Page 1: Status of the  H1 Squeezer Experiment

G0900538-v1

Status of the H1 Squeezer Experiment

8th EDOARDO AMALDI CONFERENCE, New York, June 26, 2009

Daniel Sigg, LIGO Hanford Observatory

ANU, AEI, MIT, CIT and LHO collaboration

Page 2: Status of the  H1 Squeezer Experiment

G0900538-v1

Motivation

High power operation in future detectors Maybe the biggest remaining technical risk Squeezing allows for lower laser power

Squeezer technology now ready 7 dB of squeezing down to 10 Hz Has been demonstrated on a bench and on interferometers (40M)

Missing: Low frequency noise demonstration Planned Experiments

GEO600: prototype for long baseline interferometers Hanford: low noise at low frequency

2H1 Squeezer Status

Page 3: Status of the  H1 Squeezer Experiment

G0900538-v1

Goal of the H1 Squeezer Experiment

Demonstrate squeezing at low frequency with ahighly sensitive long baseline interferometer Demonstrate 3 dB of squeezing at frequencies where we are shot

noise limited Do not introduce noise at other frequencies!

Build a squeezer which could be readily turned into an advanced LIGO upgrade

Be ready for a test in Hanford after next science run We got the OK to build it

3H1 Squeezer Status

Page 4: Status of the  H1 Squeezer Experiment

G0900538-v1

40M squeezing

H1 Squeezer Status 4

K. Goda, O. Miyakawa, E. E. Mikhailov, S. Saraf, R. Adhikari, K.McKenzie, R. Ward,S. Vass, A. J. Weinstein, and N. Mavalvala, Nature Physics 4, 472 (2008)

Page 5: Status of the  H1 Squeezer Experiment

G0900538-v1

Projected H1 Sensitivity

5H1 Squeezer Status

Page 6: Status of the  H1 Squeezer Experiment

G0900538-v1

Projected Advanced LIGO Sensitivity at 30W

6H1 Squeezer Status

Page 7: Status of the  H1 Squeezer Experiment

G0900538-v1

Baseline Design

Inject into anti-symmetric port New optics table required (8’ x 3’) New Faraday isolator design required

Reuse initial LIGO Nd:YAG laser (10W) Second-harmonic generator (SHG) uses AEI design Locked to interferometer laser by fiber Frequency locked auxiliary laser for frequency shifted subcarrier

Optical parametric oscillator (OPO) ANU design: Doubly resonant Bowtie configuration: Less backscattering Non-linear crystal: PPKTP

Homodyne Detector from AEI Use advanced LIGO electronics where possible (Hanford) Assembly and testing at MIT

7H1 Squeezer Status

Page 8: Status of the  H1 Squeezer Experiment

G0900538-v1

Optical Layout

H1 Squeezer Status 8

Page 9: Status of the  H1 Squeezer Experiment

G0900538-v1

HAM4 Layout

SQT3 9H1 Squeezer Status

Page 10: Status of the  H1 Squeezer Experiment

G0900538-v1

H1 Squeezer Time Line

Fixed start date for H1 experiment: 2/15/2011 Fixed end date for H1 experiment: 10/3/2011

Better be ready!

LLO

LHO

eLIGO S6 aLIGO: install/commissioning

~6 months

10H1 Squeezer Status