Plan for 2009 activity S. Uozumi and All Dec-14 2009 ScECAL meeting @ KEK

Upload: ellema

Post on 07-Jan-2016

24 views

Category:

Documents


2 download

DESCRIPTION

Plan for 2009 activity. S. Uozumi and All Dec-14 2009 ScECAL meeting @ KEK. Beam Test. DESY BT analysis (Satoru) KEK BT analysis (Nishiyama) FNAL BT analysis Nishiyama, Sakuma, Adil FNAL BT data taking everyone. MPPC related. Improve performance with Hamamatsu - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Plan for 2009 activity

Plan for 2009 activity

S. Uozumi and AllDec-14 2009 ScECAL meeting @ KEK

Page 2: Plan for 2009 activity

Beam Test

• DESY BT analysis (Satoru)• KEK BT analysis (Nishiyama)• FNAL BT analysis– Nishiyama, Sakuma, Adil

• FNAL BT data taking– everyone

Page 3: Plan for 2009 activity

MPPC related• Improve performance with Hamamatsu– Dynamic range (20um pitch or smaller)– Various prioerties– 1.3^2mm2 or rectangular– package

• Long-term stability (Takahashi)• Response curve study• Radiation tolerance– Estimation of radiation dose to MPPC at ILC– Radiation test

• Magnetic tolerance• Robustness (broken MPPC)

Page 4: Plan for 2009 activity

Scintillator• Establish scintillator production with KNU– Mechanical stability– Injection mould ?– Megastrip structure– 5 mm wide strip

• Bench test– Reflector, method etc.

• Optical simulation• Estimate optimal light yield

Page 5: Plan for 2009 activity

Simulation

• Strip clustering (Kotera)• MIP calibration (Yanagida, Shinshu)