Project Details- (Riverbed Sand Mining Project)Sr.No.
Details Particulars
ABOUT THE PROPOSAL1 Name of Lease Holder DEEPAKBHAI S PATEL2 Location Address Sur.No.19, Vill: Dokalyani Muwadi,Tal: Lunawada, Dist: MahisagarGUJARAT3 Applicability of the CRZ Notification,
2011NA
4 Lease Area (Hectares) 0.50.00 Hector5 Co-ordinates of the lease area 23005’55.1’’N 73036’15.1’’E
23005’53.53’’N 73036’15.5’’E23005’52.5’’N 73036’13.6’’E23005’54.2’’N 73036’13.00’’E
6 Ownership of Land (Gove./Private Land) Government7 Status of operation (New project or
Existing project operating since 2008New Project
8 Status of Lease (Lease no., date of issue,lease period, date of application for leaserenewal, etc.)
Approval of mining plan lease issued by theCollector office (Mining Department) Room No. 9to 14, First Floor, Godhra on dated 09.05.2011 videletter no. AGG/QAL/1607/2947, Mahisagar
9 Sand Reserve (MT) As per Technical Report10 Rate of mining of mineral (MT/Month) 8000MT/YearENVIRONMENT SETTINGS11 If located within 10km, aerial distance of
the lease area from the nearest:Name Distance
(Km)i. National Park/Wildlife
Sanctuary/Biosphere Reserve:NA
ii. Reserve Forest/Protected Forest: NAiii. Human Habitation Village: Dokalyani Muwadi 1.15
iv. Railway Line: - -v. Road: Village Road 0.9vi. Notified/Protected Archaeological
sites:NA
vii. Social infrastructures, e.g. school,hospital, historic/cultural/religiousplaces, defense establishments,etc. :
Community Health CentreLunawada
Religious Places: Local Temple,School
19
1.20
12 Width of riverbed (Meters) 8013 Average depth of water at lease area
(Meteres)85 Mtr
14 Average thickness of sand deposit at leasearea
3 Mtr. Max
15 Details of riparian vegetation, includingendemic and endangered species of fauna,if any
NA
16 Geo-Hydrology of the river flow(perennial, seasonal, etc.), Sedimenttransport characteristics/replenishmentpotential, etc.
Seasonal Short time
17 Width and condition of access road(Kutcha/pucca) to the lease area:
5 Mt. Width and 600 Mt. long Kutcha Road
DETAILS ON MINING/EXCAVATION ACTIVITIES18 Type of mining (Manual/Semi-
mechanized/mechanized)Type of mining :Semi-mechanized
19. Equipments to be used (Bulldozers,hydraulic excavators, loaders etc.)
JCB, Loader.
20. Minimum setback distance from river bank(Meters)
10 Mtr
21. Minimum buffer distance from bridgepiers/water intake wells/irrigation structure
500 Mtr
22. Minimum distance of stockpiles/vehicleloading place from the river bank
Mining will carried out in lease area. Thestockpiles/vehicle loading will be done in a such acontrolled manner that the nature of river does notdisturb. No artificial structure i.e. road or bund willbe created in lease area.
23. Maximum depth of sand removal (3 m orwater depth whichever is less)
3 Mtr
24. Man power requirement 0925. No. of working days in a year 180 Days26. Time of working hours in a day 8:00 to 17:00 (Total 8 Hours of working and one
hour of recess)Environmental management plan27. Measures proposed for protection of
environmental attributes like riverbed,riverbed vegetation, water, air, humanhealth, etc.
The precaution will be taken for nature of river bedand ensure that it would not be disturbed due tomining. No riverbed vegetation has been found inthe lease area. The depth of the mining will berestricted to 3 mtr. or water level, whichever is less.Domestic wastewater if generated will be disposedoff through soak pit/septic tank. Approach road &lease area will be water sprinkled regularly. Speedof vehicle entering in to the lease are will berestricted up to 20 kms/hrs. Overloaded vehicles wilbe covered with tarpaulin.
28. Details on transportation route & measuresproposed for control of fugitive emissionduring transportation
Approach road and lease area will be watersprinkled regularly. Speed of vehicle entering in tothe lease are will be restricted up to 20 kms/hrs.Overloaded vehicles will be covered with tarpaulin.
29. Details on transportation route area/ roadsides in at least 20% of lease area, numbers& types of species and budgetary outlay forthe same.
The green belt with tree plantation will be donesurrounding the available space of lease area andvillage.
30. Plan for restoration/reclamation The mine out area will be reclaimed through wastematerial i.e. coarse sand or gravel