portfolio · portfolio. title: instrument_clusters2 created date: 5/11/2018 4:44:30 pm

1
www.aesmolds.com [email protected] Painted Parts Chromed Parts Mold weight up to 5 Ton Special Steel requirement Specialized Polish requirement Machining Specific Technique requirement FAI (First Article Inspection) requirement Advanced Rheological Simulation requirements Specific Mold Engineering Know-how requirement Multi Cavity Tools with Hot Runner requirement CPk (Statistical Dimensional Study) requirement Molds with 1 Million Shot warranty requirement Scientific Injection Process Development requirement Multiple mold package launched and delivered at the same time Product with Highly Visual requirement (with and without texture) INSTRUMENT CLUSTERS PORTFOLIO

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PORTFOLIO · PORTFOLIO. Title: Instrument_Clusters2 Created Date: 5/11/2018 4:44:30 PM

www.aesmolds.com [email protected]

Painted Parts

Chromed Parts

Mold weight up to 5 Ton

Special Steel requirement

Specialized Polish requirement

Machining Specific Technique requirement

FAI (First Article Inspection) requirement

Advanced Rheological Simulation requirements

Specific Mold Engineering Know-how requirement

Multi Cavity Tools with Hot Runner requirement

CPk (Statistical Dimensional Study) requirement

Molds with 1 Million Shot warranty requirement

Scientific Injection Process Development requirement

Multiple mold package launched and delivered at the same time

Product with Highly Visual requirement (with and without texture)

INSTRUMENT CLUSTERSPORTFOLIO