Transcript
Page 1: PORTFOLIO · PORTFOLIO. Title: Instrument_Clusters2 Created Date: 5/11/2018 4:44:30 PM

www.aesmolds.com [email protected]

Painted Parts

Chromed Parts

Mold weight up to 5 Ton

Special Steel requirement

Specialized Polish requirement

Machining Specific Technique requirement

FAI (First Article Inspection) requirement

Advanced Rheological Simulation requirements

Specific Mold Engineering Know-how requirement

Multi Cavity Tools with Hot Runner requirement

CPk (Statistical Dimensional Study) requirement

Molds with 1 Million Shot warranty requirement

Scientific Injection Process Development requirement

Multiple mold package launched and delivered at the same time

Product with Highly Visual requirement (with and without texture)

INSTRUMENT CLUSTERSPORTFOLIO

Top Related