RAD hardening
Half of dual HV supply or quarter of quad HV supply w
breakout
Output connector
Input connector
Ion Pump: RAD area
Standard cable
RAD-hard cable
Ion Pump: non-RAD area
![Page 2: RAD hardening](https://reader036.vdocument.in/reader036/viewer/2022082818/56812cee550346895d91b6f6/html5/thumbnails/2.jpg)
Notes
The Standard cable is the long cable from the rack-mounted HV supply to the area near the ion pump; it is plenum rated.
Where RAD-hard is not a requirement, the short segment is not used; alternatively, a full length RAD-hard cable can be used.
![Page 3: RAD hardening](https://reader036.vdocument.in/reader036/viewer/2022082818/56812cee550346895d91b6f6/html5/thumbnails/3.jpg)
Break-out
Half of dual HV supply or quarter
of quad HV supply w breakout
Ion Pump
Standard HV cable
Direct-to-pump using controller-provided break-out
![Page 4: RAD hardening](https://reader036.vdocument.in/reader036/viewer/2022082818/56812cee550346895d91b6f6/html5/thumbnails/4.jpg)
Break-out
Half of dual HV supply or quarter
of quad HV supply w/o breakout
Ion Pump
Standard HV cable
Standard HV cable
1:2 Breakout
Box
Indirect-to-pump using inline break-out box