Download - Hanlan
• Largest and most extensive watermain Peel has
ever designed and constructed
• Two major watermains will be constructed:• The Hanlan Feedermain (2,400 mm – 8 ft.) will carry water
from Lakeview Water Treatment Plant to the Hanlan
Reservoir and Pumping Station on Tomken Road and
Britannia Road
• The Mississauga City Centre Subtransmission Main
(1,500 mm - 5 ft.) will carry water from Hanlan Pumping
Station to the Mississauga city centre core
Why is the Hanlan Water Project needed?
• To meet the water demands of future planned
and approved Regional population growth,
including in the Mississauga city centre core
• To provide operational flexibility when existing
Hanlan Feedermain needs to be temporarily shut
off for inspection or repair
• Construction started south of Lakeshore Road in late 2011 and is expected to be completed by mid-2016
• Work will be done by open-cut and tunnellingmethods of construction
• Necessary replacement of local distribution watermains along the route will coincide with construction to avoid multiple disruptions
• Project is divided into two assignments
– South: Hanlan Feedermain from Lakeshore Water
Treatment Plant to Dixie Road & Eastgate Parkway
– North: Hanlan Feedermain from Dixie Road &
Eastgate Parkway to Hanlan Pumping Station, and
Mississauga City Centre Subtransmission Main
• Work will occur simultaneously in both North and
South assignments
Keeping in Touch
• We want you to be able to keep in touch
with us
• Speak to us in person, by phone, email or
through Twitter
• We’re reaching out to the public in other
ways
Project Ambassador
• The Ambassador is dedicated to providing service
to residents and businesses
• The Ambassador is your first point of contact for
your construction concerns
• The Ambassador will provide the most up-to-date
information about construction
• Look for the logo on
the Ambassador’s hard
hat and safety vest
• You can speak with
him about all your
construction concerns
Can’t find the Ambassador?
• Phone or email us, and we’ll arrange for the
Ambassador to visit your home or place of
business
Business and Institutional Care Program
• This program helps ensure your business or
organization continues to function normally
during construction
• The Ambassador will visit you to learn
about your specific needs and circumstances
Website
• Visit hanlanwaterproject.ca to keep up to date with
Hanlan news
Drivers’ Hotline
• Call 1-855-hanlan1 (1-855-426-5261) to hear
where traffic might be affected
Drop by our table for specific questions and
get more information
about the Hanlan Water Project
Thank you for coming!