E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
1
• Slide-Jack Tuner Assembly• TTF-III Warm Coupler Assembly• Connection of Beam Pipes
Eiji Kako (KEK, Japan)
Status of S1-Global
![Page 2: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/2.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
2
Slide-Jack Tuner Assembly23rd, March
2010’
MHI-06
MHI-05
Slide-Jack Tuner Center
Piezo Tuner& Load Sensor
![Page 3: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/3.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
3
Slide-Jack Tuner Assembly23rd, March
2010’
MHI-09
MHI-07
Slide-Jack Tuner End
Piezo Tuner& Load Sensor
![Page 4: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/4.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
4
Schedule of Warm Coupler Assembly
15 Mon ; am./pm. Arrival of Denis Kostin from DESY (Installation of Cryomodule-C in Tunnel)16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check & Preparation of Coupler Parts Set-up of Clean-booth & Pumping system17 Wed; am./pm. Assembly of Warm Coupler (Z109) Assembly of Warm Coupler (Z108)18 Thu ; am./ pm. Assembly of Warm Coupler (ACC011) Assembly of Warm Coupler (AES004) 19 Fri ; am./pm. Disassembly of Warm Coupler (AES004) Reassembly of Warm Coupler (AES004)
![Page 5: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/5.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
5
TTF-III Warm Coupler Assembly
TTF-IIIWarm
Coupler Photos by Toge-san
![Page 6: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/6.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
6
TTF-III Warm Coupler Assembly
![Page 7: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/7.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
7
TTF-III Warm Coupler Assembly
Denis Kostin (DESY)March 19th , 2010’
![Page 8: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/8.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
8
TTF-III Warm Coupler Assembly
Z109 Z108 ACC011 AES004
March 23, 2010’
![Page 9: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes](https://reader036.vdocument.in/reader036/viewer/2022062409/56814f95550346895dbd5105/html5/thumbnails/9.jpg)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
9
Connection of Beam Pipefor Cryomodule-C
Beam Pipe
Scheduled in April, 6th - 7th