FINAL PRESENTATIONANASTAZJA SĘDZICKA
CRACOW UNIVERSITY OF TECHNOLOGYJUNE – OCTOBER 2015 28.10.2015
![Page 2: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/2.jpg)
My tasks:
HMI Touch Panel Creating electrical schematics for TIF Connecting devices in TIF Electrical connections in TRACI Improvements of control program for TRACI Improvements of electrical documentation for TRACI Registering new devices in CERN network Updating electrical schematics for CMS Making some changes in PVSS Making orders parts for CMS
![Page 3: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/3.jpg)
HMI Touch Panel
Touch screen was supposed to be in CMS for easier and more effective control of the plant.
Unfortunately after 5 weeks of working with the Touch Panel a problem occurred.We have contacted SIEMENS in this case,but after giving them some details andspecified files they could not help us.
![Page 4: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/4.jpg)
HMI Touch Panel
Number of tags used: 1978Number of screens: 290
![Page 5: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/5.jpg)
Electrical schematics and connection for TIF
Connecting thedevices in TIF and making changes in PVSS.
Making electrical schematics for devices which I connected in TIF for more transparent work and to complete the documentation.
![Page 6: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/6.jpg)
Working with TRACI
Vv.1.0
v.2.0
Upgrading the electrical schematicsof TRACI and making changes according to the new one.
Calibrating the devices (flowmeter)by connecting them to the computerand using program attached tothe device.
![Page 7: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/7.jpg)
Working with TRACI
Register PLC and HMI Touch Panel in CERN network Adjusting the program to the new IP addresses and
new location of registrated devices Connecting pressure and temperature sensors Ordering electrical cables Making changes in control function
![Page 8: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/8.jpg)
CMS
Making little changes in PVSS for Point 5
![Page 9: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/9.jpg)
CMS
Comparing the electrical schematics with reality and correcting them
![Page 10: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015](https://reader038.vdocument.in/reader038/viewer/2022103010/5a4d1aed7f8b9ab05997bfba/html5/thumbnails/10.jpg)
Thank you!