Plan for 2009 activity
S. Uozumi and AllDec-14 2009 ScECAL meeting @ KEK
![Page 2: Plan for 2009 activity](https://reader036.vdocument.in/reader036/viewer/2022083006/56813e82550346895da8b19a/html5/thumbnails/2.jpg)
Beam Test
• DESY BT analysis (Satoru)• KEK BT analysis (Nishiyama)• FNAL BT analysis– Nishiyama, Sakuma, Adil
• FNAL BT data taking– everyone
![Page 3: Plan for 2009 activity](https://reader036.vdocument.in/reader036/viewer/2022083006/56813e82550346895da8b19a/html5/thumbnails/3.jpg)
MPPC related• Improve performance with Hamamatsu– Dynamic range (20um pitch or smaller)– Various prioerties– 1.3^2mm2 or rectangular– package
• Long-term stability (Takahashi)• Response curve study• Radiation tolerance– Estimation of radiation dose to MPPC at ILC– Radiation test
• Magnetic tolerance• Robustness (broken MPPC)
![Page 4: Plan for 2009 activity](https://reader036.vdocument.in/reader036/viewer/2022083006/56813e82550346895da8b19a/html5/thumbnails/4.jpg)
Scintillator• Establish scintillator production with KNU– Mechanical stability– Injection mould ?– Megastrip structure– 5 mm wide strip
• Bench test– Reflector, method etc.
• Optical simulation• Estimate optimal light yield
![Page 5: Plan for 2009 activity](https://reader036.vdocument.in/reader036/viewer/2022083006/56813e82550346895da8b19a/html5/thumbnails/5.jpg)
Simulation
• Strip clustering (Kotera)• MIP calibration (Yanagida, Shinshu)