Ronald Kleverlaan
Director European Centre for Alternative Finance Utrecht University
[email protected] || @kleverlaan || http://www.uu.nl/ecaf
Future of FinanceAlternative Finance trends and main obstacles for growth
ACCIÓ, Barcelona - Alternative Finance trends - 19-11-2019 @kleverlaan || www.altfinance.eu
![Page 2: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/2.jpg)
Global market Alternative Finance - USA (10%) China (87%)
Source: 4th EU Alternative Finance Industry Report (2019), Cambridge Centre for Alternative Finance
@kleverlaan || www.altfinance.eu
![Page 3: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/3.jpg)
Alternative Finance in Europe €10 billion (2017)
Source: 4th EU Alternative Finance Industry Report (2019), Cambridge Centre for Alternative Finance
@kleverlaan || www.altfinance.eu
![Page 4: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/4.jpg)
Source: Expanding Horizons, The 3rd European Alternative Finance Industry Report (2016), Cambridge Centre for Alternative Finance
Market volume per capita
@kleverlaan || www.altfinance.eu
![Page 5: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/5.jpg)
Source: 5th UK Alternative Finance Industry Report (2017), Cambridge Centre for Alternative Finance
29% of financing for small SMEs by AltFin (UK)
@kleverlaan || www.altfinance.eu
![Page 6: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/6.jpg)
Alternative Finance20+ different new financing solutions and 100s of providers
@kleverlaan || www.altfinance.eu
![Page 7: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/7.jpg)
Traditional Finance
@kleverlaan || www.altfinance.eu
![Page 8: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/8.jpg)
Alternative Finance
Online
Leasing
Online
Factoring
P2P business lending Equity
crowdfundingSocial Impact Bonds
Real-estate lending
Business angels
Debt based
securities
STO/ICORevenue sharing
@kleverlaan || www.altfinance.eu
![Page 9: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/9.jpg)
P2P/Marketplace business lending
@kleverlaan || www.altfinance.eu
![Page 10: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/10.jpg)
Funding Circle£4,2 billion – 42.000 companies
@kleverlaan || www.altfinance.eu
![Page 11: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/11.jpg)
CrowdfundingCommunity of investors
@kleverlaan || www.altfinance.eu
![Page 12: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/12.jpg)
Crowdfunding = Community FundingAn involved community providing more then money
@kleverlaan || www.altfinance.eu
![Page 13: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/13.jpg)
Brewdog – Equity Crowdfunding£25 million in equity - 42,000 investors – 5 rounds
@kleverlaan || www.altfinance.eu
![Page 14: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/14.jpg)
Monzo
Crowd & VC co-investment
• 2016 - £7 million (VC) + £1 million (Crowd)• 2017 - £22 million (VC) + £2,5 million (Crowd)• 2018 - £85 million (VC) + £20 million (Crowd)
(valuation 40x higher then 2016)
@kleverlaan || www.altfinance.eu
![Page 15: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/15.jpg)
@kleverlaan || www.altfinance.eu
![Page 16: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/16.jpg)
Bigger/traditional companies using crowdfunding
Fragmented financial landscape with specialized financial
suppliers
Co-funding and multiple funding rounds
New independent “trusted advisors” support companies
Citizens and government will work together on societal
challenges
Future of crowdfunding
@kleverlaan || www.altfinance.eu
![Page 17: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/17.jpg)
Not just for start-upsand small companies
@kleverlaan || www.altfinance.eu
![Page 18: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/18.jpg)
Philips€6 million for new product introduction
@kleverlaan || www.altfinance.eu
![Page 19: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/19.jpg)
BD Bacata (Colombia)$150 million by 3.000 retail investors
@kleverlaan || www.altfinance.eu
![Page 20: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/20.jpg)
Multiple funding rounds
@kleverlaan || www.altfinance.eu
![Page 21: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/21.jpg)
Pebble watch$10,3 million by 68,929 backers
@kleverlaan || www.altfinance.eu
![Page 22: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/22.jpg)
$10,3M
$20,3M
$12,8M
@kleverlaan || www.altfinance.eu
![Page 23: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/23.jpg)
Societal challenges:- Energy transition
- Local food production- Social housing
- Cleaner and greener cities
@kleverlaan || www.altfinance.eu
![Page 24: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/24.jpg)
24
Energy TransitionChallenges: NIMBY, high-risk pre-financing, profits external partners
![Page 25: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/25.jpg)
25
Windfarm Nijmegen-Betuwe1.076 local investors for € 18,5 million windfarm
![Page 26: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/26.jpg)
26
United Downs£5,2 million crowd investment
![Page 27: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/27.jpg)
Social housing
Local food productionChallenges: small scale projects, sales for farmers
![Page 28: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/28.jpg)
28
Herenboeren200 local citizens invest €2.000 each to start and own their own farm
![Page 29: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/29.jpg)
29
Social housingChallenges: bottom-up projects difficult to finance
![Page 30: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/30.jpg)
30
KnarrenhofSmall groups of elderly people co-finance local private+social housing
![Page 31: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/31.jpg)
31
Nature based solutions for urban sustainability goals
Challenges: alternative business models and non-financial returns
![Page 32: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/32.jpg)
32
![Page 33: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/33.jpg)
33
![Page 34: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/34.jpg)
Immature and young alternative finance eco-system
Good financial regulation for Alternative Finance
Lack of knowledge about Alternative Finance at
entrepreneurs and companies
Lack of knowledge about Alternative Finance at SME
financial advisors
Biggest obstacles for growth
@kleverlaan || www.altfinance.eu
![Page 35: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/35.jpg)
Market Government
Source: Current State of Crowdfunding in Europe 2016 – Alternative Finance Maturity Index
@kleverlaan || www.altfinance.eu
![Page 36: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/36.jpg)
It takestwo to tango
@kleverlaan || www.altfinance.eu
![Page 37: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/37.jpg)
Introduction
Growth
Competition
Consolidation
Maturity
Alternative Finance Maturity Model (5 phases)
@kleverlaan || www.altfinance.eu
![Page 38: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/38.jpg)
Immature and young alternative finance eco-system
Good financial regulation for Alternative Finance
Lack of knowledge about Alternative Finance at
entrepreneurs and companies
Lack of knowledge about Alternative Finance at SME
advisors
Biggest obstacles for growth
@kleverlaan || www.altfinance.eu
![Page 39: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/39.jpg)
Government/regulator
Investor protection vs Access to Finance
Professionality of new industry players
European vs National Regulation
UK & German market up to €8m campaigns
Experiment with sandboxes
@kleverlaan || www.altfinance.eu
![Page 40: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/40.jpg)
Introduction
Growth
Competition
Consolidation
Maturity
Alternative Finance Maturity Model (Government)
Open dialogue with industry
Create clear regulations + public support
Investor protection + transparency on
defaults
Integrated completely in financial regulations
@kleverlaan || www.altfinance.eu
![Page 41: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/41.jpg)
Immature and young alternative finance eco-system
Good financial regulation for Alternative Finance
Lack of knowledge about Alternative Finance at
entrepreneurs and companies
Lack of knowledge about Alternative Finance at SME
advisors
Biggest obstacles for growth
@kleverlaan || www.altfinance.eu
![Page 42: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/42.jpg)
Industry
Promotion and Education
Educational programs for Entrepreneurs,
Investors and Advisors.
Independent Research on industry data
Transparancy on defaults, risks
Certification program for
platforms and advisors
Co-financing by government and banks
@kleverlaan || www.altfinance.eu
![Page 43: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/43.jpg)
Introduction
Growth
Competition
Consolidation
Maturity
Alternative Finance Maturity Model (Industry)
Industry roundtables and work with
independent advisors
Collective promotion of success stories. Regular publications of growth
in industry. Training advisors. Launch
industry association
Support independent (academic) research,
certification of advisors, transparency on defaults,
several industry associations, combine AltFin with traditional finance
Integration in traditional (institutional) finance industry, specialized
(academic) research centre.
@kleverlaan || www.altfinance.eu
![Page 44: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/44.jpg)
Immature and young alternative finance eco-system
Good financial regulation for Alternative Finance
Lack of knowledge about Alternative Finance at
entrepreneurs and companies
Lack of knowledge about Alternative Finance at SME
advisors
Biggest obstacles for growth
@kleverlaan || www.altfinance.eu
![Page 45: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/45.jpg)
Alternative Finance in Europe is growing rapidly
Fragmented financial landscape
New group of independent “trusted advisors”
Alternative Finance market needs to become more
mature
Conclusions
@kleverlaan || www.altfinance.eu
![Page 46: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/46.jpg)
Ronald Kleverlaan
Director European Centre for Alternative Finance Utrecht University
[email protected] || @kleverlaan || http://www.uu.nl/ecaf
Future of FinanceAlternative Finance trends and main obstacles for growth
ACCIÓ, Barcelona - Alternative Finance trends - 19-11-2019 @kleverlaan || www.altfinance.eu
![Page 47: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/47.jpg)
http://www.altfinance.eu
Weekly Alternative Finance newsletter
@kleverlaan || www.altfinance.eu
![Page 48: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/48.jpg)
Digital Business Angels
@kleverlaan || www.altfinance.eu
![Page 49: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/49.jpg)
Social Impact BondOutcome payment by government
@kleverlaan || www.altfinance.eu
![Page 50: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/50.jpg)
SME factoring
Sell individual invoices
@kleverlaan || www.altfinance.eu
![Page 51: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/51.jpg)
Profit sharing
Receive % of future profits
@kleverlaan || www.altfinance.eu
![Page 52: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/52.jpg)
STO/ICO
Security token offerings – digitized stocks
@kleverlaan || www.altfinance.eu
![Page 53: Future of Finance - accio.gencat.cat€¦ · Energy Transition Challenges: NIMBY, high-risk pre-financing, profits external partners . 25 Windfarm Nijmegen-Betuwe 1.076 local investors](https://reader034.vdocument.in/reader034/viewer/2022051607/602b009e22dd5558c11b30a2/html5/thumbnails/53.jpg)
Smart (energy) contracts
Raise funding upfront for future (energy) usage
@kleverlaan || www.altfinance.eu