final presentation anastazja sĘdzicka cracow university of technology june – october 2015...

10
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

Upload: edward-summers

Post on 08-Jan-2018

222 views

Category:

Documents


1 download

DESCRIPTION

HMI Touch Panel Touch screen was supposed to be in CMS for easier and more effective control of the plant. Unfortunately after 5 weeks of working with the Touch Panel a problem occurred. We have contacted SIEMENS in this case, but after giving them some details and specified files they could not help us.

TRANSCRIPT

Page 1: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

FINAL PRESENTATIONANASTAZJA SĘDZICKA

CRACOW UNIVERSITY OF TECHNOLOGYJUNE – OCTOBER 2015 28.10.2015

Page 2: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

My tasks:

HMI Touch Panel Creating electrical schematics for TIF Connecting devices in TIF Electrical connections in TRACI Improvements of control program for TRACI Improvements of electrical documentation for TRACI Registering new devices in CERN network Updating electrical schematics for CMS Making some changes in PVSS Making orders parts for CMS

Page 3: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

HMI Touch Panel

Touch screen was supposed to be in CMS for easier and more effective control of the plant.

Unfortunately after 5 weeks of working with the Touch Panel a problem occurred.We have contacted SIEMENS in this case,but after giving them some details andspecified files they could not help us.

Page 4: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

HMI Touch Panel

Number of tags used: 1978Number of screens: 290

Page 5: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

Electrical schematics and connection for TIF

Connecting thedevices in TIF and making changes in PVSS.

Making electrical schematics for devices which I connected in TIF for more transparent work and to complete the documentation.

Page 6: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

Working with TRACI

Vv.1.0

v.2.0

Upgrading the electrical schematicsof TRACI and making changes according to the new one.

Calibrating the devices (flowmeter)by connecting them to the computerand using program attached tothe device.

Page 7: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

Working with TRACI

Register PLC and HMI Touch Panel in CERN network Adjusting the program to the new IP addresses and

new location of registrated devices Connecting pressure and temperature sensors Ordering electrical cables Making changes in control function

Page 8: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

CMS

Making little changes in PVSS for Point 5

Page 9: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

CMS

Comparing the electrical schematics with reality and correcting them

Page 10: FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER 2015 28.10.2015

Thank you!