Transcript
Page 1: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

Presented at the LANCE User Working Group MeetingApril 29, 2015

LANCE AMSR2 UPDATE

Sherry [email protected]

Page 2: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

2LANCE UWG

Topics• System• Products

o Datao Imagery

• Metricso Registered Userso Latency

4/29/15

Page 3: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

LANCE AMSR2 System

JAX

A G

CO

M-W

1D

ata

Pro

vid

ing

Serv

ice

LANCE AMSR2 Level 2 and Level 3 processing at AMSR SIPS (GHRC)

GIBS

L1R

EOSDIS User Registration

System (URS)

Worldview

• Redundant processing strings on 2 independent networks in different buildings will greatly reduce the possibility of data being unavailable due to system outages

• LANCE AMSR2 NRT data products will be available at AMSR SIPS on GHRC DAAC, for 7-14 days

JPG/PNG imagery

Data Ingest & Processing

LANCE Web & FTP Server

LANCE Web & FTP Server

AMSR2 NRT L2, L3 daily Science data

Data Ingest & Processing

lance.nsstc.nasa.gov

lance.itsc.uah.edu

gwen.nsstc.nasa.gov

gwen.itsc.uah.edu

KSAT Svalbard Ground Station

API

D

pack

ets

http

s://g

com

-w1.

jaxa

.jp

ECHO

LANCE AMSR2 NRT data product in HDF-EOS5

metadata

Reg

iste

red

U

sers

Page 4: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

4LANCE UWG

AMSR2 NRT Data Products

Product Short Name

DescriptionPrinciple

InvestigatorImage

A2_RainOcn_NRT

NRT AMSR2 L2B Global Swath GSFC Profiling Algorithm 2010: Surface Precipitation, Wind Speed over Ocean, Water Vapor over Ocean and Cloud Liquid Water over Ocean

Dr. Chris Kummerow

A2_DySno_NRT(in progress)

NRT AMSR2 Daily L3 Global Snow Water Equivalent EASE-Grids (daily incremental)

Dr. Marco Tedesco

4/29/15

Page 5: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

5LANCE UWG

AMSR2 NRT Planned Data ProductsProduct Short Name Description Principle Investigator

A2_Land_NRT NRT AMSR2 L2B Surface Soil Moisture, Ancillary Parameters and QC EASE-Grids

Dr. Eni Njoku

A2_SI6_NRTNRT AMSR2 Daily L3 6.25 km 89 GHz Brightness Temperature (Tb) Polar Grids(daily incremental)

Dr. Thorsten Markus

A2_SI12_NRTNRT AMSR2 Daily L3 12.5 km Tb, Sea Ice Concentration and Snow Depth Polar Grids (daily incremental)

Dr. Thorsten Markus

A2_SI25_NRTNRT AMSR2 Daily L3 25 km Tb and Sea Ice Concentration Polar Grids (daily incremental)

Dr. Thorsten Markus

4/29/15

Page 6: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

6LANCE UWG

AMSR2 High Resolution Imagery

4/29/15

Page 7: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

7LANCE UWG

Registered Users• 33 registered URS Users (since our public

announcement on March 17, 2015)o from 12 different countries

Affiliation of users• 10 government• 9 education• 3 non-profit• 1 agriculture

4/29/15

Page 8: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

8LANCE UWG

Latency: AMSR2 RainOcean

Using NRT L1R data

4/29/15

Using standard L1R data

Page 9: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

9LANCE UWG

L1R Input Data: Latency of Standard vs NRT Product

Standard L1R processing• pole to pole 1/2 orbits• data files complete• consistently not meeting 3 hour LANCE NRT processing

requirement

NRT L1R processing• one satellite downlink, roughly a whole orbit• we split the NRT L1R files at the southernmost observation,

creating approximate 1/2 orbit files for processing• occasional data loss• meet LANCE NRT 3 hour processing requirement

4/29/15

Page 10: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

10LANCE UWG

Back-Up Charts

4/29/15

Page 11: Presented at the LANCE User Working Group Meeting April 29, 2015 LANCE AMSR2 UPDATE Sherry Harrison sharrison@itsc.uah.edu

11LANCE UWG

Latency: AMSR2 L1R

4/29/15

Using NRT L1R data

Using standard L1R data


Top Related