AMEC Introduction
![Page 3: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/3.jpg)
02/06/2009 3
mining
AMEC – Areas of Operation
![Page 4: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/4.jpg)
02/06/2009 4
AMEC is a leading international project
management, engineering and services company.
We design, deliver and support clients’ assets,
from local technical services to international
landmark projects.
AMEC's Natural Resources, Power and Process and Earth and
Environmental businesses employ over 23,000 people in more than
30 countries globally.
Worldwide annual revenues of over US$4.6 billion
AMEC at a Glance
![Page 5: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/5.jpg)
02/06/2009 5
AMEC Paragon is AMEC’s hub for oil and gas
operations based in Houston, Texas, providing
engineering, materials management, and
construction management services to the oil
and gas, pipeline, and midstream industries.
More than 700 people
Completed more than 4,000 projects in 30 countries
for over 260 clients.
28 Year History of Excellence in Houston
AMEC Paragon at a Glance
![Page 6: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/6.jpg)
02/06/2009 6
What Is IPE?
Integrated Project Execution
![Page 7: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/7.jpg)
02/06/2009 7
What Is IPE ?
AMEC Paragon uses Aveva’s Suite of Applications in
an environment which…
…enables the collaboration
…of all parties
…and all applications
…involved in an EPC project
…executed from multiple locations
…safely, efficiently and effectively
![Page 8: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/8.jpg)
02/06/2009 8
Challenges of a Design Project
The design model must reflect reality (what is to be
built)
Document changes must be controlled
Changes in one document must be reflected in all
documents
Information must be readily available to all
The pieces must fit together when fabricated
![Page 9: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/9.jpg)
02/06/2009 9
Solutions to Design Challenges
The design model must reflect reality (What is to be built)
– Design model must be dynamically linked to P&ID’s and procurement
Document changes must be controlled
– Electronic approvals required for revisions
Changes in one document must be reflected in all documents
– Documents, models and other engineering deliverables must be linked and “red flagged” when a change is made
Information must be readily available to all
– Internet access required
– Documents must be linked for quick reference
The pieces must fit together when fabricated
– Design model must include everything (actual structure, pipe supports, cable trays, realistic valves and controls)
![Page 10: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/10.jpg)
02/06/2009 10
Description of IPE
IPE Industry Standard
Trained staff using a common work
process
Each project organized differently
Intelligent P&IDs linked to 3-D Model,
engineering deliverables and
procurement & expediting databases
Separate stand alone databases and
spread sheets
Automatic consistency check between
P&ID, procurement and 3-D Model
Not possible
Electronic control requiring approvals
for issuing revisions
Manual approvals based on signature
block. Revisions can be issued without
proper sign-off
Latest revision automatically available
on electronic document management
system
Manual checking is necessary to
assure the paper document being used
is latest issue. Not possible to assure
destruction of all out of date
documents.
![Page 11: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/11.jpg)
02/06/2009 11
Description of IPE (Continued)
IPE Industry Standard
Historical tracking of drafts and
revisions
Manual tracking possible only if old
copies kept and everyone manually
records each change made
All changes “red flagged” on all other
effected documents
Not possible
All documents searchable and cross-
referenced by metadata (e.g. tag
number, PO, line number, etc.)
Not possible
Design done in 3-D Model. Drawings
printed from 3-D Model
Model built from 2-D drawings
3-D Model includes all pipe, pipe
supports, cable trays and controls
Model includes major pipe
3-D Model includes proper coping of
structural joints
Structural members carried to
centerline of joint
All data shared over Internet Not possible
![Page 12: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/12.jpg)
02/06/2009 12
ALL NON-TAGGED BILLS OF MATERIALS
TAGGED ITEMS
INDEXES
ENGINEERING
DATABASE
H
O
L
D
VPE
3D MODEL
(PDMS)
VPD
ENGINEERING
H
O
L
D
PROCUREMENT
H
O
L
D
VPRM
MATERIAL
MANAGEMENT
MTO & REQUISITIONS
MATERIAL
CATALOG
PDMS
SPECIFICATIONS
CONTROLLING
ENGINEERING
DOCUMENT
VPID
P&IDs
P&IDs
SPECIFICATIONSINSTR.
DATABASE
INtools
AMEC Paragon Systems Summary
• Convero provides project cost, progress, time entry, and
document control.
• Fusion provides document management with bi-directional
integration to Convero.
• VPID provides intelligent P&IDs with native integration to
VPE and PDMS using Model Object Manager.
• VPE is the engineering database providing datasheets,
major equipment list, line list, and specialty items list with
native integration with VPRM.
• INtools is the instrument database providing datasheets,
loops, and the instrument index with custom integration to
VPE for basic tag data management.
• VPRM is the material management system used to create
requisitions, purchase orders, material tracking and
expediting with status reporting to Convero.
• VPD / PDMS is the 3D design system that will be used with
native integration to VPE and VPRM as noted above.
Estimating
System
ConveroPROJECT MANAGEMENT, PROJECT ACCOUNTING, HOME OFFICE MANAGEMENT, CONSTRUCTION MANAGEMENT, & DOCUMENT CONTROL
DOCUMENT MANAGEMENT FOR ALL PROJECT DOCUMENTS, PROCESS WORKFLOW, & COLLABORATION
Fusion
ST
AT
US
RE
PO
RT
ING
IPE System Diagram
![Page 13: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/13.jpg)
02/06/2009 13
![Page 14: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/14.jpg)
02/06/2009 14
Aveva Provides the Framework that delivers IPE:
• Reliable and repeatable work processes
• Common technical database across multiple projects areas,
eliminating duplicated effort & producing consistent results
• Common configuration across multiple projects, resulting in
consistent design and execution
• Consistent basis for progress tracking & reporting
• Improved quality management
• Improvements in communication and collaborative work effort
between multiple work sites
• Consistent material requisitions, awards and tracking of procured
equipment and material
• Quicker and more consistent conveyance and storage of
deliverables and other project documents
![Page 15: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/15.jpg)
02/06/2009 15
Delivering Measurable Projects Savings
Integrated Project Execution
![Page 16: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/16.jpg)
02/06/2009 16
To help provide a magnitude to the size and scope of this project
here are some brief statistics:
– Existing offshore gas platform
– West Coast of Africa
– 100,000 man-hour project
– $10MM engineering
– High pressure (3000 psig), large bore pipe routing
Overview of Project #1
![Page 17: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/17.jpg)
02/06/2009 17
“Before” Pictures of the Existing Platform
![Page 18: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/18.jpg)
02/06/2009 18
Existing Area Looking East
![Page 19: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/19.jpg)
02/06/2009 19
Existing Area Looking West
![Page 20: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/20.jpg)
02/06/2009 20
PDMS Model Illustrations
![Page 21: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/21.jpg)
02/06/2009 21
PDMS Model View
![Page 22: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/22.jpg)
02/06/2009 22
PDMS Model View
![Page 23: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/23.jpg)
02/06/2009 23
PDMS Model View
![Page 24: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/24.jpg)
02/06/2009 24
PDMS Model View
![Page 25: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/25.jpg)
02/06/2009 25
“After” Pictures of the Installation
![Page 26: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/26.jpg)
02/06/2009 26
Blowdown Line tie-in to Flare Scrubber
![Page 27: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/27.jpg)
02/06/2009 27
Incoming Gas
![Page 28: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/28.jpg)
02/06/2009 28
Looking South
![Page 29: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/29.jpg)
02/06/2009 29
Looking Southeast
![Page 30: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/30.jpg)
02/06/2009 30
Looking Northeast
![Page 31: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/31.jpg)
02/06/2009 31
Looking North
![Page 32: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/32.jpg)
02/06/2009 32
Looking North / Injection Line
![Page 33: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/33.jpg)
02/06/2009 33
Looking West / Maintenance Cart Path Markings / Incoming 16 Inch Gas Line
![Page 34: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/34.jpg)
02/06/2009 34
Looking Southwest
![Page 35: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/35.jpg)
02/06/2009 35
West Side of Firewall
![Page 36: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/36.jpg)
02/06/2009 36
Looking Southeast
![Page 37: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/37.jpg)
02/06/2009 37
Delivering Measurable Projects Savings (Continued)
20% reduction in spool piping field welds
0% rework of piping and structural clashes within the new installation.
Project saved approximately one month of offshore hook-up time at completion
5% reduction of material waste due to lack of interferences, clashes, rerouting, etc.
Reduced Engineering time by up to 10%
Reduced Offshore Visits by up to 70%
Offshore project using laser scanning integrated with PDMS design were cutting edge efforts. The following benefits were obtained :
![Page 38: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/38.jpg)
02/06/2009 38
The magnitude, size and scope of this project here are some
brief statistics:
– New build offshore gas platform
– 6000 ton topsides
– West Coast of Africa
– 100,000 man-hour project
– $12MM engineering
Overview of Project #2
![Page 39: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/39.jpg)
02/06/2009 39
Delivering Measurable Projects Savings (Continued)
50% reduction in Procurement group man-hours for
major equipment packages.
90% reduction in Procurement group man-hours for
bulk material packages.
50% reduction in Document Control man-hours for
client handover.
95% reduction in reprographic costs related to client
handover.
Creation of weight management reports in less than
5 minutes instead of 4 hours.
Offshore project using VPE, VPRM, and PDMS integration had measurable value. AMEC Paragon obtained the following benefits:
![Page 40: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/40.jpg)
02/06/2009 40
Review
Integrated Project Execution
![Page 41: Document](https://reader031.vdocument.in/reader031/viewer/2022020419/568bdb081a28ab2034acfce0/html5/thumbnails/41.jpg)
02/06/2009 41
In Summary
IPE uses Aveva’s Suite of Applications as an integral part
of an environment which enables the collaboration of all
parties and all applications involved in an EPC project
executed from multiple locations safely, efficiently and
effectively.
IPE delivers documented results and savings
IPE delivers a competitive advantage and strengthens
AMEC Paragon’s ability to deliver quality projects to our
customers.