Transcript
![Page 1: PORTFOLIO · PORTFOLIO. Title: Instrument_Clusters2 Created Date: 5/11/2018 4:44:30 PM](https://reader036.vdocument.in/reader036/viewer/2022063007/5fb83bca98b0e509cb7f03d6/html5/thumbnails/1.jpg)
www.aesmolds.com [email protected]
Painted Parts
Chromed Parts
Mold weight up to 5 Ton
Special Steel requirement
Specialized Polish requirement
Machining Specific Technique requirement
FAI (First Article Inspection) requirement
Advanced Rheological Simulation requirements
Specific Mold Engineering Know-how requirement
Multi Cavity Tools with Hot Runner requirement
CPk (Statistical Dimensional Study) requirement
Molds with 1 Million Shot warranty requirement
Scientific Injection Process Development requirement
Multiple mold package launched and delivered at the same time
Product with Highly Visual requirement (with and without texture)
INSTRUMENT CLUSTERSPORTFOLIO