMC O & G

Dec 2012 - May 2013

Provision Of Front End Engineering Design Services For SKO Pipelines And Facilities Rejuvenation Project Consists Of:

• Pipeline Route Selection • Pipeline Mechanical Calculation • Pipeline Failure Mode Effect Analysis • Life Cycle Cost Study • Pipeline Material Comparison &

Selection • Pipeline Material Option Study Report

South Acis Oil And Gas Development Project Detailed Engineering

MURPHY Sarawak/Sabah Oil Co., Ltd/Wood Group Kenny Sdn Bhd/TL Offshore Sdn Bhd

14 Feb – 8 Mac 2013

South Acis Oil and Gas Development Project Detailed Engineering Consists Of:

• Assessment of Riser Guard Plate Impact Strength on The Jacket Truss Structure

• To perform Finite Element Analysis to assess the Impact Strength of the riser guard plate Welded and clamp to Jacket Truss Structure

• Impact Strength Assessment of Plate will be carried out using ABAQUS/SIMULA

• The effect of Hydrostatic Pressure would be included alongside the vessel Impact load on the Plate.

Provison Of Pre-Front End Engineering Design And Front End Engineering Design Services For PFLNG Tie-In Project

Petronas Carigali/MMC Oil & Gas

Mac – May 2013

Provision Of Pre-front end Engineering Design and front end KL Engineering Design Services for PFLNG Tie-In Project Consists Of:

• Modification works on KAKG-A to cater for additional new facilities

• Flexible pipeline design and installation analysis of approximately 3km of export line from KAKG-A to Pipeline End Termination (PLET) at seabed

• Design and Installation of PLET structure (Subsea)

 

Project

Owner/Client Date Scope Of Work

Detailed Design Engineering Drawing And Lifting Analysis For Riser Guard .

Murphy/TL Offshore Sdn.Bhd./CSD Marine Engineering Sdn Bhd

3 April – 2 May 2013

Detailed Design Engineering Drawing And Lifting Analysis For Riser Guard Project Consists Of:

• Installation Drawings • Determine the loading sustained for

each of the lifting cable (sling) • Determine the configuration of the lifting

cable

Detailed Engineering Design for Dalak Pipeline Project

Petronas Carigali/MMC Oil & Gas

July - Oct 2013

Detailed Engineering Design for Dalak pipeline project consist of:

• Offshore & Onshore Pipeline Route • Study • Offshore Pipeline Installation Study • Pipeline On-Bottom Roughness • Analysis • Offshore Pipeline Shore Approach • Constructability Study • Offshore Pipeline Shore Approach • Design • Riser Stress Design Report • Riser VIV At Labuan • Riser Clamp Design At Labuan • Onshore Pipeline In-Situ Stress • Onshore Pipeline Road Crossing • Design • Onshore Installation Study and • Installation Analysis • Onshore Pipeline Cathodic Protection • Onshore Section Drawings • Conversion Survey drawing to DTM • Determination of flooded control area

Development of Ombak Biru Satu Pipelay Barge

Ombak Marine Group Sdn. Bhd./PT Rekayasa Industri

Oct-Dec 2013

Development of Ombak Biru Satu Pipelay

• Barge project consist of: • Barge and Stinger Setting, Ideal

Setting • (Barge Radius 200m and Range of • Stinger Radius Possibility) • Existing Stinger Pin Configuration,

Ideal • Setting and Existing Pin Setting • (Without Modification to Lay 16” • Rekayasa Industri Pipeline) • Lay Analysis for 16” Rekayasa Industri • Pipeline, Ideal Setting and Existing • Setting Best Possible Configuration • (Without Modification) • Site Visit and As-Builting Pipelay • Support and Stinger Configuration • Integrity Review and Design for

Support • Structure of the Stinger

 

Project

Owner/Client Date Scope Of Work

Conceptual Design and Front End Engineering Design of BPA and The Associated Tie-Ins

Talisman Malaysia Limited / MMC Oil & Gas

Oct-Dec 2013

Conceptual Design and Front End Engineering Design of BPA and The Associated Tie-Ins Project consist of:

• Determine the optimum pipeline route • including platform approach and tie- • in/interface locations. • Feasibility study of optimal pipeline and

riser installation. • Verify the riser locations and topside

piping

[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485

Project Profile

COMPANY PROFILE

B

asic

Eng

inee

ring

Des

ign

for t

he d

evel

opm

ent o

f the

G

olsh

an a

nd F

irdow

si fi

elds

Invo

lved

7 d

iffer

ent p

ipe

size

s di

amet

er o

f ons

hore

pi

pelin

es—

Tw

o (2

) 32-

inch

es &

One

(1) 2

6-in

ches

dia

met

er

carb

on s

teel

exp

ort m

ultip

hase

pip

elin

e , O

ne (1

) 4-in

ches

&

Two

(2) 4

.5-in

ches

anc

illary

pip

elin

es fo

r hyd

rate

and

co

rrosi

on in

hibi

tor c

hem

ical

tran

spor

t , O

ne (1

) 36-

inch

es

diam

eter

con

dens

ate

pipe

line.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

Gol

shan

and

Fird

owsi

Fie

ld D

evel

opm

ent P

roje

ct

O

nsho

re P

ipel

ine

Des

ign

Bas

is

O

nsho

re P

ipel

ine

Rou

te S

elec

tion

O

nsho

re P

ipel

ine

Mec

hani

cal S

tudy

Ons

hore

Pip

elin

e S

tress

Ana

lysi

s

Ons

hore

Pip

elin

e E

ngin

eerin

g D

raw

ings

EcoP

rasi

nos

Res

pons

ibili

ties

w

ww

.eco

pras

inos

.com

Clie

nt

P

ars

Oil

and

Gas

Com

pany

MM

C O

il &

Gas

EX

PO

RT

PIP

ELIN

ES

GO

LSH

AN

OFF

SH

OR

E

FAC

ILIT

IES

2000

MM

scfd

Sep

arat

ion

ME

G In

ject

ion

(70-

80m

Wat

er D

epth

)

GO

LSH

AN

AN

D F

IRD

OW

SI

UP

STR

EA

M O

NS

HO

RE

FA

CIL

ITIE

S20

00 M

Msc

fd(2

x 5

Mtp

aLN

G)

Slu

gcat

cher

/Sep

arat

ion

CO

2/H

2S R

emov

alS

ulfu

r Uni

tD

ehyd

ratio

nC

onde

nsat

e S

tabi

lisat

ion

Sul

fur S

tora

ge/O

ffloa

ding

Con

dens

ate

Sto

rage

/Offl

oadi

ng

FIR

DO

WS

IG

OL

SH

AN

TAN

KE

R

OFF

LOA

DIN

G

FIR

DO

WS

I OFF

SH

OR

E

FAC

ILIT

IES

500

MM

scfd

Sep

arat

ion

ME

G In

ject

ion

(70-

80m

Wat

er D

epth

)

CPF

CP

F

FIR

DO

WS

I & G

OLS

HA

N

DO

WN

STR

EA

M F

AC

ILTI

ES

CP

F

EX

PO

RT

PIP

ELIN

ES

GO

LSH

AN

OFF

SH

OR

E

FAC

ILIT

IES

2000

MM

scfd

Sep

arat

ion

ME

G In

ject

ion

(70-

80m

Wat

er D

epth

)

GO

LSH

AN

AN

D F

IRD

OW

SI

UP

STR

EA

M O

NS

HO

RE

FA

CIL

ITIE

S20

00 M

Msc

fd(2

x 5

Mtp

aLN

G)

Slu

gcat

cher

/Sep

arat

ion

CO

2/H

2S R

emov

alS

ulfu

r Uni

tD

ehyd

ratio

nC

onde

nsat

e S

tabi

lisat

ion

Sul

fur S

tora

ge/O

ffloa

ding

Con

dens

ate

Sto

rage

/Offl

oadi

ng

FIR

DO

WS

IG

OL

SH

AN

TAN

KE

R

OFF

LOA

DIN

G

FIR

DO

WS

I OFF

SH

OR

E

FAC

ILIT

IES

500

MM

scfd

Sep

arat

ion

ME

G In

ject

ion

(70-

80m

Wat

er D

epth

)

CPF

CP

F

FIR

DO

WS

I & G

OLS

HA

N

DO

WN

STR

EA

M F

AC

ILTI

ES

CP

FC

PF

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Dec

200

9 -F

eb 2

010.

M

alik

ai is

a d

eepw

ater

oil

disc

over

y in

offs

hore

S

abah

, Mal

aysi

a w

here

Sab

ah S

hell

Pet

role

um

Com

pany

is th

e de

sign

ated

Ope

rato

r

The

untre

ated

cru

de o

il w

ill be

sen

t to

Keb

aban

gan

plat

form

(KB

B) f

or p

roce

ssin

g vi

a 50

km

10”

pip

elin

e an

d ev

entu

ally

exp

orte

d to

Sab

ah O

il &

Gas

Ter

min

al

(SO

GT)

.

Proj

ect D

escr

iptio

n

M

alik

ai D

eep

Wat

er P

roje

ct

P

ipel

ine

& R

iser

Des

ign

Bas

is

P

ipel

ine

Rou

te S

elec

tion

P

ipel

ine

Mec

hani

cal A

naly

sis

P

ipel

ine

End

Exp

ansi

on A

naly

sis

P

ipel

ine

& R

iser

Ext

erna

l Cor

rosi

on S

tudy

Pip

elin

e La

tera

l and

Uph

eava

l Buc

klin

g A

naly

sis

EcoP

rasi

nos

Res

pons

ibili

ties

P

ipel

ine

Free

Spa

nnin

g A

naly

sis

B

otto

m R

ough

ness

Ana

lysi

s

Pip

elin

e C

ross

ing

Des

ign

P

ipe

Soi

l Int

erac

tion

Flow

line

and

Ris

er S

yste

m C

onst

ruct

ion

and

Inst

alla

tion

Des

ign

P

ipel

ine

and

Ris

er E

ngin

eerin

g D

raw

ings

Clie

nt

S

abah

She

ll P

etro

leum

Com

pany

MM

C A

ME

C

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Jan

201

0 - M

ay 2

010

FE

ED

rede

velo

pmen

t of t

he S

amar

ang

field

are

div

ided

into

2

phas

es, P

hase

-1 a

nd P

hase

-2.

P

hase

1 –

SM

DP

-B a

nd S

MJT

-F

P

hase

2 –

SM

JT-C

/D/E

/G a

nd n

ew p

latfo

rm a

nd p

ipel

ines

Pet

rona

s C

arig

ali S

dn B

hd a

re th

e ow

ner o

f the

pro

ject

.

Proj

ect D

escr

iptio

n

S

amar

ang

Red

evel

opm

ent P

roje

ct

P

ipel

ine

& R

iser

Des

ign

Bas

is

P

ipel

ine

Rou

te S

elec

tion

P

ipel

ine

Mat

eria

l Sel

ectio

n &

Wal

l Thi

ckne

ss C

alcu

latio

n

Pip

elin

e O

n-B

otto

m S

tabi

lity

Ana

lysi

s

Pip

elin

e Fr

ee S

pann

ing

Ana

lysi

s

Pip

elin

e E

nd E

xpan

sion

Ana

lysi

s

Pip

elin

e an

d R

iser

Eng

inee

ring

Dra

win

gs

R

iser

stre

ss a

naly

sis

EcoP

rasi

nos

Res

pons

ibili

ties

R

iser

VIV

ana

lysi

s

R

iser

han

ger f

lang

e an

d cl

amp

desi

gn

P

ipel

ine

Mat

eria

l Tak

e-of

f

Pip

elin

e M

ater

ial S

peci

ficat

ion

P

ipel

ine

Pig

ging

Phi

loso

phy

Clie

nt

P

etro

nas

Car

igal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Apr

il 20

09 –

Feb

201

1

Th

e C

PO

C B

lock

B-1

7 Fi

eld

Dev

elop

men

t Are

a is

situ

ated

of

fsho

re in

the

Gul

f of T

haila

nd a

t the

nor

ther

n tip

of t

he

Mal

ay B

asin

that

is T

hai-M

alay

sia

Join

t Dev

elop

men

t Are

a (J

DA

).

Th

is P

hase

-2 d

evel

opm

ent i

nvol

ves

thre

e sa

tellit

e w

ellh

ead

plat

form

s (n

amel

y M

DE

, MD

F an

d JK

B) i

n B

ock

B-1

7 ga

s fie

ld a

nd a

lso

inst

alla

tion

of s

ubse

a pi

pelin

es to

gat

her

prod

uctio

n fro

m th

ree

sate

llite

wel

lhea

d pl

atfo

rms.

Proj

ect D

escr

iptio

n

JD

A B

lock

– B

17 D

evel

opm

ent P

roje

ct

P

ipel

ine

Hyd

raul

ic S

tudy

Pip

elin

e &

Ris

er D

esig

n B

asis

Flow

line

Rou

te S

elec

tion

Stu

dy

P

ipel

ine

Wal

l Thi

ckne

ss &

Mat

eria

l G

rade

Sel

ectio

n

P

ipel

ine

Tren

chin

g &

Bur

ial D

esig

n

Pip

elin

e M

echa

nica

l Pro

tect

ion

Des

ign

P

ipel

ine

Glo

bal B

uckl

ing

P

ipel

ine

and

Ris

er E

ngin

eerin

g D

raw

ings

Pip

elin

e M

ater

ial T

ake-

off

EcoP

rasi

nos

Res

pons

ibili

ties

P

ipel

ine

On-

Bot

tom

Sta

bilit

y A

naly

sis

P

ipel

ine

Ext

erna

l Cor

rosi

on S

tudy

Pip

elin

e S

pann

ing

Ana

lysi

s

Pip

elin

e E

nd E

xpan

sion

Ana

lysi

s

Pip

elin

e C

ross

ing

Des

ign

Clie

nt

C

arig

ali P

TTE

P C

ompa

ny S

dn B

hd

M

MC

Oil

& G

as

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Nov

201

0 –

Mar

ch 2

011

Th

e m

ain

obje

ctiv

e of

the

proj

ect i

s to

elim

inat

e th

e co

ntin

uous

ope

ratio

nal f

larin

g at

TC

OT

and

redu

ce p

lant

em

issi

ons

by re

triev

ing

the

flare

d ga

ses.

This

is in

line

with

PE

TRO

NA

S’s

obl

igat

ion

to re

duce

G

reen

Hou

se G

as (G

HG

) as

outli

ned

by C

orpo

rate

HS

E.

Proj

ect D

escr

iptio

n

Tere

ngga

nu C

rude

Oil

Term

inal

(TC

OT)

Zer

o Fl

arin

g Pr

ojec

t

O

nsho

re P

ipel

ine

Des

ign

Bas

is

O

nsho

re P

ipel

ine

Rou

te S

elec

tion

O

nsho

re P

ipel

ine

Mec

hani

cal S

tudy

Ons

hore

Pip

elin

e S

tress

Ana

lysi

s

Ons

hore

Pip

elin

e E

xter

nal C

orro

sion

Sel

ectio

n S

tudy

Ons

hore

Pip

elin

e S

tabi

lity

Ana

lysi

s

Ons

hore

Pip

elin

e E

nd E

xpan

sion

Ana

lysi

s

Ec

oPra

sino

s R

espo

nsib

ilitie

s

O

nsho

re P

ipel

ine

Spe

cific

atio

n

Ons

hore

Pip

elin

e E

ngin

eerin

g D

raw

ings

Ons

hore

Pip

elin

e M

ater

ial T

ake-

off

Clie

nt

P

etro

nas

Car

igal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Dec

201

0 –

June

201

1

Th

e ta

rget

for E

rb W

est d

evel

opm

ent a

re to

hav

e ze

ro

flarin

g, in

crea

sed

prod

uctio

ns a

nd in

crea

se re

serv

e re

cove

ry

fact

or b

y th

e en

d of

pro

ject

com

plet

ion.

This

revi

sit w

ill en

sure

the

field

life

is e

xpec

ted

to e

xten

d be

yond

202

9

Th

e sc

ope

of w

ork

is P

rovi

sion

Rev

isit

Ser

vice

s Pr

ojec

t Des

crip

tion

E

RB

Wes

t Dev

elop

men

t Pro

ject

P

ipel

ine

drop

ped

obje

ct s

tudy

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Car

igal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

May

201

1

Fu

ll W

ell S

tream

(FW

S) p

rodu

ctio

n fro

m D

21 w

ill be

sen

d to

D

35 fo

r pro

cess

ing

and

the

proc

esse

d liq

uid

will

be e

xpor

ted

to th

e B

intu

lu C

rude

Oil

Term

inal

(BC

OT)

via

the

Bay

an

plat

form

.

The

D21

JT-A

Wel

lhea

d P

latfo

rm (W

HP

) is

plan

ned

to b

e in

stal

l in

Qua

rter 3

201

2. F

irst o

il fo

r D21

is ta

rget

ed b

y Q

uarte

r 4 2

012.

The

scop

e of

wor

k is

Pos

t-FE

ED

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

D21

Dev

elop

men

t Pro

ject

EcoP

rasi

nos

Res

pons

ibili

ties

P

ipel

ine

Ext

erna

l Cor

rosi

on P

rote

ctio

n D

esig

n

Pip

elin

e Fr

ee S

pann

ing

Ana

lysi

s

Pip

elin

e E

nd E

xpan

sion

Ana

lysi

s

Pip

elin

e &

Ris

er In

stal

latio

n S

tudy

Clie

nt

P

etro

nas

Car

igal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Jul

y-S

ept 2

011

P

ipel

ine

& R

iser

Des

ign

Bas

is

P

ipel

ine

Rou

te S

elec

tion

P

ipel

ine

Mat

eria

l Sel

ectio

n &

Wal

l Thi

ckne

ss

Cal

cula

tion

P

ipel

ine

On-

Bot

tom

Sta

bilit

y A

naly

sis

P

ipel

ine

and

Ris

er E

ngin

eerin

g D

raw

ings

Ris

er s

tress

ana

lysi

s

R

iser

VIV

ana

lysi

s

R

iser

han

ger f

lang

e an

d cl

amp

desi

gn

P

ipel

ine

Mat

eria

l Tak

e-of

f

Te

man

a R

edev

elop

men

t pro

ject

com

pris

es th

e de

velo

pmen

t of

I-60

and

I-65

rese

rvoi

rs. T

hese

rese

rvoi

rs a

re lo

cate

d at

Te

man

a C

entra

l fau

lt bl

ock

54/9

9.

Th

e pr

ojec

t Obj

ectiv

e fo

r Tem

ana

Red

evel

opm

ent p

roje

ct is

to

impr

ove

reco

very

fact

ors

of T

eman

a I-6

5/I-6

0 re

serv

oirs

to

56%

( end

of f

ield

life

) with

incr

emen

tal r

eser

ves

of

37.8

MM

Stb

by

impl

emen

ting

pres

sure

mai

nten

ance

(wat

er

inje

ctio

n).

Proj

ect D

escr

iptio

n

T

eman

a R

edev

elop

men

t Pro

ject

P

ipel

ine

& R

iser

Des

ign

Bas

is

P

ipel

ine

Rou

te S

elec

tion

P

ipel

ine

Mat

eria

l Sel

ectio

n &

Wal

l Thi

ckne

ss

Cal

cula

tion

P

ipel

ine

On-

Bot

tom

Sta

bilit

y A

naly

sis

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Car

igal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Sep

t 201

1 –

Feb

2012

P

ipel

ine

and

Ris

er E

ngin

eerin

g D

raw

ings

Ris

er s

tress

ana

lysi

s

R

iser

VIV

ana

lysi

s

R

iser

han

ger f

lang

e an

d cl

amp

desi

gn

P

ipel

ine

Mat

eria

l Tak

e-of

f

P

ipel

ine

Free

Spa

nnin

g A

naly

sis

P

ipel

ine

End

Exp

ansi

on A

naly

sis

P

ipel

ine

& R

iser

Inst

alla

tion

Stu

dy

Mal

ikai

Rev

isit

Pro

ject

is

cont

inua

tion

from

Mal

ikai

Dee

pwat

er

Pro

ject

. The

des

ign

wor

ks re

quire

d ar

e as

follo

ws:

2k

m

of

the

MLK

10

-inch

cr

ude

oil

pipe

line

from

K

BB

plat

form

2k

m o

f the

MLK

8-in

ch g

as p

ipel

ine

from

KB

B p

latfo

rm

Sub

sea

tie-in

spo

ol fo

r bot

h pi

pelin

es a

t KB

B p

latfo

rm

The

scop

e of

wor

k is

Det

aile

d E

ngin

eerin

g D

esig

n.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

Firs

t 2km

8-in

ch G

as a

nd 1

0-in

ch L

iqui

d an

d K

BB

Ris

er T

ie-in

Spo

ol P

ipel

ines

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

Sab

ah S

hell

Pet

role

um C

o. L

td.

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Nov

201

1-M

ar 2

012

Pip

elin

e M

echa

nica

l Ana

lysi

s P

ipel

ine

End

Exp

ansi

on A

naly

sis

Pip

elin

e S

tabi

lity

Ana

lysi

s K

ebab

anga

n R

iser

Tie

-in S

pool

Ana

lysi

s P

ipel

ine

Spa

nnin

g A

naly

sis

Pip

elin

e M

ater

ial T

ake-

off

Per

mas

mul

tipha

se o

il w

ill flo

w 5

000

bpd

of o

il vi

a ap

prox

imat

ely

39km

of 1

0 in

ch d

iam

eter

pip

elin

e to

a

prod

ucin

g pl

atfo

rm S

A-P

A in

Sou

th A

cis

Fiel

d Th

e fie

ld d

evel

opm

ent i

s un

der t

wo

prod

uctio

n ph

ase

whi

ch is

inte

rim p

rodu

ctio

n ph

ase

and

full

faci

litie

s pr

oduc

tion

phas

e Th

e sc

ope

of w

ork

is F

EE

D

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

FEED

for P

erm

as F

ield

Sub

stru

ctur

e, T

opsi

de a

nd P

ipel

ine

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

Mur

phy

Sar

awak

Oil

Co.

, Ltd

M

MC

Oil

& G

as

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Mar

-Jul

y 20

12

Pip

elin

e &

Ris

er D

esig

n P

rem

ise

Pip

elin

e &

Ris

er M

echa

nica

l Des

ign

Pip

elin

e &

Ris

er R

oute

Sel

ectio

n S

tudy

P

ipel

ine

Sta

bilit

y D

esig

n R

iser

VIV

Ana

lysi

s R

iser

In-P

lace

Stre

ss A

naly

sis

Pip

elin

e &

Ris

er E

xter

nal C

orro

sion

Pro

tect

ion

Des

ign

Pip

elin

e E

nd E

xpan

sion

Des

ign

P

ETR

ON

AS

Car

igal

i S

dn B

hd i

s un

derta

king

Ang

si C

EO

R F

ull

Fiel

d Im

plem

enta

tion

to

impr

ove

the

incr

emen

tal

oil

reco

very

of

Ang

si .

The

desi

gn w

ork

requ

ired

is a

s fo

llow

:

Pro

pose

d Fl

exib

le W

ater

Inj

ectio

n Li

ne f

rom

Flo

ater

to

AN

PG

-A

for A

ngsi

Che

mic

al E

nhan

ced

Oil

Rec

over

y (C

EO

R) P

roje

ct

Th

e tre

ated

RO

wat

er w

ith c

hem

ical

s na

mel

y A

lkal

ine,

Sur

fact

ant

and

Pol

ymer

(A

SP

) w

ill be

inj

ecte

d by

the

Flo

ater

thr

ough

the

Fl

exib

le L

ine.

Firs

t Inj

ectio

n is

sch

edul

ed to

com

men

ce in

Q2

2014

.

The

scop

e of

wor

k is

Fro

nt E

nd E

ngin

eerin

g D

esig

n.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n AN

GSI

CH

EMIC

AL

ENH

AN

CED

OIL

REC

OVE

RY (C

EOR

) PR

OJE

CT

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Car

i Gal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Jul

201

2-O

ct 2

012

Fl

exib

le P

ipel

ine

& R

iser

Pip

elin

e

Flex

ible

Pip

elin

e R

oute

Sel

ectio

n

Fl

exib

le P

ipel

ine

Spe

cific

atio

n

Ris

er D

esig

n, A

naly

sis

and

Stu

dy

Fl

exib

le P

ipel

ine

Mat

eria

l Tak

e-O

ff

Fl

exib

le P

ipel

ine

Failu

re M

echa

nism

and

Miti

gatio

n S

tudy

Inte

grity

Rev

iew

of t

he E

xist

ing

Ang

si W

ater

Inje

ctio

n P

ipel

ines

Flex

ible

Pip

elin

e an

d R

iser

Inst

alla

tion

Feas

ibilit

y S

tudy

& L

ayin

g A

naly

sis

D

alak

Pip

elin

e de

velo

pmen

t pro

ject

for

the

new

gas

pip

elin

e fro

m

Sab

ah S

araw

ak G

as P

ipel

ine

(SS

GP

) te

e-of

f to

Gas

Rec

eivi

ng

Term

inal

2 (G

RT-

2).

S

ervi

ce o

f 150

mm

scfd

feed

gas

16-

inch

Gas

Pip

elin

e fro

m S

SG

P

tee-

off t

o G

RT-

2.

Th

e sc

ope

of w

ork

is F

EE

D.

Proj

ect D

escr

iptio

n

FEED

Ser

vice

s Fo

r Dal

ak P

ipel

ine

Proj

ect

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Car

igal

i Sdn

.Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Jul

y 20

12-N

ov 2

012

P

ipel

ine

Rou

te S

elec

tion

&

P

ipel

ine

In-S

itu S

tress

Ana

lysi

s

P

ipel

ine

Ext

erna

l Cor

rosi

on

Pip

elin

e D

rop

Obj

ect A

naly

sis

P

ipel

ine

Spa

nnin

g A

naly

sis

P

ipel

ine

Roa

d C

ross

ing

D

esig

n

Spe

cific

atio

n

Pip

elin

e P

iggi

ng P

hilo

soph

y

P

relim

inar

y P

ipel

ine

Inst

alla

tion

Feas

ibilit

y S

tudy

Pre

limin

ary

Pip

elin

e C

ost E

stim

ate

P

ipel

ine

Sho

re A

ppro

ach

Des

ign

C

ham

pion

is w

ell k

now

n as

the

larg

est f

ield

s w

hich

con

tain

ing

mor

e th

an

500

rese

rvoi

rs a

nd d

espi

te lo

ng p

rodu

ctio

n hi

stor

y.

Th

e fir

st w

ater

inje

ctio

n hi

stor

y w

as im

plem

ente

d in

the

mid

‘80s

.

The

Cha

mpi

on W

ater

Flo

od P

roje

ct w

as in

itiat

ed in

Mar

200

5.

Th

e ob

ject

ive

of

the

proj

ect

is

to

purs

ue

inte

grat

ed

Wat

er

flood

D

evel

opm

ent

of

the

Cha

mpi

on

rese

rvoi

rs

ad

the

curre

nt

view

on

ex

ecut

ion

scop

e in

clud

es n

ew p

rodu

ctio

n, w

ater

inj

ectio

n an

d po

wer

fa

cilit

ies,

sev

eral

new

dril

ling

plat

form

s/ja

cket

s an

d 14

0+ n

ew w

ells

, bot

h oi

l pro

duce

rs a

nd w

ater

inje

ctio

n.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

CH

AM

PIO

N W

AT

ER

FL

OO

D

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

rinci

pia

Asi

a P

acifi

c E

ngin

eerin

g

Bru

nei S

hell

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

20

Sep

t 201

2 –

5 O

ct 2

012

To

dra

w in

CA

D th

e se

para

tion

Con

cret

e-M

attre

sses

at t

he c

ross

-in

g lo

catio

ns in

the

alig

nmen

t she

et d

raw

ings

(nos

2 d

wgs

)

To

allo

cate

det

ails

info

rmat

ion

of e

ach

cros

sing

s in

the

alig

nmen

t sh

eet d

wgs

To

che

ck th

e cr

ossi

ng a

ngle

in li

ne w

ith th

e ta

bula

tion

tabl

e th

at

will

be g

iven

by

Prin

cipi

a up

on s

tart

wor

k

To a

lloca

te th

e st

abilit

y C

oncr

ete-

Mat

tress

es w

ith th

e pr

ovid

ed

sepa

ratio

n an

d ch

eck

that

the

mat

tress

es w

ill n

ot c

oinc

ide

at th

e sa

g be

nd o

f the

um

bilic

al o

r cro

ssin

g lo

catio

n

P

ETR

ON

AS

Car

igal

i Sdn

Bhd

(P

ETR

ON

AS

Car

igal

i) is

und

erta

king

the

re

juve

natio

n pr

ojec

t of

pip

elin

es a

nd a

ssoc

iate

d to

psid

e fa

cilit

ies

for

Sar

awak

Ope

ratio

n (S

KO

).

S

KO

, one

of P

ETR

ON

AS

Car

igal

i’s th

ree

regi

onal

ope

ratio

ns in

Mal

aysi

a co

mpr

ises

th

e B

aram

D

elta

O

pera

tion

(BD

O)

field

s,

Bal

ingi

an

field

, B

intu

lu C

rude

Oil

Term

inal

(B

CO

T) a

nd M

iri C

rude

Oil

Term

inal

(M

CO

T).

The

desi

gn w

ork

is B

aram

Fie

lds

Pip

elin

e N

etw

ork

and

Bal

ingi

an

Fiel

ds P

ipel

ine

Net

wor

k.

S

KO

pro

duct

ion

is f

orec

aste

d to

inc

reas

e to

160

,000

bpd

oil

and

250

mill

ion

scf/d

Nat

ural

gas

from

201

3.

Th

e m

ost

optim

um m

ater

ial

to b

e us

ed w

ill b

e id

entif

ied

for

the

SK

O

pipe

line

repl

acem

ent u

nder

Wor

k O

der M

MC

RO

1.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

PR

OV

ISIO

N O

F F

RO

NT

EN

D E

NG

INE

ER

ING

DE

SIG

N S

ER

VIC

ES

FO

R S

KO

PIP

EL

INE

S A

ND

FA

CIL

ITIE

S R

EJU

VE

NA

TIO

N P

RO

JEC

T

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Sar

awak

Ope

ratio

n

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Dec

201

2-M

ay 2

013

P

ipel

ine

Rou

te S

elec

tion

P

ipel

ine

Mec

hani

cal C

alcu

latio

n

P

ipel

ine

Failu

re M

ode

Effe

ct A

naly

sis

P

ipel

ine

Mat

eria

l Com

paris

on &

Sel

ectio

n

Li

fe C

ycle

Cos

t Stu

dy

P

ipel

ine

Mat

eria

l Opt

ion

Stu

dy R

epor

t

To

Mur

phy

Sar

awak

Oil

Co

Ltd

(MO

C)

curr

ently

has

tw

o (2

) P

SC

s w

ith P

ETR

ON

AS

Car

igal

i S

dn B

hd (

PC

SB

), an

d is

the

op

erat

or o

f, B

lock

s S

K30

9 an

d S

K31

1 of

fsho

re S

araw

ak,

Eas

t M

alay

sia.

MO

C b

egan

pro

duci

ng o

il fro

m th

e W

est P

atric

ia fi

eld

in 2

003.

In 2

009

MO

C c

omm

ence

d de

liver

y of

gas

from

the

Gol

ok fi

eld

via

the

Bin

tulu

O

nsho

re

Rec

eivi

ng

Faci

lity

(BO

RF)

to

M

LNG

, co

mpl

etin

g S

K

Gas

P

hase

1

with

ga

s pr

oduc

tion

from

th

e S

eram

pang

Fie

ld in

201

0.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

SOU

TH A

CIS

OIL

AN

D G

AS

DEV

ELO

PMEN

T PR

OJE

CT

DET

AIL

ED E

NG

INEE

RIN

G

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

TL

Offs

hore

Sdn

Bhd

MU

RP

HY

Sar

awak

/Sab

ah O

il C

o., L

td

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

14

Feb-

8 M

ac 2

013

To

Ass

essm

ent

of R

iser

Gua

rd P

late

Im

pact

Stre

ngth

on

The

Jack

et T

russ

Stru

ctur

e

To

per

form

Fin

ite E

lem

ent A

naly

sis

to a

sses

s th

e Im

pact

S

treng

th o

f the

rise

r gua

rd p

late

Wel

ded

and

clam

p to

Jac

ket

Trus

s S

truct

ure.

Im

pact

Stre

ngth

Ass

essm

ent o

f Pla

te w

ill be

car

ried

out u

sing

A

BA

QU

S/S

IMU

LIA

.

The

effe

ct o

f Hyd

rost

atic

Pre

ssur

e w

ould

be

incl

uded

alo

ngsi

de th

e ve

ssel

Impa

ct lo

ad o

n th

e P

late

.

Th

e ba

se d

evel

opm

ent

plan

for

PFL

NG

Tie

-in f

acilit

ies

is t

o ha

ve

bran

ch o

ut p

ipin

g fro

m e

xitin

g ga

s an

d co

nden

sate

exp

ort p

ipel

ine

to M

LNG

, iso

latio

n/co

ntro

l val

ves,

met

erin

g, s

tatic

mix

er, l

aunc

her

on K

AK

G-A

pip

elin

e an

d P

LEM

at s

eabe

d.

Th

e pr

oduc

tion

(i.e.

gas

and

con

dens

ate)

fro

m K

AK

G-A

will

be

com

min

gled

in s

tatic

mak

er tr

ansp

orte

d to

PFL

NG

via

3km

pip

elin

e an

d P

LEM

.

PFL

NG

will

tie-in

its

flexi

ble

riser

at P

LEM

and

con

nect

the

riser

to

flang

e at

turre

t and

rout

ed th

e ga

s an

d co

nden

sate

to s

lug

rece

iver

on

PFL

NG

.

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

PR

OV

ISIO

N O

F P

RE

-FR

ON

T E

ND

EN

GIN

EE

RIN

G D

ES

IGN

AN

D F

RO

NT

EN

D K

L

EN

GIN

EE

RIN

G D

ES

IGN

SE

RV

ICE

S F

OR

PF

LN

G T

IE-I

N P

RO

JEC

T

EcoP

rasi

nos

Res

pons

ibili

ties

Clie

nt

P

etro

nas

Car

i Gal

i Sdn

Bhd

MM

C O

il &

Gas

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

Jul

201

3 to

Oct

201

3

M

odifi

catio

n w

orks

on

KA

KG

-A to

cat

er fo

r add

ition

al e

quim

ent

In

stal

latio

n A

naly

sis

and

Stu

dy o

f PLE

M

In

stal

latio

n st

udy

and

anal

ysis

of n

ew e

quip

men

t on

KA

KG

-A

Hoo

k-up

wor

ks o

n K

AK

G-A

dur

ing

shut

dow

n w

indo

w s

tudy

In

stal

latio

n an

alys

is o

f app

roxi

mat

ely

3km

of f

lexi

ble

pipe

line

from

KA

KG

-Ato

Pip

elin

e E

nd M

anifo

ld (P

LEM

) AT

SE

AB

ED

H

ook-

up a

nd c

omm

issi

onin

g w

orks

dur

ing

tie-in

stu

dy

M

urph

y S

araw

ak O

il C

o Lt

d (M

OC

) cur

rent

ly h

as tw

o (2

) PS

Cs

with

PE

TRO

NA

S C

arig

ali S

dn B

hd (P

CS

B),

and

is th

e op

erat

or

of, B

lock

s S

K30

9 an

d S

K31

1 of

fsho

re S

araw

ak, E

ast M

alay

sia.

MO

C b

egan

pro

duci

ng o

il fro

m th

e W

est P

atric

ia fi

eld

in 2

003.

In 2

009

MO

C c

omm

ente

d de

liver

y of

gas

from

the

Gol

ok fi

eld

via

the

Bin

tulu

Ons

hore

Rec

eivi

ng F

acilit

y (B

OR

F) to

MLN

G,

com

plet

ing

SK

Gas

Pha

se 1

with

gas

pro

duct

ion

from

the

Ser

ampa

ng F

ield

in 2

010

w

ww

.eco

pras

inos

.com

Proj

ect D

escr

iptio

n

Det

aile

d D

esig

n En

gine

erin

g D

raw

ing

And

Lift

ing

Ana

lysi

s Fo

r Ris

er G

uard

EcoP

rasi

nos

Res

pons

ibili

ties

R

iser

cla

mp

deta

iled

dra

win

gs

Li

fting

Con

figur

atio

n dr

awin

gs

Clie

nt

M

urph

y

TL O

ffsho

re S

dn. B

hd.

C

SD

Mar

ine

Eng

inee

ring

Ser

vice

s S

dn. B

hd.

bd@

ecop

rasi

nos.

com

I

ww

w.e

copr

asin

os.c

om

I T

el: +

06-0

3-89

2734

85

Proj

ect D

urat

ion:

3 A

pril

- 2 M

ay 2

013

C

lam

p D

etai

led

Des

ign

Ana

lysi

s

Lifti

ng lu

g an

alys

is a

nd s

tress

che

ck

D

eter

min

e th

e lo

adin

g su

stai

ned

for e

ach

of

the

liftin

g ca

ble

(slin

g)

D

eter

min

e th

e co

nfig

urat

ion

of th

e lif

ting

slin

g-ca

ble

bd

@ec

op

rasi

no

s.co

m I

w

ww

.eco

pra

sin

os.

com

I

Tel

: +

06-0

3-89

2734

85

Dev

elo

pm

ent

of

Om

bak

Bir

u S

atu

Pip

elay

Bar

ge

Clie

nt

O

mba

k M

arin

e G

roup

Sdn

Bhd

P

roje

ct D

escr

ipti

on

O

mba

k M

arin

e G

roup

ha

s be

en

awar

ded

cont

ract

by

P

T

Rek

ayas

a In

dust

ri to

pe

rfor

m

pipe

line

inst

alla

tion

utili

zing

O

mba

k B

iru S

atu

pipe

lay

barg

e fo

r th

e 16

” O

ffsho

re S

ectio

nal

Pip

elin

e R

eloc

atio

n an

d In

stal

latio

n P

roje

ct in

Indo

nesi

a.

E

coP

rasi

nos

Eng

inee

ring

Sdn

. B

hd.

has

been

aw

arde

d co

ntra

ct

by O

mba

k M

arin

e G

roup

to

act

as a

n en

gine

erin

g su

ppor

t to

pe

rfor

m t

he e

ngin

eerin

g su

ppor

t fo

r O

mba

k B

iru S

atu

pipe

lay

barg

e. T

he w

ork

invo

lvem

ents

are

to

verif

y an

d re

com

men

d if

any

mod

ifica

tion

are

requ

ired

on

Om

bak

Biru

S

atu

pipe

lay

barg

e.

Pro

ject

Du

rati

on

: O

ct 2

013

– D

ec 2

013

Eco

Pra

sin

os

Res

po

nsi

bili

ties

The

wor

k in

volv

emen

ts a

re a

s fo

llow

s:

1)

Bar

ge a

nd S

tinge

r S

ettin

g, Id

eal S

ettin

g (B

arge

Rad

ius

200m

and

Ran

ge o

f S

tinge

r R

adiu

s P

ossi

bilit

y)

2)

Exi

stin

g S

tinge

r P

in C

onfig

urat

ion,

Ide

al S

ettin

g an

d E

xist

ing

Pin

Set

ting

(With

out

Mod

ifica

tion

to L

ay 1

6” R

ekay

asa

Indu

stri

Pip

elin

e)

3)

Lay

Ana

lysi

s fo

r 16

” R

ekay

asa

Indu

stri

Pip

elin

e, I

deal

Set

ting

and

Exi

stin

g S

ettin

g B

est

Pos

sibl

e C

onfig

urat

ion

(With

out

Mod

ifica

tion)

4)

S

ite V

isit

and

As-

Bui

lting

Pip

elay

Sup

port

and

Stin

ger

Con

figur

atio

n 5)

In

tegr

ity R

evie

w a

nd D

esig

n fo

r S

uppo

rt S

truc

ture

of t

he S

tinge

r

bd

@ec

op

rasi

no

s.co

m I

w

ww

.eco

pra

sin

os.

com

I

Tel

: +

06-0

3-89

2734

85

Clie

nt

T

alis

man

Mal

aysi

a Li

mite

d

M

MC

Oil

& G

as

Pro

ject

Des

crip

tio

n

C

OM

PA

NY

has

dev

elop

ed P

M-3

CA

A N

orth

ern

Fie

lds

with

a

Cen

tral

Pro

cess

ing

Pla

tform

BO

-A l

ocat

ed a

t th

e B

unga

Ork

id

Fie

ld w

ith a

ser

ies

of W

ell

Hea

d R

iser

Pla

tform

s de

liver

ing

hydr

ocar

bons

fro

m t

he v

ario

us f

ield

are

as t

o th

e C

PP

with

Bun

ga P

akm

a A

as

futu

re.

T

he

proj

ect

will

co

nsid

er

the

desi

gn,

build

, in

stal

latio

n an

d

com

mis

sion

ing

of t

he B

P-A

min

imum

fac

ilitie

s pl

atfo

rm f

or t

he

drill

ing

of 7

initi

al g

as w

ells

with

pot

entia

l of u

p to

11

futu

re w

ells

.

T

he c

urre

nt p

lan

date

for

first

gas

is 1

st Q

201

6.

T

he s

cope

of w

ork

is C

once

ptua

l and

FE

ED

. P

roje

ct D

ura

tio

n:

Oct

201

3 –

Dec

201

3 E

coP

rasi

no

s R

esp

on

sib

iliti

es:

D

eter

min

e th

e op

timum

pi

pelin

e ro

ute

incl

udin

g pl

atfo

rm

appr

oach

and

tie-

in/in

terf

ace

loca

tions

.

F

easi

bilit

y st

udy

of o

ptim

al p

ipel

ine

and

riser

inst

alla

tion.

V

erify

the

riser

loca

tions

and

tops

ide

pipi

ng.

BU

NG

A P

AK

MA

DE

VE

LO

PM

EN

T C

ON

CE

PT

UA

L A

ND

FR

ON

T E

ND

EN

GIN

EE

RIN

G D

ES

IGN

(F

EE

D)


Top Related