Page 1: Hanlan
Page 2: Hanlan

• Largest and most extensive watermain Peel has

ever designed and constructed

• Two major watermains will be constructed:• The Hanlan Feedermain (2,400 mm – 8 ft.) will carry water

from Lakeview Water Treatment Plant to the Hanlan

Reservoir and Pumping Station on Tomken Road and

Britannia Road

• The Mississauga City Centre Subtransmission Main

(1,500 mm - 5 ft.) will carry water from Hanlan Pumping

Station to the Mississauga city centre core

Page 3: Hanlan

Why is the Hanlan Water Project needed?

• To meet the water demands of future planned

and approved Regional population growth,

including in the Mississauga city centre core

• To provide operational flexibility when existing

Hanlan Feedermain needs to be temporarily shut

off for inspection or repair

Page 4: Hanlan

• Construction started south of Lakeshore Road in late 2011 and is expected to be completed by mid-2016

• Work will be done by open-cut and tunnellingmethods of construction

• Necessary replacement of local distribution watermains along the route will coincide with construction to avoid multiple disruptions

Page 5: Hanlan

• Project is divided into two assignments

– South: Hanlan Feedermain from Lakeshore Water

Treatment Plant to Dixie Road & Eastgate Parkway

– North: Hanlan Feedermain from Dixie Road &

Eastgate Parkway to Hanlan Pumping Station, and

Mississauga City Centre Subtransmission Main

• Work will occur simultaneously in both North and

South assignments

Page 6: Hanlan

Keeping in Touch

Page 7: Hanlan

• We want you to be able to keep in touch

with us

• Speak to us in person, by phone, email or

through Twitter

• We’re reaching out to the public in other

ways

Page 8: Hanlan

Project Ambassador

• The Ambassador is dedicated to providing service

to residents and businesses

• The Ambassador is your first point of contact for

your construction concerns

• The Ambassador will provide the most up-to-date

information about construction

Page 9: Hanlan

• Look for the logo on

the Ambassador’s hard

hat and safety vest

• You can speak with

him about all your

construction concerns

Page 10: Hanlan

Can’t find the Ambassador?

• Phone or email us, and we’ll arrange for the

Ambassador to visit your home or place of

business

Page 11: Hanlan

Business and Institutional Care Program

• This program helps ensure your business or

organization continues to function normally

during construction

• The Ambassador will visit you to learn

about your specific needs and circumstances

Page 12: Hanlan

Website

• Visit hanlanwaterproject.ca to keep up to date with

Hanlan news

Drivers’ Hotline

• Call 1-855-hanlan1 (1-855-426-5261) to hear

where traffic might be affected

Page 13: Hanlan

Drop by our table for specific questions and

get more information

about the Hanlan Water Project

Thank you for coming!