Plan for 2009 activity. S. Uozumi and All Dec-14 2009 ScECAL meeting @ KEK. Beam Test. DESY BT analysis (Satoru) KEK BT analysis (Nishiyama) FNAL BT analysis Nishiyama, Sakuma, Adil FNAL BT data taking everyone. MPPC related. Improve performance with Hamamatsu - PowerPoint PPT PresentationTRANSCRIPT
Plan for 2009 activity
S. Uozumi and AllDec-14 2009 ScECAL meeting @ KEK
Beam Test
• DESY BT analysis (Satoru)• KEK BT analysis (Nishiyama)• FNAL BT analysis– Nishiyama, Sakuma, Adil
• FNAL BT data taking– everyone
MPPC related• Improve performance with Hamamatsu– Dynamic range (20um pitch or smaller)– Various prioerties– 1.3^2mm2 or rectangular– package
• Long-term stability (Takahashi)• Response curve study• Radiation tolerance– Estimation of radiation dose to MPPC at ILC– Radiation test
• Magnetic tolerance• Robustness (broken MPPC)
Scintillator• Establish scintillator production with KNU– Mechanical stability– Injection mould ?– Megastrip structure– 5 mm wide strip
• Bench test– Reflector, method etc.
• Optical simulation• Estimate optimal light yield
Simulation
• Strip clustering (Kotera)• MIP calibration (Yanagida, Shinshu)