epsbprofilerev5
DESCRIPTION
noTRANSCRIPT
EP-BD-CP-REV 5
SUBSEA PIPELINES&ASSOCIATED FACILITIES . SUBSEA PIPELINES SPECIALIST SKILLS . ONSHORE RECEPTION FACILITIES . ELECTRONIC DOCUMENT MANAGEMENT SYSTEM .
NOISE&VIBRATION TESTING . COMPUTER AIDED ENGINEERING.
2-2-02, Jalan Medan PB1 Medan PB1 Pusat Bandar Bangi
43650, Bandar Baru Bangi Selangor, WEST MALAYSIA
www.ecoprasinos.com Tel : +603-89273485 Fax: +603-89273486
E-mail: [email protected]
ECOPRASINOS ENGINEERING
SDN BHD
COMPANY PROFILE
2013
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
was founded to provide the most responsive, pragmatic total product and
Subsea And Pipeline Engineering solution of the highest quality, with total commitment both timely and at
the most optimum cost for every project we undertake. We are full Consultant Engineer providing
comprehensive array of engineering services from the smallest and simplest to the largest and most
complex projects. So whether it is specialist technical advice or total Consultation that you need,
Ecoprasinos is pleased to be of service.
Ecoprasinos is a wholly Malaysian Bumiputra owned company incorporated on 24 August 2009. The
company is a full Consultant Engineer providing comprehensive array serving both private and public sector
clients. The diversity of Ecoprasinos's expertise enables the organisation to provide comprehensive
professional service for large and small, as well as simple and complex to a diverse global clientele.
This Company Profile establishes Ecoprasinos’s credentials for providing engineering support services on
Subsea and Pipeline Projects Worldwide. Ecoprasinos is ideally suited to provide these engineering support
services because Ecoprasinos has the:
• Experienced People
• Technical Capability
• Track Record
• Local Knowledge
• Project Systems
to deliver a best-in-class result for the work contemplated.
COMPANY PROFILE I FORWARD
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
Contents
This document represents an overview of EcoPrasinos Engineering Sdn Bhd company profile and track records.
Section 1 provides company information on EcoPrasinos’s company structure and office location. Section 2 details of our technical expertise Section 3 contains of our resources. Section 4 presents about system and technical database applied. Section 5 provides a track record of our projects Section 6 provides projects profile involved
1. Company Information Company Details Company Accreditation 2. Services Subsea Pipeline and Associated Facilities Specialist Skills Onshore Reception Facilities Electronic Document Management System Vibration 3. Resources Engineering Office Facilities 4. System & Technical Database Technical Database Hardware and Software 5. Track Record Subsea and Pipeline Projects 6. Project Profile
COMPANY PROFILE I INTRODUCTION
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
Company Details
Name Of Establishment
:
Ecoprasinos Engineering Sdn Bhd
Principal Activity
: Subsea And Pipeline Engineering Consultancy
Date Of Incorporation
: 24th August 2009
Company Registration No.
: 869657-U
Registered Address
: 2-2-02, Jalan Medan PB 1 Medan PB 1, Pusat Bandar Bangi 43650 Bandar Baru Bangi Selangor, Malaysia
Tel : +60-3-89273485
Fax : +60-3-89273486
E-Mail Address
: [email protected] [email protected]
General Manager : Dr.Azlina Binti Abu Nahar
Staff
: Directors – 2 Sn Engineers – 6 Engineers - 6 Pipeline Designer – 1 Pipeline Drafters - 2 Admin – 3
Company Banker : Maybank Islamic Berhad (787435-M) IBS CPI Bandar Baru Bangi
No.789, Jalan 9/9C, 43650 Bandar Baru Bangi, Selangor, Malaysia
COMPANY PROFILE I COMPANY INFORMATION
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I COMPANY INFORMATION
Company Accreditation
Companies Commission of Malaysia
EcoPrasinos is a wholly Malaysian Bumiputra
owned company incorporated on 24th August
2009 with registration number 869657-U.
Registered with Board of Engineer Malaysia
EcoPrasinos Engineering Sdn Bhd is registered
with Board of Engineer Malaysia with certificate
number 1102-06000-PE-11121. The Board of
Engineers Malaysia (BEM) is a statutory body
constituted under the Registration of Engineers
Act 1967. It was formed in 23rd August 1972.
Quality Management System Quality
EcoPrasinos Engineering operates a Quality
Management System that has been
independently assessed and approved by
Lloyd’s Register Quality Assurance and is
accredited to BS EN ISO 9001:2008 and MS
ISO9001:2008. The certificate number is KLR
6009203.
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I COMPANY ACCREDITATION
Registered with Kastam Diraja Malaysia
EcoPrasinos Engineering Sdn Bhd is registered
with Kastam Diraja Malaysia with certificate
number W24-CP-11000030/201.
Registered with Ministry of Finance
EcoPrasinos Engineering Sdn Bhd is registered
with Ministry of Finance with certificate number
465-02032206.
Registered with Petronas
EcoPrasinos Engineering Sdn Bhd has been
approved by Petronas to provide pipeline
engineering consultant services with license
number L-869657-U.
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Subsea Pipelines and Associated Facilities EcoPrasinos has established core teams of
subsea and pipeline engineers to service clients
in this region. This group has extensive
experience in the design and project management
of all aspects of subsea systems.
For offshore pipeline projects, EcoPrasinos is
able to provide field-proven expertise in:
• Design of Submarine pipeline Systems for Preliminary and detailed design
• Pipeline Steady State Analysis
• Pipeline Route Selection
• Wall Thickness and Material Grade Selection
• Pipeline On-Bottom Stability Analysis
• Pipeline Free Span Analysis
• Pipeline End Expansion Analysis
• Platform risers
• Riser VIV Analysis
• Riser Hanger Flange and Clamp Design
• Shore crossings
• Pipeline crossings
• Subsea pipeline end facilities.
• Bottom roughness study
• Subsea Intervention Study
• Pipeline lateral and upheaval buckling study
• Project Specifications
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Subsea Pipelines Specialist Skills
The EcoPrasinos’s Engineering provides
engineering expertise across a wide range of
subsea and pipeline applications including:
• Subsea satellite wells, production templates, jumpers and manifolds
• Pipeline end manifolds, distribution skids, isolation valve skids and control pods/systems
• Subsea Dynamic risers
• Subsea umbilicals and cables
• Driverless installation systems
• Interfaces with floating production systems
• Tow-installed lines and templates
• Rigid and flexible riser systems
EcoPrasinos's capabilities in each of these areas
allows us to consider all options and to apply the
most economic and flexible solution to the subsea
aspects of project developments.
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Onshore Reception Facilities
EcoPrasinos technical team has in-depth
experience of all aspects - engineering,
procurement, construction and management – of
onshore pipelines. This includes pipeline for the
treatment of hydrocarbon gases and liquids both
for upstream facilities and for downstream
petrochemical projects. Many onshore
developments are phased over an extended
period. Upgrades, such as the addition of
compression facilities, are planned for
implementation during later field life. Major
unplanned upgrades can also be necessary to
resolve operating change, such as, wellstream
compositions and the allowable concentration of
effluent contaminants.
The skills in the EcoPrasinos’s technical team
group allow the following issues to be addressed:
• Site selection
• Pipeline Steady State Analysis
• Routing study
• Pipeline material selection
• Design Onshore pipeline system for Preliminary and detailed design
• Onshore Pipeline Stress Analysis
• Road/ River/ Canal/ Agriculture Crossing
• Upheaval and lateral buckling
• Pipeline intervention and Mitigation for buckling
• Pipeline Installation Engineering
• Onshore reception facilities
• Pig trap design
• Risk Assessment
• Specifications
• Protection and stabilization
• Design of Cathodic Protection System
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Electronic Document Management System
EcoPrasinos Engineering Sdn Bhd is Petro IT implementation partner which holds the sole license of
EDMS for Malaysia market. As an experienced engineering consultant company for oil and gas industry,
EcoPrasinos has the expertise to provide the man power, knowledge and technical support for the
software implementation.
Petro IT is actually an organization providing specialized Electronic Document Management Solutions
and Services to the Hydrocarbon sector. Strong Oil and Gas domain expertise coupled with an
exemplary software development team has led us to create focused and purpose built solutions.
EDMS is a computer system or suite of programs designed to store and track electronic documents and
other media. Stated simply, electronic document management is the management of “paperwork”
electronically rather than with paper. The solution proposed will be developed on Microsoft’s SharePoint
2010 content management system.
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Noise and Vibration Engineering Testing
At EcoPrasinos Engineering Sdn Bhd, we can
provide testing solutions and expertise in
following areas to our customers:
Rotating Machinery Testing
• Fixed Sampling
• Order Tracking
• Running Mode Analysis
Structural Testing
• Shaker Testing
• Impact Testing
• Stepped Sine and Normal Modes
• Modal Analysis
• Modal Design
• MIMO FRF measurement
Acoustic Testing
• Sound Quality
• Jury Testing
• Pass By Noise Measurement
• Acoustic Intensity
• Acoustic Holography
• Transfer Path Analysis
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SERVICES
Computer Aided Engineering
At EcoPrasinos Engineering Sdn Bhd, we provide
CAE solutions and also expertise in following areas
to our customers:
Noise Vibration Harshness (NVH) Modeling & Analysis
Vibro-Acoustic Modeling
Normal Modes Analysis
Acoustic
Frequency Response
Vibro-Acoustic Modeling
Durability Modeling & Analysis
Static Stress Analysis
Non Linear Stress Analysis
Fatigue Analysis
Thermal Modeling & Analysis
Computational Fluid Dynamics (CFD) Modeling & Analysis
Component Modeling and Analysis
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I RESOURCES
Engineering Office
The engineering of Subsea and Pipeline Projects
will be carried out from EcoPrasinos’s design
offices at Bangi, Selangor, Malaysia. For special
projects, where unique expertise are required,
affiliates / alliance with specialist from United
Kingdom, Houston and France may work together
to provide clients with the best of EcoPrasinos’s
resources. EcoPrasinos’s engineering office
layouts comprise a mixture of open plan office
space as well as a number of individual and
shared offices. Office accommodation for Client
personnel can be provided as required
Facilities
EcoPrasinos and it affiliates / alliance are linked
through a global IT internet and are fully equipped
with modern facilities including computers,
facsimiles, modems, internet connection to ensure
efficient communication client offices and within
the affiliates offices if necessary.
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
System & Technical Database
COMPANY PROFILE
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SYSTEM & TECHNICAL DATABASE
Technical Database
EcoPrasinos’s extensive experience team member in designing offshore pipelines means that we can
bring an extensive set of relevant technical specifications and guidelines built up over many years. Below
is part of typical international standards that we commonly use for the design of offshore pipelines.
Det Norske Veritas (DNV)
• DNV OS-F101
Submarine Pipeline Systems
• DNV RP E305
On-Bottom Stability Design of Submarine Pipelines
American Society of Mechanical Engineers (ASME)
• ASME B31.4
Liquid Transportation Systems for Hydrocarbons, Liquid
Petroleum Gas, Anhydrous Ammonia and Alcohols.
• ASME B31.8
Gas Transmission and Distribution Piping Systems
American Petroleum Institute (API)
• API Spec 5L
Specification for Line Pipe
International Organization for Standardization (ISO)
• ISO 13623
Petroleum and natural gas industries Pipeline transportation systems
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
COMPANY PROFILE I SYSTEM & TECHNICAL DATABASE
Hardware and Software
IT Infrastructure and Connectivity
EcoPrasinos has in place a global IT network.
This network connects all of EcoPrasinos’s
affiliate / alliances together, as well as offering
secure remote access via the internet. Prime
operating environment is the Microsoft Platform
for both Client and server, with all core systems
being accessible via a browser interface.
Software and Systems
EcoPrasinos uses a Microsoft Operating Platform
and the MS office suite of office administration
software. As a major engineering and project
management services provider, EcoPrasinos
uses all industry standard technical and
management software packages. A list of the
more commonly used applications is included
below.
Listed below are the software capabilities of the
subsea / pipelines group:
Process Engineering Software
Pipeline/ Subsea Engineering Software
Structural Engineering Software
Administration/Project Control Software
Drafting Software
[email protected] I www.ecoprasinos.com I Tel: +06-03-89273485
EC
OP
RA
SIN
OS E
NG
IN
EE
RIN
G S
DN
BH
D –
TH
E J
OU
RN
EY
YEA
R 2
00
9
YEA
R 2
011
YEA
R 2
010
YEA
R 2
012
YEA
R 2
013
On
sho
re P
ipe
line
Bas
ic
Engi
ne
eri
ng
De
sign
Fo
r G
ols
han
An
d F
ird
ow
si
Fie
ld D
eve
lop
men
t In
Ir
an
PO
GC
/MM
C
De
c 2
00
9 –
Feb
20
10
FEED
Fo
r M
alik
ai D
ee
p
Wat
er
Pro
ject
SS
PC
/MM
C-A
MEC
Ja
n 2
01
0 –
May
20
10
De
sign
An
d E
ngi
ne
eri
ng
Serv
ice
s Fo
r Sa
mar
ang
Re
-De
velo
pm
ent
Pro
ject
SP
MT/
MM
C O
&G
M
ay –
De
cem
be
r 2
01
0
JDA
Blo
ck B
-17
De
velo
pm
ent
Pro
ject
Ph
ase
-2 D
eve
lop
men
t C
arig
ali P
TTEP
Co
mp
any
Sdn
B
hd
(C
PO
C)
/ M
MC
O&
G
No
v 2
01
0–M
arch
20
11
Pro
visi
on
Fo
r En
gin
ee
rin
g W
ork
s A
nd
Te
chn
ical
Su
pp
ort
Fo
r TC
OT
Zero
Fla
rin
g P
roje
ct, P
etr
on
as
Car
igal
i-P
MO
P
etr
on
as C
arig
ali /
MM
C O
&G
D
ec
20
10
– J
un
e 2
01
1
Pro
visi
on
Of
Engi
ne
eri
ng
Re
visi
t Se
rvic
es
For
ERB
We
st
De
velo
pm
en
t P
roje
ct
Pe
tro
nas
Car
igal
i / M
MC
O&
G
May
20
11
Co
nce
ptu
al A
nd
FEE
D F
or
Sem
aran
g R
ed
eve
lop
me
nt
Ph
ase
2 (
PC
SB)
Pe
tro
nas
Car
igal
i / M
MC
O&
G
Au
g 2
01
0–A
ug
20
11
Pro
visi
on
Of
Po
st-F
EED
De
sign
Fo
r D
21
De
velo
pm
en
t P
roje
ct
Pe
tro
nas
Car
igal
i / M
MC
O&
G
July
– S
ep
t 2
01
1
Pro
visi
on
Of
FEED
Se
rvic
es
An
d
De
tail
De
sign
Se
rvic
es
(Op
tio
nal
) Fo
r Te
man
a R
ed
eve
lop
me
nt
Pro
ject
P
etr
on
as C
arig
ali /
MM
C O
&G
Se
pt
20
11
-Feb
20
12
Engi
ne
eri
ng
De
sign
Fo
r 2
km O
f M
alik
ai P
ipe
line
At
KB
B A
pp
roac
h
Sab
ah S
he
ll P
etr
ole
um
Co
. Ltd
. /
MM
C O
&G
N
ov
20
11
- M
ar 2
01
2
Fro
nt
End
En
gin
ee
rin
g &
De
sign
Fo
r P
erm
as F
ield
Su
bst
ruct
ure
, To
psi
de
A
nd
Pip
elin
e
Mu
rph
y /
MM
C O
&G
M
ar 2
01
2- J
ul 2
01
2
Pro
visi
on
Of
The
Fro
nt
End
En
gin
ee
rin
g D
esi
gn F
or
An
gsi
Ch
em
ical
En
han
ced
Oil
Re
cove
ry
(CEO
R)
Pro
ject
P
etr
on
as C
ari G
ali S
dn
Bh
d /
MM
C
O&
G
Jul 2
01
2 -
Oct
20
12
Pro
visi
on
Of
FEED
Se
rvic
es
For
D
alak
Pip
elin
e P
roje
ct
Pe
tro
nas
Car
igal
i / M
MC
O&
G
July
- N
ov
20
12
Ch
amp
ion
Wat
er
Flo
od
B
run
ei S
he
ll /
Pri
nci
pia
Asi
a P
acif
ic
Engi
ne
eri
ng
20
Se
pt
- 5
Oct
20
12
Pro
visi
on
Of
Fro
nt
End
En
gin
ee
rin
g D
esi
gn S
erv
ice
s Fo
r SK
O P
ipe
line
s A
nd
Fac
iliti
es
Re
juve
nat
ion
Pro
ject
Fo
r P
etr
on
as C
arig
ali S
dn
Bh
d,
Sara
wak
Op
era
tio
ns
Pe
tro
nas
Sar
awak
Op
era
tio
n
De
c 2
01
2 -
May
20
13
Sou
th A
cis
Oil
and
Gas
De
velo
pm
en
t P
roje
ct D
eta
iled
En
gin
ee
rin
g M
UR
PH
Y S
araw
ak/S
abah
Oil
Co
.,
Ltd
/Wo
od
Gro
up
Ke
nn
y Sd
n B
hd
1
4 F
eb
– 8
Mac
20
13
2-2
-02,
Jala
n M
edan P
B1
Tam
an M
edan P
B1
43650,
Bandar
Baru
Bangi
Sela
ngor,
WE
ST
MA
LA
YS
IA
ww
w.e
copra
sin
os.c
om
Te
l: +
603-8
9273485
Fa
x:
+603-8
9273486
E-m
ail:
bd@
ecopra
sin
os.c
om
Pro
viso
n o
f P
re-f
ron
t e
nd
En
gin
ee
rin
g D
esi
gn a
nd
fro
nt
en
d K
L En
gin
ee
rin
g D
esi
gn S
erv
ice
s fo
r P
FLN
G T
ie-I
n P
roje
ct
Pe
tro
nas
Car
igal
i / M
MC
O&
G
Mac
– M
ay 2
01
3
De
taile
d D
esi
gn E
ngi
ne
eri
ng
Dra
win
g A
nd
Lif
tin
g A
nal
ysis
Fo
r R
ise
r G
uar
d
Pro
ject
M
urp
hy
/ TL
Off
sho
re S
dn
. Bh
d. /
C
SD M
arin
e E
ngi
ne
erin
g Se
rvic
es
Sdn
. Bh
d.
3 A
pri
l – 2
May
20
13
De
taile
d E
ngi
ne
eri
ng
De
sign
Se
rvic
es
For
Dal
ak P
ipe
line
Pro
ject
P
etr
on
as C
arig
ali /
MM
C O
&G
Ju
ly –
Oct
ob
er
20
13
Bu
nga
Pak
ma
De
velo
pm
ent
Co
nce
ptu
al A
nd
Fro
nt
End
En
gin
ee
rin
g D
esi
gn (
Fee
d)
Talis
man
Mal
aysi
a Li
mit
ed
/MM
C
O&
G
Oct
20
13
– D
ec
20
13
De
velo
pm
en
t o
f O
mb
ak B
iru
Sat
u
Pip
ela
y B
arge
O
mb
ak M
arin
e G
rou
p S
dn
Bh
d/P
T R
eka
yasa
Ind
ust
ri
Oct
20
13
– D
ec
20
13
SUBSEA AND PIPELINES PROJECTS
Project
Owner/Client Date Scope Of Work
Onshore Pipeline Basic Engineering Design For Golshan And Firdowsi Field Development In Iran
POGC/MMC Dec 2009 – Feb 2010
Basic Engineering Design For The Development Of The Golshan And Firdowsi Fields. Establish On-Shore Pipeline Route Selection Study, On-Shore Pipeline Mechanical Stress Design Study, On-Shore Pipeline Installation Engineering And On- Shore Pipeline Route Selection Drawings. The Onshore Pipeline Project Comprises Of Five (5) Different Pipe Sizes.
FEED For Malikai Deep Water Project
SSPC/MMC- AMEC
Jan 2010 – May 2010
FEED For 10-Inch And 8-Inch Flowlines. Establish The Following Deliverables;
• Flowline And Riser System Basis • Flowline Route Selection Study • Flowline Stability Analysis • Flowline Mechanical Analysis • Flowline End Expansion Analysis • Flowline & Riser Internal Corrosion
Study • Flowline & Riser External Corrosion
Coating Study • Flowline & Riser Cathodic Protection
Design • Thermal Insulation Design • Flowline Lateral, Upheaval Buckling,
Walking • Flowline Spanning Analysis • Bottom Roughness Analysis • Design Of Buckle Arrestors • Flowline Crossing Design • Flowline Intervention Design • Pipe Soil Interaction Study • Steel Centenary Riser Design
Design And Engineering Services For Samarang Re- Development Project
SPMT/MMC O&G
May 2010 – December 2010
Engaged In Project Execution Planning,Monitoring And Control Of Design Work, Communication With Petronas Personnel And Project Team Members And Management. Review, Audited, Approved Technical Reports. Attended Weekly Progress Meetings With Project Personnel, Client Representatives, Resolved Technical And Management Issues.
Project
Owner/Client Date Scope Of Work
JDA Block B-17 Development Project Phase-2 Development
Carigali PTTEP Company Sdn Bhd (CPOC) / MMC O&G
Nov 2010 – March 2011
Phase-2 Development Involves Three Satellite Wellhead Platforms (Namely MDE, MDF And JKB) In Bock B-17 Gas Field. Phase-2 Development Plan Also Involves Installation Of Subsea Pipelines To Gather Production From Three Satellite Wellhead Platforms. Production Receiving Facility Shall Also Be Installed An Existing JKA Platform And MDPP Under Phase 2 Development. FEED For Intrafield Pipelines Which Are:
• 18” Multiphase FWS From JKB To JKA
• 18” Multiphase FWS From MDE To MDPP
• 18” Multiphase FWS From MDF To MDE
Provision For Engineering Works And Technical Support For TCOT Zero Flaring Project, Petronas Carigali-PMO
Petronas Carigali / MMC O&G
Dec 2010 – June 2011
The Main Objective Of The Project Is To Eliminate The Continuous Operational Flaring At TCOT And Reduce Plant Emissions By Retrieving The Flared Gases. This Is Inline With PETRONAS’s Obligation To Reduce Green House Gas (GHG) As Outlined By Corporate HSE. Detailed Design Of The 6-Inch Flare Gas Pipeline Of Following Activities:
• Prepare Onshore Pipeline Design Basis
• Prepare Onshore Pipeline Route Study Report
• Prepare Onshore Pipeline Specifications
• Prepare Onshore Pipeline ITB Package
• Prepare Onshore Pipeline Engineering Calculation For Authority Approval
• Prepare Engineering Drawings
Provision Of Engineering Revisit Services For ERB West Development Project
Petronas Carigali / MMC O&G
May 2011
The Targets For The Erb West Development Are To Have Zero Flaring, Increased Productions And Increase Reserve Recovery Factor By The End Of Project Completion. Detailed Design Of Risk Assessment Of Pipeline Protection Against Accidental External Loads.
Project
Owner/Client Date Scope Of Work
Conceptual And FEED For Samarang Redevelopment Phase 2 (PCSB)
Petronas Carigali / MMC O&G
Aug 2010 – Aug 2011
Samarang Redevelopment Phase 2 Project Consists Of Upgrading And Modification Work On The Existing Facilities As Preparation Of The Remaining Infill Drilling And To Cater Additional Production Output. There Will Be Also Development Of New Facilities For Implementation Of Enhance Oil Recovery (EOR) And To Facilitate The Production Increase. Conceptual And FEED Consists Of Six (6) Intrafield Pipelines One (1) Subsea Cable Which Are:
• 14” LP Gas From SMP-C To SMP-A • 6” Water Injection Line From SMP-B
To SMJT-E • 6” Gas Injection Line From SMG-A To
SMW-B • 10” FWS Line From SMJT-D To SMP-
C • 10” FWS Line From SMJT-F To
SMJT-C • 16” LP Gas From SMP-B To SMG-A • Subsea Cable From SMG-A To
SMW-B
Provision Of Post- FEED Design For D21 Development Project
Petronas Carigali / MMC O&G
July 2011 – Sept 2011
Post-FEED For 10-Inch Full Well Stream Line From D21JT-A And D35R-A Platform. Responsible For The Following Deliverables;
• Riser Design • Pipeline External Corrosion Protection
Design • Pipeline Material Specifications • Pipeline Material Selection & Wall
Thickness Calculation
Provision Of FEED Services And Detail Design Services (Optional) For Temana Redevelopment Project
Petronas Carigali / MMC O&G
Sept 2011-Feb 2012
FEED Services And Detail Design Services (Optional) For Temana Redevelopment Project Consists Of:
• 8-Inch FWS Line From TEJT-D To TEK-A
• 6-Inch LP Gas Line From TEJT-T To TEJT-D
• 8-Inch Water Injection Line From TEWIM To TEJT-D
• 6-Inch Water Injection Line From TEJT-D To TEJT-C
• 6-Inch Water Injection Line From TEJT-C To TEJT-W
• 8-Inch Water Intake Line From TEWI To TEWIM
Project
Owner/Client Date Scope Of Work
Engineering Design For 2km Of Malikai Pipeline At KBB Approach
Sabah Shell Petroleum Co. Ltd. / MMC O&G
Nov 2011 -Mar 2012
Engineering Design For 2km Of Malikai Pipeline At KBB Approach Consists Of:
• Pipeline Mechanical Analysis • Pipeline Stability Analysis • Pipeline Spanning Analysis • Pipeline End Expansion Analysis • Kebabangan Riser Tie-In Spool
Analysis • Pipeline Material Take-Off (MTO)
Detailed Engineering Design for Dalak Pipeline Project
Petronas Carigali/MMC Oil & Gas
Mar 2012 - Julai 2012
FEED Services And Detail Design Services (Optional) For Permas Field Substructure, Topside And Pipeline Consists Of:
• Pipeline & Riser Design Premise • Pipeline & Riser Mechanical Design • Pipeline & Riser Route Selection • Study • Pipeline Stability Design • Pipeline & Riser External Corrosion • Protection Design • Pipeline End Expansion Design • Riser Design
Provision Of The Front End Engineering Design For Angsi Chemical Enhanced Oil Recovery (CEOR) Project
Petronas Cari Gali Sdn Bhd / MMC O&G
Jul 2012 - Oct 2012
Provision Of The Front End Engineering Design For Angsi Chemical Enhanced Oil Recovery (CEOR) Project Consists Of:
• Flexible Pipeline & Riser Design Basis • Flexible Pipeline Route Selection • Flexible Pipeline Specification • Specification For Flexible Pipeline • Specification For Flexible Pipe End • Connector • Specification For Pipe Fittings • Specification For Bend Restrictor • Specification For Bend Stiffener • Specification For I-Tube Clamps • Specification For Flexible Pipeline • Pulling Head • Specification For Hang Off Collar • Specification For Sacrificial Anode • Specification For Bolts, Nuts And • Gasket • Riser Design, Analysis And Study • Flexible Riser Static And Dynamic
Analysis • Flexible Riser Static Analysis • Flexible Pipeline Material Take-Off
(MTO) • Flexible Pipeline Failure Mechanism
And Mitigation Study
Project
Owner/Client Date Scope Of Work
• Integrity Review Of The Existing Angsi Water Injection Pipelines
• Flexible Pipeline And Riser Installation Feasibility Study & Laying Analysis
Provision Of Services For Pipeline Project FEED Dalak
Petronas Carigali / MMC O&G
July - Nov 2012
FEED Services For 16-Inch Gas Pipeline From SSGT Tee-Off To GRT-2 For Dalak Pipeline Project. Responsible For The Following Deliverables :
• Pipeline Route Selection & Optimization Study
• Pipeline External Corrosion Mitigation Studies
• Pipeline Spanning Analysis • Pipeline In-Situ Stress Analysis • Pipeline Road Crossing Design • Pipeline Drop Object Analysis • Marine Hazards Study • Preliminary Pipeline Installation
Feasibility Study • Pipeline Material Take-Off • Preliminary Pipeline Cost Estimate • Specification • Pipeline Shore Approach Design • Pipeline Pigging Philosophy
Champion Flood Water
Brunei Shell / Principia Asia Pacific Engineering
20 Sept - 5 Oct 2012
To Provide For Drafting Support Services For Champion Water Flood Project. The Drafting Support Services Include:
• To Draw In CAD The Separation Concrete-Mattresses At The Crossing Locations In The Alignment Sheet Drawings (Nos 29 Dwgs)
• To Allocate Details Information Of Each Crossings In The Alignment Sheet Dwgs.
• To Check The Crossing Angle In Line With The Tabulation Table That Will Be Given By Principia Upon Start Work
• To Allocate The Stability Concrete- Mattresses With The Provided Separation And Check That The Mattresses Will Not Coincide At The Sag Bend Of The Umbilical Or Crossing Location.
Project
Owner/Client Date Scope Of Work
Provision Of Front End Engineering Design Services For SKO Pipelines And Facilities Rejuvenation Project For Petronas Carigali Sdn Bhd, Sarawak Operations
Petronas Sarawak Operation/MMC O & G
Dec 2012 - May 2013
Provision Of Front End Engineering Design Services For SKO Pipelines And Facilities Rejuvenation Project Consists Of:
• Pipeline Route Selection • Pipeline Mechanical Calculation • Pipeline Failure Mode Effect Analysis • Life Cycle Cost Study • Pipeline Material Comparison &
Selection • Pipeline Material Option Study Report
South Acis Oil And Gas Development Project Detailed Engineering
MURPHY Sarawak/Sabah Oil Co., Ltd/Wood Group Kenny Sdn Bhd/TL Offshore Sdn Bhd
14 Feb – 8 Mac 2013
South Acis Oil and Gas Development Project Detailed Engineering Consists Of:
• Assessment of Riser Guard Plate Impact Strength on The Jacket Truss Structure
• To perform Finite Element Analysis to assess the Impact Strength of the riser guard plate Welded and clamp to Jacket Truss Structure
• Impact Strength Assessment of Plate will be carried out using ABAQUS/SIMULA
• The effect of Hydrostatic Pressure would be included alongside the vessel Impact load on the Plate.
Provison Of Pre-Front End Engineering Design And Front End Engineering Design Services For PFLNG Tie-In Project
Petronas Carigali/MMC Oil & Gas
Mac – May 2013
Provision Of Pre-front end Engineering Design and front end KL Engineering Design Services for PFLNG Tie-In Project Consists Of:
• Modification works on KAKG-A to cater for additional new facilities
• Flexible pipeline design and installation analysis of approximately 3km of export line from KAKG-A to Pipeline End Termination (PLET) at seabed
• Design and Installation of PLET structure (Subsea)
Project
Owner/Client Date Scope Of Work
Detailed Design Engineering Drawing And Lifting Analysis For Riser Guard .
Murphy/TL Offshore Sdn.Bhd./CSD Marine Engineering Sdn Bhd
3 April – 2 May 2013
Detailed Design Engineering Drawing And Lifting Analysis For Riser Guard Project Consists Of:
• Installation Drawings • Determine the loading sustained for
each of the lifting cable (sling) • Determine the configuration of the lifting
cable
Detailed Engineering Design for Dalak Pipeline Project
Petronas Carigali/MMC Oil & Gas
July - Oct 2013
Detailed Engineering Design for Dalak pipeline project consist of:
• Offshore & Onshore Pipeline Route • Study • Offshore Pipeline Installation Study • Pipeline On-Bottom Roughness • Analysis • Offshore Pipeline Shore Approach • Constructability Study • Offshore Pipeline Shore Approach • Design • Riser Stress Design Report • Riser VIV At Labuan • Riser Clamp Design At Labuan • Onshore Pipeline In-Situ Stress • Onshore Pipeline Road Crossing • Design • Onshore Installation Study and • Installation Analysis • Onshore Pipeline Cathodic Protection • Onshore Section Drawings • Conversion Survey drawing to DTM • Determination of flooded control area
Development of Ombak Biru Satu Pipelay Barge
Ombak Marine Group Sdn. Bhd./PT Rekayasa Industri
Oct-Dec 2013
Development of Ombak Biru Satu Pipelay
• Barge project consist of: • Barge and Stinger Setting, Ideal
Setting • (Barge Radius 200m and Range of • Stinger Radius Possibility) • Existing Stinger Pin Configuration,
Ideal • Setting and Existing Pin Setting • (Without Modification to Lay 16” • Rekayasa Industri Pipeline) • Lay Analysis for 16” Rekayasa Industri • Pipeline, Ideal Setting and Existing • Setting Best Possible Configuration • (Without Modification) • Site Visit and As-Builting Pipelay • Support and Stinger Configuration • Integrity Review and Design for
Support • Structure of the Stinger
Project
Owner/Client Date Scope Of Work
Conceptual Design and Front End Engineering Design of BPA and The Associated Tie-Ins
Talisman Malaysia Limited / MMC Oil & Gas
Oct-Dec 2013
Conceptual Design and Front End Engineering Design of BPA and The Associated Tie-Ins Project consist of:
• Determine the optimum pipeline route • including platform approach and tie- • in/interface locations. • Feasibility study of optimal pipeline and
riser installation. • Verify the riser locations and topside
piping
B
asic
Eng
inee
ring
Des
ign
for t
he d
evel
opm
ent o
f the
G
olsh
an a
nd F
irdow
si fi
elds
Invo
lved
7 d
iffer
ent p
ipe
size
s di
amet
er o
f ons
hore
pi
pelin
es—
Tw
o (2
) 32-
inch
es &
One
(1) 2
6-in
ches
dia
met
er
carb
on s
teel
exp
ort m
ultip
hase
pip
elin
e , O
ne (1
) 4-in
ches
&
Two
(2) 4
.5-in
ches
anc
illary
pip
elin
es fo
r hyd
rate
and
co
rrosi
on in
hibi
tor c
hem
ical
tran
spor
t , O
ne (1
) 36-
inch
es
diam
eter
con
dens
ate
pipe
line.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
Gol
shan
and
Fird
owsi
Fie
ld D
evel
opm
ent P
roje
ct
O
nsho
re P
ipel
ine
Des
ign
Bas
is
O
nsho
re P
ipel
ine
Rou
te S
elec
tion
O
nsho
re P
ipel
ine
Mec
hani
cal S
tudy
Ons
hore
Pip
elin
e S
tress
Ana
lysi
s
Ons
hore
Pip
elin
e E
ngin
eerin
g D
raw
ings
EcoP
rasi
nos
Res
pons
ibili
ties
w
ww
.eco
pras
inos
.com
Clie
nt
P
ars
Oil
and
Gas
Com
pany
MM
C O
il &
Gas
EX
PO
RT
PIP
ELIN
ES
GO
LSH
AN
OFF
SH
OR
E
FAC
ILIT
IES
2000
MM
scfd
Sep
arat
ion
ME
G In
ject
ion
(70-
80m
Wat
er D
epth
)
GO
LSH
AN
AN
D F
IRD
OW
SI
UP
STR
EA
M O
NS
HO
RE
FA
CIL
ITIE
S20
00 M
Msc
fd(2
x 5
Mtp
aLN
G)
Slu
gcat
cher
/Sep
arat
ion
CO
2/H
2S R
emov
alS
ulfu
r Uni
tD
ehyd
ratio
nC
onde
nsat
e S
tabi
lisat
ion
Sul
fur S
tora
ge/O
ffloa
ding
Con
dens
ate
Sto
rage
/Offl
oadi
ng
FIR
DO
WS
IG
OL
SH
AN
TAN
KE
R
OFF
LOA
DIN
G
FIR
DO
WS
I OFF
SH
OR
E
FAC
ILIT
IES
500
MM
scfd
Sep
arat
ion
ME
G In
ject
ion
(70-
80m
Wat
er D
epth
)
CPF
CP
F
FIR
DO
WS
I & G
OLS
HA
N
DO
WN
STR
EA
M F
AC
ILTI
ES
CP
F
EX
PO
RT
PIP
ELIN
ES
GO
LSH
AN
OFF
SH
OR
E
FAC
ILIT
IES
2000
MM
scfd
Sep
arat
ion
ME
G In
ject
ion
(70-
80m
Wat
er D
epth
)
GO
LSH
AN
AN
D F
IRD
OW
SI
UP
STR
EA
M O
NS
HO
RE
FA
CIL
ITIE
S20
00 M
Msc
fd(2
x 5
Mtp
aLN
G)
Slu
gcat
cher
/Sep
arat
ion
CO
2/H
2S R
emov
alS
ulfu
r Uni
tD
ehyd
ratio
nC
onde
nsat
e S
tabi
lisat
ion
Sul
fur S
tora
ge/O
ffloa
ding
Con
dens
ate
Sto
rage
/Offl
oadi
ng
FIR
DO
WS
IG
OL
SH
AN
TAN
KE
R
OFF
LOA
DIN
G
FIR
DO
WS
I OFF
SH
OR
E
FAC
ILIT
IES
500
MM
scfd
Sep
arat
ion
ME
G In
ject
ion
(70-
80m
Wat
er D
epth
)
CPF
CP
F
FIR
DO
WS
I & G
OLS
HA
N
DO
WN
STR
EA
M F
AC
ILTI
ES
CP
FC
PF
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Dec
200
9 -F
eb 2
010.
M
alik
ai is
a d
eepw
ater
oil
disc
over
y in
offs
hore
S
abah
, Mal
aysi
a w
here
Sab
ah S
hell
Pet
role
um
Com
pany
is th
e de
sign
ated
Ope
rato
r
The
untre
ated
cru
de o
il w
ill be
sen
t to
Keb
aban
gan
plat
form
(KB
B) f
or p
roce
ssin
g vi
a 50
km
10”
pip
elin
e an
d ev
entu
ally
exp
orte
d to
Sab
ah O
il &
Gas
Ter
min
al
(SO
GT)
.
Proj
ect D
escr
iptio
n
M
alik
ai D
eep
Wat
er P
roje
ct
P
ipel
ine
& R
iser
Des
ign
Bas
is
P
ipel
ine
Rou
te S
elec
tion
P
ipel
ine
Mec
hani
cal A
naly
sis
P
ipel
ine
End
Exp
ansi
on A
naly
sis
P
ipel
ine
& R
iser
Ext
erna
l Cor
rosi
on S
tudy
Pip
elin
e La
tera
l and
Uph
eava
l Buc
klin
g A
naly
sis
EcoP
rasi
nos
Res
pons
ibili
ties
P
ipel
ine
Free
Spa
nnin
g A
naly
sis
B
otto
m R
ough
ness
Ana
lysi
s
Pip
elin
e C
ross
ing
Des
ign
P
ipe
Soi
l Int
erac
tion
Flow
line
and
Ris
er S
yste
m C
onst
ruct
ion
and
Inst
alla
tion
Des
ign
P
ipel
ine
and
Ris
er E
ngin
eerin
g D
raw
ings
Clie
nt
S
abah
She
ll P
etro
leum
Com
pany
MM
C A
ME
C
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Jan
201
0 - M
ay 2
010
FE
ED
rede
velo
pmen
t of t
he S
amar
ang
field
are
div
ided
into
2
phas
es, P
hase
-1 a
nd P
hase
-2.
P
hase
1 –
SM
DP
-B a
nd S
MJT
-F
P
hase
2 –
SM
JT-C
/D/E
/G a
nd n
ew p
latfo
rm a
nd p
ipel
ines
Pet
rona
s C
arig
ali S
dn B
hd a
re th
e ow
ner o
f the
pro
ject
.
Proj
ect D
escr
iptio
n
S
amar
ang
Red
evel
opm
ent P
roje
ct
P
ipel
ine
& R
iser
Des
ign
Bas
is
P
ipel
ine
Rou
te S
elec
tion
P
ipel
ine
Mat
eria
l Sel
ectio
n &
Wal
l Thi
ckne
ss C
alcu
latio
n
Pip
elin
e O
n-B
otto
m S
tabi
lity
Ana
lysi
s
Pip
elin
e Fr
ee S
pann
ing
Ana
lysi
s
Pip
elin
e E
nd E
xpan
sion
Ana
lysi
s
Pip
elin
e an
d R
iser
Eng
inee
ring
Dra
win
gs
R
iser
stre
ss a
naly
sis
EcoP
rasi
nos
Res
pons
ibili
ties
R
iser
VIV
ana
lysi
s
R
iser
han
ger f
lang
e an
d cl
amp
desi
gn
P
ipel
ine
Mat
eria
l Tak
e-of
f
Pip
elin
e M
ater
ial S
peci
ficat
ion
P
ipel
ine
Pig
ging
Phi
loso
phy
Clie
nt
P
etro
nas
Car
igal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Apr
il 20
09 –
Feb
201
1
Th
e C
PO
C B
lock
B-1
7 Fi
eld
Dev
elop
men
t Are
a is
situ
ated
of
fsho
re in
the
Gul
f of T
haila
nd a
t the
nor
ther
n tip
of t
he
Mal
ay B
asin
that
is T
hai-M
alay
sia
Join
t Dev
elop
men
t Are
a (J
DA
).
Th
is P
hase
-2 d
evel
opm
ent i
nvol
ves
thre
e sa
tellit
e w
ellh
ead
plat
form
s (n
amel
y M
DE
, MD
F an
d JK
B) i
n B
ock
B-1
7 ga
s fie
ld a
nd a
lso
inst
alla
tion
of s
ubse
a pi
pelin
es to
gat
her
prod
uctio
n fro
m th
ree
sate
llite
wel
lhea
d pl
atfo
rms.
Proj
ect D
escr
iptio
n
JD
A B
lock
– B
17 D
evel
opm
ent P
roje
ct
P
ipel
ine
Hyd
raul
ic S
tudy
Pip
elin
e &
Ris
er D
esig
n B
asis
Flow
line
Rou
te S
elec
tion
Stu
dy
P
ipel
ine
Wal
l Thi
ckne
ss &
Mat
eria
l G
rade
Sel
ectio
n
P
ipel
ine
Tren
chin
g &
Bur
ial D
esig
n
Pip
elin
e M
echa
nica
l Pro
tect
ion
Des
ign
P
ipel
ine
Glo
bal B
uckl
ing
P
ipel
ine
and
Ris
er E
ngin
eerin
g D
raw
ings
Pip
elin
e M
ater
ial T
ake-
off
EcoP
rasi
nos
Res
pons
ibili
ties
P
ipel
ine
On-
Bot
tom
Sta
bilit
y A
naly
sis
P
ipel
ine
Ext
erna
l Cor
rosi
on S
tudy
Pip
elin
e S
pann
ing
Ana
lysi
s
Pip
elin
e E
nd E
xpan
sion
Ana
lysi
s
Pip
elin
e C
ross
ing
Des
ign
Clie
nt
C
arig
ali P
TTE
P C
ompa
ny S
dn B
hd
M
MC
Oil
& G
as
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Nov
201
0 –
Mar
ch 2
011
Th
e m
ain
obje
ctiv
e of
the
proj
ect i
s to
elim
inat
e th
e co
ntin
uous
ope
ratio
nal f
larin
g at
TC
OT
and
redu
ce p
lant
em
issi
ons
by re
triev
ing
the
flare
d ga
ses.
This
is in
line
with
PE
TRO
NA
S’s
obl
igat
ion
to re
duce
G
reen
Hou
se G
as (G
HG
) as
outli
ned
by C
orpo
rate
HS
E.
Proj
ect D
escr
iptio
n
Tere
ngga
nu C
rude
Oil
Term
inal
(TC
OT)
Zer
o Fl
arin
g Pr
ojec
t
O
nsho
re P
ipel
ine
Des
ign
Bas
is
O
nsho
re P
ipel
ine
Rou
te S
elec
tion
O
nsho
re P
ipel
ine
Mec
hani
cal S
tudy
Ons
hore
Pip
elin
e S
tress
Ana
lysi
s
Ons
hore
Pip
elin
e E
xter
nal C
orro
sion
Sel
ectio
n S
tudy
Ons
hore
Pip
elin
e S
tabi
lity
Ana
lysi
s
Ons
hore
Pip
elin
e E
nd E
xpan
sion
Ana
lysi
s
Ec
oPra
sino
s R
espo
nsib
ilitie
s
O
nsho
re P
ipel
ine
Spe
cific
atio
n
Ons
hore
Pip
elin
e E
ngin
eerin
g D
raw
ings
Ons
hore
Pip
elin
e M
ater
ial T
ake-
off
Clie
nt
P
etro
nas
Car
igal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Dec
201
0 –
June
201
1
Th
e ta
rget
for E
rb W
est d
evel
opm
ent a
re to
hav
e ze
ro
flarin
g, in
crea
sed
prod
uctio
ns a
nd in
crea
se re
serv
e re
cove
ry
fact
or b
y th
e en
d of
pro
ject
com
plet
ion.
This
revi
sit w
ill en
sure
the
field
life
is e
xpec
ted
to e
xten
d be
yond
202
9
Th
e sc
ope
of w
ork
is P
rovi
sion
Rev
isit
Ser
vice
s Pr
ojec
t Des
crip
tion
E
RB
Wes
t Dev
elop
men
t Pro
ject
P
ipel
ine
drop
ped
obje
ct s
tudy
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Car
igal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
May
201
1
Fu
ll W
ell S
tream
(FW
S) p
rodu
ctio
n fro
m D
21 w
ill be
sen
d to
D
35 fo
r pro
cess
ing
and
the
proc
esse
d liq
uid
will
be e
xpor
ted
to th
e B
intu
lu C
rude
Oil
Term
inal
(BC
OT)
via
the
Bay
an
plat
form
.
The
D21
JT-A
Wel
lhea
d P
latfo
rm (W
HP
) is
plan
ned
to b
e in
stal
l in
Qua
rter 3
201
2. F
irst o
il fo
r D21
is ta
rget
ed b
y Q
uarte
r 4 2
012.
The
scop
e of
wor
k is
Pos
t-FE
ED
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
D21
Dev
elop
men
t Pro
ject
EcoP
rasi
nos
Res
pons
ibili
ties
P
ipel
ine
Ext
erna
l Cor
rosi
on P
rote
ctio
n D
esig
n
Pip
elin
e Fr
ee S
pann
ing
Ana
lysi
s
Pip
elin
e E
nd E
xpan
sion
Ana
lysi
s
Pip
elin
e &
Ris
er In
stal
latio
n S
tudy
Clie
nt
P
etro
nas
Car
igal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Jul
y-S
ept 2
011
P
ipel
ine
& R
iser
Des
ign
Bas
is
P
ipel
ine
Rou
te S
elec
tion
P
ipel
ine
Mat
eria
l Sel
ectio
n &
Wal
l Thi
ckne
ss
Cal
cula
tion
P
ipel
ine
On-
Bot
tom
Sta
bilit
y A
naly
sis
P
ipel
ine
and
Ris
er E
ngin
eerin
g D
raw
ings
Ris
er s
tress
ana
lysi
s
R
iser
VIV
ana
lysi
s
R
iser
han
ger f
lang
e an
d cl
amp
desi
gn
P
ipel
ine
Mat
eria
l Tak
e-of
f
Te
man
a R
edev
elop
men
t pro
ject
com
pris
es th
e de
velo
pmen
t of
I-60
and
I-65
rese
rvoi
rs. T
hese
rese
rvoi
rs a
re lo
cate
d at
Te
man
a C
entra
l fau
lt bl
ock
54/9
9.
Th
e pr
ojec
t Obj
ectiv
e fo
r Tem
ana
Red
evel
opm
ent p
roje
ct is
to
impr
ove
reco
very
fact
ors
of T
eman
a I-6
5/I-6
0 re
serv
oirs
to
56%
( end
of f
ield
life
) with
incr
emen
tal r
eser
ves
of
37.8
MM
Stb
by
impl
emen
ting
pres
sure
mai
nten
ance
(wat
er
inje
ctio
n).
Proj
ect D
escr
iptio
n
T
eman
a R
edev
elop
men
t Pro
ject
P
ipel
ine
& R
iser
Des
ign
Bas
is
P
ipel
ine
Rou
te S
elec
tion
P
ipel
ine
Mat
eria
l Sel
ectio
n &
Wal
l Thi
ckne
ss
Cal
cula
tion
P
ipel
ine
On-
Bot
tom
Sta
bilit
y A
naly
sis
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Car
igal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Sep
t 201
1 –
Feb
2012
P
ipel
ine
and
Ris
er E
ngin
eerin
g D
raw
ings
Ris
er s
tress
ana
lysi
s
R
iser
VIV
ana
lysi
s
R
iser
han
ger f
lang
e an
d cl
amp
desi
gn
P
ipel
ine
Mat
eria
l Tak
e-of
f
P
ipel
ine
Free
Spa
nnin
g A
naly
sis
P
ipel
ine
End
Exp
ansi
on A
naly
sis
P
ipel
ine
& R
iser
Inst
alla
tion
Stu
dy
Mal
ikai
Rev
isit
Pro
ject
is
cont
inua
tion
from
Mal
ikai
Dee
pwat
er
Pro
ject
. The
des
ign
wor
ks re
quire
d ar
e as
follo
ws:
2k
m
of
the
MLK
10
-inch
cr
ude
oil
pipe
line
from
K
BB
plat
form
2k
m o
f the
MLK
8-in
ch g
as p
ipel
ine
from
KB
B p
latfo
rm
Sub
sea
tie-in
spo
ol fo
r bot
h pi
pelin
es a
t KB
B p
latfo
rm
The
scop
e of
wor
k is
Det
aile
d E
ngin
eerin
g D
esig
n.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
Firs
t 2km
8-in
ch G
as a
nd 1
0-in
ch L
iqui
d an
d K
BB
Ris
er T
ie-in
Spo
ol P
ipel
ines
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
Sab
ah S
hell
Pet
role
um C
o. L
td.
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Nov
201
1-M
ar 2
012
Pip
elin
e M
echa
nica
l Ana
lysi
s P
ipel
ine
End
Exp
ansi
on A
naly
sis
Pip
elin
e S
tabi
lity
Ana
lysi
s K
ebab
anga
n R
iser
Tie
-in S
pool
Ana
lysi
s P
ipel
ine
Spa
nnin
g A
naly
sis
Pip
elin
e M
ater
ial T
ake-
off
Per
mas
mul
tipha
se o
il w
ill flo
w 5
000
bpd
of o
il vi
a ap
prox
imat
ely
39km
of 1
0 in
ch d
iam
eter
pip
elin
e to
a
prod
ucin
g pl
atfo
rm S
A-P
A in
Sou
th A
cis
Fiel
d Th
e fie
ld d
evel
opm
ent i
s un
der t
wo
prod
uctio
n ph
ase
whi
ch is
inte
rim p
rodu
ctio
n ph
ase
and
full
faci
litie
s pr
oduc
tion
phas
e Th
e sc
ope
of w
ork
is F
EE
D
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
FEED
for P
erm
as F
ield
Sub
stru
ctur
e, T
opsi
de a
nd P
ipel
ine
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
Mur
phy
Sar
awak
Oil
Co.
, Ltd
M
MC
Oil
& G
as
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Mar
-Jul
y 20
12
Pip
elin
e &
Ris
er D
esig
n P
rem
ise
Pip
elin
e &
Ris
er M
echa
nica
l Des
ign
Pip
elin
e &
Ris
er R
oute
Sel
ectio
n S
tudy
P
ipel
ine
Sta
bilit
y D
esig
n R
iser
VIV
Ana
lysi
s R
iser
In-P
lace
Stre
ss A
naly
sis
Pip
elin
e &
Ris
er E
xter
nal C
orro
sion
Pro
tect
ion
Des
ign
Pip
elin
e E
nd E
xpan
sion
Des
ign
P
ETR
ON
AS
Car
igal
i S
dn B
hd i
s un
derta
king
Ang
si C
EO
R F
ull
Fiel
d Im
plem
enta
tion
to
impr
ove
the
incr
emen
tal
oil
reco
very
of
Ang
si .
The
desi
gn w
ork
requ
ired
is a
s fo
llow
:
Pro
pose
d Fl
exib
le W
ater
Inj
ectio
n Li
ne f
rom
Flo
ater
to
AN
PG
-A
for A
ngsi
Che
mic
al E
nhan
ced
Oil
Rec
over
y (C
EO
R) P
roje
ct
Th
e tre
ated
RO
wat
er w
ith c
hem
ical
s na
mel
y A
lkal
ine,
Sur
fact
ant
and
Pol
ymer
(A
SP
) w
ill be
inj
ecte
d by
the
Flo
ater
thr
ough
the
Fl
exib
le L
ine.
Firs
t Inj
ectio
n is
sch
edul
ed to
com
men
ce in
Q2
2014
.
The
scop
e of
wor
k is
Fro
nt E
nd E
ngin
eerin
g D
esig
n.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n AN
GSI
CH
EMIC
AL
ENH
AN
CED
OIL
REC
OVE
RY (C
EOR
) PR
OJE
CT
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Car
i Gal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Jul
201
2-O
ct 2
012
Fl
exib
le P
ipel
ine
& R
iser
Pip
elin
e
Flex
ible
Pip
elin
e R
oute
Sel
ectio
n
Fl
exib
le P
ipel
ine
Spe
cific
atio
n
Ris
er D
esig
n, A
naly
sis
and
Stu
dy
Fl
exib
le P
ipel
ine
Mat
eria
l Tak
e-O
ff
Fl
exib
le P
ipel
ine
Failu
re M
echa
nism
and
Miti
gatio
n S
tudy
Inte
grity
Rev
iew
of t
he E
xist
ing
Ang
si W
ater
Inje
ctio
n P
ipel
ines
Flex
ible
Pip
elin
e an
d R
iser
Inst
alla
tion
Feas
ibilit
y S
tudy
& L
ayin
g A
naly
sis
D
alak
Pip
elin
e de
velo
pmen
t pro
ject
for
the
new
gas
pip
elin
e fro
m
Sab
ah S
araw
ak G
as P
ipel
ine
(SS
GP
) te
e-of
f to
Gas
Rec
eivi
ng
Term
inal
2 (G
RT-
2).
S
ervi
ce o
f 150
mm
scfd
feed
gas
16-
inch
Gas
Pip
elin
e fro
m S
SG
P
tee-
off t
o G
RT-
2.
Th
e sc
ope
of w
ork
is F
EE
D.
Proj
ect D
escr
iptio
n
FEED
Ser
vice
s Fo
r Dal
ak P
ipel
ine
Proj
ect
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Car
igal
i Sdn
.Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Jul
y 20
12-N
ov 2
012
P
ipel
ine
Rou
te S
elec
tion
&
P
ipel
ine
In-S
itu S
tress
Ana
lysi
s
P
ipel
ine
Ext
erna
l Cor
rosi
on
Pip
elin
e D
rop
Obj
ect A
naly
sis
P
ipel
ine
Spa
nnin
g A
naly
sis
P
ipel
ine
Roa
d C
ross
ing
D
esig
n
Spe
cific
atio
n
Pip
elin
e P
iggi
ng P
hilo
soph
y
P
relim
inar
y P
ipel
ine
Inst
alla
tion
Feas
ibilit
y S
tudy
Pre
limin
ary
Pip
elin
e C
ost E
stim
ate
P
ipel
ine
Sho
re A
ppro
ach
Des
ign
C
ham
pion
is w
ell k
now
n as
the
larg
est f
ield
s w
hich
con
tain
ing
mor
e th
an
500
rese
rvoi
rs a
nd d
espi
te lo
ng p
rodu
ctio
n hi
stor
y.
Th
e fir
st w
ater
inje
ctio
n hi
stor
y w
as im
plem
ente
d in
the
mid
‘80s
.
The
Cha
mpi
on W
ater
Flo
od P
roje
ct w
as in
itiat
ed in
Mar
200
5.
Th
e ob
ject
ive
of
the
proj
ect
is
to
purs
ue
inte
grat
ed
Wat
er
flood
D
evel
opm
ent
of
the
Cha
mpi
on
rese
rvoi
rs
ad
the
curre
nt
view
on
ex
ecut
ion
scop
e in
clud
es n
ew p
rodu
ctio
n, w
ater
inj
ectio
n an
d po
wer
fa
cilit
ies,
sev
eral
new
dril
ling
plat
form
s/ja
cket
s an
d 14
0+ n
ew w
ells
, bot
h oi
l pro
duce
rs a
nd w
ater
inje
ctio
n.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
CH
AM
PIO
N W
AT
ER
FL
OO
D
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
rinci
pia
Asi
a P
acifi
c E
ngin
eerin
g
Bru
nei S
hell
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
20
Sep
t 201
2 –
5 O
ct 2
012
To
dra
w in
CA
D th
e se
para
tion
Con
cret
e-M
attre
sses
at t
he c
ross
-in
g lo
catio
ns in
the
alig
nmen
t she
et d
raw
ings
(nos
2 d
wgs
)
To
allo
cate
det
ails
info
rmat
ion
of e
ach
cros
sing
s in
the
alig
nmen
t sh
eet d
wgs
To
che
ck th
e cr
ossi
ng a
ngle
in li
ne w
ith th
e ta
bula
tion
tabl
e th
at
will
be g
iven
by
Prin
cipi
a up
on s
tart
wor
k
To a
lloca
te th
e st
abilit
y C
oncr
ete-
Mat
tress
es w
ith th
e pr
ovid
ed
sepa
ratio
n an
d ch
eck
that
the
mat
tress
es w
ill n
ot c
oinc
ide
at th
e sa
g be
nd o
f the
um
bilic
al o
r cro
ssin
g lo
catio
n
P
ETR
ON
AS
Car
igal
i Sdn
Bhd
(P
ETR
ON
AS
Car
igal
i) is
und
erta
king
the
re
juve
natio
n pr
ojec
t of
pip
elin
es a
nd a
ssoc
iate
d to
psid
e fa
cilit
ies
for
Sar
awak
Ope
ratio
n (S
KO
).
S
KO
, one
of P
ETR
ON
AS
Car
igal
i’s th
ree
regi
onal
ope
ratio
ns in
Mal
aysi
a co
mpr
ises
th
e B
aram
D
elta
O
pera
tion
(BD
O)
field
s,
Bal
ingi
an
field
, B
intu
lu C
rude
Oil
Term
inal
(B
CO
T) a
nd M
iri C
rude
Oil
Term
inal
(M
CO
T).
The
desi
gn w
ork
is B
aram
Fie
lds
Pip
elin
e N
etw
ork
and
Bal
ingi
an
Fiel
ds P
ipel
ine
Net
wor
k.
S
KO
pro
duct
ion
is f
orec
aste
d to
inc
reas
e to
160
,000
bpd
oil
and
250
mill
ion
scf/d
Nat
ural
gas
from
201
3.
Th
e m
ost
optim
um m
ater
ial
to b
e us
ed w
ill b
e id
entif
ied
for
the
SK
O
pipe
line
repl
acem
ent u
nder
Wor
k O
der M
MC
RO
1.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
PR
OV
ISIO
N O
F F
RO
NT
EN
D E
NG
INE
ER
ING
DE
SIG
N S
ER
VIC
ES
FO
R S
KO
PIP
EL
INE
S A
ND
FA
CIL
ITIE
S R
EJU
VE
NA
TIO
N P
RO
JEC
T
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Sar
awak
Ope
ratio
n
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Dec
201
2-M
ay 2
013
P
ipel
ine
Rou
te S
elec
tion
P
ipel
ine
Mec
hani
cal C
alcu
latio
n
P
ipel
ine
Failu
re M
ode
Effe
ct A
naly
sis
P
ipel
ine
Mat
eria
l Com
paris
on &
Sel
ectio
n
Li
fe C
ycle
Cos
t Stu
dy
P
ipel
ine
Mat
eria
l Opt
ion
Stu
dy R
epor
t
To
Mur
phy
Sar
awak
Oil
Co
Ltd
(MO
C)
curr
ently
has
tw
o (2
) P
SC
s w
ith P
ETR
ON
AS
Car
igal
i S
dn B
hd (
PC
SB
), an
d is
the
op
erat
or o
f, B
lock
s S
K30
9 an
d S
K31
1 of
fsho
re S
araw
ak,
Eas
t M
alay
sia.
MO
C b
egan
pro
duci
ng o
il fro
m th
e W
est P
atric
ia fi
eld
in 2
003.
In 2
009
MO
C c
omm
ence
d de
liver
y of
gas
from
the
Gol
ok fi
eld
via
the
Bin
tulu
O
nsho
re
Rec
eivi
ng
Faci
lity
(BO
RF)
to
M
LNG
, co
mpl
etin
g S
K
Gas
P
hase
1
with
ga
s pr
oduc
tion
from
th
e S
eram
pang
Fie
ld in
201
0.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
SOU
TH A
CIS
OIL
AN
D G
AS
DEV
ELO
PMEN
T PR
OJE
CT
DET
AIL
ED E
NG
INEE
RIN
G
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
TL
Offs
hore
Sdn
Bhd
MU
RP
HY
Sar
awak
/Sab
ah O
il C
o., L
td
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
14
Feb-
8 M
ac 2
013
To
Ass
essm
ent
of R
iser
Gua
rd P
late
Im
pact
Stre
ngth
on
The
Jack
et T
russ
Stru
ctur
e
To
per
form
Fin
ite E
lem
ent A
naly
sis
to a
sses
s th
e Im
pact
S
treng
th o
f the
rise
r gua
rd p
late
Wel
ded
and
clam
p to
Jac
ket
Trus
s S
truct
ure.
Im
pact
Stre
ngth
Ass
essm
ent o
f Pla
te w
ill be
car
ried
out u
sing
A
BA
QU
S/S
IMU
LIA
.
The
effe
ct o
f Hyd
rost
atic
Pre
ssur
e w
ould
be
incl
uded
alo
ngsi
de th
e ve
ssel
Impa
ct lo
ad o
n th
e P
late
.
Th
e ba
se d
evel
opm
ent
plan
for
PFL
NG
Tie
-in f
acilit
ies
is t
o ha
ve
bran
ch o
ut p
ipin
g fro
m e
xitin
g ga
s an
d co
nden
sate
exp
ort p
ipel
ine
to M
LNG
, iso
latio
n/co
ntro
l val
ves,
met
erin
g, s
tatic
mix
er, l
aunc
her
on K
AK
G-A
pip
elin
e an
d P
LEM
at s
eabe
d.
Th
e pr
oduc
tion
(i.e.
gas
and
con
dens
ate)
fro
m K
AK
G-A
will
be
com
min
gled
in s
tatic
mak
er tr
ansp
orte
d to
PFL
NG
via
3km
pip
elin
e an
d P
LEM
.
PFL
NG
will
tie-in
its
flexi
ble
riser
at P
LEM
and
con
nect
the
riser
to
flang
e at
turre
t and
rout
ed th
e ga
s an
d co
nden
sate
to s
lug
rece
iver
on
PFL
NG
.
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
PR
OV
ISIO
N O
F P
RE
-FR
ON
T E
ND
EN
GIN
EE
RIN
G D
ES
IGN
AN
D F
RO
NT
EN
D K
L
EN
GIN
EE
RIN
G D
ES
IGN
SE
RV
ICE
S F
OR
PF
LN
G T
IE-I
N P
RO
JEC
T
EcoP
rasi
nos
Res
pons
ibili
ties
Clie
nt
P
etro
nas
Car
i Gal
i Sdn
Bhd
MM
C O
il &
Gas
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
Jul
201
3 to
Oct
201
3
M
odifi
catio
n w
orks
on
KA
KG
-A to
cat
er fo
r add
ition
al e
quim
ent
In
stal
latio
n A
naly
sis
and
Stu
dy o
f PLE
M
In
stal
latio
n st
udy
and
anal
ysis
of n
ew e
quip
men
t on
KA
KG
-A
Hoo
k-up
wor
ks o
n K
AK
G-A
dur
ing
shut
dow
n w
indo
w s
tudy
In
stal
latio
n an
alys
is o
f app
roxi
mat
ely
3km
of f
lexi
ble
pipe
line
from
KA
KG
-Ato
Pip
elin
e E
nd M
anifo
ld (P
LEM
) AT
SE
AB
ED
H
ook-
up a
nd c
omm
issi
onin
g w
orks
dur
ing
tie-in
stu
dy
M
urph
y S
araw
ak O
il C
o Lt
d (M
OC
) cur
rent
ly h
as tw
o (2
) PS
Cs
with
PE
TRO
NA
S C
arig
ali S
dn B
hd (P
CS
B),
and
is th
e op
erat
or
of, B
lock
s S
K30
9 an
d S
K31
1 of
fsho
re S
araw
ak, E
ast M
alay
sia.
MO
C b
egan
pro
duci
ng o
il fro
m th
e W
est P
atric
ia fi
eld
in 2
003.
In 2
009
MO
C c
omm
ente
d de
liver
y of
gas
from
the
Gol
ok fi
eld
via
the
Bin
tulu
Ons
hore
Rec
eivi
ng F
acilit
y (B
OR
F) to
MLN
G,
com
plet
ing
SK
Gas
Pha
se 1
with
gas
pro
duct
ion
from
the
Ser
ampa
ng F
ield
in 2
010
w
ww
.eco
pras
inos
.com
Proj
ect D
escr
iptio
n
Det
aile
d D
esig
n En
gine
erin
g D
raw
ing
And
Lift
ing
Ana
lysi
s Fo
r Ris
er G
uard
EcoP
rasi
nos
Res
pons
ibili
ties
R
iser
cla
mp
deta
iled
dra
win
gs
Li
fting
Con
figur
atio
n dr
awin
gs
Clie
nt
M
urph
y
TL O
ffsho
re S
dn. B
hd.
C
SD
Mar
ine
Eng
inee
ring
Ser
vice
s S
dn. B
hd.
bd@
ecop
rasi
nos.
com
I
ww
w.e
copr
asin
os.c
om
I T
el: +
06-0
3-89
2734
85
Proj
ect D
urat
ion:
3 A
pril
- 2 M
ay 2
013
C
lam
p D
etai
led
Des
ign
Ana
lysi
s
Lifti
ng lu
g an
alys
is a
nd s
tress
che
ck
D
eter
min
e th
e lo
adin
g su
stai
ned
for e
ach
of
the
liftin
g ca
ble
(slin
g)
D
eter
min
e th
e co
nfig
urat
ion
of th
e lif
ting
slin
g-ca
ble
bd
@ec
op
rasi
no
s.co
m I
w
ww
.eco
pra
sin
os.
com
I
Tel
: +
06-0
3-89
2734
85
Dev
elo
pm
ent
of
Om
bak
Bir
u S
atu
Pip
elay
Bar
ge
Clie
nt
O
mba
k M
arin
e G
roup
Sdn
Bhd
P
roje
ct D
escr
ipti
on
O
mba
k M
arin
e G
roup
ha
s be
en
awar
ded
cont
ract
by
P
T
Rek
ayas
a In
dust
ri to
pe
rfor
m
pipe
line
inst
alla
tion
utili
zing
O
mba
k B
iru S
atu
pipe
lay
barg
e fo
r th
e 16
” O
ffsho
re S
ectio
nal
Pip
elin
e R
eloc
atio
n an
d In
stal
latio
n P
roje
ct in
Indo
nesi
a.
E
coP
rasi
nos
Eng
inee
ring
Sdn
. B
hd.
has
been
aw
arde
d co
ntra
ct
by O
mba
k M
arin
e G
roup
to
act
as a
n en
gine
erin
g su
ppor
t to
pe
rfor
m t
he e
ngin
eerin
g su
ppor
t fo
r O
mba
k B
iru S
atu
pipe
lay
barg
e. T
he w
ork
invo
lvem
ents
are
to
verif
y an
d re
com
men
d if
any
mod
ifica
tion
are
requ
ired
on
Om
bak
Biru
S
atu
pipe
lay
barg
e.
Pro
ject
Du
rati
on
: O
ct 2
013
– D
ec 2
013
Eco
Pra
sin
os
Res
po
nsi
bili
ties
The
wor
k in
volv
emen
ts a
re a
s fo
llow
s:
1)
Bar
ge a
nd S
tinge
r S
ettin
g, Id
eal S
ettin
g (B
arge
Rad
ius
200m
and
Ran
ge o
f S
tinge
r R
adiu
s P
ossi
bilit
y)
2)
Exi
stin
g S
tinge
r P
in C
onfig
urat
ion,
Ide
al S
ettin
g an
d E
xist
ing
Pin
Set
ting
(With
out
Mod
ifica
tion
to L
ay 1
6” R
ekay
asa
Indu
stri
Pip
elin
e)
3)
Lay
Ana
lysi
s fo
r 16
” R
ekay
asa
Indu
stri
Pip
elin
e, I
deal
Set
ting
and
Exi
stin
g S
ettin
g B
est
Pos
sibl
e C
onfig
urat
ion
(With
out
Mod
ifica
tion)
4)
S
ite V
isit
and
As-
Bui
lting
Pip
elay
Sup
port
and
Stin
ger
Con
figur
atio
n 5)
In
tegr
ity R
evie
w a
nd D
esig
n fo
r S
uppo
rt S
truc
ture
of t
he S
tinge
r
bd
@ec
op
rasi
no
s.co
m I
w
ww
.eco
pra
sin
os.
com
I
Tel
: +
06-0
3-89
2734
85
Clie
nt
T
alis
man
Mal
aysi
a Li
mite
d
M
MC
Oil
& G
as
Pro
ject
Des
crip
tio
n
C
OM
PA
NY
has
dev
elop
ed P
M-3
CA
A N
orth
ern
Fie
lds
with
a
Cen
tral
Pro
cess
ing
Pla
tform
BO
-A l
ocat
ed a
t th
e B
unga
Ork
id
Fie
ld w
ith a
ser
ies
of W
ell
Hea
d R
iser
Pla
tform
s de
liver
ing
hydr
ocar
bons
fro
m t
he v
ario
us f
ield
are
as t
o th
e C
PP
with
Bun
ga P
akm
a A
as
futu
re.
T
he
proj
ect
will
co
nsid
er
the
desi
gn,
build
, in
stal
latio
n an
d
com
mis
sion
ing
of t
he B
P-A
min
imum
fac
ilitie
s pl
atfo
rm f
or t
he
drill
ing
of 7
initi
al g
as w
ells
with
pot
entia
l of u
p to
11
futu
re w
ells
.
T
he c
urre
nt p
lan
date
for
first
gas
is 1
st Q
201
6.
T
he s
cope
of w
ork
is C
once
ptua
l and
FE
ED
. P
roje
ct D
ura
tio
n:
Oct
201
3 –
Dec
201
3 E
coP
rasi
no
s R
esp
on
sib
iliti
es:
D
eter
min
e th
e op
timum
pi
pelin
e ro
ute
incl
udin
g pl
atfo
rm
appr
oach
and
tie-
in/in
terf
ace
loca
tions
.
F
easi
bilit
y st
udy
of o
ptim
al p
ipel
ine
and
riser
inst
alla
tion.
V
erify
the
riser
loca
tions
and
tops
ide
pipi
ng.
BU
NG
A P
AK
MA
DE
VE
LO
PM
EN
T C
ON
CE
PT
UA
L A
ND
FR
ON
T E
ND
EN
GIN
EE
RIN
G D
ES
IGN
(F
EE
D)