slide-jack tuner assembly ttf-iii warm coupler assembly connection of beam pipes
DESCRIPTION
Status of S1-Global. Slide-Jack Tuner Assembly TTF-III Warm Coupler Assembly Connection of Beam Pipes. Eiji Kako (KEK, Japan). Slide-Jack Tuner Assembly. 23rd, March 2010’. MHI-05. MHI-06. Piezo Tuner & Load Sensor. Slide-Jack Tuner Center. Slide-Jack Tuner Assembly. MHI-07. - PowerPoint PPT PresentationTRANSCRIPT
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
1
• Slide-Jack Tuner Assembly• TTF-III Warm Coupler Assembly• Connection of Beam Pipes
Eiji Kako (KEK, Japan)
Status of S1-Global
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
2
Slide-Jack Tuner Assembly23rd, March
2010’
MHI-06
MHI-05
Slide-Jack Tuner Center
Piezo Tuner& Load Sensor
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
3
Slide-Jack Tuner Assembly23rd, March
2010’
MHI-09
MHI-07
Slide-Jack Tuner End
Piezo Tuner& Load Sensor
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
4
Schedule of Warm Coupler Assembly
15 Mon ; am./pm. Arrival of Denis Kostin from DESY (Installation of Cryomodule-C in Tunnel)16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check & Preparation of Coupler Parts Set-up of Clean-booth & Pumping system17 Wed; am./pm. Assembly of Warm Coupler (Z109) Assembly of Warm Coupler (Z108)18 Thu ; am./ pm. Assembly of Warm Coupler (ACC011) Assembly of Warm Coupler (AES004) 19 Fri ; am./pm. Disassembly of Warm Coupler (AES004) Reassembly of Warm Coupler (AES004)
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
5
TTF-III Warm Coupler Assembly
TTF-IIIWarm
Coupler Photos by Toge-san
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
6
TTF-III Warm Coupler Assembly
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
7
TTF-III Warm Coupler Assembly
Denis Kostin (DESY)March 19th , 2010’
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
8
TTF-III Warm Coupler Assembly
Z109 Z108 ACC011 AES004
March 23, 2010’
E. KAKO (KEK) 2010' Mar. 23 Webex meeting S1-G
Global Design Effort
9
Connection of Beam Pipefor Cryomodule-C
Beam Pipe
Scheduled in April, 6th - 7th