glast calorimeter slac lat meeting 17jul 2003 naval research lab washington dc wnjohnson 1 slac...

14
wnjohnson 1 GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC SLAC Meeting SLAC Meeting Calorimeter Subsystem Calorimeter Subsystem 17 July 2003 W. N. Johnson Naval Research Lab

Upload: sharlene-merritt

Post on 22-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 1

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

SLAC MeetingSLAC MeetingCalorimeter SubsystemCalorimeter Subsystem

17 July 2003

W. N. Johnson

Naval Research Lab

Page 2: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 2

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

OutlineOutline

Current Status Interdependencies with other Subsystems Flight hardware procurements Engineering Model Testing Closure Greatest Risks to Schedule Unresolved Assumptions Critical Path – key drivers

Page 3: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 3

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Current SituationCurrent Situation

Absorption of original French Work Revised MoA with IN2P3 has been signed. Drawings have been translated to English. Most are ready for release. Critical

titanium parts are in manuf. Side plates will be purchased from France Baseplate delayed in CAL-Grid I/F redesign and assoc analyses CDE bonding team in place at Swales. Test bonding has begun. Flight qual

tooling is being manufactured. PDA manufacturing tooling in design, process specification is being updated.

Requirements have been discussed with potential vendors. RFQ has not been released

ASIC GCFE ver 9A has been submitted. Out of fab 9/17/03 GCRC5 working on EM w/ GCFE7 does not work well at 20 MHz.

Problems are being investigated EM EMI/EMC testing indicate need for better test configuration and test

plans. Don’t know if they show design problem in CAL.

Page 4: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 4

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Interdependencies with other Interdependencies with other LAT componentsLAT components

Resolve and verify CAL – Grid interface Complete analyses. Detail extra features – cable tray attachment Release IDDs or whatever

Resolve and verify CAL – T&DF box mechanical, thermal design, and EMI/EMC design.

Identify, cost and schedule needed TEM and PS (EM2??) that supports the compressed CAL assembly and test schedule. Improve documentation and procedures

Produce EEE Parts required documentation (as identified by GSFC) for the ASICs or tell them NO and resolve the qualification of the ASICs for flight.

Page 5: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 5

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Flight Hardware Flight Hardware ProcurementsProcurements

Except for new work in US, most flight procurements are made or are in process. EEE parts complete except for uncertainty on some PPL resistors. AFEE – TEM interconnect cable order needs design verification and EEE parts

test agreement. AFEE PCB is in design modification.

CDE manufacturing contract in place – Swales PDA manufacturing spec is in development – outside vendor, GFE’ed to

Swales. Plan CDE Manufacturing Readiness Review in August.

Metallic machined parts from NRL. Awaiting revised drawings of baseplate. Potential issues relative to recent EMI/EMC testing – surface treatment, more

screws Plastic and Elastomeric parts for CDE – structure interface at LLR

Specs in place, vendors selected, parts approved. First procurements in place.

Page 6: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 6

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Engineering Model Engineering Model Testing ClosureTesting Closure

ComprehensivePerformance Test

(LAT-PS-01371-01) EMI/EMC Testing(LAT-PS-01513-01)

ComprehensivePerformance Test

(LAT-PS-01371-01)

Vibration Testing(LAT-PS-01346-01)

Sine Sweep

LimitedPerformance Test

Random

Sine Burst

LimitedPerformance Test

Thermal VacuumTesting

(LAT-PS-01347-01)

12 Thermal Cycles(Limited & Comprehensive

Performance Teststhroughout)

Burn-In

LAT Testing at SLAC

Beam Test at GSI

Support FlightProduction at NRL

and SLAC

Additional BeamTests, etc

Mass Properties

ComprehensivePerformance Test

(LAT-PS-01371-01)

Ship to SLAC

Return EM to NRL

Thermal Cycle(1 atmosphere)

ComprehensivePerformance Test

(LAT-PS-01371-01) Swap TEM/PSInstall GCRC5

Aug 8

Nov 14

Oct 15

Dec 25

Page 7: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 7

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Greatest Risks to ScheduleGreatest Risks to Schedule

ASIC acceptability for flight – both performance and qualification.

CDE Bonding process development and qualification delay.

Ability of Sweden to maintain the delivery rate and schedule of CsI crystals.

EEE parts use approval and impact on assembly of AFEE board.

Failure or process problem in module assembly or test which stops the production pipeline.

Page 8: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 8

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

CAL Revised Summary ScheduleCAL Revised Summary Schedule

Module Available Dates (RFI)

Module Need Dates (RFI)

Page 9: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 9

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Unresolved AssumptionsUnresolved Assumptions

CAL will receive 18 Flight TEM and Power Supplies that are fully tested and ready for integration with CAL flight hardware. Required EGSE for functional testing of TKR side of TEM will be provided. Required Test scripts for testing of TKR side of TEM will be provided. TKR simulation configuration (whatever is required) will meet environmental test

requirements – TVAC, EMI/EMC(?), Vib– mechanical support of connector savers during vib?– Cable lengths or mounting of simulators

Capable of surviving CAL Vibration Test levels Capable of providing appropriate EMI/EMC test environment.

~5 EM1 or EM2 TEM boards (unpackaged?) to support AFEE card assembly and test

CAL will receive sufficient VME Interface Cards (COMM & PDU?) and PowerPCs to support XX CAL Test Stands 10 CTS to support module Assy & Test 6 mini CTS to support AFEE card assembly and test - minimal config, power control not

needed. EGSE communications (COMM to/from TEM) can support required cable lengths for

TVAC and EMI/EMC testing over temperature – 10 m or more with bulkhead connector adaptors.

Page 10: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 10

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

AFEE Board Burn-In EGSEAFEE Board Burn-In EGSE

UPS

PC

Power Supply(DC)

Monitor

TransitionBoard

LCB

MVME2306

VME CRATE

FlukeNetDaq

2640

AFEE+X, 0,Side

AFEE-X, 2,Side

AFEE+Y, 1,Side

AFEE-Y, 3,Side

UPS

PC

Power Supply(DC)

Monitor

TransitionBoard

LCB

MVME2306

VME CRATE

FlukeNetDaq

2640

AFEE+X, 0,Side

AFEE-X, 2,Side

AFEE+Y, 1,Side

AFEE-Y, 3,Side

THERMAL CHAMBER

CM

D

Eve

ntE

vent

CM

D

CAT-5HUB

CAT-5HUB

PWR

PWR

PWR

PWR

PWR

Ethernet

Ethernet

Ethernet

GA

SU

GA

SU

PWR

PWR

PWR

PWR

PWR

TEMEGSE

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

10

TEMEGSE

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

10

AFEEMONITOR

MDM69PMDM69R MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

DB50P/DB50S

12

DB

9P

DB

9S

DB

9P

DB

9S

DB50P/DB50S

AFEEMONITOR

MDM69PMDM69R MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

12

2

2

3

3

4

4

PWR

PWR

5

8

5

6

6

7

7 8

9

9

11

11

13

13

14

14

15

15

16

17

MDM51PMDM51R

HD78PHD78S

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

MDM69PMDM69R

AFEE 3.3VDC

TEM GSE 3.3VDC

NEED: 4 – 5 AFEE Board Test Stands

Page 11: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 11

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

TVAC EGSE Config – 2 ModulesTVAC EGSE Config – 2 Modules

GASU TV

PDU TV

Thermal Vacuum Chamber

PSA

CALModule[2 of 2]

TEM

PSA

CALModule[1 of 2]

TEM

UPS

PC

TransitionBoard

LCB

MVME2306

Power Supply(DC)

Monitor

VME CRATE

CAT5 Ethernet

GASU TV

PDU TV

GASU TV

PDU TV

PDU TV

UPS

PC

TransitionBoard

LCB

MVME2306

Power Supply(DC)

Monitor

VME CRATE

CAT5 Ethernet

CM

D

Eve

nt

CM

D

Eve

nt

28VDC Power Harness

28VDC Power Harness

PWR

PWR

PWR

PWR

PWR

PWR

PWR

PWR

GASU TV

GASU TV

22

22

44

44

25

22

22

44

44

25

25

25

37-PIN BulkheadFeedthrough Connectors(Thermal VacuumCompatible)

16

16

22

22

1

2

3

4

5

6

1

2

3

4

10

98

7

11

11

12

13

14

12

13

14

15

16

5

6

7

8

10

9

15

16

MDM51 MDM51

HD78PHD78S

MDM51 MDM51

HD78PHD78S

MDM51 MDM51

HD78PHD78S

MDM51 MDM51

HD78PHD78S

97-3106A-28-21S 97-3106A-28-21P

97-3106A-28-21S 97-3106A-28-21P

97-3106A-28-21S 97-3106A-28-21P

97-3106A-28-21S 97-3106A-28-21P

97-3106A-28-21S 97-3106A-28-21P

97-3106A-28-21S 97-3106A-28-21P

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

MDM25MDM25

1718 Deutsch - 37D Female

Deutsch - 37D Male

NEED Peak of 10 Complete Cal Test Stands (CTS)

Page 12: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 12

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

Critical Path (CDR) Critical Path (CDR) Qual Module (FMA)Qual Module (FMA)

Dual PIN PhotodiodeNRL, CEA/Salcay06/18/03 (29)

CsI CrystalsSweden05/16/03 (50)

Crystal Detector Elements (CDE)CEA/Saclay

09/26/03 (-18)

Carbon Composite StructureAl base, closeouts, plastic partsLLR/Ecole Polytechnique

07/24/03 (30)

Pre Electronics ModuleNRL11/04/03 (-18)

ASICsSLAC, NRL08/08/03 (1)

Other EEE partsParts Qual/ScreenNRL08/08/03 (1)

PCBNRL, SLAC07/11/03 (12)

Analog Front End Electronics (AFEE) NRL10/09/03 (1)

CAL ModuleNRL12/16/03 (-18)

CalibrationEnvironmental TestNRL03/04/04 (-27)

Ready for Integration (RFI)03/25/04 (-27) (L3: 02/17/04)

Completion Dates (float)

Critical Path in Red

10/15/03Baseplate

10/28/03CDE Bonding

11/15/03Another FabCritical Path

June ’03 Needs Assessment

~1/15/04

~2/20/04

~5/20/04

BIG ERROR3/16/04

BIG ERROR7/02/04

Page 13: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 13

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

New Module RFIs ???New Module RFIs ???

Page 14: GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson

wnjohnson 14

GLAST Calorimeter

SLAC LAT Meeting

17Jul 2003

Naval Research LabWashington DC

CAL Milestones Lvl 3 & 4CAL Milestones Lvl 3 & 4