Status of S1-Global. Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes. Eiji Kako (KEK, Japan). Slide-Jack Tuner Assembly. 23rd, March 2010’. MHI-05. MHI-06. Piezo Tuner & Load Sensor. Slide-Jack Tuner Center. Slide-Jack Tuner Assembly. MHI-07. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

1

• Slide-Jack Tuner Assembly• TTF-III Warm Coupler Assembly• Connection of Beam Pipes

Eiji Kako (KEK, Japan)

Status of S1-Global

Page 2: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

2

Slide-Jack Tuner Assembly23rd, March

2010’

MHI-06

MHI-05

Slide-Jack Tuner Center

Piezo Tuner& Load Sensor

Page 3: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

3

Slide-Jack Tuner Assembly23rd, March

2010’

MHI-09

MHI-07

Slide-Jack Tuner End

Piezo Tuner& Load Sensor

Page 4: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

4

Schedule of Warm Coupler Assembly

15 Mon ; am./pm. Arrival of Denis Kostin from DESY (Installation of Cryomodule-C in Tunnel)16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check & Preparation of Coupler Parts Set-up of Clean-booth & Pumping system17 Wed; am./pm. Assembly of Warm Coupler (Z109) Assembly of Warm Coupler (Z108)18 Thu ; am./ pm. Assembly of Warm Coupler (ACC011) Assembly of Warm Coupler (AES004) 19 Fri ; am./pm. Disassembly of Warm Coupler (AES004) Reassembly of Warm Coupler (AES004)

Page 5: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

5

TTF-III Warm Coupler Assembly

TTF-IIIWarm

Coupler Photos by Toge-san

Page 6: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

6

TTF-III Warm Coupler Assembly

Page 7: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

7

TTF-III Warm Coupler Assembly

Denis Kostin (DESY)March 19th , 2010’

Page 8: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

8

TTF-III Warm Coupler Assembly

Z109 Z108 ACC011 AES004

March 23, 2010’

Page 9: Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes

E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G

Global Design Effort

9

Connection of Beam Pipefor Cryomodule-C

Beam Pipe

Scheduled in April, 6th - 7th