Sir, Please find below the status report /update on the pipeline manifold As-built Documentation. 1. ORIGINAL WORK SCOPE The original plan for this project covers the upgrade of 33 land and 17 swamp SPDC East pipeline manifold to capture modifications to existing facilities and produce As-built drawings-PFS, PEFS, ISO, PLOT PLAN, PGA, HAC, STRUCTURAL AND DIGITAL PICTURES. See list of the manifolds in the attached spreadsheet. 2. PRESENT STATUS The work done to date is as in the attached spreadsheet. The overall work scope has been reviewed to 50% of the original scope. Hence the outstanding manifolds have been reduced to 16 manifolds as per attached 3. FORCASTED PROGRESS The weekly project progress report is as per attached. Contractor has paid for FTO for 10 manifolds but needs to make additional payments. Field visit is tied to availability of FTO. Field visit to about 4 manifolds per week is intended to have all field work completed by February, and then drawing reviews and approval and final documentation and close out completed by March. A revised work schedule will be concluded after a meeting with contactor on Friday.

Upload: anthony-rosa

Post on 16-Aug-2015

212 views

Category:

Documents


0 download

DESCRIPTION

As-built mail

TRANSCRIPT

Sir,Please find below the status report /update on the pipeline manifold As-built Documentation.1. ORII!A" #OR$ S%OP&'he ori(inal plan for this pro)ect co*ers the up(rade of ++ land and 1, swamp SPD% &ast pipeline manifold to capture modifications to e-istin( facilities and produce As-built drawin(s-P.S, P&.S, ISO, P"O' P"A!, PA, /A%, S'R0%'0RA" A!D DII'A" PI%'0R&S.See list of the manifolds in the attached spreadsheet.1. PR&S&!' S'A'0S'he wor2 done to date is as in the attached spreadsheet.'he o*erall wor2 scope has been re*iewed to 345 of the ori(inal scope. /ence the outstandin( manifolds ha*e been reduced to 16 manifolds as per attached+. .OR%AS'&D PROR&SS'he wee2l7 pro)ect pro(ress report is as per attached.%ontractor has paid for .'O for 14 manifolds but needs to ma2e additional pa7ments..ield *isit is tied to a*ailabilit7 of .'O..ield *isit to about 8 manifolds per wee2 is intended to ha*e all field wor2 completed b7 .ebruar7, and then drawin( re*iews and appro*al and final documentation and close out completed b7 9arch. A re*ised wor2 schedule will be concluded after a meetin( with contactor on .rida7.