Sir,Please find below the status report /update on the pipeline manifold As-built Documentation.1. ORII!A" #OR$ S%OP&'he ori(inal plan for this pro)ect co*ers the up(rade of ++ land and 1, swamp SPD% &ast pipeline manifold to capture modifications to e-istin( facilities and produce As-built drawin(s-P.S, P&.S, ISO, P"O' P"A!, PA, /A%, S'R0%'0RA" A!D DII'A" PI%'0R&S.See list of the manifolds in the attached spreadsheet.1. PR&S&!' S'A'0S'he wor2 done to date is as in the attached spreadsheet.'he o*erall wor2 scope has been re*iewed to 345 of the ori(inal scope. /ence the outstandin( manifolds ha*e been reduced to 16 manifolds as per attached+. .OR%AS'&D PROR&SS'he wee2l7 pro)ect pro(ress report is as per attached.%ontractor has paid for .'O for 14 manifolds but needs to ma2e additional pa7ments..ield *isit is tied to a*ailabilit7 of .'O..ield *isit to about 8 manifolds per wee2 is intended to ha*e all field wor2 completed b7 .ebruar7, and then drawin( re*iews and appro*al and final documentation and close out completed b7 9arch. A re*ised wor2 schedule will be concluded after a meetin( with contactor on .rida7.


Top Related