Download - Iem Bem Report
REPORT ON PROFESSIONAL TRAINING AND
EXPERIENCES ACQUIRED IN THE FIELD OF
ELECTRICAL & ELECTRONIC ENGINEERING
Prepared By:
ZAINAL BIN SHAMSUDDIN(IC NO. 670708-10-5821)
Submitted to Lembaga Jurutera Malaysia
In partial fulfillment of the requirements for the
Application Of Professional Engineer
Date: Feb 2013
1
ABSTRACT
Abstract of Report on Professional Training and Experience Acquired in the field
Electrical & Electronic Engineering
This report provides an overview of my training gained through the 22 years of my working
experiences in the field of electrical and electronic engineering.
My experiences include both conceptual and detailed design aspects of tolled expressway and
the operation and maintenance aspects of the highways. In the course of my work, apart from
operation and maintenance, my experiences also encompass site supervision and project
management of the highways during construction. I was also involved in the design and
research of Integrated Circuit (IC) in the semiconductor industry at Toshiba Corporation in
Japan. Currently, I am doing consultancy works for System Integration for Mass Railway
Transit (MRT) – Sungai Buloh Kajang (SBK) Line.
The challenges and problems that I faced throughout my experience and training had
developed in making good and critical decision during the course of the projects or
assignments.
2
ACKNOWLEDGEMENT
First and foremost, I would like to express my thankfulness to my parents for their
support in providing me with a good education in the field of electrical & electronic
engineering and the opportunities to contribute to the building of this nation, Malaysia.
I would like to extend my appreciation to the following persons for their invaluable time,
guidance and encouragement throughout the length of my working careers:
1. Ir.Chan Sai Chok : BSc. Elec, MBA(Bath), P.Eng, MIEM
2. En. Amran Amir
3. Ir. Dr. Y.W Thung : Phd, Msc(Eng), Bsc(Hons), CEng MIET, MHKIE
4. Ir. Marco Cheung : BSc(Eng), CEng MIET, MHKIE
5. Ir. CS Chang : BSc(Eng), MBA, CEng FIET, MIRSE, RPE
3
Table Of Contents
No. Description Page No.
1.0 INTRODUCTION…………………………………………………………...5
2.0 PROFESSIONAL TRAINING AND EXPERIENCES……………………6
2.1 Senior Test Engineer (from Sep 1990 to April 1995)………………6 - 7
2.2 Deputy Regional Engineer ( from May 1995 to Dec 1996)…………7
2.3 M & E Manager (from Jan 1997 to Feb 2003)………………………8 - 9
2.4 Project Manager (from Mar 2003 to May 2011)…………………….9
2.5 Facilities Manager (from Jun 2011 to Jul 2012)…………………….10
2.6 System Integration Specialist (from Aug 2012 to Present)………….11-12
3.0 CONCLUSION………………………………………………………………..12 -13
4
1.0 INTRODUCTION
It is essential for an apprentice engineer to undergo an appropriate training and
acquire adequate experience and knowledge in his/her endeavor to becoming a
professional engineer. All professional engineers are required to make critical
decisions and good evaluations in the course of their works as they develop reliable
and safe design within a reasonable cost.
This report will describe my 22 years working experiences in an esteemed
semiconductor company, highway concession companies and an engineering
consulting company, Perunding Eagles Engineers Sdn. Bhd.
5
2.0 PROFESSIONAL TRAINING AND EXPERIENCES
After graduating from Widener University at Pennsylvania, USA in 1990, I
started my career as Test Engineer at Toshiba Electronics (M) Sdn Bhd at Telok
Panglima Garang, Jalan Banting - Klang, Selangor. The company was involved in
the semiconductor industry from assembly process until testing process/quality
assurance of integrated circuits (IC). After working for one (1) year, I was assigned
to go for On-Job-Training at Toshiba Japan specialized in TV/Video VLSI Circuit.
In Japan, I was attached with Toshiba Research and Design Center at Tsurumi,
Yokohama – Japan. I was trained by the Toshiba Engineers on the Know-How to
design VLS Integrated Circuit until the mass production of the ICs at manufacturing
plant at Kitakyushu, Japan.
After working with the semiconductor manufacturing company for almost 5
years, I made a decision to explore a new field in my career which was highway
operations and maintenance. I joined PLUS Bhd in 1995 as a Deputy Regional
Engineer and after a short stint at PLUS, I joined a newly constructed highway
which was Lebuhraya Damansara-Puchong as M&E Manager. At LITRAK, I was
working together with Perunding Eagles Engineers Sdn Bhd for the Design,
Tendering, Awarding, Installation, Testing & Commissioning and Evaluation of the
Equipment and System of Toll Equipment, TCSS Equipment etc.
Currently, I am attached with Perunding Eagles Engineers Sdn Bhd and doing
a consultancy works on System Integration for MRT Project.
2.1 Senior Test Engineer at Toshiba (M) Sdn Bhd (Sep 1990 – Apr 1995)
I started my working career at Toshiba Electronics (M) Sdn Bhd. On
22nd September 1990, I started my assignment as Test Engineer and worked
under an experienced Japanese engineer namely Mr. Fukuda, who was my
immediate superior responsible for test engineering pertaining to ICs Testing.
I was promoted to Senior Engineer after working for 3 years at Toshiba.
My responsibilities and scope of works as a Senior Test Engineer include but
not limited to the followings :-
6
1. Lead a team of engineers, technical executives and technicians to handle
operation and maintenance of production test engineering.
2. To provide engineering support to manufacturing operations to achieve target.
3. Responsible for all maintenance of tester and handler equipment for ICs. To
ensure that all preventive and corrective maintenance are carried according to
the pre-plan maintenance standards and achieve the MTBF target.
4. To propose a design change of testers and handlers equipment in order to
improve the machine index and production capacity.
5. Assist management in planning for a new transfer product, production up plan
requirement, new machine requirement and specification.
6. Lead a team for productivity up plan so called Concept 250 which utilizing the
labor, machine and operation lead time to increase productivity.
7. To resolve quality assurance rejection and customer claim in product
performance.
2.2 Deputy Region Engineer at PLUS Bhd (May 1995 to Dec 1996)
I started working at Projek Lebuhraya Utara-Selatan Berhad (PLUS) in
1995 overseeing the Operation and Maintenance of Mechanical & electrical
and equipment/system for PLUS’s highway.
My responsibilities and scope of works as a Deputy Region Engineer for
Central Region include but not limited to the followings :-
1. To oversee the overall operation and maintenance of mechanical, electrical
and electronic equipment and machineries inclusive of an upgrading and
improvement works along the highway.
2. Project management works with contractors and respective departments for
the implementation of all Integrated Transportation System (ITS) and M&E
projects.
3. To ensure all preventive and corrective maintenance works were carried out
according to the maintenance plan and meets the maintenance standard
guidelines set by the Lembaga Lebuhraya Malaysia (LLM).
4. Responsible on the Maintenance Monthly Report to the Management and
Lembaga Lebuhraya Malaysia (LLM).
7
5. Directly involved in the design and implementation of the Medium Voltage
Street Lighting Project from Jalan Duta to Bukit Raja along NKVE
Expressway.
2.3 M&E Manager at Lingkaran TransKota Sdn Bhd (LITRAK)
(Jan 1997 to Feb 2003).
(Concesssion Company for Expressway Damansara-Puchong and Sprint
Highway)
My responsibilities and scope of works as an M&E Manager include but not
limited to the followings :-
1. Evaluation on the Design Brief for Toll Collection System (TCS), Traffic
Control & Surveillance System (TCSS), Automatic Cash Transfer System
(ACTS) and other associated equipment/system for the highway. Working
together with Perunding Eagles Engineers Sdn Bhd under the supervision of
Ir. Chan Sai Chok.
2. Provide Technical Information for preparation of tender and contract
documents for TCS, TCSS and ACTS etc and assist in the analysis and
review of contractors / consultant’s proposals/tenders. Working together with
Perunding Eagles Engineers Sdn Bhd under the supervision of Ir. Chan Sai
Chok.
3. Evaluation on the Technical and Functional Specification for TCS, TCSS,
ACTS in accord to the operational and LLM’s requirements. Working
together with Perunding Eagles Engineers Sdn Bhd under the supervision of
Ir. Chan Sai Chok.
4. Evaluation on the Factory Acceptance Test (FAT) and Site Acceptance Test
(SAT).
5. Review of Shop Drawings, Method Statements, Materials, Samples and As-
Built Drawings.
6. Assist in Installation, Testing & Commissioning of TCS, TCSS, ACTS and
other E&M services.
8
7. Develop and Implement Plans, Policies and Standard Procedures for the
Operation and Maintenance (O&M) of the equipment/system and E&M
services.
8. Undertake the development and review of the Operation and Maintenance
(O&M) Manual for equipment/system and E&M services for the highway
and associated buildings.
9. Control, Supervise and Co-ordinate the implementation of approved
Maintenance Plan.
10. Develop and Implement Maintenance Standards for all Integrated Traffic
System (ITS) such as CCTV, Variable Message Sign (VMS), Traffic Lights
System, Street Lighting System, Traffic Counting System, Fiber Optic
Communication System, Control Room Equipment etc.
11. To propose on any upgrading works to the equipment/system and other
E&M services in order to improve highway operation and cost efficiency.
12. Preparation of Budget and Business Plan for the Operation and Maintenance
of the Highway/Buildings.
Project Handling at LITRAK/SPRINT Highways:
1. Supply, Install and Test & Commission of Street Lighting System.
2. Supply , Install and Test & Commission of Traffic Light Signal
System.
3. Supply, Install and Test & Commission of Toll Collection System
4. Supply, Install and Test & Commission of all M&E Services For
Buildings.
2.4 Project Manager at Relong Megah Sdn Bhd (Mar 2003 to May 2011)
There were various projects assigned to me during my tenure of services at
Relong Megah Sdn Bhd. My involvement includes the various stages from
Tendering, Site-Implementation and Installation, Testing and Commissioning of
Laboratory and Security Equipment/System.
My responsibilities and scope of works as a Project Manager include but not
limited to the followings :-
9
1. To oversee the overall business development of the company.
2. To undertake the Preparation and Submission of Technical Proposal to the
government agencies/clients.
3. Handling all engineering technical matters with regards to the Technical
Proposal.
4. Responsible to the contract administrations comprising progress payment,
variation order, cost analysis and final account for closure.
5. Liaison with clients for approval of design/technical proposals and
submissions.
6. Ensuring the implementation and execution of awarded contracts.
2.5 Facilities Manager at LATAR Expressway (Jun 2011 to Jul 2012)
Started at LATAR as a Facilities Manager overseeing the Operation
and Maintenance of the highway and associated buildings. I was also assigned
to the project management on the construction of new toll plazas which
involve the approval from LLM, tendering exercise and technical evaluation.
My responsibilities and scope of works as a Facilities Manager include but not
limited to the followings :-
1. Undertake the development and review of the Operation and Maintenance
(O&M) Manual for equipment/system and E&M services for the highway
and associated buildings.
2. Control, Supervise and Co-ordinate the implementation of Approved
Maintenance Plan.
3. Develop and Implement Maintenance Standards for all Integrated Traffic
System (ITS) such as CCTV, Variable Message Sign (VMS), Traffic Lights
System, Street Lighting System, Traffic Counting System, Fiber Optic
Communication System, Control Room Equipment etc.
4. To propose on any upgrading works to the equipment/system and other
E&M services in order to improve highway operation and cost efficiency.
5. Preparation of Budget and Business Plan for the Operation and Maintenance
of the Highway/Buildings.
10
2.6 System Integration Specialist For Mass Rapid Transit (MRT) Project
: Sungai Buloh – Kajang (SBK) Line. (Aug 2012 – Present).
Perunding Eagles Engineers Sdn Bhd and PYPUN-KD Associates
Limited Joint Venture has been awarded a Consultancy Works for the System
Integration between Civil Work Packages Contractors (CWPC) and Railway
System Work Packages (RSWP). Perunding Eagles is to undertake the
establishment and the execution of the Interface Management and Control
Plan until the Full Completion of the MRT Project (Phase 1 and 2) and during
the 2-Year Defect Liability Period (DLP). Basically, I am working under the
supervision of several PYPUN-KD Professional Engineers for the MRT
Project.
The Railway System Work Packages consist of the followings :-
a) Electric Trains (ET)
b) Depot Equipment and Maintenance Vehicle (DEMV)
c) Signal and Train Control System (S&TCS)
d) Power Supply and Distribution System (PS&DS)
e) Platform Screen Door (PSD)
f) TrackWork (TWK)
g) Telecommunication (COMMS)
h) Electronic Access Control System (EACS)
i) Facility SCADA (FSCADA)
j) Automatic Fare Collection (AFC)
k) Building Management System (BMS)
The Civil Work Packages (CWP) consist of the followings :-
a) Elevated Viaduct Guideway and Associated Works Inclusive Of
Stations.
b) Underground Tunnel and Associated Works Inclusive Stations.
c) Sungai Buloh Depot Inclusive of Administration Building,
Maintenance Depot and Operation Control Centre.
d) Kajang Depot Inclusive of Maintenance Depot and Back Control Centre (BCC).
11
My responsibilities and scope of works as a System Integration Specialist
include but not be limited to the followings :
1. To Develop and Establish a System Engineering Management Plan (SEMP)
on System Interface in order to ensure all system integration are in place and
meet the Employer’s Requirements.
2. To initiate Inaugural Interface Meeting between the interfacing contractors ie.
Civil/System and System/System.
3. To Develop and Establish an Interface Management Plan (IMP) Template. To
guide and facilitate contractors in preparing the IMP. The framework of IMP
consists of the followings :-
a. Introduction and Overview.
b. Resource Management.
c. Interface Requirement.
d. Process Management ie. IDCP and IRCR .
e. Document Management.
f. Communication Management.
g. Interface Hazard management.
h. Work Programme.
4. To Develop and Establish Interface Management Tools ie. Interface Action
Log Register, Interface Information Exchange Register and Interface Matrix.
5. Review and Report on the IMP Submission.
6. To Develop and Establish an Interface Coordination Plan (ICD) Template.
The ICD details out all interface requirements between contractors on the
Physical/Mechanical Interface, Electrical Interface, Functional Interface and
Work Programme.
7. To facilitate the preparation and development of ICD between the interfacing
contractors. Review and Report on the ICD Submission.
8. To facilitate contractors on the preparation of Integrated Test Plan ie.
Program, Test Procedures etc.
9. Drive the process of Installation, Testing & Commissioning. Witness and
facilitate the Interface Test and Integrated Functional Interface Test for all
systems.
10. Record, Document and Keep all Interface Documents for the submission to the
clients.
12
3.0 CONCLUSION
The experiences gained from my involvement and assignments had not only
enabled me to handle critical decisions and make good engineering evaluations but
also to implement the best engineering practices in the various roles and
responsibilities. The vast experience in the operation and maintenance helps me to
understand better the standard of services rendered by the customers and end-users.
The experience gained by doing a System Integration consultancy works at MRT has
also made me realized and understand the importance of good and ethical
engineering practice in System Engineering Management Plan (SEMP) to develop
and construct safe and reliable systems in a complex high-technology.
13