![Page 1: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/1.jpg)
DiscretionaryDependency
Cost ofQuality (COQ)
Summary Activity
Baseline
ActivitySplitting
Gantt Chart
EXAM FLASHCARDS
By Jonathan Donado
Over 600 dynamic Flashcards with Graphics in PowerPoint
PART 1 of
5
PMP
![Page 2: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/2.jpg)
About me
Linkedin.com/in/jonathandonado
Twitter.com/donadosays
Bilingual senior general management executive with expertise in international
business and Mergers & Acquisitions (M&A)
If you like the Flashcards, please give a ”Like” on SlideShare. It’s much appreciated !
o Education: - Senior Executive Fellow – Harvard University- MBA – IESE
o Certifications:- Six Sigma Black Belt (CSSBB) – ASQ Certified- PMP- PMI-ACP – Agile Certified Practitioner
Jonathan Donado
![Page 3: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/3.jpg)
Instructions: PowerPoint
ContingencyReserve
Time or money allocated in the schedule or cost baseline for known risks with active
response strategies
Click on the “Slide Show Mode”
1. Download presentation - PowerPoint2. Use “Slide Show Mode”
![Page 4: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/4.jpg)
Acceptance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A response strategy to a risk event, either negative (threat)
or positive (opportunity), generally made when the
probability of the event or its impact are small
![Page 5: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/5.jpg)
AcceptanceTest
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A group of end-users work with the final product to test it for unidentified issues that may
appear during routine use. Also known as User Acceptance
Testing (UAT)
![Page 6: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/6.jpg)
Acceptance Criteria
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A set of conditions & requirements
that must be met before deliverables are accepted
Note: it is usually stated in a contract and/or SOW (Statement Of Work)
![Page 7: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/7.jpg)
Acceptance Deliverables
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Products, results or capabilities produced by a project and
validated by the customer or sponsors as meeting their
acceptance criteria
![Page 8: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/8.jpg)
Acquisition Process
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of acquiring
personnel/goods/services for new or existing work within the general definitions of contracts requiring an offer and acceptance, consideration,
lawful subject matter, and competent parties
![Page 9: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/9.jpg)
Acquire Project Team
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of confirming Human Resources availability
and selecting the team necessary to complete the
project activities
![Page 10: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/10.jpg)
Accuracy
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Accuracy means that the measured value is very close to true value (target or goal). Accuracy is about correctnessNote: Accuracy is not precision. To state that the results are
accurate means that they are correct.
![Page 11: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/11.jpg)
Action Item Status
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A list of problem issues including a description, point
of contact, and dates of action and resolution
![Page 12: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/12.jpg)
Action Plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A plan that describes what needs to be done and when it
needs to be completed. Project plans are action plans
![Page 13: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/13.jpg)
Active Listening
Linkedin.com/in/jonathandonadoJONATHAN DONADO
This occurs when the receiver confirms the message is being
received. It can be done by way of feedback, questions, prompts for clarity, and other signs of having
received the message
![Page 14: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/14.jpg)
Activity
JONATHAN DONADO
A distinct, scheduled portion of
work performed during the course of a project.
An activity typically has an expected duration, cost and requires certain resources. Also known as “Task”
Linkedin.com/in/jonathandonado
![Page 15: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/15.jpg)
Activity Attributes
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Multiple attributes associated with a schedule activity can be
included within an activity It includes: Activity Codes/ID; Name & Description; WBS ID;
Predecessor & Successor Activities; Logical Relationships Leads & Lags; Assumptions; Location, etc
![Page 16: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/16.jpg)
Activity on Arrow
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A network diagramming method where the arrows in the arrow diagramming method network
diagram represent the activities within the project
![Page 17: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/17.jpg)
ActivityCode
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An alphanumeric value assigned to each activity that enables
classifying, sorting, and filtering
![Page 18: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/18.jpg)
ActivityCost Estimation
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The projected cost of the scheduled activity that includes
the cost of all resources required to perform and complete the
activity
![Page 19: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/19.jpg)
ActivityDelay
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The maximum amount of time that an activity can be delayed due to lack of
resources
![Page 20: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/20.jpg)
ActivityDuration
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The time in calendar units between the start and finish
of a schedule activity
![Page 21: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/21.jpg)
ActivityDuration
Estimating
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Estimating the number of work periods that will be needed to complete individual activities
![Page 22: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/22.jpg)
ActivityDependency
Linkedin.com/in/jonathandonadoJONATHAN DONADO
These are the relationships of the preceding tasks to the succeeding
tasks. There are 4 types:
![Page 23: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/23.jpg)
Activity Identifier
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A unique alphanumeric value assigned to an activity and
used to differentiate that activity from other activities
![Page 24: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/24.jpg)
Activity List
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A list of the defined activities that need to be completed for a
project
![Page 25: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/25.jpg)
Activity-on-Arrow(AoA)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
AoA is a network diagramming method where the arrow in a
project network diagram represent the activities within
the project
Explanation: A method of diagramming the sequence of activities in a project using arrows to represent activities and small circles (nodes) connecting the activities to represent relationships. Dummy activities may be included to show activities that are dependent on one another. This method has only finish-to-start relationships. Also known as Arrow Diagramming Method (ADM)
![Page 26: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/26.jpg)
Activity-on-Node(AoN)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
AoN is a network diagramming
method where the node in a project network diagram represent the
activities within the project
Explanation: A method of diagramming the sequence of activities in a project where rectangles (nodes) represent the activities and arrows represent the relationship between the activities. This method uses four types of dependency relationships: finish to start, start to start, finish to finish and start to finish. Also known as precedence diagramming method (PDM)
![Page 27: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/27.jpg)
Activity Priority
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A priority value assigned to activities to provide an ordering for activities that are waiting for
resources (during resource-constrained scheduling)
![Page 28: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/28.jpg)
ActivitySequencing
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Identifying activity dependency relationships (how activities
affect each other) and determining the best order to
perform the activities to complete the project
![Page 29: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/29.jpg)
ActivitySplitting
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Allowing activities to be split into segments during resource
allocation. In some instances, preemption of activities may free a
resource to be used by a more critical activity
![Page 30: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/30.jpg)
Actual Cost(AC)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The realized cost incurred for
the work performed onan activity or work package during a specific time period
![Page 31: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/31.jpg)
Actual Duration
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The number of hours or days expanded to complete a project
activity
![Page 32: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/32.jpg)
Actual Effort
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The actual number of person hours or days expended to
complete an activity
![Page 33: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/33.jpg)
Actual Finish Date (AF)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The calendar date in which work actually ended on an activity
End dates
![Page 34: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/34.jpg)
Actual Start Date (AF)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The calendar date work actually began on an activity
![Page 35: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/35.jpg)
Adaptive Life Cycle
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A project life cycle that is intended to facilitate change and require a
high-degree of stakeholder involvement. They are iterative and
incremental
Note: Also known as Agile or Change-Driven Cycle
![Page 36: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/36.jpg)
AdministrativeClosure
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The documenting of the project results and the acceptance of the product by the customer or the
project sponsor. Also needed if a project is terminated
![Page 37: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/37.jpg)
Adjusting Leads & Lags
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A technique to find ways to bring project activities that are behind into alignment with plan during
project execution
Explanation: A technique used to adjust the amount of time between predecessor and successor activities
![Page 38: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/38.jpg)
Aggregation
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Using activity resource requirements to calculate total resource needs rather than to
constrain the project schedule. Normally, resource requirements
are used to perform resource-constrained scheduling
![Page 39: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/39.jpg)
Agreements
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Any document or communication that defines the initial intentions
of a project. This can take the form of a contract, memorandum of understanding (MOU), letters
of agreements, verbal agreements, etc
![Page 40: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/40.jpg)
Advertising
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A process to bring attention to a project or effort
![Page 41: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/41.jpg)
Agile Project Management
Linkedin.com/in/jonathandonadoJONATHAN DONADO
It is an iterative, incremental method of project
management
![Page 42: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/42.jpg)
AlignmentType
The alignment type is used to identify the type of constraint associated with a target date.
The following types are available:o Finish On o Finish On or After o Finish On or Beforeo Start Ono Start On or Aftero Start On or Beforeo Mandatory Start o Mandatory Finish
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 43: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/43.jpg)
Affinity Diagram
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A group creativity technique that allows large number of ideas to
be classified in groups for review and analysis
![Page 44: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/44.jpg)
AlternativeAnalysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Breaking down a complex scope situation for the purpose of
generating and evaluating different solutions and approaches
![Page 45: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/45.jpg)
AnalogousEstimating
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A technique for estimating the duration or cost of an activity or a project using historical data from a
similar activity or project. Also known as Top-Down estimating. It is
a form of expert judgement
![Page 46: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/46.jpg)
Analysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The study something complex and the separation into its more
simple components. Analysis typically includes discovering not only what the parts of the item being studied are, but also how they fit together. Example: study of
schedule variances for cause, impact, corrective action, and results
![Page 47: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/47.jpg)
Application Areas
Linkedin.com/in/jonathandonadoJONATHAN DONADO
These are the areas of business, industry which the project manager
may need special knowledge. Common application areas include
legal issues, technical issues, engineering information, and manufacturing information
![Page 48: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/48.jpg)
Apportioned Effort
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An activity where effort is allotted proportionately across certain
discrete efforts and not divisible into discrete efforts. Apportioned
Effort is work that cannot be directly associated to a WBS component or a
project deliverable, like Perform Quality Assurance. The term
apportion means to divide or share. Note: Apportioned effort is one of three earned value management (EVM)
types of activities used to measure work performance
![Page 49: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/49.jpg)
Approve
Linkedin.com/in/jonathandonadoJONATHAN DONADO
To accept as satisfactory. The approval may still require
confirmation by somebody else, as in levels of approval. In
management use, the important distinction is between approve and
authorize
Note: See Authorization flashcard
![Page 50: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/50.jpg)
Approved Change Request
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A Change Request that has been processed through the integrated
change control processed and approved
![Page 51: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/51.jpg)
Approved Change Request
Review
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A review of the Change Requests to verify that these
were implemented as approved
![Page 52: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/52.jpg)
Arrow Diagramming
Method (ADM)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A network diagramming technique in which activities are represented by arrows. The tail
of the arrow represents the start and the head represents the finish of the activity (the
length of the arrow does not represent the expected duration of the activity). Activities
are connected at points called ”Nodes" (usually drawn as small circles) to illustrate
the sequence in which the activities are expected to be performed
![Page 53: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/53.jpg)
Assignment
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The activities team members are responsible to complete
![Page 54: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/54.jpg)
Assumptions
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Factors in the planning process considered to be true, real, or
certain, without proof or demonstration. Need to be
documented and validated as they may impact risk
![Page 55: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/55.jpg)
AssumptionAnalysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A technique that explores the accuracy of assumptions and
identifies risks to the project from inaccuracy, inconsistency or
incompleteness of assumptions
![Page 56: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/56.jpg)
Authority
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The right to apply project resources, spend funds, make decisions or give
approvals
![Page 57: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/57.jpg)
Authorization
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The power granted by management to specified individuals allowing them to approve transactions, procedures, or total systems.
Defined as the final organization authority
Note: See Approve flashcard
![Page 58: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/58.jpg)
AuthorizedWork
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An effort that has been approved by higher authority
and may or may not be definedAuthorized Work Example:
![Page 59: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/59.jpg)
Avoidance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
This is one response to a risk event. The risk is avoided by
planning a different technique to remove the risk from the project
![Page 60: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/60.jpg)
Backlog
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A listing of product requirements and deliverables to be completed, written
as stories, and prioritized as the business to manage and organize the
project work. Used in Agile.
![Page 61: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/61.jpg)
Backward Pass
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A critical path method technique for calculating the late start and late finish dates, for the uncompleted
portions of all network activities, by working backward through the
schedule model from the project end date date
![Page 62: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/62.jpg)
Balancing Constraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Balancing the competing demands of scope, cost, time, quality, risk,
resources and customer expectations for a project
![Page 63: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/63.jpg)
Bar (Gantt) Chart
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A chart that shows schedule activities,
with start and end dates, activity durations, resources assigned and project
status. Also known as Gantt Chart
![Page 64: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/64.jpg)
Baseline
Linkedin.com/in/jonathandonadoJONATHAN DONADO
There are 3 baselines: Schedule + Scope + Cost. It is the approved version of a
work product that can be changed using formal change control procedures, and it
is used as the basis for comparison to actual results
Note: The original plan (for a project, a work package, or an activity) plus or minus approved changes. Usually used with a modifier (e.g., cost baseline, schedule baseline and scope baseline)
![Page 65: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/65.jpg)
BaselineSchedule
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A project schedule consisting of baseline start and finish dates,
which represent an estimated or expected schedule, or both
Note: This schedule is often derived from an initial set of early, late, or scheduled finish dates. Typically, once a baseline schedule is established, it does change over the course of a project)
![Page 66: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/66.jpg)
Basis of Estimates
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Supporting documentation outlining
the details used in establishing project estimates such as
assumptions, constraints, level of detail, ranges, and confidence levels
![Page 67: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/67.jpg)
Benchmarking
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A process of using prior projects within, or external to, the performing
organization to compare and set quality standards for processes and
results
![Page 68: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/68.jpg)
Benefit Measurement
Methods
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Used in comparing the value of one
project against the value, or benefits, of another; often used in
project selection decisions
![Page 69: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/69.jpg)
Benefit/Cost Analysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of determining the pros and cons of any project, process, product, or activity
![Page 70: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/70.jpg)
Best Practices
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A generally accepted set of standards for performing work
![Page 71: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/71.jpg)
Bidder Conference
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The meeting with prospective
sellers prior to the preparation of a bid or proposal to ensure all
prospective vendors have a clear and common understanding of the
procurement
Note: Also known as contractor conference, vendor conference, or pre-bid conference
![Page 72: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/72.jpg)
Bottom Up ‐Estimating
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A method of estimating project duration or cost by aggregating the
estimates of the lower level ‐components of the work
breakdown structure (WBS))
Explanation: A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet requirements of each of the lower, more detailed pieces of work, and
these estimates are then aggregated into a total quantity for the component of work. The accuracy of bottom-up estimating is driven by the size and
complexity of the work identified at the lower levels
![Page 73: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/73.jpg)
Brainstorming
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A general data gathering and
creativity technique that can be used to identify risks, ideas or solutions to
issues by using a group of team members or subject matter experts
![Page 74: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/74.jpg)
Budget
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The approved estimate or amount of money allocated for
a project
![Page 75: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/75.jpg)
Budget at Completion
(BAC)
JONATHAN DONADO Linkedin.com/in/jonathandonado
The sum of all budgets established in the planning phase for the entire
project or work to be performed
![Page 76: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/76.jpg)
Budget Cost of Work Performed
(BCWP)
JONATHAN DONADO Linkedin.com/in/jonathandonado
The total budgeted cost of all work
completed on a project to date. Also known as earned value (EV)
![Page 77: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/77.jpg)
Budget Cost of Work Scheduled
(BCWS)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The total budgeted cost expected to be spent for specific work
![Page 78: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/78.jpg)
Budget Estimate Range
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 79: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/79.jpg)
BusinessImpact Analysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Identifies project constraints, alternatives, and related
assumptions as they apply to the initiation phase
![Page 80: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/80.jpg)
Business Case
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The project purpose and justification. It
explains how the project support the firm’s strategic goals. It is a documented financial feasibility study used to establish validity of the benefits of a selected component
lacking sufficient definition and that is used as a basis for the authorization of further
project management activities
![Page 81: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/81.jpg)
Business Plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A business model used by a manager for planning a project or work
![Page 82: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/82.jpg)
BusinessRequirements
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The conditions that the product
must meet to support the high-level processes and needs of the business
![Page 83: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/83.jpg)
BusinessValue
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The positive impact for the business that will be achieved with
completion of the project (such as revenue, customer satisfaction, etc)
![Page 84: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/84.jpg)
Buyer
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The acquirer of products, services, or results for an
organization
![Page 85: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/85.jpg)
Cause Effect Diagram
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A decomposition technique that helps trace an undesirable effect
back to its root causes
Note: Also known as Fish Bone Diagram
![Page 86: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/86.jpg)
Central Tendency
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A property of the central limit theorem predicting that the data
observations in a normal distribution will tend to group around its mean as
the group sample size increases
Note: Mean, Median and Mode are the most common measurements
![Page 87: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/87.jpg)
Centralized Contracting
Linkedin.com/in/jonathandonadoJONATHAN DONADO
There is one single procurement department in the organization, and the procurement manager handles
simultaneously procurement on multiple projects
![Page 88: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/88.jpg)
Champion
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A person who takes on personal responsibility for the successful
completion of a “visionary project”
![Page 89: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/89.jpg)
Change ControlProcess
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A process whereby modifications to
documents, deliverables, or baselines associated with the
project are identified, documented, approved, or rejected
![Page 90: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/90.jpg)
Change Control Board
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A formally chartered group responsible for evaluating,
approving, delaying, or rejecting changes to the project, and for recording and communicating
such decisions
Note: It may include project manager, customer, experts, sponsor, other
![Page 91: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/91.jpg)
Change Control System
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A set of procedures that describes how modifications to the project deliverables will be controlled, changed and approved
![Page 92: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/92.jpg)
Change of Scope
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A change in objectives, work plan, or schedule resulting in a material
difference from the terms of previously granted approval to
proceed
![Page 93: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/93.jpg)
Change Log
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A list of changes made during the project. This includes dates of the
changes and impact in terms of time, cost and risk
![Page 94: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/94.jpg)
Change Management
Plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A plan that documents the process for
managing changes to the project deliverables and documentation
![Page 95: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/95.jpg)
ChangeRequest
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A formal request to modify any
document, deliverable, or baseline after the Project Management Plan has been
approved. Changes are approved through the Integrated Change Control Process
![Page 96: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/96.jpg)
Chart of Accounts
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Any numbering system used to monitor project costs by category (labor,
supplies, materials, etc). The project chart of accounts is usually based upon
corporate chart of accounts of the primary performing organization
![Page 97: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/97.jpg)
Charter
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A document issued by the initiator of the project, usually the project
sponsor, that formally authorizes the existence of the project, and provides
the project manager with the authority to apply organizational resources to
project activities
![Page 98: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/98.jpg)
Check sheet
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A tally sheet that can be used as a checklist when gathering
data
![Page 99: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/99.jpg)
Claim
A request or demand by a Seller against a Buyer, or vice-versa, for consideration, compensation or payment under the terms of a
contract, such a for a disputed change
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 100: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/100.jpg)
Claim Administration
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of processing, adjudicating and communicating
contract claims
![Page 101: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/101.jpg)
Closing Process Group
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of finalizing all the activities across all the Project
Management Process Groups to formally complete a project or
phase
![Page 102: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/102.jpg)
Close Procurement
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of completing each project procurement
![Page 103: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/103.jpg)
Closing Process Group
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process performed to finalize all activities across all Process Groups to
formally close a project or phase
![Page 104: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/104.jpg)
Code of Accounts
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A numbering system used to uniquely identify each component of the Work Breakdown Structure
(WBS)
![Page 105: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/105.jpg)
CollectRequirements
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of defining and documenting stakeholder needs to meet the project objectives
![Page 106: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/106.jpg)
Colocation
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Placing all team members in the
same physical location close to one another in order to improve communications, working
relationships and productivity
![Page 107: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/107.jpg)
Communication
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Relaying information so that all concerned parties have an equal
understanding
![Page 108: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/108.jpg)
CommunicationChannels
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Number of communication among project team members
N (N-1)----------- = 2
N = number of team members
![Page 109: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/109.jpg)
CommunicationConstraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Restrictions on the content, timing and audience or individual who will deliver the communication usually
stemming from a specific legislation or regulation, technology or
organizational policies
![Page 110: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/110.jpg)
CommunicationsManagement
Plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A component of the project, program, or portfolio management plan that describes how, when, and
by whom information will be administered and disseminated
![Page 111: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/111.jpg)
CommunicationsMethods
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A systematic procedure or technique used to transfer information among
project stakeholders
![Page 112: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/112.jpg)
CommunicationsProcess
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Simple Process:
Detailed Process:
![Page 113: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/113.jpg)
CommunicationsPlanning
The planning process to determine the communication requirements. Identifying who will need what
information, when they will need it and how the information should be
formatted and disseminated
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 114: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/114.jpg)
CommunicationsRequirements
Analysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An analytical technique to determine the information needs
of the project stakeholders through interviews, workshop, etc
![Page 115: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/115.jpg)
CompositeResource Calendar
JONATHAN DONADO
It includes the availability, capabilities and skills of human resources. It is developed as part of the Activity
Resource Estimating process
Linkedin.com/in/jonathandonado
![Page 116: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/116.jpg)
Compliance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A general concept to conforming to a rule, standard, law, requirement generating a result of “complaint”
or “not-complaint”
![Page 117: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/117.jpg)
Compress a Schedule
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Fast tracking and crashing are
two schedule compression techniques that help you shorten the duration of your project. Fast tracking does not
involve any cost but it increases risks. On the other hand, crashing does not
introduce much risk but it is a costly affair
![Page 118: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/118.jpg)
Conceptual Project Planning
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of developing broad-scope project documentation from which the technical requirements,
estimates, schedules, control procedures, and effective project
management will all flow
![Page 119: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/119.jpg)
Configuration Control
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of evaluating, approving
or disapproving, and managing changes to controlled items
![Page 120: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/120.jpg)
ConfigurationManagement
System
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A system that allows everyone to know what version of the baseline and other
components of the project management plan are the latest
versions
![Page 121: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/121.jpg)
Concurrent Engineering
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An approach to project staffing that,
in its most general form, calls for implementers to be involved in the design phase. Sometimes confused
with Fast Tracking
![Page 122: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/122.jpg)
Conflict Resolution Techniques
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A conflict is a situation when the interests, needs, goals or values of involved parties interfere with one
another. A conflict is a common phenomenon in the workplace. The
techniques are:
![Page 123: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/123.jpg)
Consensus
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A decision that a group agrees to support. It is usually achieved by discussing the relevant issues and
options
![Page 124: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/124.jpg)
Constraint
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A limiting factor that affects the execution of a project, program,
portfolio, or process
![Page 125: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/125.jpg)
Contingency
Linkedin.com/in/jonathandonadoJONATHAN DONADO
1) something that may happen: an
event that might occur in the future, especially a problem, emergency, or
expense that might arise unexpectedly and therefore must be prepared for
2) provision made against future unforeseen events
![Page 126: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/126.jpg)
ContingencyPlan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A document describing actions that the project team can take if
predetermined trigger conditions or risks/threats occur
![Page 127: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/127.jpg)
ContingencyReserve
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Time or money allocated in the schedule or cost baseline for known risks with active response strategies
![Page 128: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/128.jpg)
Continuous Improvement
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A methodology provides an
organization with powerful tools that improve its ability to plan,
implement, and control its activities. Also known as “Kaizen”
![Page 129: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/129.jpg)
Contract
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A legal, mutually-binding document
between buyer and seller covering the terms and conditions by which the
work must be completed
![Page 130: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/130.jpg)
ContractCloseout
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The process of determining whether the work as outlined in the contract
was completed accurately and settling the terms of the contract
![Page 131: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/131.jpg)
ContractChange Control
System
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A system created to modify the
contract and to control changes to the contract
![Page 132: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/132.jpg)
ContractAdministration
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Managing the relationship with
the seller or buyer
![Page 133: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/133.jpg)
ControlAccount
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A management control point where scope, budget, actual cost, and
schedule are integrated and compared to earned value for
performance measurement
![Page 134: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/134.jpg)
ControlQuality
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Monitoring specific project results to determine if they comply with
the relevant quality standards
![Page 135: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/135.jpg)
Control Chart
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Diagram of process results over time and against specified limits to determine whether processes are
acceptable or need adjustment
![Page 136: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/136.jpg)
ControlScope
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Process of monitoring the status of the project and product scope and
managing changes to the scope baseline
![Page 137: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/137.jpg)
CorrectiveAction
Linkedin.com/in/jonathandonadoJONATHAN DONADO
An intentional activity that realigns
the performance of the project work with the project management plan
![Page 138: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/138.jpg)
CostBaseline
JONATHAN DONADO Linkedin.com/in/jonathandonado
The approved version of the work
package cost estimates and contingency reserve that can be
changed using formal change control procedures and is used as the basis
for comparison to actual results
Note: The difference between cost budget and cost baseline is that the cost budget adds management reserve to the cost baseline
![Page 139: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/139.jpg)
Cost-Benefit Analysis
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A benefit measurement method
that weighs expected project costs against expected project benefits
![Page 140: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/140.jpg)
CostControl
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Managing and controlling changes to the cost baseline
![Page 141: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/141.jpg)
CostBudget
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The overall project cost budget for a project. It includes management
reserve.
![Page 142: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/142.jpg)
CostBudgeting
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Assigning specific cost estimates to specific activities and creating the
cost baseline
![Page 143: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/143.jpg)
CostEstimating
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Estimating the cost of resources that will be required to complete
each project activity
![Page 144: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/144.jpg)
CostLimits
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The acceptable range of variation on a control chart
![Page 145: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/145.jpg)
Cost ofQuality (COQ)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Determining costs incurred to ensure quality: including
prevention, appraisals and failure costs. Also known as ”Cost of Poor
Quality”
![Page 146: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/146.jpg)
CostManagement
Plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A component of a project or program management plan that
describes how costs will be planned, structured, and
controlled
![Page 147: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/147.jpg)
CostPerformanceIndex (CPI)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost
Explanation: The ratio of budgeted costs to actual costs (BCWP/ACWP). The CPI is often used to predict the magnitude of a possible cost overrun using the following formula: original cost estimate/CPI = projected cost at completion.
![Page 148: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/148.jpg)
Cost PlusFixed Fee Contract(CPFC)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A cost-reimbursable contract where the buyer pays for costs defined in the contract plus an
additional defined amount (fixed fee)
![Page 149: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/149.jpg)
Cost PlusIncentive Fee
Contract (CPIF)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A cost-reimbursable contract where the buyer pays for costs defined in the contract plus an additional amount if the seller meets performance criteria as
outlined in the contract
![Page 150: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/150.jpg)
Cost PlusPercentageCost (CPPC)
Contract
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A contract where Buyer reimburses the Seller for the Seller’s allowable costs plus a
percentage of the cost
![Page 151: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/151.jpg)
CostReimbursable
Contract
A contract that provides for payment to the seller for actual
costs incurred
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 152: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/152.jpg)
CostVariance
(CV)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The amount of budget deficit or surplus at a given point in time,
expressed as the difference between Earned Value and Actual Cost
CV = EV – AC
Note: (1) Any difference between the estimated cost of an activity and the actual cost of an activity (2) In earned value, BCWP less ACWP.
![Page 153: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/153.jpg)
CostTypes
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The types are:
![Page 154: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/154.jpg)
Crashing
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A schedule compression technique
used to shorten the schedule duration for the least incremental
cost by adding resources
![Page 155: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/155.jpg)
Create WBS
Linkedin.com/in/jonathandonadoJONATHAN DONADO
A process of subdividing the major project deliverables into smaller more manageable components.
The result is the Work Breakdown Structure (WBS)
![Page 156: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/156.jpg)
Critical Activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
Any activity in the Critical Path
![Page 157: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/157.jpg)
Critical Chain Method
A schedule method that allows the project team to place buffers on any project schedule path to account for
limited resources and project uncertainties. It has a resource
focus, whereas Critical Path is task order focused (not the same as
Critical Path Method)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 158: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/158.jpg)
Critical Path
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The sequence of activities that
represents the longest path through a project, which determines the
shortest possible duration. It is task order focused
![Page 159: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/159.jpg)
Critical PathMethod (CPM)
A method used to estimate the minimum project duration and
determine the amount of scheduling flexibility on the logical network
paths within the schedule model
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 160: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/160.jpg)
Customer
Linkedin.com/in/jonathandonadoJONATHAN DONADO
The recipient of service or product that the project
created. Also known as client in some organizations
![Page 161: PMP Exam Flashcards presentation 1 of 5 (PMBOK - 5th Edition - PMI). Free Dynamic Flash cards in PowerPoint. Download Them to Help You Study your PMP test](https://reader033.vdocument.in/reader033/viewer/2022061307/58a2512b1a28abe8738b5c47/html5/thumbnails/161.jpg)
52
Connect with me
Linkedin.com/in/jonathandonado
Twitter.com/donadosays
Bilingual senior general management executive with expertise in international
business and Mergers & Acquisitions (M&A)
If you like the Flashcards, please give a ”Like” on SlideShare. It’s much appreciated !
o Education: - Senior Executive Fellow – Harvard University- MBA – IESE
o Certifications:- Six Sigma Black Belt (CSSBB) – ASQ Certified- PMP- Agile (ACP) – PMI Certified
Jonathan Donado
THANK YOU