Page 1: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhoto

1 BD-01

Non-C

RN

MD

R

17.3

00

BR:M

DR:1

7.3

00

05-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Bid

ar

Bid

ar

Bid

ar

Bid

ar

Manja

ra

1997

Rajo

kheni

8.40 7.40

PSC I

Girder

7 25.00 175.00 Open

17.8

0400

77.3

1380

• Girders in good condition

• Light Leaching observed on the

cantilever portion of the slab on both

sides.

• Railings slightly damaged

• Drainage spouts to be cleaned /

repaired

• Debris over pier cap to be removed.

• Expansion Joint fully damaged

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be repaired wherever

required.

• Expansion Joint to be replaced

• Drainage spouts to be repaired /

provided

• Bearings to be repaired / Greased.

72.80

2 BD-02

CRN

SH

34

57.0

00

BR:S

H34:B

HA201:5

6.5

15

08-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Bid

ar

Bid

ar

Bhalk

i

Bhalk

i

Kara

nja

1970

Bhalk

i

8.30 7.10

RC G

irder

11 11.90 130.90 Open

18.0

0110

77.1

9510

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Concrete of poor quality in girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Guard posts damaged

• Overflows by around 0.50m above

Road Level during Heavy discharge /

Rains.

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Guard Posts shall be reconstructed /

Repaired wherever required.

• As an alternative, High level

Bridge can be proposed adjacent to

the existing Bridge with footpath - 6

spans of 24.0m c/c)

54.23

3 BD-03

CRN

SH

75

15.7

00

BR:S

H75:H

UM

202:1

5.5

7

23-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Bid

ar

Bid

ar

Hum

nabad

Hum

nabad

Tributa

ry t

o K

ara

nja

1970

Dubalg

undi

8.00 7.00RC G

irder

6 12.00 72.00 Open

17.8

6110

77.1

8850

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Concrete of poor quality in girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Railings damaged

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

52.12

4 GB-01

CRN

SH

11

61.5

50

BR:S

H11:A

LD

2:6

1.4

85

02-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Ala

nd

Ala

nd

Tributa

ry t

o B

enneth

ora

2014

Am

bala

ga

8.50 7.50

RC G

irder

8 12.40 99.20 Open

17.6

0120

76.8

9130

• Constructed by KRDCL

• Structure in Good condition.

• Light Leaching observed on the

cantilever portion of the slab on both

sides.

• Drainage spouts to be cleaned /

repaired (Outlet pipe to be provided)

• Debris over pier cap to be removed.

• Expansion Joint to be cleaned

• Vegetative growth to be removed on

side slopes

• Expansion Joint to be cleaned

• Drainage spouts to be cleaned /

repaired (Outlet pipe to be provided)

• Bearings to be Greased.

89.04

Sl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

P2 - 1 of 36

Page 2: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

5 GB-02

CRN

SH

32

37.0

00

BR:S

H32:A

LD

3:3

7.0

96

05-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Ala

nd

Ala

nd

Benneth

ora

2005

Sangunda

8.50 7.50

RC S

lab

9 10.06 95.40 Open

17.6

2110

76.7

1900

• Structure in Good condition.

• Vegetative growth on side slopes and

approaches

• Expansion Joint to be repaired /

Cleaned

• Drainage spouts to be repaired /

Cleaned

• Vegetative growth to be removed on

side slopes

• Railings shall be reconstructed /

Repaired wherever required.

73.03

6 GB-03

CRN

SH

51

35.2

00

BR:S

H51:A

LD

203:4

5.5

75

04-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

ara

g

Gulb

arg

a

Ala

nd

Ala

nd

Benneth

ora

1975

Bhodhan

8.00 7.00

RC G

irder

4 12.00 48.00 Open

17.5

7280

76.7

5790

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Reinforcement exposed at bottom of

Girders at few places

• Concrete of poor quality in girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Guard posts damaged

• Over Flows by 3.00m during Rains.

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Guard posts shall be reconstructed /

Repaired wherever required.

• As an Alternative, Propose a High

Level Bridge with 12.00m Width.

51.03

7 GB-04

CRN

SH

51

42.0

00

BR:S

H51:A

LD

203:5

2.8

4

05-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Ala

nd

Ala

nd

Nalla

1975

Chin

chanasur

7.50 6.50 HP 30 + 2

0.90 +

2.1046.20 Raft

17.5

2270

76.7

8260

• NP2 Pipes Cracked

• Head wall damaged

• Guard posts damaged

• Scour of around 0.50m observed at

around 20 pipes

• Pipes silted.

• Road surface sinked.

• Thick Vegetative Growth blocking

vents.

• Overflows by 1.0m above Ground

Level

• Propose for Reconstruction with

Highlevel Bridge

25.19

8 GB-05

CRN

MD

R

19.5

00

BR:M

DR_ALD

8:A

LD

8:9

.166

06-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Ala

nd

Ala

nd

Nalla

1985

Hitta

lsriur

8.50 7.50

RC S

lab

19 10.40 197.60 Open

17.3

8070

76.5

6480

• Structure in Good condition.

• Vegetative growth on side slopes and

approaches

• Honey combing observed in few slab

at edges.

• Thick vegetative growth / thorny

bushes blocking the water way.

• Expansion Joint to be repaired /

Cleaned

• Drainage spouts to be repaired /

Cleaned

• Vegetative growth to be removed on

side slopes

• Railings shall be reconstructed /

Repaired wherever required.

• Thick vegetative growth / thorny

bushes to be removed

• Plastering / grouting to be done for

slab / sub-structure wherever required.

66.36

P2 - 2 of 36

Page 3: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

9 GB-06

Non-C

RN

MD

R

95.5

00

BR:M

DR:9

5.5

00

08-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Yadgir

Gulb

arg

a

Jew

arg

i

Jew

arg

i

Nalla

1975

Vadagere

8.00 7.00

MCPC

18 3.30 67.90 Raft

16.7

5916

76.5

5085

• Honey combing of concrete observed

in the Pipes

• Minor Cracks observed at top in few

pipes

• MS Railings damaged

• Scour of around 0.50m observed at

around 20 pipes

• Few pipes silted by around 50%

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• MS Railings shall be reconstructed /

Repaired wherever required.

53.33

10 GB-07

Non-C

RN

MD

R

19.0

00

BR:M

DR:1

9.0

00

08-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Yadgir

Gulb

arg

a

Jew

arg

i

Jew

arg

i

Nalla

2002

Kadakol

8.00 7.00

MCPC

42 3.00 146.50 Raft

16.8

7141

76.4

9502

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 10 pipes

• Few pipes silted

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• Guard posts shall be reconstructed /

Repaired wherever required.

71.40

11 GB-08

Non-C

RN

MD

R

0.3

00

BR:M

DR:0

.300

08-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Yadgir

Gulb

arg

a

Jew

arg

i

Jew

arg

i

Nalla

1985

Aura

d

8.50 7.50

RC S

lab

10 8.20 82.00 Open

16.9

7084

76.7

6641

• Structure in Good condition.

• Vegetative growth on side slopes and

approaches

• Honey combing observed in few slab

at edges.

• Thick vegetative growth / thorny

bushes blocking the water way.

• Expansion Joint to be repaired /

Cleaned

• Drainage spouts to be repaired /

Cleaned

• Vegetative growth to be removed on

side slopes

• Railings shall be reconstructed /

Repaired wherever required.

• Thick vegetative growth / thorny

bushes to be removed

• Plastering / grouting to be done for

slab / sub-structure wherever required.

66.09

12 SD-01

CRN

SH

10

101.0

00

BR:S

H10:S

ED

1:1

00.7

47

28-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Sedam

Sedam

Kagin

a

1975

Malk

hed

7.30 0.50

RC G

irder

21 10.00 210.00 Open

17.1

9680

77.1

5490

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Concrete of poor quality in girders

• Leaching / Spalling and reinforcement

exposed observed on the cantilever

portion of the slab on both sides.

• Reinforcement exposed in girders (in

central 2 to 3 spans)

• Expansion joints fully clogged

• MS Railings slightly damaged

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be repaired wherever

required.

53.70

P2 - 3 of 36

Page 4: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

13 SD-02

CRN

SH

15

143.0

00

BR:S

H15:S

ED

2:1

45.4

13

27-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Sedam

Sedam

Kagin

a

1972

Sata

pata

nahalli

8.00 7.00

RC G

irder

19 11.70 222.30 Open

17.2

2240

77.3

1220

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Reinforcement exposed at bottom of

Girders at few places

• Concrete of poor quality in girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Railings damaged

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

56.16

14 SD-03

CRN

SH

15

148.0

00

BR:S

H15:S

ED

2:1

49.9

78

02-0

2-2

018

Nort

h e

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Sedam

Sedam

Kam

ala

vath

i

1990

Bib

banahalli Cro

ss

8.10 7.10

RC S

lab

15 4.60 69.00 Open

17.1

9080

77.2

8950

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• Railings slightly damaged

• Drainage spouts to be repaired

• The edges of slab to be rehabilitated

by grouting / guniting in all spans

• Vegetative growth to be removed on

side slopes

• Railings shall be repaired wherever

required.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

60.77

15 SD-04

CRN

SH

10

118.4

00

BR:S

H10:S

ED

1:1

18.4

57

30-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Sedam

Sedam

Kam

ala

vath

i

2002

Bate

gera

8.50 7.50

RC G

irder

7 12.45 87.15 Open

17.1

4820

77.3

0000

• Constructed by KRDCL

• Structure in Good condition.

• Light Leaching observed on the

cantilever portion of the slab on both

sides.

• Drainage spouts to be cleaned /

repaired (Outlet pipe to be provided)

• Debris over pier cap to be removed.

• Expansion Joint to be cleaned

• Vegetative growth to be removed on

side slopes

• Expansion Joint to be cleaned

• Drainage spouts to be cleaned /

repaired (Outlet pipe to be provided)

• Bearings to be Greased.

73.19

16 SD-05

CRN

SH

15

103.3

00

BR:S

H15:C

NL1:1

05.0

39

01-0

2-2

018

Nort

h e

ast

Gulb

arg

a

Chin

choli

Gulb

arg

a

Chin

choli

Chin

choli

Tributa

ry t

o M

ullam

ari

1980

Ain

oli C

ross

8.10 7.10

RC S

lab

18 6.90 124.20 Open

17.4

9360

77.4

3040

• Severe Spalling of Concrete at soffit of

slab

• Reinforcement exposed at soffit of

Slab

• Expansion joints fully clogged

• Parapet damaged

• Drainage spouts to be repaired

• The Entire slab for all spans have to be

fully rehabilitated with grouting /

guniting

• Vegetative growth to be removed on

side slopes

• Parapet shall be repaired wherever

required.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

• As an alternative the entire super-

structure can be replaced for 8.50m

width, retaining the sub-structure.

52.76

P2 - 4 of 36

Page 5: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

17 SD-06

CRN

SH

75

67.7

00

BR:S

H75:C

NL201:6

4.3

07

24-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Chin

cholli

Chin

cholli

Backw

ate

r of M

ullam

ari

1985

Channaru

r

7.10 6.10

RC G

irder

8 16.80 134.40 Open

17.5

4630

77.2

2620

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Concrete of poor quality in girders

• Reinforcement exposed at few places

at bottom of Longitudinal girder.

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Parapet slightly damaged

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Parapet shall be reconstructed /

Repaired wherever required.

59.52

18 SD-07

CRN

SH

125

12.5

00

BR:S

H125:C

TR75:5

0.2

95

01-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Chitapur

Gulb

arg

a

Chitapur

Chitapur

Tributa

ry K

agin

a

1980

Gotu

r

8.00 7.00

RC G

irder

12 12.00 144.00 Open

17.3

5420

77.1

0310

• Slight Leaching / Spalling observed on

the cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Guard posts damaged

• Thick Vegetative growth at approaches

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be repaired /

provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes

• Guard posts shall be reconstructed /

Repaired wherever required.

57.95

19 SD-08

Non-C

RN

MD

R

120.0

00

BR:M

DR:1

20.0

00

31-0

1-2

018

Nort

h E

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Chin

cholli

Chin

cholli

Tributa

ry K

agin

a

1975

Tengli

8.00 7.00

RC G

irder

12 11.80 141.60 Open

17.2

5310

77.1

3020

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Reinforcement exposed at bottom of

Girders at few places

• Concrete of poor quality in girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Guard posts damaged

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Guard posts shall be reconstructed /

Repaired wherever required.

53.42

20 SD-09

Non-C

RN

MD

R

69.4

00

BR:M

DR:6

9.4

00

02-0

2-2

018

Nort

h E

ast

Gulb

arg

a

Sedam

Gulb

arg

a

Chin

cholli

Chin

cholli

Kagin

a

1975

Dandhoti

7.50 6.50

MCPC

72 3.30 273.10 Raft

17.1

7530

77.1

0470

• Honey combing of concrete observed

in the Pipes

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 20 pipes

• Few pipes silted by around 50%

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• Guard posts shall be reconstructed /

Repaired wherever required

54.80

P2 - 5 of 36

Page 6: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

21 Bk-01

CRN

MD

R

17.2

00

BR:M

DR_BD

M201:B

DM

201:1

7.2

84

06-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Badam

i

Badam

i

Tributa

ry t

o M

ala

pra

bha

2015

Teggi

8.50 7.50

RC S

lab

6 10.80 64.80 Open

16.0

5482

75.7

0690

• Newly constructed

• Structure in good condition

• Thick vegetative growth to be removed

from waterway at ends

• Drainage spouts to be cleaned.

• Outlet pipe to be provided.

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Drainage spouts to be cleaned, out let

pipes to be provided

• Expansion joint to be cleaned.

88.08

22 Bk-02

CRN

SH

135

29.4

00

BR:S

H135:B

DM

207:2

2.3

05

05-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Badam

i

Badam

i

Tributa

ry t

o M

ala

pra

bha

2015

Muru

di

12.00 11.00

RC S

lab

6 10.80 64.80 Open

16.0

4072

75.7

5591

• Newly constructed

• Structure in good condition

• Thick vegetative growth to be removed

from waterway at ends

• Side slope pitching to be provided

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Slab at edges in one span to be

grouted.

88.18

23 Bk-03

CRN

SH

14

68.4

00

BR:S

H14:B

DM

2:6

7.6

92

05-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Badam

i

Badam

i

Rangasam

udra

1965

Rangasam

udra

8.00 7.00

RC S

lab

19 5.50 104.50 Open

15.9

4585

75.8

5287

• Structure in good condition

• Slight spalling of concrete at edges in

soffit of slab in 6 to 7 spans

• Reinforcement slightly exposed at

edges.

• Thick vegetative growth to be removed

from waterway at ends

• Road surface slightly cracked.

• MS Railings slightly damaged.

• The slab soffit at edges to be

rehabilitated / grouted with epoxy grout

• Pier cap to be grouted, cracks to be

sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Road surface to be repaired

53.31

24 Bk-04

Non-C

RN

MD

R

6.0

00

BG

L014006150

01-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Bagalk

ot

Bagalk

ot

Tributa

ry t

o K

rishna

2000

Nain

egali

8.50 7.50

RC G

irder

4 25.00 100.00 Open

16.2

9006

75.9

5550

• Structure in good condition

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Slight Honey combing observed in

girders.

• Slight spalling, reinf. Exposed in main

girders at bottom in few girders.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes

in waterway

• Grating of Drainage spouts damaged.

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Thick Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

• Pointing to sub-structure to be done as

required.

73.98

P2 - 6 of 36

Page 7: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

25 Bk-05

CRN

SH

53

129.0

00

BR:S

H53:B

LG

206_B:1

29.3

19

06-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Bilgi

Bilgi

Ghata

pra

bha

2015

btw

Kala

dgi /

kata

rki

8.50 7.50

RC S

lab

37 4.85 179.45 Open

16.2

2686

75.4

9068

• Newly constructed, Bridge cum

Barrage

• Structure in good condition

• Side slope pitching to be provided

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Railings to be repaired

88.01

26 Bk-06

CRN

SH

133

87.2

00

BR:S

H133:H

UD

209:8

7.2

83

05-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o M

ala

pra

bha

1980

Chitta

ragi /

Gangur

7.80 6.80

RC S

lab

15 5.40 81.00 Open

16.1

1594

75.9

6984

• Severe Spalling of Concrete at edges

in soffit of slab in all spans.

• Reinforcement exposed and corroded

at edges

• Honey combing observed at mid span

in soffit of slab in few spans.

• Thick vegetative growth to be removed

from waterway at ends

• Pointing eroded in piers (at few

locations)

• Drainage spouts fully blocked, non

functional.

• Vegetative growth at Pier cap location

• The slab soffit at edges and at bottom

to be fully rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

• Vegetative growth at Pier cap location

to be removed

• Sub-structure pointing to be done by

grouting.

• Drainage spout to be repaired /

replaced.

51.19

27 Bk-07

CRN

SH

133

90.0

00

BR:S

H133:H

UD

209:9

0.1

43

04-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o M

ala

pra

bha

1975

Kirasur

8.00 7.00

MCPC

28 2.30m Dia 77.90 Open

16.1

2328

75.9

9239

• Vents 50% silted.

• Thick vegetative growth blocking

almost half of the vents.

• severe Honey combing of concrete

observed in the Pipes

• Concrete of poor quality

• Minor Cracks observed at top in few

pipes

• Parapet slightly damaged

• All the Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Thick vegetative growth to be removed

from the waterway.

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• MS railings shall be reconstructed /

repaired wherever required.

• As an alternative a high level

bridge for a length of 75.0m can be

proposed by increasing the vent

height.

42.08

28 Bk-08

CRN

SH

14

110.4

00

BR:S

H14:H

UD

3_B:1

10.6

02

02-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

2002

Jala

kam

ala

din

ni

8.50 7.50

RC G

irder

8 12.35 98.80 Open

16.1

0417

76.1

6256

• Structure in good condition,

constructed by KRDCL

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Main girder and cross girder in good

condition

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Grating of Drainage spouts damaged.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased 73.36

P2 - 7 of 36

Page 8: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

29 Bk-09

CRN

SH

14

115.6

00

BR:S

H14:H

UD

3_B:1

16.2

12

03-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

2000

Kara

di

8.00 7.00

RC S

lab

20 5.10 102.00 Open

16.1

0184

76.2

0488

• Severe Spalling of Concrete at edges

in soffit of slab in all spans.

• Reinforcement exposed and corroded

at edges

• Spalling / Honey combing observed at

mid span in soffit of slab in few spans.

• Thick vegetative growth to be removed

from waterway at ends

• Vegetative growth at Pier cap location

• The slab soffit at edges and at bottom

to be fully rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

• Vegetative growth at Pier cap location

to be removed 61.72

30 Bk-10

CRN

SH

14

127.0

00

BR:S

H14:H

UD

3_B:1

27.2

2

21-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

1975

Kodih

al

8.00 7.00

MCPC

24 3.05m Dia 84.70 Raft

16.0

9503

76.2

9977

• Severe Honey combing of concrete

observed in the Pipes at bottom

• Minor Cracks observed at top in few

pipes

• RC parapet slightly damaged

• Scour of around 0.50m observed at

around 10 pipes

• Few pipes silted

• Floor protection works damaged.

• Side slope pitching damaged.

• Road surface slightly worned out.

• SSM Return wall pointing eroded.

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• RC Parapet shall be repaired wherever

required.

• Wearing coat to be provided.

• Grouting of joints to be done for SSM

returnwall

53.81

31 Bk-11

CRN

SH

20

139.6

00

BR:S

H20:H

UD

2:1

40.4

02

02-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

2002

Gadis

unkapur

8.50 7.50

RC G

irder

7 13.45 94.15 Open

16.0

1352

76.1

8528

• Structure in good condition,

constructed by KRDCL

• Girder slightly damaged at bearing

location in span-2

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Main girder and cross girder in good

condition

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Grating of Drainage spouts damaged.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

• Pointing to sub-structure to be done as

required.

70.46

32 Bk-12

CRN

SH

20

144.8

00

BR:S

H20:H

UD

2:1

45.9

46

04-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

1982

Kesara

bhavi

8.50 7.50

RC S

lab

35 5.20 182.00 Open

16.0

1659

76.1

3585

• Severe Spalling of Concrete at edges

in soffit of slab (from span-20 to span-

30)

• Reinforcement exposed and corroded

at edges

• Honey combing observed at mid span

in soffit of slab in few spans.

• Thick vegetative growth to be removed

from waterway at ends

• Pointing eroded in piers (at few

locations)

• Drainage spouts fully blocked, non-

functional.

• Vegetative growth at Pier cap location

• The slab soffit at edges and at bottom

to be fully rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

• Vegetative growth at Pier cap location

to be removed

• Sub-structure pointing to be done by

grouting.

• Drainage spout to be repaired /

replaced.

54.58

P2 - 8 of 36

Page 9: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

33 Bk-13

CRN

SH

20

165.2

00

BR:S

H20:H

UD

2:1

66.2

16

03-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o M

ala

pra

bha

1985

Rakkasagi

8.00 7.00

RC S

lab

16 4.50 72.00 Open

16.0

5660

75.9

7186

• Severe Spalling of Concrete at edges

in soffit of slab in all spans.

• Reinforcement exposed and corroded

at edges

• Spalling / Honey combing observed at

mid span in soffit of slab in few spans.

• Thick vegetative growth to be removed

from waterway at ends

• Pointing eroded in piers (at few

locations)

• Drainage spouts fully blocked, non

functional.

• Vegetative growth at Pier cap location

• The slab soffit at edges and at bottom

to be fully rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

• Vegetative growth at Pier cap location

to be removed

• Sub-structure pointing to be done by

grouting.

• Drainage spout to be repaired /

replaced.

57.34

34 Bk-14

Non-C

RN

MD

R

11.2

00

HU

D018011354

03-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Hungund

Hungund

Tributa

ry t

o K

rishna

2002

Kara

di

8.50 7.50

RC S

lab

8 10.50 84.00 Pile

16.0

9611

76.2

0110

• Constructed by KRDCL

• Structure in good condition

• Thick vegetative growth to be removed

from waterway at ends

• Drainage spouts to be cleaned.

• Outlet pipe to be provided.

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Drainage spouts to be cleaned, out let

pipes to be provided

• Expansion joint to be cleaned.

72.93

35 Bk-15

CRN

SH

34

381.1

00

BR:S

H34:J

MK1:3

82.9

2

12-0

6-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Jam

khandi

Jam

khandi

Krishna

1955

Chik

kapadasala

gi

7.40 6.40RCC A

rch

20 20.65 413.00 Open

16.5

6722

75.3

8794

• Spalling / Reinforcement exposed in

arch soffit at few places

• Honey combing observed in arch soffit

due to poor concrete

• Vegetative Growth at Pier / Spandral

wall location.

• Wearing coat / road surface slightly

damaged

• MS Railings slightly damaged

• Drainage spouts to be provided

• Structure Narrow

• Vegetative growth to be removed at

pier / Spandral wall location

immediately.

• Railings shall be repaired wherever

required.

• The Arch shall be strengthened /

grouted by Sealing with Cement Grout.

• The Spandral wall shall be sealed with

Cement Grout at cracks and then it shall

be plastered wherever required.

• The Spandral wall / Pier / Abutment

shall be repaired and grouted / plastered

as required.

• Drainage spouts shall be provided with

proper outlet pipes.

• If required new Wearing coat shall be

provided by removing the existing

wearing coat.

• As alternative, New 2 Lane High

level Bridge (for a total length of

around 415m) may be provided

adjacent to the existing Bridge.

50.87

36 Bk-16

Non-C

RN

MD

R

6.2

00

JMK015006450

07-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Jam

khandi

Jam

khandi

Krishna

2015

Jam

bagi

12.00

7.50 +

2.25

FP on

BS

PSC B

ox G

irder

+ P

SC I

Girder

12 49.65 595.80 Open

16.5

6492

75.3

1474

• Structure in good condition

• Newly constructed

• 20m Box Girder + 40.00m PSC I

Girder span arrangement

• Expansion joints fully blocked by silt /

debris

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Bearings to be greased

92.85

P2 - 9 of 36

Page 10: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

37 Bk-17

CRN

SH

20

230.8

00

BR:S

H20:M

DL3:2

31.1

65

06-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Mudhol

Mudhol

Tributa

ry t

o G

hata

pra

bha

1975

Khajjid

oni

8.00 7.00

MCPC

27 3.05m Dia 95.35 Raft

16.1

7402

75.4

4585

• Honey combing of concrete observed

in the Pipes

• Minor Cracks observed at top in few

pipes

• RC parapet slightly damaged

• Scour of around 0.50m observed at

around 10 pipes

• Few pipes silted

• Floor protection works damaged.

• Severe Gaps btw pipes

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Gaps between pipes shall be sealed.

• RC Parapet shall be repaired wherever

required.

54.25

38 Bk-18

CRN

SH

34

440.2

00

BR:S

H34:M

DL201:4

40.3

45

07-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Mudhol

Mudhol

Nalla

2012

Lokapur

8.50 7.50

RC G

irder

5 13.20 66.00 Open

16.1

5331

75.3

6393

• Structure in good condition

• Recently constructed

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Main girder and cross girder in good

condition

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Grating of Drainage spouts damaged.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

• Pointing to sub-structure to be done as

required.

81.09

39 Bk-19

CRN

SH

54

123.3

00

BR:S

H54:M

DL16:1

23.6

68

06-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Mudhol

Mudhol

Ghata

pra

bha

1970

Dhavale

shw

ar

6.00 5.50

RC S

lab

17 5.00 85.00 Open

16.3

3101

75.0

7340

• Structure narrow

• Bridge cum barrage, gets over flowed

during heavy discharge

• Honey combing / spalling of concrete

at edges in soffit of slab

• Honey combing of concrete in piers

• The slab soffit at edges to be fully

rehabilitated / grouted with epoxy grout

• Pier to be grouted, cracks to be sealed

with epoxy grout

• Guard posts to be repaired

• As an Alternative an new high

level Bridge of length of 90m and

12.00m wide can be proposed 55.51

40 Bk-20

CRN

SH

55

52.0

00

BR:S

H55:M

DL30:5

0.2

64

07-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Mudhol

Mudhol

Ghata

pra

bha

1975

Mudhol

8.00 7.00

RC G

irder

13 12.00 156.00 Open

16.3

2420

75.2

8114

• Spalling of concrete / Honey combing

of concrete observed in the Longitudinal

Girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• MS railings damaged

• Thick Vegetative growth at end spans.

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at end spans

• MS Railings shall be Repaired wherever

required.

56.61

P2 - 10 of 36

Page 11: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

41 Bk-21

Non-C

RN

MD

R

8.6

00

MD

L021008867

06-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Mudhol

Mudhol

Ghata

pra

bha

1980

Nandagoan

4.50 4.00

RC S

lab

19 4.70 89.30 Open

16.3

2666

75.1

1706

• Structure narrow

• Bridge cum barrage, gets over flowed

during heavy discharge

• Honey combing / spalling of concrete

at edges in soffit of slab

• Honey combing of concrete in piers

• The slab soffit at edges to be fully

rehabilitated / grouted with epoxy grout

• Pier to be grouted, cracks to be sealed

with epoxy grout

• Guard posts to be repaired

• As an Alternative an new high

level Bridge of length of 100m and

8.50m wide can be proposed 52.26

42 Bk-22

Non-C

RN

MD

R

9.4

00

BD

M005012766

05-0

8-2

018

Nort

h

Belg

aum

Bagalk

ot

Bagalk

ot

Badam

i

Badam

i

Tributa

ry t

o M

ala

pra

bha

1980

Aft

er

Gule

dagudda t

ow

ard

s B

adam

i

7.50 6.50

RC S

lab

10 7.10 71.00 Open

16.0

3683

75.7

3551

• Severe spalling of concrete at edges in

soffit of slab

• Reinforcement exposed and corroded

at edges.

• Thick vegetative growth to be removed

from waterway at ends

• Road surface slightly cracked.

• RC Railings damaged.

• Scour at pier location

• The slab soffit at edges to be fully

rehabilitated / grouted with epoxy grout

• Pier cap to be grouted, cracks to be

sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Road surface to be repaired

• Floor protection works to be provided

• Railings to be reconstructed.

56.50

43 Bel-01

Non-C

RN

MD

R

6.1

00

BAI2

31006149

08-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Bailhongal

Bailhongal

Nalla

1975

Nagnur

6.80 6.00

RC S

lab

16 2.00 32.00 Open

15.8

3813

74.7

9614

• Spalling of Concrete in soffit of slab.

• Reinforcement exposed and corroded

• MS Railings fully damaged

• Structure Narrow

• Spalling of Pier cap in piers observed

• The entire slab soffit to be fully

rehabilitated or replace the

superstructure

• Pier / Pier cap to be grouted

• Pointing to be done for sub structure

as per requirement.

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

• Bridge is narrow, Widening not

feasible, As an alternative New High

level Bridge can be proposed taking into

account the Traffic.

46.11

44 Bel-02

Non-C

RN

MD

R

1.2

00

BG

M204001294

06-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Belg

aum

Belg

aum

Nalla

2016

Old

PB R

oad (

Belg

aum

)

17.3012.80

+ FP

RC S

lab

12 5.90 70.80 Open

15.8

3403

74.5

4051

• Newly constructed

• Structure in good condition

• Retain with routine maintenance

89.72

P2 - 11 of 36

Page 12: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

45 Bel-03

Non-C

RN

SH

141

22.5

00

BG

M208022391

06-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Belg

aum

Belg

aum

Mark

andey

1990

Kangra

li k

hurd

12.007.50m

+ FP

RC G

irder

4 16.50 66.00 Open

15.8

9887

74.4

9824

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Honey combing, reinforcement

exposed at bearing location in few

girders

• Minor Cracks in end cross girder at

junction.

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• The Girders / cross girders have to be

Gunited / Grouted at honey comb

locations

• Drainage spouts to be repaired

/replaced

• Expansion joint to be repaired /

replaced

• Side slope pitching shall be reinstated.

62.69

46 Bel-04

CRN

SH

133

1.8

00

BR:S

H133:R

MG

203:1

.955

08-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Ram

durg

Ram

durg

Mala

pra

bha

2000

Ham

pih

oli

8.30 7.30

MCPC

35 3.30 132.50 Raft

15.9

0133

75.4

0891

• Honey combing of concrete observed

in the Pipes

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 20 pipes

• Few pipes silted by around 20%

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• Guard posts shall be reconstructed /

repaired wherever required.

64.58

47 Bel-05

CRN

SH

139

27.8

00

BR:S

H139:R

MG

204:2

7.9

05

07-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Ram

durg

Ram

durg

Tributa

ry t

o M

ala

pra

bha

1970

Sunnal

8.30 7.30

RC G

irder

7 11.75 82.25 Open

15.9

6833

75.2

5473

• Severe spalling, reinforcement

exposed and corroded in cantilever slab

on both sides in all spans

• Expansion joints fully blocked - non

existence

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Cracks with spalling, reinforcement

exposed observed in Pier caps

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• The Entire cantilever slab to be

rehabilitated for entire length on both

sides.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• The Girders / cross girders shall be

provided with Guniting / Grouting as per

requirement.

• Pier Cap / Abutment Cap shall be

sealed with epoxy grout.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

53.79

48 Bel-06

CRN

SH

45

55.5

00

BR:S

H45:S

AU

3:5

5.2

46

23-0

7-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Saundatt

i

Saundatt

i

Mala

pra

bha

2005

Manolli

12.00

9.75m

+ FP of

1.50m

on LHS

PSC I

Girder

7 24.60 172.20 Pile

15.8

4904

75.1

2363

• Structure in good condition,

constructed by KRDCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders (in

2 Girders)

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased 73.53

P2 - 12 of 36

Page 13: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

49 Bel-07

Non-C

RN

SH

140

52.8

00

SAU

206052803

08-0

5-2

018

Nort

h

Belg

aum

Belg

aum

Belg

aum

Saundatt

i

Saundatt

i

Nalla

1990

Murk

um

bi

8.40 7.40

RC S

lab

16 8.35 133.60 Open

15.8

4626

74.8

8148

• Spalling of Concrete at edges in soffit

of slab.

• Reinforcement exposed and corroded

• Spalling, reinforcement exposed and

corroded in Pier cap at few locations

• Thick vegetative growth to be removed

from waterway

• The slab soffit at edges to be fully

rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

60.68

50 Bel-08

CRN

SH

12

60.5

00

BR:S

H12:A

TN

2:6

0.6

30-0

4-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Tributa

ry t

o K

rishna

1990

Khota

natt

i

8.40 7.40

RC S

lab

13 6.85 89.05 Open

16.7

4360

75.2

1770

• Spalling of Concrete at edges in soffit

of slab.

• Reinforcement exposed and corroded

• Honey Combing observed in few slabs

• Spalling, reinforcement exposed and

corroded in Pier cap at few locations

• Cracks with spalling of concrete

observed at cut water / Ease water

portion of Pier

• Thick vegetative growth to be removed

from waterway

• The slab soffit at edges to be fully

rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Cut water / Ease water portion of Pier

to be grouted with epoxy, cracks to be

sealed.

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

60.95

51 Bel-09

CRN

SH

12

86.0

00

BR:S

H12:A

TN

2:8

5.8

75

13-0

6-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Agra

ni

2003

Mura

gundi

8.50 7.50

RC G

irder

9 12.35 111.15 Open

16.7

3942

74.9

9047

• Structure in good condition,

constructed by KRDCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders (in

2 Girders)

• Reinforcement exposed at bottom in

the Longitudinal Girders (in Span 5)

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris

• Outlet pipe missing in Drainage spout

• The Girders / cross girders have to be

Gunited / Grouted at honey comb

locations

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Outlet pipes to be provided for the

Drainage spouts

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

72.65

52 Bel-10

CRN

SH

31

9.0

00

BR:S

H31:A

TN

3:9

.097

30-0

4-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Tributa

ry t

o A

gra

ni

2018

Mala

bad

12.00 11.00

RC G

irder

4 15.00 60.00 Open

16.8

8577

75.1

1526

• New Bridge under Construction • Retained

100.00

P2 - 13 of 36

Page 14: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

53 Bel-11

CRN

SH

72

100.5

00

BR:S

H72:A

TN

20_B:1

00.5

48

29-0

4-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Agra

ni

2010

Shin

al

12.007.50m

+ FP

RC G

irder

5 16.50 82.50 Open

16.7

0493

74.9

7968

• Severe Honey combing at bottom of

main Girders

• Reinforcement exposed and corroded

at bottom of Main girders

• Expansion joints fully blocked - non

existence

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• The Entire Girders at bottom have to

be rehabilitated, epoxy grouting to be

done for the entire girder

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes

• Railings shall be Repaired wherever

required.

61.61

54 Bel-12

CRN

SH

72

144.5

00

BR:S

H72:A

TN

20_B:1

45.6

28

30-0

4-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Nalla

2013

btw

Kott

alg

i /

Kanam

ari

10.00 9.00

RC B

ox

12 6.00 72.00 Raft

16.8

9885

75.3

0081

• Recently constructed

• Structure in good condition

• 3 vents blocked by Silt

• Thick Thorny bushes blocking vent way

• Retain with routine maintenance

• Vegetative growth to be removed on

side slopes

• Silt to be removed from vents

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

71.37

55 Bel-13

Non-C

RN

MD

R

7.0

00

ATN

015007151

29-0

4-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Agra

ni

1990

Tevara

tti

8.40 7.40

RC S

lab

14 6.70 93.80 Open

16.7

9124

75.0

3219

• Spalling of Concrete at edges in soffit

of slab.

• Reinforcement exposed and corroded

• Honey Combing observed in few slabs

• Spalling, reinforcement exposed and

corroded in Pier cap at few locations

• Cracks with spalling of concrete

observed at cut water / Ease water

portion of Pier

• Railings slightly damaged

• Bridge cum Barrage

• The slab soffit at edges to be fully

rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Cut water / Ease water portion of Pier

to be grouted with epoxy, cracks to be

sealed.

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

61.09

56 Bel-14

Non-C

RN

MD

R

11.4

00

ATN

010011420

01-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Ath

ni

Ath

ni

Nalla

2010

Kokatn

ur

8.50 7.50

RC S

lab

5 10.60 53.00 Open

16.6

9353

75.2

1613

• Recently constructed

• Structure in good condition

• Wearing coat worn out

• Expansion joint fully blocked

• Retain with routine repairs

• Expansion joint to be repaired

• Drainage spout to be repaired

• Pitching on side slopes to be provided.

80.17

P2 - 14 of 36

Page 15: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

57 Bel-15

CRN

MD

R

5.2

00

BR:M

DR_CKD

7:C

KD

7:9

.978

16-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Doodganga

1975

Shiradw

ad

8.50 7.50

RC G

irder

5 18.00 90.00 Open

16.5

5913

74.4

8910

• Severe spalling, reinforcement

exposed and corroded in cantilever slab

on both sides in all spans

• Severe spalling, reinforcement

exposed and corroded in Bottom of Main

Girder

• Cracks observed in Main girder in

longitudinal direction.

• Expansion joints fully blocked - non

existence

• Drainage spouts blocked by debris, no

outlet pipes

• Wearing Coat Damaged

• The Entire cantilever slab and Main

Girders have to be rehabilitated for

entire length.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• The Girders shall be provided with

Micro concrete / Guniting / Grouting as

per requirement.

• Pier Cap / Abutment Cap shall be

sealed with epoxy grout.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

• Protection works to be provided.

As an Alternative, the entire super

structure can be replaced by

retaiing the sub-structure

45.83

58 Bel-16

CRN

SH

12

128.5

00

BR:S

H12:C

KD

2:1

28.9

37

03-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Tributa

ry t

o K

rishna

1980

Manja

riw

adi

8.50 7.50

RC G

irder

10 11.70 117.00 Open

16.5

9167

74.6

9919

• Severe spalling, reinforcement

exposed and corroded in cantilever slab

on both sides in all spans

• Expansion joints fully blocked - non

existence

• Honey combing of concrete with

reinforcement exposed observed in the

Longitudinal Girders

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• Thick vegetative growth blocking vents

• The Entire cantilever slab to be

rehabilitated for entire length on both

sides.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• The Girders / cross girders shall be

provided with Guniting / Grouting as per

requirement.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

54.16

59 Bel-17

CRN

SH

12

133.0

00

BR:S

H12:C

KD

2:1

33.2

57

14-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Krishna

2000

Ankali

9.00 7.50

PSC I

Girder

14 36.10 505.40 Well

16.5

5808

74.6

8011

• Structure in good condition,

constructed by NPCCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders /

Cross Girders in few spans

• Slight Spalling of concrete observed in

the Longitudinal Girders / Cross Girders

in few spans

• Leaching / Dampness observed on the

cantilever portion of the slab at edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris

• Grouting / Shortcrete / Gunitting to be

carried out at spalling locations of the

Main Girder / Cross Girder

• Grouting / Shortcrete / Gunitting to be

carried out at Drainage spout, Cantilever

slab at edges to be repaired

• Expansion Joint to be replaced /

repaired

• Drainage spouts to be cleaned of

debris, outlet pipe, gratings to be

provided

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

71.91

P2 - 15 of 36

Page 16: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

60 Bel-18

CRN

SH

72

14.5

00

BR:S

H72:C

KD

201_A:1

4.5

51

05-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Tributa

ry t

o K

rishna

1970

Bhim

apurw

adi

8.00 7.00

RC A

rch

10 7.15 71.50 Open

16.4

7865

74.4

5112

• Vegetative Growth at Pier / Spandrel

wall location.

• Thick Vegetative growth in the river at

Pier location.

• MS Railing damaged

• Road surface slightly worn out

• Drainage spouts / Outlet clogged

• Scour of around 0.50m at pier

locations (at central piers)

• Vegetative growth to be removed at

pier / Spandral wall location

• Thick Vegetative growth in the river at

Pier locations to be removed

• Railing shall be repaired wherever

required.

• The Pier / Abutment shall be repaired

and plastered as required.

• The Spandral wall shall be sealed with

Cement Grout at cracks and then it shall

be plastered wherever required.

• Drainage spouts shall be provided with

proper outlet pipes.

• As alternative, New 2 Lane High

level Bridge (for a total length of

around 75m) may be provided

adjacent to the existing Bridge.

55.79

61 Bel-19

CRN

SH

72

45.6

00

BR:S

H72:C

KD

201_A:4

5.7

81

04-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Krishna

1960

btw

kallol /

Yadur

7.40 6.40

RC S

lab

62 2.50 155.00 Open

16.5

7447

74.6

4558

• Bridge cum barrage over River Krishna

• Severe spalling, reinforcement

exposed and corroded in slab soffit in all

spans

• Severe honey combing in pier

• Concrete of poor quality

• Propose for New construction on

alternate alignment retaining the

existing Bridge cum barrage

• New High level Bridge of 200m

length with Footpath can be

proposed

39.13

62 Bel-20

CRN

SH

78

84.5

00

BR:S

H78:C

KD

203:8

4.5

75

04-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Doodganga

2014

Sadalg

a

6.00 5.00

RC S

lab

10 10.20 102.00 Open

16.5

6561

74.5

3297

• Recently constructed

• Structure in good condition

• Structure narrow

• Retain with routine maintenance

• Pitching on side slopes to be provided.

94.00

63 Bel-21

CRN

SH

98

22.5

00

BR:S

H98:C

KD

205:2

2.7

8

17-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Doodganga

2000

Kunnur

12.007.50 +

FP

RC G

irder

5 18.00 90.00 Well

16.5

5356

74.4

0870

• Structure in good condition

• Slight Honey combing of concrete

observed in the Longitudinal Girders at

few places

• Reinforcement exposed at bottom in

the Longitudinal Girders in 2 girders

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Drainage spout blocked by silt / debris

• Outlet pipe missing in Drainage spout

• Footpath slabs damaged

• The Girders / cross girders have to be

Gunited / Grouted / shortcrete at spalled

/ honeycombed locations

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Outlet pipes to be provided for the

Drainage spouts

• Vegetative growth to be removed on

side slopes

• Bearings to be greased

• Side slope pitching to be provided

• Footpath slabs to be repaired.

70.66

P2 - 16 of 36

Page 17: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

64 Bel-22

Non-C

RN

MD

R

3.8

00

CKD

208003836

03-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Tributa

ry t

o K

rishna

2015

Ankali

8.50 7.50

RC S

lab

6 11.00 66.00 Open

16.5

4121

74.6

7674

• Recently constructed

• Structure in good condition

• Retain with routine maintenance

• Pitching on side slopes to be provided.

94.05

65 Bel-23

Non-C

RN

MD

R

5.7

00

CKD

214005703

05-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Doodganga

2008

MH

Bord

er

12.007.50 +

FP

RC G

irder

7 16.85 117.95 Open

16.5

8486

74.5

6639

• Slight Leaching, Dampness of concrete

observed in cantilever slab at edges

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• The Cantilever slab have to be Gunited

/ Grouted at honey comb locations

• Drainage spouts to be repaired

/replaced

• Expansion joint to be repaired /

replaced

• Side slope pitching shall be reinstated.

72.03

66 Bel-24

Non-C

RN

MD

R

7.5

00

CKD

212007883

05-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Tributa

ry t

o K

rishna

1980

Manja

riw

adi

7.50 6.50

RC S

lab

15 3.30 49.50 Open

16.5

9457

74.6

9709

• Thick Vegetative growth blocking vents

on either side

• Slight honey combing observed at

edges in slab

• Wearing coat worn out

• Expansion joint fully blocked

• Railings damaged

• Stone pitching on side slopes eroded

• Slab shall be rehabilitated as per

requirement

• Thick vegetative growth to be cleared

• Wearing coat to be re-laid

• Railings to be repaired

• Pitching on side slopes to be provided.

64.09

67 Bel-25

Non-C

RN

MD

R

2.0

00

CKD

214002029

04-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Chik

kodi

Chik

kodi

Tributa

ry t

o D

oodganga

1985

Sadalg

a

5.30 4.30

RC S

lab

20 6.70 134.00 Open

16.5

6844

74.5

3797

• Spalling, reinforcement exposed in

soffit of slab at edges

• Minor cracks at edges of slab

• MS Railings Damaged

• Expansion joint fully blocked

• Spalling / minor Cracks observed in

pier cap at edges

• Pointing slightly eroded in pier at few

locations

• Grouting / Gunitting to be carried out

for slab soffit

• Minor cracks to be sealed with epoxy

grout in slab soffit and at pier cap

locations

• Expansion joint to be repaired

• Drainage spout to be repaired

• Pitching on side slopes to be provided.

• Railings to be repaired 62.32

P2 - 17 of 36

Page 18: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

68 Bel-26

CRN

SH

44

52.5

00

BR:S

H44:G

OK6:5

2.5

44

22-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Ghata

pra

bha

2005

Masaguppi

12.007.50 +

FP

PSC I

Girder

6 15.00 90.00 Open

16.2

5788

74.9

6496

• Structure in good condition,

constructed by KRDCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders (in

2 Girders)

• Slight Spalling of concrete observed in

the few cross girders

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris,

outlet pipe missing

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

• Grouting with epoxy can be done for

Main Girders / Cross Girders wherever

Honey combing / spalling is observed.

• Grouting of gaps btw slab and girder

to be carried out

82.52

69 Bel-27

CRN

SH

44

69.9

00

BR:S

H44:G

OK6:6

9.4

99

07-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Tributa

ry t

o G

hata

pra

bha

1975

Tim

mapur

Cro

ss

8.00 7.00

MCPC

26 3.00 90.50 Raft

16.2

4703

75.1

2054

• Honey combing of concrete observed

in the Pipes

• Minor Cracks observed at top in few

pipes

• MS Railings damaged

• Scour of around 0.50m observed at

around 20 pipes

• Few pipes silted by around 20%

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• Guard posts shall be reconstructed /

Repaired wherever required.

53.90

70 Bel-28

CRN

SH

44

76.6

00

BR:S

H44:G

OK6:7

6.7

59

07-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Tributa

ry t

o G

hata

pra

bha

1975

Yadaw

ad

8.00 7.00

MCPC

32 3.00 115.20 Raft

16.2

3466

75.1

8157

• Honey combing of concrete observed

in the Pipes

• Severe honey combing in few pipes

• Minor Cracks observed at top in few

pipes

• MS Railings damaged

• Scour of around 0.50m observed at

around 20 pipes

• Few pipes silted by around 20%

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes

• Silt to be removed from all the pipes

• Protection works shall be provided as

per requirement

• MS railings shall be reconstructed /

Repaired wherever required.

53.17

71 Bel-29

CRN

SH

45

20.8

00

BR:S

H45:G

OK203:2

0.9

1

06-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Tributa

ry t

o G

hata

pra

bha

2001

Chik

kanandi

12.007.50 +

FP

PSC D

eck S

lab

7 10.50 73.50 Open

16.0

8604

74.9

2825

• Constructed by KRDCL

• Replaced entire superstructure

retaining the sub-structure and existing

Steel I girders

• Structure in good condition

• Expansion joint fully blocked

• Footpath slabs damaged

• Protection works at pier location

eroded

• Retain with routine repairs

• Expansion joint to be repaired

• Drainage spout to be cleaned /

repaired

• Pitching on side slopes to be provided.

• Footpath slabs to be repaired

• Protection works at pier location to be

provided

73.04

P2 - 18 of 36

Page 19: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

72 Bel-30

CRN

SH

54

89.2

00

BR:S

H54:G

OK8:8

9.2

03

06-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Tributa

ry t

o G

hata

pra

bha

1985

Mam

dapur

8.50 7.50

RC S

lab

18 5.20 93.60 Open

16.1

0848

74.9

2600

• Spalling of Concrete at edges in soffit

of slab.

• Reinforcement exposed and corroded

• Honey Combing observed in few slabs

• Minor Cracks at edges of slab

• Spalling, reinforcement exposed and

corroded in Pier cap at few locations

• Pointing eroded at few places in pier

• Thick vegetative growth to be removed

from waterway

• The slab soffit at edges to be fully

rehabilitated

• Pier / Pier cap to be grouted, cracks to

be sealed with epoxy grout

• Pointing to be done for pier

• Vegetative growth to be removed on

side slopes

• Pitching on side slopes to be provided.

61.60

73 Bel-31

CRN

SH

73

77.8

00

BR:S

H73:G

OK205_A:7

7.9

49

21-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Ghata

pra

bha

2012

Dupdhal

11.509.50 +

FP

PSC I

GIr

der

6 + 4 20.00 + 18.00 116.00 Open

16.2

0646

74.7

5305

• Structure in good condition,

constructed by KRDCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders (in

2 Girders)

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased 83.05

74 Bel-32

CRN

SH

73

78.2

00

BR:S

H73:G

OK205_A:7

8.3

39

22-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Gokak

Gokak

Ghata

pra

bha

2012

Dupdhal

11.509.50 +

FP

PSC I

GIr

der

12 20.00 240.00 Open

16.2

0543

74.7

4973

• Structure in good condition,

constructed by KRDCL

• Slight Honey combing of concrete

observed in the Longitudinal Girders (in

2 Girders)

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Drainage spout blocked by silt / debris

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased 83.16

75 Bel-33

CRN

SH

78

32.2

00

BR:S

H78:H

UK207:3

2.3

4

17-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Hukkeri

Hukkeri

Hiranyakshi

2001

Goudaw

ad

12.007.50 +

FP

RC G

irder

9 17.00 153.00 Open

16.1

8849

74.5

7679

• Spalling, reinforcement exposed in

cantilever slab on both sides

• Honey combing / Spalling of concrete

observed in the Longitudinal Girders (in

spans 2 to 5)

• Honey combing / Spalling of concrete

observed in the Cross Girders - at

bearing locations

• Expansion joints fully blocked - non

existence

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• Thick vegetative growth on side slopes

• Footpath slabs slightly damaged

• The Entire cantilever slab to be

rehabilitated for entire length on both

sides.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• The Girders / cross girders shall be

rehabilitated with Guniting / Grouting as

per requirement.

• Bearings shall be greased / repaired

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes

• Railings shall be reconstructed /

Repaired wherever required.

65.59

P2 - 19 of 36

Page 20: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

76 Bel-34

CRN

SH

1

477.5

00

BR:S

H1:H

UK204:4

77.9

71

18-0

7-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Hukkeri

Hukkeri

Hid

kal Reserv

oir

1975

Hid

kal D

am

8.00 7.00

RC G

irder

16 12.20 195.20 Open

16.1

4572

74.6

5028

• Spalling, reinforcement exposed in

cantilever slab on both sides

• Honey combing / Spalling of concrete

observed in the Longitudinal Girders (in

spans 2 to 5)

• Reinforcement exposed at bottom of

Longitudinal girders in span-9 to span-

11

• Honey combing / Spalling of concrete

observed in the Cross Girders - at

bearing locations

• Expansion joints fully blocked - non

existence

• Drainage spouts blocked by debris, no

outlet pipes

• Expansion joint fully covered / blocked

• Thick vegetative growth on side slopes

and at expansion joint location on pier

cap

• Metallic steel plates bearing slightly

rusted at few locations.

• Stones dislodged in cut / ease water

location in pier P5, P6 and P7

• The Entire cantilever slab to be

rehabilitated for entire length on both

sides.

• The Girders / cross girders shall be

rehabilitated with Guniting / Grouting /

Shortcrete / Micro Concrete as per

requirement.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• The Girders / cross girders shall be

rehabilitated with Guniting / Grouting as

per requirement.

• Bearings shall be greased / repaired

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes

• Railings shall be reconstructed /

Repaired wherever required.

• Pointing to sub-structure to be done,

Cut water / Ease water to be

strengthened / repaired.

55.42

77 Bel-35

Non-C

RN

MD

R

14.5

00

HU

K214000913

05-0

5-2

018

Nort

h

Belg

aum

Chik

kodi

Belg

aum

Hukkeri

Hukkeri

Ghata

pra

bha

1985

Nogin

hal

8.50 7.50

RC S

lab

14 11.00 154.00 Open

16.1

8553

74.6

8198

• Water flowing full in all spans

• Minor Spalling, reinforcement exposed

in soffit of slab at edges

• Minor cracks at edges of slab

• Guard posts Damaged

• Expansion joint fully blocked

• Pointing slightly eroded in pier at few

locations

• Grouting / Gunitting to be carried out

for slab soffit

• Minor cracks to be sealed with epoxy

grout in slab soffit and at pier cap

locations

• Expansion joint to be repaired

• Drainage spout to be repaired

• Pitching on side slopes to be provided.

• Guard posts to be repaired 63.12

78 BJ-01

CRN

SH

41

100.7

00

BR:S

H41:B

BV2:1

01.2

61

10-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

B B

agevadi

B B

agevadi

Dona

1985

Satihal

8.20 7.20

RC S

lab

20 5.20 104.00 Open

16.7

3842

76.0

5814

• Entire super structure recently

replaced

• Drainage spouts to be Cleaned

• Pointing eroded at few places in pier

• Silt deposit in waterway

• Concrete wearing coat cracked at few

places

• Pointing to be done for sub structure

as per requirement.

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Pitching on side slopes to be provided.

• Silt to be removed form waterway

• Wearing coat to be repaired 62.06

79 BJ-02

CRN

SH

41

126.3

00

BR:S

H41:B

BV2:1

26.9

23

11-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

B B

agevadi

B B

agevadi

Nalla

1985

Sola

wadagi

8.50 7.50

RC B

ox

24 3.00 72.00 Open

16.5

1853

76.0

9243

• Structure in good condition

• Spalling / Honey combing observed in

Top slab and Mid Walls at few places

• Expansion joints fully clogged

• Drainage spouts - outlet pipe missing

• Silt / Vegetative growth blocking vents

• Top slab at edges, Mid walls shall be

plastered / grouted

• Vegetative growth to be removed on

side slopes

• Expansion Joint to be cleaned

• Drainage spouts to be cleaned

• Railings to be repaired

63.69

P2 - 20 of 36

Page 21: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

80 BJ-03

Non-C

RN

MD

R

25.5

00

BBV007025985

10-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

B B

agevadi

B B

agevadi

Nalla

2005

Btw

Ukkali /

Masabin

al

12.00 11.00

RC B

ox

11 6.40 70.40 Open

16.6

9120

75.9

2268

• Structure in good condition

• Drainage spouts to be Cleaned

• Silt deposit / Thorny bushes in

waterway

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Pitching on side slopes to be provided.

• Silt to be removed form waterway

72.00

81 BJ-04

Non-C

RN

MD

R

37.9

00

BR:M

DR:B

BV009:3

6.3

61

24-0

3-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

B B

agevadi

B B

agevadi

Krishna (

Alm

att

i Backw

ate

rs)

2005

Alm

att

i

8.50 7.50

PSC I

Girder

12 42.00 504.00 Pile

16.3

5944

75.8

9868

• Girders in good condition

• Honey combing observed in Cross

Girders in Few spans

• Railings slightly damaged

• Drainage spouts to be cleaned /

repaired

• Cross Girders shall be grouted (with

Epoxy grout, Gunitting)

• Vegetative growth to be removed on

side slopes

• Railings shall be repaired wherever

required.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be repaired /

provided

• Bearings to be Greased.

76.50

82 BJ-05

Non-C

RN

MD

R

7.5

00

BBV012007729

11-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

B B

agevadi

B B

agevadi

Nalla

2010

K S

ala

wadagi

5.00 4.00

RC S

lab

12 5.00 60.00 Open

16.6

1668

76.1

0197

• Structure in good condition

• Structure Narrow

• Bridge Cum Barrage

• Recently constructed

• Guard posts to be repaired

• Structure narrow check if widening is

required as per traffic.

73.04

83 BJ-06

CRN

SH

12

16.5

00

BR:S

H12:B

JP4:1

6.9

25

08-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Dona

2003

Tora

vi

12.007.50 +

FP

RC G

irder

5 21.30 106.50 Pile

16.9

9874

75.9

9030

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Slight Leaching / Spalling observed on

the cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Railings Slightly Damaged

• Vents blocked by thick thorny bushes,

debris.

• The Cantilever Slab have to be

rehabilitated wherever required (by

Shortcrete / Guniting / Grouting)

• Expansion Joint to be replaced /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

• Debris / Vegetative Growth shall be

removed from the Waterway.

71.10

P2 - 21 of 36

Page 22: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

84 BJ-07

CRN

SH

12

31.0

00

BR:S

H12:B

JP4:3

1.3

65

08-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Dona

1973

Honaw

ad

8.20 7.20

RC B

ox C

antile

ver

3 + 233.00 +

9.00117.00 Well

16.8

1810

75.4

6280

• The Entire super structure was

rehabilitated in year 2014, earlier to this

the existing condition was as follows

(The rehabilitation measures carried out

is for a strengthening the super

structure for short period only)

• Severe spalling and bending and shear

cracks, bulging in the external side walls

of spans S1, S2, S4 and S5.

• All Expansion joints damaged.

• Bearings damaged.

• Settlement in the super structure of

spans S2 and S4.

• Dirt walls of both abutments divided

into pieces.

• All piers and pier caps damaged.

• Vegetation from the expansion joints

of Box girder.

• Drainage spouts without gratings

ended at edge of curb

• The rehabilitation measures carried

out is for a strengthening the super

structure for short period only

• The Bridge shall be reconstructed

on alternate alignment

49.00

85 BJ-08

CRN

SH

34

312.9

00

BR:S

H34:B

JP201:3

14.3

4

08-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Nalla

1985

Nagath

an

8.20 7.20

RC S

lab

8 8.50 68.00 Open

16.9

2114

75.8

3252

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• Parapet damaged

• Drainage spouts to be repaired

• Approaches on curve

• The slab soffit to be rehabilitated by

grouting / guniting in all spans

• Vegetative growth to be removed on

side slopes

• Parapet to be reconstructed.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

• Check if the Bridge can be

widened on both sides to 12.0m

width.

61.58

86 BJ-09

CRN

SH

34

347.9

00

BR:S

H34:B

JP201:3

49.7

25

20-0

3-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Dona

1962

Sara

wad

7.50 6.50

RC G

irder

8 13.90 111.20 Open

16.7

1111

75.6

2930

• Longitudinal Girders soffit recently

rehabilitated / repaired

• Cross Girders soffit recently

rehabilitated / repaired

• Severe spalling, reinforcement

exposed and corroded in cantilever slab

on both sides in all spans

• Expansion joints fully blocked - non

existence

• Brick masonry parapet slightly

damaged

• The Entire cantilever slab to be

rehabilitated for entire length on both

sides.

• The Girders / cross girders shall be

provided with Guniting / Grouting as per

requirement.

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

• Alternate Option: Replace entire

super structure to 8.50m overall

width by retaining the sub-

structure.

49.46

87 BJ-10

Non-C

RN

MD

R

9.5

00

BJP

007009357

13-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Nalla

1985

Ukum

anal

8.40 7.40

RC S

lab

22 5.50 121.00 Open16.7

7989

75.8

1513

• Severe Spalling / Reinforcement

exposed in slab soffit at edges

• Cut water / Easewater cracked and

concrete spalling form pier

• concrete spalling form Abutment

• Severe Spalling / Reinforcement

exposed in Abutment cap / pier cap

• Silt deposit / Thorny bushes in

waterway

• Concrete wearing coat cracked at few

places

• Railings to be repaired /

Reconstructed.

• Slab soffit to be strengthened (by

grouting, gunitting, shortcrete etc.)

• Pier cap, abutment cap to be

strengthened (by grouting, gunitting,

shortcrete etc.)

• Pier and abutment to be strengthened

(by grouting, gunitting, shortcrete etc.)

• Drip course shall be provided along

both the edges of slab.

• Pitching on side slopes to be provided.

• Silt to be removed form waterway

• Wearing coat to be repaired

56.63

P2 - 22 of 36

Page 23: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

88 BJ-11

Non-C

RN

MD

R

10.5

00

BJP

016010301

09-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Dona

2013

Btw

Tora

vi /

Tajp

ur

(Kanam

uchanal)

12.007.50 +

FP

RC S

lab

6 12.70 76.20 Open

16.7

4528

75.6

1422

• Structure recently constructed

• Structure in good condition

• Retain with routine maintenance

93.55

89 BJ-12

Non-C

RN

MD

R

10.2

00

BJP

078010143

09-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Nalla

1985

btw

Kodabagi /

Taja

pur

8.50 7.50

RC S

lab

7 10.80 75.60 Open

16.5

0298

75.5

7061

• Spalling / Honey combing in slab soffit

at edges

• Silt deposit / Thorny bushes in

waterway

• Concrete wearing coat cracked at few

places

• Railings fully damaged

• Slab soffit to be strengthened (by

grouting, gunitting, shortcrete etc.)

• Drip course shall be provided along

both the edges of slab.

• Railings to be reconstructed

• Pitching on side slopes to be provided.

• Silt to be removed form waterway

• Wearing coat to be repaired

62.20

90 BJ-13

Non-C

RN

MD

R

5.8

00

BJP

092005796

07-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Bijapur

Bijapur

Nalla

2010

Near

Manchanal Rly

stn

.

8.50 7.50

RC S

lab

7 8.40 58.80 Open

16.9

7527

75.8

1826

• Recently constructed.

• Slight honey combing observed at

edges

• Silt deposit / Thorny bushes in

waterway

• Grating on drainage spout missing

• Structure to be retained with routine

repairs

• Pitching on side slopes to be provided.

• Silt / thorny bushes to be removed

form waterway

• Drainage spout to be repaired

77.48

91 BJ-14

CRN

SH

34

253.5

00

BR:S

H34:I

ND

12:2

54.1

8

06-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Nalla

1980

Mars

analli /

Vib

hutihalli

8.00 7.00

RC S

lab

15 5.00 75.00 Open

17.0

9827

76.1

6838

• Around 6 to 7 spans in-accessible,

entire span filled with silt upto slab

bottom.

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• Railings slightly damaged

• Drainage spouts to be repaired

• The Silt in the entire waterway to be

removed upto bed level.

• The slab soffit to be rehabilitated by

grouting / guniting in all spans

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

55.35

P2 - 23 of 36

Page 24: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

92 BJ-15

CRN

SH

34

261.0

50

BR:S

H34:I

ND

12:2

62.0

15

06-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Nalla

1980

Naad (

BK)

8.50 7.50

RC S

lab

26 5.30 137.80 Open

17.1

1971

76.0

9951

• Severe Spalling of Concrete at edges

on both sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• Railings slightly damaged

• Drainage spouts to be repaired

• Spalling of Pier cap in piers observed

• The slab soffit to be rehabilitated by

grouting / guniting in all spans

• Pier cap to be grouted

• Pointing to be done for sub structure

as per requirement.

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

54.84

93 BJ-16

CRN

SH

34

57.8

50

BR:S

H34:I

ND

12:2

90.7

25

06-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Nalla

1990

Rugi

8.40 7.40

RC S

lab

10 5.80 58.00 Open

17.0

8684

75.9

6775

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• MS Railings slightly damaged

• Drainage spouts to be repaired

Spalling of Pier cap in piers observed

• The slab soffit to be rehabilitated by

grouting / guniting in all spans

• Pier / Pier cap to be grouted

• Pointing to be done for sub structure

as per requirement.

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

• Pitching on side slopes to be provided.

59.54

94 BJ-17

CRN

SH

34

303.9

00

BR:S

H34:I

ND

12:3

05.3

05

07-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Nalla

2005

Ath

arg

a

12.007.50 +

FP

RC B

ox

13 6.00 78.00 Open

16.9

8289

75.8

8281

• Structure in good condition

• Slight Honey combing in mid walls

• Expansion joints fully clogged

• Mid walls shall be plastered / grouted

• Vegetative growth to be removed on

side slopes

• Expansion Joint to be cleaned

• Drainage spouts to be cleaned

71.65

95 BJ-18

CRN

SH

41

11.9

50

BR:S

H41:I

ND

2:1

2.1

2

04-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Bore

e r

ivie

r

1956

Chadchan

7.50 6.80

RC S

lab

28 7.00 196.00 Open

17.3

1165

75.6

6580

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• RC Railings slightly damaged

• Drainage spouts to be repaired

• Spalling of Pier cap in piers observed

• The slab soffit to be rehabilitated by

grouting / guniting in all spans

• Pier / Pier cap to be grouted

• Pointing to be done for sub structure

as per requirement.

• Vegetative growth to be removed on

side slopes

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

• Pitching on side slopes to be provided.

• Bridge in Town Limits, Widening

not feasible, Propose New High level

Bridge adjacent to existing Bridge

with Footpath

48.57

P2 - 24 of 36

Page 25: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

96 BJ-19

CRN

SH

41

2.1

00

BR:S

H41:I

ND

2:2

.095

22-0

3-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Shirnandagi

1988

Shiradon

8.50 7.50

RC G

irder

8 13.00 104.00 Open

17.3

7302

75.6

0148

• Honey combing / Light spalling of

concrete observed in the Longitudinal

Girders.

• Severe spalling, Reinforcement

exposed and corroded in Slab between

Girders in Span 2.

• Leaching observed on the cantilever

portion of the slab on both sides.

• Expansion joints damaged

• Railings slightly damaged

• Drainage spouts to be repaired

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be repaired wherever

required.

• The Slab / Girders have to be

rehabilitated wherever required (by

Shortcrete / Guniting / Grouting / Micro

concrete)

• Exposed reinforcement shall be treated

with epoxy grouting.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be repaired /

provided

• Drainage spouts to be repaired /

provided

64.80

97 BJ-20

CRN

SH

41

67.6

00

BR:S

H41:I

ND

2:6

8.9

27

23-0

3-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Tam

ba n

ala

1995

Kanaknagar

8.50 7.50

RC G

irder

14 11.80 165.20 Open

16.9

9874

75.9

9030

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Railings Slightly Damaged

• Vents blocked by thick thorny bushes,

debris.

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

• Debris / Vegetative Growth shall be

removed from the Waterway.

68.65

98 BJ-21

Non-C

RN

MD

R

10.8

00

IND

206010754

04-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Shirnandagi

2000

Niv

arg

i

5.00 4.00

RC S

lab

17 5.00 85.00 Open

17.3

9891

75.6

6815

• Structure in good condition

• Structure Narrow

• Bridge Cum Barrage

• Guard posts damaged

• Pipe line on RHS of the Bridge

• Guard posts to be repaired

• Structure narrow check if widening is

required as per traffic.

72.30

99 BJ-22

Non-C

RN

MD

R

1.0

00

IND

207001002

07-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Indi

Indi

Nalla

2010

Near

Ath

arg

a

5.00 4.00

RC S

lab

15 5.00 75.00 Open

16.9

7966

75.8

8921

• Structure in good condition

• Structure Narrow

• Bridge Cum Barrage

• Recently constructed

• Guard posts to be repaired

• Structure narrow check if

widening is required as per traffic.

81.24

P2 - 25 of 36

Page 26: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

100 BJ-23

Non-C

RN

MD

R

10.5

00

MD

D055010718

13-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Muddebih

al

Muddebih

al

Tributa

ry t

o K

rishna

2014

Near

Bala

batt

i

8.50 7.50

RC G

irder

5 17.00 85.00 Open

16.3

2256

75.9

7679

• Recently Constructed

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Vents blocked by thick thorny bushes,

debris.

• The Girders have to be Gunited /

Grouted at honey comb locations

• Vegetative growth to be removed on

side slopes and at pier cap locations

89.62

101 BJ-24

Non-C

RN

SH

60

15.5

00

BR:S

H60:M

DD

003:1

5.5

80

26-0

3-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Muddebih

al

Muddebih

al

Krishna

1985

Yem

mih

att

i

11.007.60 +

FP

PSC I

Girder

31 24.50 759.50 Well

16.1

9435

76.0

9768

• Girders in good condition

• Leaching observed on the cantilever

portion of the slab on both sides.

• Cracks observed at junction of Main

girder and Cross girder at few places,

Honey combing observed in few Cross

girders

• Reinforcement exposed and corroded

in few spans in Precast Cantilever slab

• Drainage spouts to be replaced /

repaired, outlet pipes missing

• Railings slightly damaged

• Expansion Joint non functional, fully

blocked by bitumen

• Pitching in front of abutment and in

side slopes slightly eroded / displaced.

• Existing Water pipe line running on

LHS Footpath, Water Leaking at valves

• Cantilever portion of Slab to be

grouted with epoxy

• Cross girders at junction of Main girder

to be grouted with epoxy grout

• Bearings to be Greased / repaired.

• Railings shall be repaired / replaced

wherever required.

• Expansion Joint to be replaced

• Drainage spouts to be repaired /

provided with proper outlet

• Stone pitching in front of abutment

and side slopes shall be re-instated

• Wearing Course shall be provided if

required.65.49

102 BJ-25

Non-C

RN

SH

60

47.8

00

MD

D003047800

12-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Muddebih

al

Muddebih

al

Tributa

ry t

o D

ona

1985

Mukih

al

8.00 7.00

Hum

e p

ipe (

Causew

ay)

4 0.75 dia 55.00 Open

16.4

4203

76.2

7934

• Causeway, HFL around 2.50m above

road level during rainy season

• The road gets blocked for 1 or 2 days

• Road surface fully worn-out

• Scour of around 1.0m on down stream

side

• Propose New High level Bridge

20.84

103 BJ-26

Non-C

RN

SH

60

52.4

00

MD

D003052400

12-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Muddebih

al

Muddebih

al

Dona

1985

Talikota

7.50 6.50

RC B

ox (

Causew

ay)

7 1.50 150.00 Open

16.4

7184

76.3

0535

• Causeway, overflows by around 2.50m

above road level during rainy season

• The road gets blocked for 1 or 2 days

• Road surface fully worn-out

• Scour of around 1.0m on downstream

side

• Severe honey combing observed in

Box structure

• Vegetative growth in water way

• Propose New High level Bridge

46.99

P2 - 26 of 36

Page 27: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

104 BJ-27

Non-C

RN

MD

R

50.6

00

MD

D50600

12-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Muddebih

al

Muddebih

al

Tributa

ry t

o D

ona

1990

Mukih

al

8.40 7.40

RC G

irder

7 11.90 83.30 Open

16.4

4193

76.2

7203

• Slight Honey combing of concrete

observed in the Longitudinal Girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Railings Slightly Damaged

• Vents blocked by thick thorny bushes,

debris.

• Road Taken up for Improvement

by KRDCL

• The Girders have to be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting / Micro concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at pier cap locations

• Railings shall be reconstructed /

Repaired wherever required.

• Debris / Vegetative Growth shall be

removed from the Waterway.

62.95

105 BJ-28

CRN

SH

16

13.5

00

BR:S

H16:S

ND

2:1

3.8

95

05-0

4-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Sin

dgi

Sin

dgi

Nalla

1985

Yankanchi

8.50 7.50

RC S

lab

13 7.00 91.00 Open

16.8

6684

76.3

4123

• Spalling of Concrete at edges on both

sides in all spans.

• Reinforcement exposed at slab Edges

• Expansion joints fully clogged

• MS Railings slightly damaged

• Drainage spouts to be repaired

• The edges of slab to be rehabilitated

by grouting / guniting in all spans

• Vegetative growth to be removed on

side slopes

• Railings shall be repaired wherever

required.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

63.21

106 BJ-29

CRN

SH

34

232.5

00

BR:S

H34:S

ND

201:2

33.7

1

06-0

2-2

018

Nort

h

Belg

aum

Bijapur

Bijapur

Sin

dgi

Sin

dgi

Bheem

a

1970

Afz

alp

ur

8.20 7.20

RC A

rch

21 20.60 432.60 Open

17.1

7000

76.3

2680

• Vegetative Growth at Pier / Spandral

wall location.

• Thick Vegetative growth in the river at

Pier location.

• Railing damaged

• Road surface slightly worn out

• Drainage spouts / Outlet clogged

• Vegetative growth to be removed at

pier / Spandral wall location

• Thick Vegetative growth in the river at

Pier locations to be removed

• Railing shall be repaired wherever

required.

• The Pier / Abutment shall be repaired

and plastered as required.

• The Spandral wall shall be sealed with

Cement Grout at cracks and then it shall

be plastered wherever required.

• Drainage spouts shall be provided with

proper outlet pipes.

• As alternative, New 2 Lane High

level Bridge (for a total length of

around 430m) may be provided

adjacent to the existing Bridge.

57.88

107 BJ-30

CRN

SH

124

112.0

00

BR:S

H124:A

FZ62:1

11.8

1

05-0

4-2

018

Nort

h E

ast

Gulb

arg

a

Gulb

arg

a

Gulb

arg

a

Afz

alp

ur

Afz

alp

ur

Bheem

a

1990

Gatt

ara

gi

8.00 7.00

RC S

lab

110 3.00 330.00 Open

17.0

8850

76.4

1050

• Bridge cum Barrage over Bhima River

• Structure in good condition

• Expansion joints fully clogged

• RC Railings slightly damaged

• Drainage spouts to be repaired

• Road surface to be repaired.

• Expansion Joint to be cleaned

• Drainage spouts to be repaired /

provided

66.56

P2 - 27 of 36

Page 28: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

108 Ra-01

CRN

SH

15

294.8

00

BR:S

H15:D

EV1:2

89.9

35

27-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Devadurg

a

Devadurg

a

Tributa

ry t

o K

rishna

2002

Sunkeshw

ara

hal

8.50 7.50

RC G

irder

5 12.30 61.50 Open

16.3

2065

77.1

0434

• Structure in good condition,

constructed by KRDCL

• Spalling, reinforcement exposed at

cantilever portion in 2 spans

• Spalling of Concrete, reinf. Exposed at

support location in main girders in 2

spans

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris for entire waterway

• Grating of Drainage spouts damaged.

• Cantilever slab, Girder shall be

rehabilitated as required (by Shortcrete

/ Grouting / Guniting)

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

72.04

109 Ra-02

CRN

SH

61

145.6

00

BR:S

H61:D

EV201:1

45.2

46

27-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Devadurg

a

Devadurg

a

Tributa

ry t

o K

rishna

2015

Navilgudda

12.007.50 +

FP

PSC I

Girder

4 32.00 128.00 Open

16.3

9085

76.8

4056

• Recently constructed, constructed

under KSHIP-II

• Drainage spouts clogged

• Vegetative growth on side slopes

• Structure retained with routine

maintenance

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be cleared.

95.08

110 Ra-03

Non-C

RN

SH

128

1.6

00

DEV202001655

27-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Devadurg

a

Devadurg

a

Tributa

ry t

o K

rishna

2017

Am

rapur

12.00 11.00

RC B

ox

18 4.20 75.60 Raft

16.3

7314

76.8

3756

• Newly constructed

• Structure in good condition

• Retain with routine maintenance

• Vegetative growth to be removed on

side slopes

94.26

111 Ra-04

CRN

SH

129

52.0

00

BR:S

H129:L

IN36:5

2.1

65

29-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Maski H

alla

2000

Ram

atn

al

8.00 7.00

MCPC

25 3.00m Dia 89.40 Raft

15.8

9487

76.3

0276

• Slight Honey combing of concrete

observed at bottom in the Pipes

• Vents slightly silted

• Scoured at central pipes

• Floor protection works slightly

damaged.

• Road surface worned out.

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Grouting of joints to be done

• New wearing coat shall be provided

64.02

P2 - 28 of 36

Page 29: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

112 Ra-05

CRN

SH

41

186.4

00

BR:S

H41:L

IN5:1

86.6

11

21-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Tributa

ry t

o K

rishna

1980

Sunkal

7.30 6.30

RC S

lab

12 5.20 62.40 Open

16.2

0848

76.4

0382

• Structure Narrow.

• Slight Honey combing, spalling

observed at soffit in few slabs

• Clear vent height less

• Guard posts fully damaged

• Expansion joint damaged.

• Side slope pitching to be provided

• Vegetative growth blocking vents

• Slab to be rehabilitated (by Shortcrete

/ Gunitting / Grouting)

• Guard posts / Railings to be provided

• Expansion joint to be provided

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared

Widening not feasible, retain the

Bridge with repairs or propose for

Reconstruction by increasing the

vent Height.

55.56

113 Ra-06

CRN

SH

41

177.0

00

BR:S

H41:M

DD

1:1

78.5

03

03-1

0-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Krishna

2007

Nary

anapura

dam

12.007.50 +

FP

RC G

irder

63 18.65 1174.95 Open

16.2

2536

76.3

4969

• Structure in good condition, recently

constructed

• U/S side Basavasagara Dam

• Drainage spouts clogged

• Expansion joint filled with dust

• Road surface slightly worn out

• Side slope pitching eroded

• Railings slightly damaged

• Structure retained with routine repairs

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be cleared.

• Side slope pitching to be reinstated.

• Road surface to be repaired.

87.78

114 Ra-07

Non-C

RN

MD

R

5.2

00

LIN

006005442

28-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Tributa

ry t

o K

rishna

1960

Hatt

i

6.50 5.50

SM

Arc

h

22 2.35 51.70 Open

16.2

0627

76.6

1927

• Structure narrow, old structure

• Vegetative Growth at Pier / Spandrel

wall location.

• Thick Vegetative growth in the river at

Pier location.

• Pointing in arch eroded

• Scour of 0.50m at pier location.

• Guard posts damaged

• Road surface slightly worn out

• The Arch / Spandrel wall shall be

sealed with Cement Grout at cracks and

then it shall be plastered wherever

required.

• Vegetative growth to be removed at

pier / Spandrel wall location

• The Pier / Abutment shall be repaired

and plastered as required.

• The piers shall be strengthened at bed

level.

• Thick Vegetative growth in the river at

Pier locations to be removed

• Guard posts shall be provided

• Drainage spouts shall be provided with

proper outlet pipes.

Widening not Feasible, Propose for

Reconstruction for 8.50m wide or

retain the structure by

strengthening the structure.

44.30

115 Ra-08

Non-C

RN

MD

R

1.2

00

LIN

012001300

28-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Tributa

ry t

o K

rishna

2000

Benchald

oddi

8.50 7.50

RC S

lab

10 6.60 66.00 Open

16.2

7871

76.6

4618

• Structure in good condition

• Slight Honey combing observed at

soffit in few slabs

• Expansion joint damaged.

• Vegetative growth on pier cap location.

• Side slope pitching eroded

• Vegetative growth blocking vents

• Drainage spouts blocked

• Slab to be rehabilitated at edges

• Railings to be repaired

• Expansion joint to be provided

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared on

pier cap and in waterway.

• Drainage spouts to be cleaned /

repaired.

71.53

P2 - 29 of 36

Page 30: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

116 Ra-09

Non-C

RN

MD

R

6.5

00

LIN

017006846

03-1

0-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Krishna

1985

Jala

durg

a

8.50 7.50

RC G

irder

8 19.50 156.00 Open

16.2

4741

76.4

2741

• Slight spalling of concrete / Honey

combing of concrete observed in the

Longitudinal Girders

• Leaching / Spalling observed on the

cantilever portion of the slab on both

sides.

• Expansion joints fully blocked by

debris

• Drainage spouts clogged

• RC railings damaged

• Thick Vegetative growth at end spans.

• Side slope pitching eroded

• The Cantilever slab / Girders have to

be rehabilitated wherever required (by

Shortcrete / Guniting / Grouting / Micro

concrete)

• Exposed reinforcement shall be treated

with anti-corrosive treatment.

• Drip course shall be provided along

both the edges of slab.

• Expansion Joint to be provided

• Drainage spouts to be repaired /

provided

• Vegetative growth to be removed on

side slopes and at end spans

• Railings to be replaced

• Wearing Coat to be re-laid

60.57

117 Ra-10

Non-C

RN

SH

29

11.0

00

LIN

003011081

28-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Lin

gsugur

Lin

gsugur

Maski H

alla

2014

Nagala

pura

12.007.50 +

FP

PSC I

Girder

3 + 232.00 +

31.50159.00 Open

15.9

3249

76.4

3813

• Recently constructed, constructed

under KSHIP-II

• Drainage spouts clogged

• Footpath slabs slightly damaged

• Structure retained with routine

maintenance

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Footpath slabs to be repaired /

replaced.

• Vegetative growth to be cleared. 94.61

118 Ra-11

CRN

SH

20

46.6

00

BR:S

H20:M

AN

1_B:4

6.6

77

22-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Tributa

ry t

o K

rishna

2002

Mala

t

8.50 7.50

RC S

lab

8 10.04 80.32 Open

16.1

3988

76.9

3368

• Structure in good condition,

constructed under KSHIP-1 Project

• Super structure replaced by retaining

the Steel Girders and SSM Sub-

structure.

• Expansion joint fully covered

• Side slope pitching eroded

• Vegetative growth blocking vents

• Drainage spouts blocked

• Railings slightly damaged

• Retain with routine repairs.

• Railings to be repaired

• Expansion joint to be cleaned /

repaired

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared on

pier cap and in waterway.

• Drainage spouts to be cleaned /

repaired. 72.99

119 Ra-12

CRN

SH

23

18.0

00

BR:S

H23:M

AN

2:1

8.3

5

24-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Tributa

ry t

o T

ungabhadra

2002

Kurd

i

12.00 11.00

RC G

irder

4 15.60 62.40 Open

16.0

8491

77.1

6253

• Structure in good condition,

constructed under KSHIP-I

• Drainage spouts clogged

• Road surface slightly worn out

• Side slope pitching eroded

• Railings slightly damaged

• Structure retained with routine

maintenance

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Railings to be repaired

• Vegetative growth to be cleared.

• Side slope pitching to be reinstated.

• Road surface to be repaired.

73.51

P2 - 30 of 36

Page 31: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

120 Ra-13

CRN

SH

23

22.2

00

BR:S

H23:M

AN

2:2

2.5

55

24-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Tributa

ry t

o T

ungabhadra

2002

Kapgal

12.00 11.00

RC G

irder

4 15.60 62.40 Open

16.0

5268

77.1

4600

• Structure in good condition,

constructed under KSHIP-I

• Spalling, reinf exposed in Main Girders

at 4 to 5 locations

• Drainage spouts clogged

• Road surface slightly worn out

• Side slope pitching eroded

• Railings slightly damaged

• Girders to be grouted at 4 to 5

locations using Epoxy / cement Grout

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Railings to be repaired

• Vegetative growth to be cleared.

• Side slope pitching to be reinstated.

• Road surface to be repaired.

73.22

121 Ra-14

CRN

SH

23

41.8

00

BR:S

H23:M

AN

2:4

2.2

67

26-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Tributa

ry t

o T

ungabhadra

2002

Nasala

pur

12.007.50 +

FP

RC G

irder

7 15.60 109.20 Open

15.9

8860

76.9

9501

• Structure in good condition,

constructed under KSHIP-I

• Drainage spouts clogged

• Outlet pipes to be provided

• Road surface slightly worn out

• Side slope pitching eroded

• Railings slightly damaged

• Structure retained with routine repairs

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Railings to be repaired

• Vegetative growth to be cleared.

• Side slope pitching to be reinstated.

• Road surface to be repaired. 73.46

122 Ra-15

CRN

SH

23

56.4

00

BR:S

H23:M

AN

2:5

6.4

87

26-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Poth

nal N

alla

2002

Poth

nal

12.007.50 +

FP

RC G

irder

14 15.60 218.40 Open

15.9

2098

76.8

8696

• Structure in good condition,

constructed under KSHIP-I

• Drainage spouts clogged

• Outlet pipes to be provided

• Road surface slightly worn out

• Side slope pitching eroded

• Railings slightly damaged

• Structure retained with routine repairs

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Railings to be repaired

• Vegetative growth to be cleared.

• Side slope pitching to be reinstated.

• Road surface to be repaired. 73.45

123 Ra-16

CRN

SH

61

223.2

00

BR:S

H61:M

AN

202:2

23.4

04

24-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Nalla

1970

Gork

al

7.00 6.00

SM

Arc

h

43 2.70 116.10 Open

16.0

1071

77.1

6648

• Structure narrow, old structure

• Vegetative Growth at Pier / Spandral

wall location.

• Thick Vegetative growth in the river at

Pier location.

• Pointing in arch eroded

• Scour of 0.50m at pier location.

• Guard posts damaged

• The Arch / Spandral wall shall be

sealed with Cement Grout at cracks and

then it shall be plastered wherever

required.

• Vegetative growth to be removed at

pier / Spandral wall location

• The Pier / Abutment shall be repaired

and plastered as required.

• The piers shall be strengthened at bed

level.

• Thick Vegetative growth in the river at

Pier locations to be removed

• Guard posts shall be provided

• Drainage spouts shall be provided with

proper outlet pipes.

Widening not Feasible, Propose for

Reconstruction for 12.00m wide or

retain the structure by

strengthening the structure.

51.99

P2 - 31 of 36

Page 32: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

124 Ra-17

Non-C

RN

SH

128

48.8

00

MAN

204049125

26-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Manvi

Manvi

Nalla

1985

Bagalw

ad

6.00 5.00

HP (

Causew

ay)

13 0.90m Dia 80.00 Open

16.0

4124

76.8

9528

• Causeway, HFL around 0.90m above

road level

• NP2 pipes cracked

• SSM Headwall damaged

• Scour of 0.60m on d/s side

• Floor protection works damaged.

• Road surface fully worned out.

• Proposed for Reconstruction

• High Level Bridge of 60.0m span

for 12.0m wide

24.78

125 Ra-18

CRN

SH

127

189.0

00

BR:S

H127:R

AI2

02:1

95.7

29

23-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Raic

hur

Raic

hur

Tributa

ry t

o T

ungabhadra

1980

Upra

l

7.50 6.50 HP 55 0.90m Dia 76.50 Raft

16.0

4136

77.3

6266

• NP2 Pipes.

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 10 pipes

• around 20 to 30 pipes 50% silted

• Road surface fully worned out.

• SSM Return wall pointing eroded.

• Submersible Bridge, Over flows by

around 0.90m during rainy season.

• Vegetative growth to be removed on

side slopes and in waterway

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Guard posts shall be repaired

wherever required.

• Wearing coat to be provided.

• Grouting of joints to be done for SSM

Headwall.

As an Alternative propose High level

Bridge of 80m length by increasing

the vent Height.

50.49

126 Ra-19

CRN

SH

127

193.4

00

BR:S

H127:R

AI2

02:2

00.7

04

23-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Raic

hur

Raic

hur

Tributa

ry t

o K

rishna

2010

Gunjh

alli (J

unction w

ith N

H 1

67)

8.50 7.50

RC S

lab

7 10.50 73.50 Open

16.0

4115

77.4

0717

• Structure in good condition,

constructed by KRDCL

• Expansion joint damaged.

• Vegetative growth on pier cap location.

• Side slope pitching eroded

• Vegetative growth blocking vents

• Drainage spouts blocked

• Railings slightly damaged

• Retain with routine repairs.

• Railings to be repaired

• Expansion joint to be provided

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared on

pier cap and in waterway.

• Drainage spouts to be cleaned /

repaired.

85.58

127 Ra-20

CRN

SH

61

250.0

00

BR:S

H61:R

AI2

01:2

49.6

06

23-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Raic

hur

Raic

hur

Tributa

ry t

o K

rishna

2010

Gille

sugur

12.00 11.00

RC S

lab

7 10.50 73.50 Open

15.9

7425

77.3

6255

• Structure in good condition,

constructed by KRDCL

• Expansion joint damaged.

• Vegetative growth on pier cap location.

• Side slope pitching eroded

• Vegetative growth blocking vents

• Drainage spouts blocked

• Railings slightly damaged

• Retain with routine repairs.

• Railings to be repaired

• Expansion joint to be provided

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared on

pier cap and in waterway.

• Drainage spouts to be cleaned /

repaired.

85.74

P2 - 32 of 36

Page 33: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

128 Ra-21

Non-C

RN

SH

128

77.2

00

SIN

202077290

25-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Sin

dhanur

Sin

dhanur

Poth

nal N

alla

2000

Hulg

unchi

8.00 8.00

MCPC

45 2.50m dia 134.50 Raft

15.8

7259

77.0

0177

• Slight Honey combing of concrete

observed at bottom in the Pipes

• Guard posts damaged

• Vents slightly silted

• Scoured at central pipes

• Floor protection works damaged.

• Road surface slightly worned out.

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Guard posts shall be repaired

wherever required.

• Road surface to be repaired

• Grouting of joints to be done

64.07

129 Ra-22

Non-C

RN

SH

128

90.0

00

SIN

202090200

25-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Sin

dhanur

Sin

dhanur

Tributa

ry t

o T

ungabhadra

1985

Hedagin

al

8.00 7.00

MCPC

28 2.00m dia 69.50 Raft

15.7

9936

76.9

7165

• Slight Honey combing of concrete

observed at bottom in the Pipes

• Guard posts damaged

• Vents 50% silted

• Floor protection works damaged.

• Road surface worned out.

• Vegetative growth on side slopes and

at end spans

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes and in waterway

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Guard posts shall be repaired

wherever required.

• New wearing coat to be provided

• Grouting of joints to be done

57.44

130 Ra-23

Non-C

RN

SH

128

104.2

00

SIN

202104315

25-0

8-2

018

Nort

h E

ast

Gulb

arg

a

Raic

hur

Raic

hur

Sin

dhanur

Sin

dhanur

Sin

dhanur

Halla

1980

Ala

banur

7.50 6.50

MCPC

32 2.85m Dia 103.60 Raft

15.7

6085

76.8

6586

• Severe Honey combing of concrete

observed at bottom in the Pipes

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 10 pipes

• around 10 pipes slightly silted

• Floor protection works damaged.

• Road surface fully worned out.

• SSM Return wall cracked

• Submersible Bridge, Overflows by

around 0.50m

• Propose High level Bridge of 120m

length by increasing the vent

Height.

If Repaired / Retained

• The Pipes shall be rehabilitated fully /

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes and in waterway

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Guard posts shall be repaired

wherever required.

• Wearing coat to be provided.

• Returnwall to be reconstructed.

32.84

131 Ya-01

CRN

SH

149

22.0

00

BR:S

H149:C

TR202_A:1

9.7

45

09-0

8-2

018

Nort

h

Gulb

arg

a

Sedam

Gulb

arg

a

Chitapur

Chitapur

Bheem

a

2008

Sonth

i

8.50 7.50

RC S

lab

73 9.00 657.00 Open

16.8

3102

76.9

2902

• Bridge cum Barrage

• Structure in good condition

• Side slope pitching to be provided

• Wearing coat slightly damaged

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Railings to be repaired

• Wearing coat to be repaired

83.59

P2 - 33 of 36

Page 34: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

132 Ya-02

Non-C

RN

MD

R

8.0

00

SED

044008000

10-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Sedam

Sedam

Nalla

2016

Rajo

lla(K

)

6.50 5.50

RC S

lab

6 8.90 53.40 Open

17.1

0467

77.4

0870

• Newly constructed

• Structure in good condition

• Side slope pitching to be provided

• Vegetative growth blocking vents

• Retained with routine repairs

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared

91.43

133 Ya-03

Non-C

RN

MD

R

11.4

00

SED

007011800

10-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Sedam

Sedam

Tributa

ry t

o K

rishna

1960

Malk

ed

8.00 7.00

SM

Arc

h

20 5.00 80.00 Open

17.1

8883

77.1

6111

• Structure in Good condition

• Vegetative Growth at Pier / Spandral

wall location.

• Thick Vegetative growth in the river at

Pier location.

• Stone Railing damaged

• Road surface worn out

• Vegetative growth to be removed at

pier / Spandral wall location

• Thick Vegetative growth in the river at

Pier locations to be removed

• Stone Railing shall be repaired

wherever required.

• The Pier / Abutment shall be repaired

and plastered as required.

• The Arch / Spandral wall shall be

sealed with Cement Grout at cracks and

then it shall be plastered wherever

required.

• Drainage spouts shall be provided with

proper outlet pipes.

As alternative, New 2 Lane Bridge

(for a total length of around 80m)

may be provided adjacent to the

existing Bridge.

49.23

134 Ya-04

Non-C

RN

MD

R

1.2

00

SED

010001350

10-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Sedam

Sedam

Kagin

a

2013

Sangavi

5.00 4.00

RC S

lab

30 5.30 159.00 Open

17.2

0904

77.1

6315

• Bridge cum Barrage

• Structure in good condition, newly

constructed

• Side slope pitching to be provided

• Retained with routine repairs

• Pitching on side slopes to be provided.

• Railings to be repaired

83.55

135 Ya-05

Non-C

RN

MD

R

29.0

00

SED

010029585

10-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Sedam

Sedam

Kagin

a

2008

Lohada

5.00 4.00

RC S

lab

70 3.00 210.00 Open

17.2

2136

77.3

7120

• Bridge cum Barrage

• Structure in good condition, newly

constructed

• Side slope pitching to be provided

• Retained with routine repairs

• Pitching on side slopes to be provided.

• Railings to be repaired

83.64

P2 - 34 of 36

Page 35: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

136 Ya-06

CRN

SH

127

101.2

00

BR:S

H127:S

HA203:1

01.6

75

22-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shahpur

Shahpur

Krishna

2008

Googal

9.50

7.50 +

1.50

FP RC S

lab

80 10.00 800.00 Open

16.4

7787

77.1

4669

• Bridge cum Barrage

• Structure in good condition

• Side slope pitching to be provided

• Wearing coat slightly damaged

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Railings to be repaired

• Wearing coat to be repaired

83.66

137 Ya-07

CRN

SH

127

84.0

00

BR:S

H127:S

HA203:9

0.0

8

22-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shahpur

Shahpur

Bheem

a

2003

Gudur

8.50 6.50

RC S

lab

176 3.00 528.00 Open

16.4

8752

77.2

3471

• Bridge cum Barrage

• Structure in good condition

• Side slope pitching to be provided

• Wearing coat slightly damaged

• Pitching on side slopes to be provided.

• Expansion joint to be cleaned.

• Railings to be repaired

• Wearing coat to be repaired

73.27

138 Ya-08

CRN

SH

16

44.6

00

BR:S

H16:S

RP3:4

4.6

6

08-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shora

pur

Shora

pur

Tributa

ry t

o B

him

a

1970

Hadanuru

8.00 7.00

RC S

lab +

SM

Arc

h

18 + 9 3.90 105.30 Open

16.7

3540

76.5

4429

• 18 spans RC Slab + 9 spans SM Arch

• Slight spalling of concrete at edges in

soffit of slab

• Reinforcement slightly exposed at

edges.

• Arch Pointing Eroded slightly at few

places.

• Thick vegetative growth to be removed

from waterway at ends

• Road surface slightly cracked.

• Parapet slightly damaged.

• The slab soffit at edges to be

rehabilitated / grouted with epoxy grout

• pointing in arch to done using cement

grout

• Pier cap to be grouted, cracks to be

sealed with epoxy grout

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Road surface to be repaired

58.93

139 Ya-09

Non-C

RN

MD

R

11.0

00

SRP029011066

08-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shora

pur

Shora

pur

Tributa

ry t

o K

rishna

2011

Kachanoor

8.50 7.50

RC S

lab

5 11.10 55.50 Open

16.5

2747

76.5

8981

• Newly constructed

• Structure in good condition

• Thick vegetative growth to be removed

from waterway at ends

• Drainage spouts to be cleaned.

• Grating, outlet pipe to be provided.

• Vegetative growth to be removed on

side slopes

• Thick vegetative growth to be removed

from waterway at ends

• Pitching on side slopes to be provided.

• Drainage spouts to be cleaned, out let

pipes to be provided

• Expansion joint to be cleaned.

83.37

P2 - 35 of 36

Page 36: Summary of Major Bridges Inspected - Phase II (Year 2018-19)

Summary of Major Bridges Inspected - Phase II (Year 2018-19)

CRN /

Non-

CRNS

H /

MD

R

nu

mb

er

PW

D K

m

Ch

ain

ag

e

Brid

ge I

D

Date

of

In

sp

ecti

on

Zo

ne

Cir

cle

Div

isio

n

Dis

tric

t

Talu

k

Su

b-

div

isio

n

Nam

e o

f

Riv

er

Year of

Const.

Nearb

y

Pla

ce

OW

(m)

CW

(m)

Type of

Str.

Total

No.of

Spans

(No)

Span

Length

(m)

Overall

length of

Bridge

(m)

Type of

FdnLat Long Existing Details / Observation

Tentative Improvement

Proposal

Overall

BCIPhotoSl. No

Planning and Road Asset Management Center (PRAMC)

Government of Karnataka

140 Ya-10

Non-C

RN

MD

R

28.0

00

SRP013027238

08-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shora

pur

Shora

pur

Tributa

ry t

o K

rishna

2009

Manglo

or

8.50 7.50

RC G

irder

11 10.00 110.00 Open

16.5

5187

76.6

4041

• Structure in good condition

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Main girder and cross girder in good

condition

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris (end spans)

• Grating of Drainage spouts damaged.

• Expansion Joint to be repaired /

replaced

• Drainage spouts to be cleaned of

debris, grating, out-let pipe to be

provided.

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased

• Pointing to sub-structure to be done as

required.

81.28

141 Ya-11

Non-C

RN

MD

R

30.0

00

SRP045030257

21-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Shora

pur

Shora

pur

Dona

2003

Tangadbail

5.50 4.50

RC S

lab

15 9.30 139.50 Open

16.2

9112

76.4

2801

• Structure Narrow.

• Structure in good condition

• Slight Honey combing, spalling

observed at soffit in few slabs

• Railings slightly damaged

• Expansion joint damaged.

• Side slope pitching to be provided

• Vegetative growth blocking vents

• Slab to be rehabilitated (by Shortcrete

/ Guniting / Grouting)

• Railings to be repaired

• Expansion joint to be provided

• Pitching on side slopes to be provided.

• Vegetative growth to be cleared

• If required, the structure may be

widened.

69.12

142 Ya-12

CRN

SH

127

52.4

00

BR:S

H127:Y

DG

204:5

8.5

31

09-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Yadgir

Yadgir

Tributa

ry t

o G

hata

pra

bha

1975

Nandepalli

7.00 6.00

MCPC

80 1.60 167.50 Raft

16.6

9015

77.3

8733

• Severe Honey combing of concrete

observed at bottom in the Pipes

• Minor Cracks observed at top in few

pipes

• Guard posts damaged

• Scour of around 0.50m observed at

around 10 pipes

• around 30 to 40 pipes 50% silted

• Floor protection works damaged.

• Road surface slightly worned out.

• SSM Return wall pointing eroded.

• Structure Narrow.

• The Pipes shall be rehabilitated

wherever required (by Shortcrete /

Guniting / Grouting)

• Vegetative growth to be removed on

side slopes and in waterway

• Silt to be removed from all the pipes

• Floor Protection works shall be

provided as per requirement

• Guard posts shall be repaired

wherever required.

• Wearing coat to be provided.

• Grouting of joints to be done for SSM

returnwall

As an Alternative propose High level

Bridge of 160m length by increasing

the vent Height.

54.22

143 Ya-13

CRN

SH

15

207.2

00

BR:S

H15:Y

DG

1:2

07.1

08

09-0

8-2

018

Nort

h

Gulb

arg

a

Yadgir

Yadgir

Yadgir

Yadgir

Tributa

ry t

o B

him

a

2003

Yadgir

8.50 7.50

RC G

irder

5 12.50 62.50 Open

16.7

7509

77.1

3451

• Structure in good condition,

constructed by KRDCL

• Slight Leaching / Dampness observed

on the cantilever portion of the slab at

edges.

• Main girder and cross girder in good

condition

• Expansion joints fully blocked by silt /

debris

• Vents blocked by thick thorny bushes,

debris for entire waterway

• Grating of Drainage spouts damaged.3

• No access to underneath of Bridge due

to thick thorny bushes all around the

Bridge.

• Expansion Joint to be cleaned /

repaired

• Drainage spouts to be cleaned of

debris

• Vegetative growth to be removed on

side slopes

• Debris / Vegetative Growth shall be

removed from the Waterway.

• Bearings to be greased 73.21

P2 - 36 of 36