SORCER
Stimulating Obtaining Results in Communities in relation to
Energy-efficiency and Renewables
Integrated ProjectCall FP6-2005-TREN-4
CONCERTO II
Contract nr:TREN/07/FP6EN/S07.70576/038588
SORCER
Sorcer content
ApeldoornSewage digester, with poultry sludge (1.5 MWe)District heating Zuidbroek (2500 dwellings)EPC (shell based) of 0.82.65 GJ/dwelling*year additional energy saving (e.g. 400 Wp PV/dwelling)Woodchips peak boiler
HillerødLow temperature district heatingSolar collectors6000 m2 Class 1 Ecobuildings (-50%)20000 m2 Class 2 Ecobuildings (-25%)Biomass gasifierRenovated buildingsPV
Zuidbroek 66 months highlights
About 950 dwellings deliveredBiogas CHP completePV: about 44 kWp done on dwellings, 70 kWp on company buildings, 220 kWp on refurbished buildings, agreement on 68 kWp for housing corporationsMonitoring gives valuable results both for dwellings as for district heating system2.8 MW woodchips boiler in operation since september 2012
Dwelling monitoring results
Average consumption is close to predicted (49 kWh/m2)No significant difference between small and large dwellingsLarge spread (about factor of 5)
0
10
20
30
40
50
60
70
80
90
0 50 100 150 200 250 300 350 400 450 500
GJ p
er y
ear
for
spac
e he
ating
plu
s D
HW
Every dot is one dwelling
Annual heat consumption (May 2011-April 30 2012) degree days corrected (Deelen)
Average is 27.6 GJ
0
10
20
30
40
50
60
70
80
90
100
0 50 100 150 200 250 300
Annu
al e
nerg
y co
nsum
ption
(kW
h/m
2]
Dwelling gross floor area [m2]
Energy consumpion (heat) May2011-April2012May2011-april2012
Average is 50.7 kWh/m2
Hillerød 66 months highlights
3800 m2 solar thermal field completeBiomass boiler finished and in operationClass 1 buildings completedNew buildings added to WP8. These include town hall, city college, office administration building, conference centre, dormitory1500 m2 of low energy class 2 buildings reporting measurementsPV plants on Town Hall, Klaverfabrikken, Hillerød Varme head quarter completedGasifier being testedControl of low temperature district heating nearly implemented
Yet to do
Complete PV plans in Zuidbroek and HillerødComplete refurbishment activities in HillerødMonitoring district heating system
End date April 30, 2013
Progress summary
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Duration
Budget
RES el.
RES thermal
Solar space
New buildings
Refurb. buildings
Poly-generation
Other
~ 7.7Mio.
~ 2300 kW
~ 5650 kW
~ 0 m²
~ 186900 m²
~ 3000 m²
750 kW
100%
SORCER
72 months
data as of: October 2012, after acceptance of 60 month amendment