Current Status Interdependencies with other Subsystems Flight hardware procurements Engineering Model Testing Closure Greatest Risks to Schedule Unresolved Assumptions Critical Path – key drivers
wnjohnson 3
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Current SituationCurrent Situation
Absorption of original French Work Revised MoA with IN2P3 has been signed. Drawings have been translated to English. Most are ready for release. Critical
titanium parts are in manuf. Side plates will be purchased from France Baseplate delayed in CAL-Grid I/F redesign and assoc analyses CDE bonding team in place at Swales. Test bonding has begun. Flight qual
tooling is being manufactured. PDA manufacturing tooling in design, process specification is being updated.
Requirements have been discussed with potential vendors. RFQ has not been released
ASIC GCFE ver 9A has been submitted. Out of fab 9/17/03 GCRC5 working on EM w/ GCFE7 does not work well at 20 MHz.
Problems are being investigated EM EMI/EMC testing indicate need for better test configuration and test
plans. Don’t know if they show design problem in CAL.
wnjohnson 4
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Interdependencies with other Interdependencies with other LAT componentsLAT components
Resolve and verify CAL – Grid interface Complete analyses. Detail extra features – cable tray attachment Release IDDs or whatever
Resolve and verify CAL – T&DF box mechanical, thermal design, and EMI/EMC design.
Identify, cost and schedule needed TEM and PS (EM2??) that supports the compressed CAL assembly and test schedule. Improve documentation and procedures
Produce EEE Parts required documentation (as identified by GSFC) for the ASICs or tell them NO and resolve the qualification of the ASICs for flight.
wnjohnson 5
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Flight Hardware Flight Hardware ProcurementsProcurements
Except for new work in US, most flight procurements are made or are in process. EEE parts complete except for uncertainty on some PPL resistors. AFEE – TEM interconnect cable order needs design verification and EEE parts
test agreement. AFEE PCB is in design modification.
CDE manufacturing contract in place – Swales PDA manufacturing spec is in development – outside vendor, GFE’ed to
Swales. Plan CDE Manufacturing Readiness Review in August.
Metallic machined parts from NRL. Awaiting revised drawings of baseplate. Potential issues relative to recent EMI/EMC testing – surface treatment, more
screws Plastic and Elastomeric parts for CDE – structure interface at LLR
Specs in place, vendors selected, parts approved. First procurements in place.
wnjohnson 6
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Engineering Model Engineering Model Testing ClosureTesting Closure
ComprehensivePerformance Test
(LAT-PS-01371-01) EMI/EMC Testing(LAT-PS-01513-01)
ComprehensivePerformance Test
(LAT-PS-01371-01)
Vibration Testing(LAT-PS-01346-01)
Sine Sweep
LimitedPerformance Test
Random
Sine Burst
LimitedPerformance Test
Thermal VacuumTesting
(LAT-PS-01347-01)
12 Thermal Cycles(Limited & Comprehensive
Performance Teststhroughout)
Burn-In
LAT Testing at SLAC
Beam Test at GSI
Support FlightProduction at NRL
and SLAC
Additional BeamTests, etc
Mass Properties
ComprehensivePerformance Test
(LAT-PS-01371-01)
Ship to SLAC
Return EM to NRL
Thermal Cycle(1 atmosphere)
ComprehensivePerformance Test
(LAT-PS-01371-01) Swap TEM/PSInstall GCRC5
Aug 8
Nov 14
Oct 15
Dec 25
wnjohnson 7
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Greatest Risks to ScheduleGreatest Risks to Schedule
ASIC acceptability for flight – both performance and qualification.
CDE Bonding process development and qualification delay.
Ability of Sweden to maintain the delivery rate and schedule of CsI crystals.
EEE parts use approval and impact on assembly of AFEE board.
Failure or process problem in module assembly or test which stops the production pipeline.
wnjohnson 8
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
CAL Revised Summary ScheduleCAL Revised Summary Schedule
Module Available Dates (RFI)
Module Need Dates (RFI)
wnjohnson 9
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Unresolved AssumptionsUnresolved Assumptions
CAL will receive 18 Flight TEM and Power Supplies that are fully tested and ready for integration with CAL flight hardware. Required EGSE for functional testing of TKR side of TEM will be provided. Required Test scripts for testing of TKR side of TEM will be provided. TKR simulation configuration (whatever is required) will meet environmental test
requirements – TVAC, EMI/EMC(?), Vib– mechanical support of connector savers during vib?– Cable lengths or mounting of simulators
Capable of surviving CAL Vibration Test levels Capable of providing appropriate EMI/EMC test environment.
~5 EM1 or EM2 TEM boards (unpackaged?) to support AFEE card assembly and test
CAL will receive sufficient VME Interface Cards (COMM & PDU?) and PowerPCs to support XX CAL Test Stands 10 CTS to support module Assy & Test 6 mini CTS to support AFEE card assembly and test - minimal config, power control not
needed. EGSE communications (COMM to/from TEM) can support required cable lengths for
TVAC and EMI/EMC testing over temperature – 10 m or more with bulkhead connector adaptors.
wnjohnson 10
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
AFEE Board Burn-In EGSEAFEE Board Burn-In EGSE
UPS
PC
Power Supply(DC)
Monitor
TransitionBoard
LCB
MVME2306
VME CRATE
FlukeNetDaq
2640
AFEE+X, 0,Side
AFEE-X, 2,Side
AFEE+Y, 1,Side
AFEE-Y, 3,Side
UPS
PC
Power Supply(DC)
Monitor
TransitionBoard
LCB
MVME2306
VME CRATE
FlukeNetDaq
2640
AFEE+X, 0,Side
AFEE-X, 2,Side
AFEE+Y, 1,Side
AFEE-Y, 3,Side
THERMAL CHAMBER
CM
D
Eve
ntE
vent
CM
D
CAT-5HUB
CAT-5HUB
PWR
PWR
PWR
PWR
PWR
Ethernet
Ethernet
Ethernet
GA
SU
GA
SU
PWR
PWR
PWR
PWR
PWR
TEMEGSE
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
10
TEMEGSE
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
10
AFEEMONITOR
MDM69PMDM69R MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
DB50P/DB50S
12
DB
9P
DB
9S
DB
9P
DB
9S
DB50P/DB50S
AFEEMONITOR
MDM69PMDM69R MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
12
2
2
3
3
4
4
PWR
PWR
5
8
5
6
6
7
7 8
9
9
11
11
13
13
14
14
15
15
16
17
MDM51PMDM51R
HD78PHD78S
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
MDM69PMDM69R
AFEE 3.3VDC
TEM GSE 3.3VDC
NEED: 4 – 5 AFEE Board Test Stands
wnjohnson 11
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
TVAC EGSE Config – 2 ModulesTVAC EGSE Config – 2 Modules
GASU TV
PDU TV
Thermal Vacuum Chamber
PSA
CALModule[2 of 2]
TEM
PSA
CALModule[1 of 2]
TEM
UPS
PC
TransitionBoard
LCB
MVME2306
Power Supply(DC)
Monitor
VME CRATE
CAT5 Ethernet
GASU TV
PDU TV
GASU TV
PDU TV
PDU TV
UPS
PC
TransitionBoard
LCB
MVME2306
Power Supply(DC)
Monitor
VME CRATE
CAT5 Ethernet
CM
D
Eve
nt
CM
D
Eve
nt
28VDC Power Harness
28VDC Power Harness
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
GASU TV
GASU TV
22
22
44
44
25
22
22
44
44
25
25
25
37-PIN BulkheadFeedthrough Connectors(Thermal VacuumCompatible)
16
16
22
22
1
2
3
4
5
6
1
2
3
4
10
98
7
11
11
12
13
14
12
13
14
15
16
5
6
7
8
10
9
15
16
MDM51 MDM51
HD78PHD78S
MDM51 MDM51
HD78PHD78S
MDM51 MDM51
HD78PHD78S
MDM51 MDM51
HD78PHD78S
97-3106A-28-21S 97-3106A-28-21P
97-3106A-28-21S 97-3106A-28-21P
97-3106A-28-21S 97-3106A-28-21P
97-3106A-28-21S 97-3106A-28-21P
97-3106A-28-21S 97-3106A-28-21P
97-3106A-28-21S 97-3106A-28-21P
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
MDM25MDM25
1718 Deutsch - 37D Female
Deutsch - 37D Male
NEED Peak of 10 Complete Cal Test Stands (CTS)
wnjohnson 12
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
Critical Path (CDR) Critical Path (CDR) Qual Module (FMA)Qual Module (FMA)
Dual PIN PhotodiodeNRL, CEA/Salcay06/18/03 (29)
CsI CrystalsSweden05/16/03 (50)
Crystal Detector Elements (CDE)CEA/Saclay
09/26/03 (-18)
Carbon Composite StructureAl base, closeouts, plastic partsLLR/Ecole Polytechnique
07/24/03 (30)
Pre Electronics ModuleNRL11/04/03 (-18)
ASICsSLAC, NRL08/08/03 (1)
Other EEE partsParts Qual/ScreenNRL08/08/03 (1)
PCBNRL, SLAC07/11/03 (12)
Analog Front End Electronics (AFEE) NRL10/09/03 (1)
CAL ModuleNRL12/16/03 (-18)
CalibrationEnvironmental TestNRL03/04/04 (-27)
Ready for Integration (RFI)03/25/04 (-27) (L3: 02/17/04)
Completion Dates (float)
Critical Path in Red
10/15/03Baseplate
10/28/03CDE Bonding
11/15/03Another FabCritical Path
June ’03 Needs Assessment
~1/15/04
~2/20/04
~5/20/04
BIG ERROR3/16/04
BIG ERROR7/02/04
wnjohnson 13
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
New Module RFIs ???New Module RFIs ???
wnjohnson 14
GLAST Calorimeter
SLAC LAT Meeting
17Jul 2003
Naval Research LabWashington DC
CAL Milestones Lvl 3 & 4CAL Milestones Lvl 3 & 4