summary of major bridges inspected - phase ii (year 2018-19)
TRANSCRIPT
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhoto
1 BD-01
Non-C
RN
MD
R
17.3
00
BR:M
DR:1
7.3
00
05-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Bid
ar
Bid
ar
Bid
ar
Bid
ar
Manja
ra
1997
Rajo
kheni
8.40 7.40
PSC I
Girder
7 25.00 175.00 Open
17.8
0400
77.3
1380
• Girders in good condition
• Light Leaching observed on the
cantilever portion of the slab on both
sides.
• Railings slightly damaged
• Drainage spouts to be cleaned /
repaired
• Debris over pier cap to be removed.
• Expansion Joint fully damaged
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be repaired wherever
required.
• Expansion Joint to be replaced
• Drainage spouts to be repaired /
provided
• Bearings to be repaired / Greased.
72.80
2 BD-02
CRN
SH
34
57.0
00
BR:S
H34:B
HA201:5
6.5
15
08-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Bid
ar
Bid
ar
Bhalk
i
Bhalk
i
Kara
nja
1970
Bhalk
i
8.30 7.10
RC G
irder
11 11.90 130.90 Open
18.0
0110
77.1
9510
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Concrete of poor quality in girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Guard posts damaged
• Overflows by around 0.50m above
Road Level during Heavy discharge /
Rains.
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Guard Posts shall be reconstructed /
Repaired wherever required.
• As an alternative, High level
Bridge can be proposed adjacent to
the existing Bridge with footpath - 6
spans of 24.0m c/c)
54.23
3 BD-03
CRN
SH
75
15.7
00
BR:S
H75:H
UM
202:1
5.5
7
23-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Bid
ar
Bid
ar
Hum
nabad
Hum
nabad
Tributa
ry t
o K
ara
nja
1970
Dubalg
undi
8.00 7.00RC G
irder
6 12.00 72.00 Open
17.8
6110
77.1
8850
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Concrete of poor quality in girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Railings damaged
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
52.12
4 GB-01
CRN
SH
11
61.5
50
BR:S
H11:A
LD
2:6
1.4
85
02-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Ala
nd
Ala
nd
Tributa
ry t
o B
enneth
ora
2014
Am
bala
ga
8.50 7.50
RC G
irder
8 12.40 99.20 Open
17.6
0120
76.8
9130
• Constructed by KRDCL
• Structure in Good condition.
• Light Leaching observed on the
cantilever portion of the slab on both
sides.
• Drainage spouts to be cleaned /
repaired (Outlet pipe to be provided)
• Debris over pier cap to be removed.
• Expansion Joint to be cleaned
• Vegetative growth to be removed on
side slopes
• Expansion Joint to be cleaned
• Drainage spouts to be cleaned /
repaired (Outlet pipe to be provided)
• Bearings to be Greased.
89.04
Sl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
P2 - 1 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
5 GB-02
CRN
SH
32
37.0
00
BR:S
H32:A
LD
3:3
7.0
96
05-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Ala
nd
Ala
nd
Benneth
ora
2005
Sangunda
8.50 7.50
RC S
lab
9 10.06 95.40 Open
17.6
2110
76.7
1900
• Structure in Good condition.
• Vegetative growth on side slopes and
approaches
• Expansion Joint to be repaired /
Cleaned
• Drainage spouts to be repaired /
Cleaned
• Vegetative growth to be removed on
side slopes
• Railings shall be reconstructed /
Repaired wherever required.
73.03
6 GB-03
CRN
SH
51
35.2
00
BR:S
H51:A
LD
203:4
5.5
75
04-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
ara
g
Gulb
arg
a
Ala
nd
Ala
nd
Benneth
ora
1975
Bhodhan
8.00 7.00
RC G
irder
4 12.00 48.00 Open
17.5
7280
76.7
5790
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Reinforcement exposed at bottom of
Girders at few places
• Concrete of poor quality in girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Guard posts damaged
• Over Flows by 3.00m during Rains.
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Guard posts shall be reconstructed /
Repaired wherever required.
• As an Alternative, Propose a High
Level Bridge with 12.00m Width.
51.03
7 GB-04
CRN
SH
51
42.0
00
BR:S
H51:A
LD
203:5
2.8
4
05-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Ala
nd
Ala
nd
Nalla
1975
Chin
chanasur
7.50 6.50 HP 30 + 2
0.90 +
2.1046.20 Raft
17.5
2270
76.7
8260
• NP2 Pipes Cracked
• Head wall damaged
• Guard posts damaged
• Scour of around 0.50m observed at
around 20 pipes
• Pipes silted.
• Road surface sinked.
• Thick Vegetative Growth blocking
vents.
• Overflows by 1.0m above Ground
Level
• Propose for Reconstruction with
Highlevel Bridge
25.19
8 GB-05
CRN
MD
R
19.5
00
BR:M
DR_ALD
8:A
LD
8:9
.166
06-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Ala
nd
Ala
nd
Nalla
1985
Hitta
lsriur
8.50 7.50
RC S
lab
19 10.40 197.60 Open
17.3
8070
76.5
6480
• Structure in Good condition.
• Vegetative growth on side slopes and
approaches
• Honey combing observed in few slab
at edges.
• Thick vegetative growth / thorny
bushes blocking the water way.
• Expansion Joint to be repaired /
Cleaned
• Drainage spouts to be repaired /
Cleaned
• Vegetative growth to be removed on
side slopes
• Railings shall be reconstructed /
Repaired wherever required.
• Thick vegetative growth / thorny
bushes to be removed
• Plastering / grouting to be done for
slab / sub-structure wherever required.
66.36
P2 - 2 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
9 GB-06
Non-C
RN
MD
R
95.5
00
BR:M
DR:9
5.5
00
08-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Yadgir
Gulb
arg
a
Jew
arg
i
Jew
arg
i
Nalla
1975
Vadagere
8.00 7.00
MCPC
18 3.30 67.90 Raft
16.7
5916
76.5
5085
• Honey combing of concrete observed
in the Pipes
• Minor Cracks observed at top in few
pipes
• MS Railings damaged
• Scour of around 0.50m observed at
around 20 pipes
• Few pipes silted by around 50%
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• MS Railings shall be reconstructed /
Repaired wherever required.
53.33
10 GB-07
Non-C
RN
MD
R
19.0
00
BR:M
DR:1
9.0
00
08-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Yadgir
Gulb
arg
a
Jew
arg
i
Jew
arg
i
Nalla
2002
Kadakol
8.00 7.00
MCPC
42 3.00 146.50 Raft
16.8
7141
76.4
9502
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 10 pipes
• Few pipes silted
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• Guard posts shall be reconstructed /
Repaired wherever required.
71.40
11 GB-08
Non-C
RN
MD
R
0.3
00
BR:M
DR:0
.300
08-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Yadgir
Gulb
arg
a
Jew
arg
i
Jew
arg
i
Nalla
1985
Aura
d
8.50 7.50
RC S
lab
10 8.20 82.00 Open
16.9
7084
76.7
6641
• Structure in Good condition.
• Vegetative growth on side slopes and
approaches
• Honey combing observed in few slab
at edges.
• Thick vegetative growth / thorny
bushes blocking the water way.
• Expansion Joint to be repaired /
Cleaned
• Drainage spouts to be repaired /
Cleaned
• Vegetative growth to be removed on
side slopes
• Railings shall be reconstructed /
Repaired wherever required.
• Thick vegetative growth / thorny
bushes to be removed
• Plastering / grouting to be done for
slab / sub-structure wherever required.
66.09
12 SD-01
CRN
SH
10
101.0
00
BR:S
H10:S
ED
1:1
00.7
47
28-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Sedam
Sedam
Kagin
a
1975
Malk
hed
7.30 0.50
RC G
irder
21 10.00 210.00 Open
17.1
9680
77.1
5490
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Concrete of poor quality in girders
• Leaching / Spalling and reinforcement
exposed observed on the cantilever
portion of the slab on both sides.
• Reinforcement exposed in girders (in
central 2 to 3 spans)
• Expansion joints fully clogged
• MS Railings slightly damaged
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be repaired wherever
required.
53.70
P2 - 3 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
13 SD-02
CRN
SH
15
143.0
00
BR:S
H15:S
ED
2:1
45.4
13
27-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Sedam
Sedam
Kagin
a
1972
Sata
pata
nahalli
8.00 7.00
RC G
irder
19 11.70 222.30 Open
17.2
2240
77.3
1220
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Reinforcement exposed at bottom of
Girders at few places
• Concrete of poor quality in girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Railings damaged
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
56.16
14 SD-03
CRN
SH
15
148.0
00
BR:S
H15:S
ED
2:1
49.9
78
02-0
2-2
018
Nort
h e
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Sedam
Sedam
Kam
ala
vath
i
1990
Bib
banahalli Cro
ss
8.10 7.10
RC S
lab
15 4.60 69.00 Open
17.1
9080
77.2
8950
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• Railings slightly damaged
• Drainage spouts to be repaired
• The edges of slab to be rehabilitated
by grouting / guniting in all spans
• Vegetative growth to be removed on
side slopes
• Railings shall be repaired wherever
required.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
60.77
15 SD-04
CRN
SH
10
118.4
00
BR:S
H10:S
ED
1:1
18.4
57
30-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Sedam
Sedam
Kam
ala
vath
i
2002
Bate
gera
8.50 7.50
RC G
irder
7 12.45 87.15 Open
17.1
4820
77.3
0000
• Constructed by KRDCL
• Structure in Good condition.
• Light Leaching observed on the
cantilever portion of the slab on both
sides.
• Drainage spouts to be cleaned /
repaired (Outlet pipe to be provided)
• Debris over pier cap to be removed.
• Expansion Joint to be cleaned
• Vegetative growth to be removed on
side slopes
• Expansion Joint to be cleaned
• Drainage spouts to be cleaned /
repaired (Outlet pipe to be provided)
• Bearings to be Greased.
73.19
16 SD-05
CRN
SH
15
103.3
00
BR:S
H15:C
NL1:1
05.0
39
01-0
2-2
018
Nort
h e
ast
Gulb
arg
a
Chin
choli
Gulb
arg
a
Chin
choli
Chin
choli
Tributa
ry t
o M
ullam
ari
1980
Ain
oli C
ross
8.10 7.10
RC S
lab
18 6.90 124.20 Open
17.4
9360
77.4
3040
• Severe Spalling of Concrete at soffit of
slab
• Reinforcement exposed at soffit of
Slab
• Expansion joints fully clogged
• Parapet damaged
• Drainage spouts to be repaired
• The Entire slab for all spans have to be
fully rehabilitated with grouting /
guniting
• Vegetative growth to be removed on
side slopes
• Parapet shall be repaired wherever
required.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
• As an alternative the entire super-
structure can be replaced for 8.50m
width, retaining the sub-structure.
52.76
P2 - 4 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
17 SD-06
CRN
SH
75
67.7
00
BR:S
H75:C
NL201:6
4.3
07
24-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Chin
cholli
Chin
cholli
Backw
ate
r of M
ullam
ari
1985
Channaru
r
7.10 6.10
RC G
irder
8 16.80 134.40 Open
17.5
4630
77.2
2620
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Concrete of poor quality in girders
• Reinforcement exposed at few places
at bottom of Longitudinal girder.
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Parapet slightly damaged
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Parapet shall be reconstructed /
Repaired wherever required.
59.52
18 SD-07
CRN
SH
125
12.5
00
BR:S
H125:C
TR75:5
0.2
95
01-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Chitapur
Gulb
arg
a
Chitapur
Chitapur
Tributa
ry K
agin
a
1980
Gotu
r
8.00 7.00
RC G
irder
12 12.00 144.00 Open
17.3
5420
77.1
0310
• Slight Leaching / Spalling observed on
the cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Guard posts damaged
• Thick Vegetative growth at approaches
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be repaired /
provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes
• Guard posts shall be reconstructed /
Repaired wherever required.
57.95
19 SD-08
Non-C
RN
MD
R
120.0
00
BR:M
DR:1
20.0
00
31-0
1-2
018
Nort
h E
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Chin
cholli
Chin
cholli
Tributa
ry K
agin
a
1975
Tengli
8.00 7.00
RC G
irder
12 11.80 141.60 Open
17.2
5310
77.1
3020
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Reinforcement exposed at bottom of
Girders at few places
• Concrete of poor quality in girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Guard posts damaged
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Guard posts shall be reconstructed /
Repaired wherever required.
53.42
20 SD-09
Non-C
RN
MD
R
69.4
00
BR:M
DR:6
9.4
00
02-0
2-2
018
Nort
h E
ast
Gulb
arg
a
Sedam
Gulb
arg
a
Chin
cholli
Chin
cholli
Kagin
a
1975
Dandhoti
7.50 6.50
MCPC
72 3.30 273.10 Raft
17.1
7530
77.1
0470
• Honey combing of concrete observed
in the Pipes
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 20 pipes
• Few pipes silted by around 50%
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• Guard posts shall be reconstructed /
Repaired wherever required
54.80
P2 - 5 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
21 Bk-01
CRN
MD
R
17.2
00
BR:M
DR_BD
M201:B
DM
201:1
7.2
84
06-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Badam
i
Badam
i
Tributa
ry t
o M
ala
pra
bha
2015
Teggi
8.50 7.50
RC S
lab
6 10.80 64.80 Open
16.0
5482
75.7
0690
• Newly constructed
• Structure in good condition
• Thick vegetative growth to be removed
from waterway at ends
• Drainage spouts to be cleaned.
• Outlet pipe to be provided.
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Drainage spouts to be cleaned, out let
pipes to be provided
• Expansion joint to be cleaned.
88.08
22 Bk-02
CRN
SH
135
29.4
00
BR:S
H135:B
DM
207:2
2.3
05
05-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Badam
i
Badam
i
Tributa
ry t
o M
ala
pra
bha
2015
Muru
di
12.00 11.00
RC S
lab
6 10.80 64.80 Open
16.0
4072
75.7
5591
• Newly constructed
• Structure in good condition
• Thick vegetative growth to be removed
from waterway at ends
• Side slope pitching to be provided
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Slab at edges in one span to be
grouted.
88.18
23 Bk-03
CRN
SH
14
68.4
00
BR:S
H14:B
DM
2:6
7.6
92
05-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Badam
i
Badam
i
Rangasam
udra
1965
Rangasam
udra
8.00 7.00
RC S
lab
19 5.50 104.50 Open
15.9
4585
75.8
5287
• Structure in good condition
• Slight spalling of concrete at edges in
soffit of slab in 6 to 7 spans
• Reinforcement slightly exposed at
edges.
• Thick vegetative growth to be removed
from waterway at ends
• Road surface slightly cracked.
• MS Railings slightly damaged.
• The slab soffit at edges to be
rehabilitated / grouted with epoxy grout
• Pier cap to be grouted, cracks to be
sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Road surface to be repaired
53.31
24 Bk-04
Non-C
RN
MD
R
6.0
00
BG
L014006150
01-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Bagalk
ot
Bagalk
ot
Tributa
ry t
o K
rishna
2000
Nain
egali
8.50 7.50
RC G
irder
4 25.00 100.00 Open
16.2
9006
75.9
5550
• Structure in good condition
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Slight Honey combing observed in
girders.
• Slight spalling, reinf. Exposed in main
girders at bottom in few girders.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes
in waterway
• Grating of Drainage spouts damaged.
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Thick Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
• Pointing to sub-structure to be done as
required.
73.98
P2 - 6 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
25 Bk-05
CRN
SH
53
129.0
00
BR:S
H53:B
LG
206_B:1
29.3
19
06-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Bilgi
Bilgi
Ghata
pra
bha
2015
btw
Kala
dgi /
kata
rki
8.50 7.50
RC S
lab
37 4.85 179.45 Open
16.2
2686
75.4
9068
• Newly constructed, Bridge cum
Barrage
• Structure in good condition
• Side slope pitching to be provided
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Railings to be repaired
88.01
26 Bk-06
CRN
SH
133
87.2
00
BR:S
H133:H
UD
209:8
7.2
83
05-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o M
ala
pra
bha
1980
Chitta
ragi /
Gangur
7.80 6.80
RC S
lab
15 5.40 81.00 Open
16.1
1594
75.9
6984
• Severe Spalling of Concrete at edges
in soffit of slab in all spans.
• Reinforcement exposed and corroded
at edges
• Honey combing observed at mid span
in soffit of slab in few spans.
• Thick vegetative growth to be removed
from waterway at ends
• Pointing eroded in piers (at few
locations)
• Drainage spouts fully blocked, non
functional.
• Vegetative growth at Pier cap location
• The slab soffit at edges and at bottom
to be fully rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
• Vegetative growth at Pier cap location
to be removed
• Sub-structure pointing to be done by
grouting.
• Drainage spout to be repaired /
replaced.
51.19
27 Bk-07
CRN
SH
133
90.0
00
BR:S
H133:H
UD
209:9
0.1
43
04-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o M
ala
pra
bha
1975
Kirasur
8.00 7.00
MCPC
28 2.30m Dia 77.90 Open
16.1
2328
75.9
9239
• Vents 50% silted.
• Thick vegetative growth blocking
almost half of the vents.
• severe Honey combing of concrete
observed in the Pipes
• Concrete of poor quality
• Minor Cracks observed at top in few
pipes
• Parapet slightly damaged
• All the Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Thick vegetative growth to be removed
from the waterway.
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• MS railings shall be reconstructed /
repaired wherever required.
• As an alternative a high level
bridge for a length of 75.0m can be
proposed by increasing the vent
height.
42.08
28 Bk-08
CRN
SH
14
110.4
00
BR:S
H14:H
UD
3_B:1
10.6
02
02-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
2002
Jala
kam
ala
din
ni
8.50 7.50
RC G
irder
8 12.35 98.80 Open
16.1
0417
76.1
6256
• Structure in good condition,
constructed by KRDCL
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Main girder and cross girder in good
condition
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Grating of Drainage spouts damaged.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased 73.36
P2 - 7 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
29 Bk-09
CRN
SH
14
115.6
00
BR:S
H14:H
UD
3_B:1
16.2
12
03-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
2000
Kara
di
8.00 7.00
RC S
lab
20 5.10 102.00 Open
16.1
0184
76.2
0488
• Severe Spalling of Concrete at edges
in soffit of slab in all spans.
• Reinforcement exposed and corroded
at edges
• Spalling / Honey combing observed at
mid span in soffit of slab in few spans.
• Thick vegetative growth to be removed
from waterway at ends
• Vegetative growth at Pier cap location
• The slab soffit at edges and at bottom
to be fully rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
• Vegetative growth at Pier cap location
to be removed 61.72
30 Bk-10
CRN
SH
14
127.0
00
BR:S
H14:H
UD
3_B:1
27.2
2
21-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
1975
Kodih
al
8.00 7.00
MCPC
24 3.05m Dia 84.70 Raft
16.0
9503
76.2
9977
• Severe Honey combing of concrete
observed in the Pipes at bottom
• Minor Cracks observed at top in few
pipes
• RC parapet slightly damaged
• Scour of around 0.50m observed at
around 10 pipes
• Few pipes silted
• Floor protection works damaged.
• Side slope pitching damaged.
• Road surface slightly worned out.
• SSM Return wall pointing eroded.
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• RC Parapet shall be repaired wherever
required.
• Wearing coat to be provided.
• Grouting of joints to be done for SSM
returnwall
53.81
31 Bk-11
CRN
SH
20
139.6
00
BR:S
H20:H
UD
2:1
40.4
02
02-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
2002
Gadis
unkapur
8.50 7.50
RC G
irder
7 13.45 94.15 Open
16.0
1352
76.1
8528
• Structure in good condition,
constructed by KRDCL
• Girder slightly damaged at bearing
location in span-2
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Main girder and cross girder in good
condition
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Grating of Drainage spouts damaged.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
• Pointing to sub-structure to be done as
required.
70.46
32 Bk-12
CRN
SH
20
144.8
00
BR:S
H20:H
UD
2:1
45.9
46
04-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
1982
Kesara
bhavi
8.50 7.50
RC S
lab
35 5.20 182.00 Open
16.0
1659
76.1
3585
• Severe Spalling of Concrete at edges
in soffit of slab (from span-20 to span-
30)
• Reinforcement exposed and corroded
at edges
• Honey combing observed at mid span
in soffit of slab in few spans.
• Thick vegetative growth to be removed
from waterway at ends
• Pointing eroded in piers (at few
locations)
• Drainage spouts fully blocked, non-
functional.
• Vegetative growth at Pier cap location
• The slab soffit at edges and at bottom
to be fully rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
• Vegetative growth at Pier cap location
to be removed
• Sub-structure pointing to be done by
grouting.
• Drainage spout to be repaired /
replaced.
54.58
P2 - 8 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
33 Bk-13
CRN
SH
20
165.2
00
BR:S
H20:H
UD
2:1
66.2
16
03-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o M
ala
pra
bha
1985
Rakkasagi
8.00 7.00
RC S
lab
16 4.50 72.00 Open
16.0
5660
75.9
7186
• Severe Spalling of Concrete at edges
in soffit of slab in all spans.
• Reinforcement exposed and corroded
at edges
• Spalling / Honey combing observed at
mid span in soffit of slab in few spans.
• Thick vegetative growth to be removed
from waterway at ends
• Pointing eroded in piers (at few
locations)
• Drainage spouts fully blocked, non
functional.
• Vegetative growth at Pier cap location
• The slab soffit at edges and at bottom
to be fully rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
• Vegetative growth at Pier cap location
to be removed
• Sub-structure pointing to be done by
grouting.
• Drainage spout to be repaired /
replaced.
57.34
34 Bk-14
Non-C
RN
MD
R
11.2
00
HU
D018011354
03-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Hungund
Hungund
Tributa
ry t
o K
rishna
2002
Kara
di
8.50 7.50
RC S
lab
8 10.50 84.00 Pile
16.0
9611
76.2
0110
• Constructed by KRDCL
• Structure in good condition
• Thick vegetative growth to be removed
from waterway at ends
• Drainage spouts to be cleaned.
• Outlet pipe to be provided.
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Drainage spouts to be cleaned, out let
pipes to be provided
• Expansion joint to be cleaned.
72.93
35 Bk-15
CRN
SH
34
381.1
00
BR:S
H34:J
MK1:3
82.9
2
12-0
6-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Jam
khandi
Jam
khandi
Krishna
1955
Chik
kapadasala
gi
7.40 6.40RCC A
rch
20 20.65 413.00 Open
16.5
6722
75.3
8794
• Spalling / Reinforcement exposed in
arch soffit at few places
• Honey combing observed in arch soffit
due to poor concrete
• Vegetative Growth at Pier / Spandral
wall location.
• Wearing coat / road surface slightly
damaged
• MS Railings slightly damaged
• Drainage spouts to be provided
• Structure Narrow
• Vegetative growth to be removed at
pier / Spandral wall location
immediately.
• Railings shall be repaired wherever
required.
• The Arch shall be strengthened /
grouted by Sealing with Cement Grout.
• The Spandral wall shall be sealed with
Cement Grout at cracks and then it shall
be plastered wherever required.
• The Spandral wall / Pier / Abutment
shall be repaired and grouted / plastered
as required.
• Drainage spouts shall be provided with
proper outlet pipes.
• If required new Wearing coat shall be
provided by removing the existing
wearing coat.
• As alternative, New 2 Lane High
level Bridge (for a total length of
around 415m) may be provided
adjacent to the existing Bridge.
50.87
36 Bk-16
Non-C
RN
MD
R
6.2
00
JMK015006450
07-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Jam
khandi
Jam
khandi
Krishna
2015
Jam
bagi
12.00
7.50 +
2.25
FP on
BS
PSC B
ox G
irder
+ P
SC I
Girder
12 49.65 595.80 Open
16.5
6492
75.3
1474
• Structure in good condition
• Newly constructed
• 20m Box Girder + 40.00m PSC I
Girder span arrangement
• Expansion joints fully blocked by silt /
debris
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Bearings to be greased
92.85
P2 - 9 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
37 Bk-17
CRN
SH
20
230.8
00
BR:S
H20:M
DL3:2
31.1
65
06-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Mudhol
Mudhol
Tributa
ry t
o G
hata
pra
bha
1975
Khajjid
oni
8.00 7.00
MCPC
27 3.05m Dia 95.35 Raft
16.1
7402
75.4
4585
• Honey combing of concrete observed
in the Pipes
• Minor Cracks observed at top in few
pipes
• RC parapet slightly damaged
• Scour of around 0.50m observed at
around 10 pipes
• Few pipes silted
• Floor protection works damaged.
• Severe Gaps btw pipes
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Gaps between pipes shall be sealed.
• RC Parapet shall be repaired wherever
required.
54.25
38 Bk-18
CRN
SH
34
440.2
00
BR:S
H34:M
DL201:4
40.3
45
07-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Mudhol
Mudhol
Nalla
2012
Lokapur
8.50 7.50
RC G
irder
5 13.20 66.00 Open
16.1
5331
75.3
6393
• Structure in good condition
• Recently constructed
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Main girder and cross girder in good
condition
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Grating of Drainage spouts damaged.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
• Pointing to sub-structure to be done as
required.
81.09
39 Bk-19
CRN
SH
54
123.3
00
BR:S
H54:M
DL16:1
23.6
68
06-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Mudhol
Mudhol
Ghata
pra
bha
1970
Dhavale
shw
ar
6.00 5.50
RC S
lab
17 5.00 85.00 Open
16.3
3101
75.0
7340
• Structure narrow
• Bridge cum barrage, gets over flowed
during heavy discharge
• Honey combing / spalling of concrete
at edges in soffit of slab
• Honey combing of concrete in piers
• The slab soffit at edges to be fully
rehabilitated / grouted with epoxy grout
• Pier to be grouted, cracks to be sealed
with epoxy grout
• Guard posts to be repaired
• As an Alternative an new high
level Bridge of length of 90m and
12.00m wide can be proposed 55.51
40 Bk-20
CRN
SH
55
52.0
00
BR:S
H55:M
DL30:5
0.2
64
07-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Mudhol
Mudhol
Ghata
pra
bha
1975
Mudhol
8.00 7.00
RC G
irder
13 12.00 156.00 Open
16.3
2420
75.2
8114
• Spalling of concrete / Honey combing
of concrete observed in the Longitudinal
Girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• MS railings damaged
• Thick Vegetative growth at end spans.
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at end spans
• MS Railings shall be Repaired wherever
required.
56.61
P2 - 10 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
41 Bk-21
Non-C
RN
MD
R
8.6
00
MD
L021008867
06-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Mudhol
Mudhol
Ghata
pra
bha
1980
Nandagoan
4.50 4.00
RC S
lab
19 4.70 89.30 Open
16.3
2666
75.1
1706
• Structure narrow
• Bridge cum barrage, gets over flowed
during heavy discharge
• Honey combing / spalling of concrete
at edges in soffit of slab
• Honey combing of concrete in piers
• The slab soffit at edges to be fully
rehabilitated / grouted with epoxy grout
• Pier to be grouted, cracks to be sealed
with epoxy grout
• Guard posts to be repaired
• As an Alternative an new high
level Bridge of length of 100m and
8.50m wide can be proposed 52.26
42 Bk-22
Non-C
RN
MD
R
9.4
00
BD
M005012766
05-0
8-2
018
Nort
h
Belg
aum
Bagalk
ot
Bagalk
ot
Badam
i
Badam
i
Tributa
ry t
o M
ala
pra
bha
1980
Aft
er
Gule
dagudda t
ow
ard
s B
adam
i
7.50 6.50
RC S
lab
10 7.10 71.00 Open
16.0
3683
75.7
3551
• Severe spalling of concrete at edges in
soffit of slab
• Reinforcement exposed and corroded
at edges.
• Thick vegetative growth to be removed
from waterway at ends
• Road surface slightly cracked.
• RC Railings damaged.
• Scour at pier location
• The slab soffit at edges to be fully
rehabilitated / grouted with epoxy grout
• Pier cap to be grouted, cracks to be
sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Road surface to be repaired
• Floor protection works to be provided
• Railings to be reconstructed.
56.50
43 Bel-01
Non-C
RN
MD
R
6.1
00
BAI2
31006149
08-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Bailhongal
Bailhongal
Nalla
1975
Nagnur
6.80 6.00
RC S
lab
16 2.00 32.00 Open
15.8
3813
74.7
9614
• Spalling of Concrete in soffit of slab.
• Reinforcement exposed and corroded
• MS Railings fully damaged
• Structure Narrow
• Spalling of Pier cap in piers observed
• The entire slab soffit to be fully
rehabilitated or replace the
superstructure
• Pier / Pier cap to be grouted
• Pointing to be done for sub structure
as per requirement.
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
• Bridge is narrow, Widening not
feasible, As an alternative New High
level Bridge can be proposed taking into
account the Traffic.
46.11
44 Bel-02
Non-C
RN
MD
R
1.2
00
BG
M204001294
06-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Belg
aum
Belg
aum
Nalla
2016
Old
PB R
oad (
Belg
aum
)
17.3012.80
+ FP
RC S
lab
12 5.90 70.80 Open
15.8
3403
74.5
4051
• Newly constructed
• Structure in good condition
• Retain with routine maintenance
89.72
P2 - 11 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
45 Bel-03
Non-C
RN
SH
141
22.5
00
BG
M208022391
06-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Belg
aum
Belg
aum
Mark
andey
1990
Kangra
li k
hurd
12.007.50m
+ FP
RC G
irder
4 16.50 66.00 Open
15.8
9887
74.4
9824
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Honey combing, reinforcement
exposed at bearing location in few
girders
• Minor Cracks in end cross girder at
junction.
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• The Girders / cross girders have to be
Gunited / Grouted at honey comb
locations
• Drainage spouts to be repaired
/replaced
• Expansion joint to be repaired /
replaced
• Side slope pitching shall be reinstated.
62.69
46 Bel-04
CRN
SH
133
1.8
00
BR:S
H133:R
MG
203:1
.955
08-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Ram
durg
Ram
durg
Mala
pra
bha
2000
Ham
pih
oli
8.30 7.30
MCPC
35 3.30 132.50 Raft
15.9
0133
75.4
0891
• Honey combing of concrete observed
in the Pipes
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 20 pipes
• Few pipes silted by around 20%
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• Guard posts shall be reconstructed /
repaired wherever required.
64.58
47 Bel-05
CRN
SH
139
27.8
00
BR:S
H139:R
MG
204:2
7.9
05
07-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Ram
durg
Ram
durg
Tributa
ry t
o M
ala
pra
bha
1970
Sunnal
8.30 7.30
RC G
irder
7 11.75 82.25 Open
15.9
6833
75.2
5473
• Severe spalling, reinforcement
exposed and corroded in cantilever slab
on both sides in all spans
• Expansion joints fully blocked - non
existence
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Cracks with spalling, reinforcement
exposed observed in Pier caps
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• The Entire cantilever slab to be
rehabilitated for entire length on both
sides.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• The Girders / cross girders shall be
provided with Guniting / Grouting as per
requirement.
• Pier Cap / Abutment Cap shall be
sealed with epoxy grout.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
53.79
48 Bel-06
CRN
SH
45
55.5
00
BR:S
H45:S
AU
3:5
5.2
46
23-0
7-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Saundatt
i
Saundatt
i
Mala
pra
bha
2005
Manolli
12.00
9.75m
+ FP of
1.50m
on LHS
PSC I
Girder
7 24.60 172.20 Pile
15.8
4904
75.1
2363
• Structure in good condition,
constructed by KRDCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders (in
2 Girders)
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased 73.53
P2 - 12 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
49 Bel-07
Non-C
RN
SH
140
52.8
00
SAU
206052803
08-0
5-2
018
Nort
h
Belg
aum
Belg
aum
Belg
aum
Saundatt
i
Saundatt
i
Nalla
1990
Murk
um
bi
8.40 7.40
RC S
lab
16 8.35 133.60 Open
15.8
4626
74.8
8148
• Spalling of Concrete at edges in soffit
of slab.
• Reinforcement exposed and corroded
• Spalling, reinforcement exposed and
corroded in Pier cap at few locations
• Thick vegetative growth to be removed
from waterway
• The slab soffit at edges to be fully
rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
60.68
50 Bel-08
CRN
SH
12
60.5
00
BR:S
H12:A
TN
2:6
0.6
30-0
4-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Tributa
ry t
o K
rishna
1990
Khota
natt
i
8.40 7.40
RC S
lab
13 6.85 89.05 Open
16.7
4360
75.2
1770
• Spalling of Concrete at edges in soffit
of slab.
• Reinforcement exposed and corroded
• Honey Combing observed in few slabs
• Spalling, reinforcement exposed and
corroded in Pier cap at few locations
• Cracks with spalling of concrete
observed at cut water / Ease water
portion of Pier
• Thick vegetative growth to be removed
from waterway
• The slab soffit at edges to be fully
rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Cut water / Ease water portion of Pier
to be grouted with epoxy, cracks to be
sealed.
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
60.95
51 Bel-09
CRN
SH
12
86.0
00
BR:S
H12:A
TN
2:8
5.8
75
13-0
6-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Agra
ni
2003
Mura
gundi
8.50 7.50
RC G
irder
9 12.35 111.15 Open
16.7
3942
74.9
9047
• Structure in good condition,
constructed by KRDCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders (in
2 Girders)
• Reinforcement exposed at bottom in
the Longitudinal Girders (in Span 5)
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris
• Outlet pipe missing in Drainage spout
• The Girders / cross girders have to be
Gunited / Grouted at honey comb
locations
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Outlet pipes to be provided for the
Drainage spouts
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
72.65
52 Bel-10
CRN
SH
31
9.0
00
BR:S
H31:A
TN
3:9
.097
30-0
4-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Tributa
ry t
o A
gra
ni
2018
Mala
bad
12.00 11.00
RC G
irder
4 15.00 60.00 Open
16.8
8577
75.1
1526
• New Bridge under Construction • Retained
100.00
P2 - 13 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
53 Bel-11
CRN
SH
72
100.5
00
BR:S
H72:A
TN
20_B:1
00.5
48
29-0
4-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Agra
ni
2010
Shin
al
12.007.50m
+ FP
RC G
irder
5 16.50 82.50 Open
16.7
0493
74.9
7968
• Severe Honey combing at bottom of
main Girders
• Reinforcement exposed and corroded
at bottom of Main girders
• Expansion joints fully blocked - non
existence
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• The Entire Girders at bottom have to
be rehabilitated, epoxy grouting to be
done for the entire girder
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes
• Railings shall be Repaired wherever
required.
61.61
54 Bel-12
CRN
SH
72
144.5
00
BR:S
H72:A
TN
20_B:1
45.6
28
30-0
4-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Nalla
2013
btw
Kott
alg
i /
Kanam
ari
10.00 9.00
RC B
ox
12 6.00 72.00 Raft
16.8
9885
75.3
0081
• Recently constructed
• Structure in good condition
• 3 vents blocked by Silt
• Thick Thorny bushes blocking vent way
• Retain with routine maintenance
• Vegetative growth to be removed on
side slopes
• Silt to be removed from vents
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
71.37
55 Bel-13
Non-C
RN
MD
R
7.0
00
ATN
015007151
29-0
4-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Agra
ni
1990
Tevara
tti
8.40 7.40
RC S
lab
14 6.70 93.80 Open
16.7
9124
75.0
3219
• Spalling of Concrete at edges in soffit
of slab.
• Reinforcement exposed and corroded
• Honey Combing observed in few slabs
• Spalling, reinforcement exposed and
corroded in Pier cap at few locations
• Cracks with spalling of concrete
observed at cut water / Ease water
portion of Pier
• Railings slightly damaged
• Bridge cum Barrage
• The slab soffit at edges to be fully
rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Cut water / Ease water portion of Pier
to be grouted with epoxy, cracks to be
sealed.
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
61.09
56 Bel-14
Non-C
RN
MD
R
11.4
00
ATN
010011420
01-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Ath
ni
Ath
ni
Nalla
2010
Kokatn
ur
8.50 7.50
RC S
lab
5 10.60 53.00 Open
16.6
9353
75.2
1613
• Recently constructed
• Structure in good condition
• Wearing coat worn out
• Expansion joint fully blocked
• Retain with routine repairs
• Expansion joint to be repaired
• Drainage spout to be repaired
• Pitching on side slopes to be provided.
80.17
P2 - 14 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
57 Bel-15
CRN
MD
R
5.2
00
BR:M
DR_CKD
7:C
KD
7:9
.978
16-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Doodganga
1975
Shiradw
ad
8.50 7.50
RC G
irder
5 18.00 90.00 Open
16.5
5913
74.4
8910
• Severe spalling, reinforcement
exposed and corroded in cantilever slab
on both sides in all spans
• Severe spalling, reinforcement
exposed and corroded in Bottom of Main
Girder
• Cracks observed in Main girder in
longitudinal direction.
• Expansion joints fully blocked - non
existence
• Drainage spouts blocked by debris, no
outlet pipes
• Wearing Coat Damaged
• The Entire cantilever slab and Main
Girders have to be rehabilitated for
entire length.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• The Girders shall be provided with
Micro concrete / Guniting / Grouting as
per requirement.
• Pier Cap / Abutment Cap shall be
sealed with epoxy grout.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
• Protection works to be provided.
As an Alternative, the entire super
structure can be replaced by
retaiing the sub-structure
45.83
58 Bel-16
CRN
SH
12
128.5
00
BR:S
H12:C
KD
2:1
28.9
37
03-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Tributa
ry t
o K
rishna
1980
Manja
riw
adi
8.50 7.50
RC G
irder
10 11.70 117.00 Open
16.5
9167
74.6
9919
• Severe spalling, reinforcement
exposed and corroded in cantilever slab
on both sides in all spans
• Expansion joints fully blocked - non
existence
• Honey combing of concrete with
reinforcement exposed observed in the
Longitudinal Girders
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• Thick vegetative growth blocking vents
• The Entire cantilever slab to be
rehabilitated for entire length on both
sides.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• The Girders / cross girders shall be
provided with Guniting / Grouting as per
requirement.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
54.16
59 Bel-17
CRN
SH
12
133.0
00
BR:S
H12:C
KD
2:1
33.2
57
14-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Krishna
2000
Ankali
9.00 7.50
PSC I
Girder
14 36.10 505.40 Well
16.5
5808
74.6
8011
• Structure in good condition,
constructed by NPCCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders /
Cross Girders in few spans
• Slight Spalling of concrete observed in
the Longitudinal Girders / Cross Girders
in few spans
• Leaching / Dampness observed on the
cantilever portion of the slab at edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris
• Grouting / Shortcrete / Gunitting to be
carried out at spalling locations of the
Main Girder / Cross Girder
• Grouting / Shortcrete / Gunitting to be
carried out at Drainage spout, Cantilever
slab at edges to be repaired
• Expansion Joint to be replaced /
repaired
• Drainage spouts to be cleaned of
debris, outlet pipe, gratings to be
provided
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
71.91
P2 - 15 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
60 Bel-18
CRN
SH
72
14.5
00
BR:S
H72:C
KD
201_A:1
4.5
51
05-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Tributa
ry t
o K
rishna
1970
Bhim
apurw
adi
8.00 7.00
RC A
rch
10 7.15 71.50 Open
16.4
7865
74.4
5112
• Vegetative Growth at Pier / Spandrel
wall location.
• Thick Vegetative growth in the river at
Pier location.
• MS Railing damaged
• Road surface slightly worn out
• Drainage spouts / Outlet clogged
• Scour of around 0.50m at pier
locations (at central piers)
• Vegetative growth to be removed at
pier / Spandral wall location
• Thick Vegetative growth in the river at
Pier locations to be removed
• Railing shall be repaired wherever
required.
• The Pier / Abutment shall be repaired
and plastered as required.
• The Spandral wall shall be sealed with
Cement Grout at cracks and then it shall
be plastered wherever required.
• Drainage spouts shall be provided with
proper outlet pipes.
• As alternative, New 2 Lane High
level Bridge (for a total length of
around 75m) may be provided
adjacent to the existing Bridge.
55.79
61 Bel-19
CRN
SH
72
45.6
00
BR:S
H72:C
KD
201_A:4
5.7
81
04-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Krishna
1960
btw
kallol /
Yadur
7.40 6.40
RC S
lab
62 2.50 155.00 Open
16.5
7447
74.6
4558
• Bridge cum barrage over River Krishna
• Severe spalling, reinforcement
exposed and corroded in slab soffit in all
spans
• Severe honey combing in pier
• Concrete of poor quality
• Propose for New construction on
alternate alignment retaining the
existing Bridge cum barrage
• New High level Bridge of 200m
length with Footpath can be
proposed
39.13
62 Bel-20
CRN
SH
78
84.5
00
BR:S
H78:C
KD
203:8
4.5
75
04-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Doodganga
2014
Sadalg
a
6.00 5.00
RC S
lab
10 10.20 102.00 Open
16.5
6561
74.5
3297
• Recently constructed
• Structure in good condition
• Structure narrow
• Retain with routine maintenance
• Pitching on side slopes to be provided.
94.00
63 Bel-21
CRN
SH
98
22.5
00
BR:S
H98:C
KD
205:2
2.7
8
17-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Doodganga
2000
Kunnur
12.007.50 +
FP
RC G
irder
5 18.00 90.00 Well
16.5
5356
74.4
0870
• Structure in good condition
• Slight Honey combing of concrete
observed in the Longitudinal Girders at
few places
• Reinforcement exposed at bottom in
the Longitudinal Girders in 2 girders
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Drainage spout blocked by silt / debris
• Outlet pipe missing in Drainage spout
• Footpath slabs damaged
• The Girders / cross girders have to be
Gunited / Grouted / shortcrete at spalled
/ honeycombed locations
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Outlet pipes to be provided for the
Drainage spouts
• Vegetative growth to be removed on
side slopes
• Bearings to be greased
• Side slope pitching to be provided
• Footpath slabs to be repaired.
70.66
P2 - 16 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
64 Bel-22
Non-C
RN
MD
R
3.8
00
CKD
208003836
03-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Tributa
ry t
o K
rishna
2015
Ankali
8.50 7.50
RC S
lab
6 11.00 66.00 Open
16.5
4121
74.6
7674
• Recently constructed
• Structure in good condition
• Retain with routine maintenance
• Pitching on side slopes to be provided.
94.05
65 Bel-23
Non-C
RN
MD
R
5.7
00
CKD
214005703
05-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Doodganga
2008
MH
Bord
er
12.007.50 +
FP
RC G
irder
7 16.85 117.95 Open
16.5
8486
74.5
6639
• Slight Leaching, Dampness of concrete
observed in cantilever slab at edges
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• The Cantilever slab have to be Gunited
/ Grouted at honey comb locations
• Drainage spouts to be repaired
/replaced
• Expansion joint to be repaired /
replaced
• Side slope pitching shall be reinstated.
72.03
66 Bel-24
Non-C
RN
MD
R
7.5
00
CKD
212007883
05-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Tributa
ry t
o K
rishna
1980
Manja
riw
adi
7.50 6.50
RC S
lab
15 3.30 49.50 Open
16.5
9457
74.6
9709
• Thick Vegetative growth blocking vents
on either side
• Slight honey combing observed at
edges in slab
• Wearing coat worn out
• Expansion joint fully blocked
• Railings damaged
• Stone pitching on side slopes eroded
• Slab shall be rehabilitated as per
requirement
• Thick vegetative growth to be cleared
• Wearing coat to be re-laid
• Railings to be repaired
• Pitching on side slopes to be provided.
64.09
67 Bel-25
Non-C
RN
MD
R
2.0
00
CKD
214002029
04-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Chik
kodi
Chik
kodi
Tributa
ry t
o D
oodganga
1985
Sadalg
a
5.30 4.30
RC S
lab
20 6.70 134.00 Open
16.5
6844
74.5
3797
• Spalling, reinforcement exposed in
soffit of slab at edges
• Minor cracks at edges of slab
• MS Railings Damaged
• Expansion joint fully blocked
• Spalling / minor Cracks observed in
pier cap at edges
• Pointing slightly eroded in pier at few
locations
• Grouting / Gunitting to be carried out
for slab soffit
• Minor cracks to be sealed with epoxy
grout in slab soffit and at pier cap
locations
• Expansion joint to be repaired
• Drainage spout to be repaired
• Pitching on side slopes to be provided.
• Railings to be repaired 62.32
P2 - 17 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
68 Bel-26
CRN
SH
44
52.5
00
BR:S
H44:G
OK6:5
2.5
44
22-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Ghata
pra
bha
2005
Masaguppi
12.007.50 +
FP
PSC I
Girder
6 15.00 90.00 Open
16.2
5788
74.9
6496
• Structure in good condition,
constructed by KRDCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders (in
2 Girders)
• Slight Spalling of concrete observed in
the few cross girders
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris,
outlet pipe missing
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
• Grouting with epoxy can be done for
Main Girders / Cross Girders wherever
Honey combing / spalling is observed.
• Grouting of gaps btw slab and girder
to be carried out
82.52
69 Bel-27
CRN
SH
44
69.9
00
BR:S
H44:G
OK6:6
9.4
99
07-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Tributa
ry t
o G
hata
pra
bha
1975
Tim
mapur
Cro
ss
8.00 7.00
MCPC
26 3.00 90.50 Raft
16.2
4703
75.1
2054
• Honey combing of concrete observed
in the Pipes
• Minor Cracks observed at top in few
pipes
• MS Railings damaged
• Scour of around 0.50m observed at
around 20 pipes
• Few pipes silted by around 20%
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• Guard posts shall be reconstructed /
Repaired wherever required.
53.90
70 Bel-28
CRN
SH
44
76.6
00
BR:S
H44:G
OK6:7
6.7
59
07-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Tributa
ry t
o G
hata
pra
bha
1975
Yadaw
ad
8.00 7.00
MCPC
32 3.00 115.20 Raft
16.2
3466
75.1
8157
• Honey combing of concrete observed
in the Pipes
• Severe honey combing in few pipes
• Minor Cracks observed at top in few
pipes
• MS Railings damaged
• Scour of around 0.50m observed at
around 20 pipes
• Few pipes silted by around 20%
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes
• Silt to be removed from all the pipes
• Protection works shall be provided as
per requirement
• MS railings shall be reconstructed /
Repaired wherever required.
53.17
71 Bel-29
CRN
SH
45
20.8
00
BR:S
H45:G
OK203:2
0.9
1
06-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Tributa
ry t
o G
hata
pra
bha
2001
Chik
kanandi
12.007.50 +
FP
PSC D
eck S
lab
7 10.50 73.50 Open
16.0
8604
74.9
2825
• Constructed by KRDCL
• Replaced entire superstructure
retaining the sub-structure and existing
Steel I girders
• Structure in good condition
• Expansion joint fully blocked
• Footpath slabs damaged
• Protection works at pier location
eroded
• Retain with routine repairs
• Expansion joint to be repaired
• Drainage spout to be cleaned /
repaired
• Pitching on side slopes to be provided.
• Footpath slabs to be repaired
• Protection works at pier location to be
provided
73.04
P2 - 18 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
72 Bel-30
CRN
SH
54
89.2
00
BR:S
H54:G
OK8:8
9.2
03
06-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Tributa
ry t
o G
hata
pra
bha
1985
Mam
dapur
8.50 7.50
RC S
lab
18 5.20 93.60 Open
16.1
0848
74.9
2600
• Spalling of Concrete at edges in soffit
of slab.
• Reinforcement exposed and corroded
• Honey Combing observed in few slabs
• Minor Cracks at edges of slab
• Spalling, reinforcement exposed and
corroded in Pier cap at few locations
• Pointing eroded at few places in pier
• Thick vegetative growth to be removed
from waterway
• The slab soffit at edges to be fully
rehabilitated
• Pier / Pier cap to be grouted, cracks to
be sealed with epoxy grout
• Pointing to be done for pier
• Vegetative growth to be removed on
side slopes
• Pitching on side slopes to be provided.
61.60
73 Bel-31
CRN
SH
73
77.8
00
BR:S
H73:G
OK205_A:7
7.9
49
21-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Ghata
pra
bha
2012
Dupdhal
11.509.50 +
FP
PSC I
GIr
der
6 + 4 20.00 + 18.00 116.00 Open
16.2
0646
74.7
5305
• Structure in good condition,
constructed by KRDCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders (in
2 Girders)
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased 83.05
74 Bel-32
CRN
SH
73
78.2
00
BR:S
H73:G
OK205_A:7
8.3
39
22-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Gokak
Gokak
Ghata
pra
bha
2012
Dupdhal
11.509.50 +
FP
PSC I
GIr
der
12 20.00 240.00 Open
16.2
0543
74.7
4973
• Structure in good condition,
constructed by KRDCL
• Slight Honey combing of concrete
observed in the Longitudinal Girders (in
2 Girders)
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Drainage spout blocked by silt / debris
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased 83.16
75 Bel-33
CRN
SH
78
32.2
00
BR:S
H78:H
UK207:3
2.3
4
17-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Hukkeri
Hukkeri
Hiranyakshi
2001
Goudaw
ad
12.007.50 +
FP
RC G
irder
9 17.00 153.00 Open
16.1
8849
74.5
7679
• Spalling, reinforcement exposed in
cantilever slab on both sides
• Honey combing / Spalling of concrete
observed in the Longitudinal Girders (in
spans 2 to 5)
• Honey combing / Spalling of concrete
observed in the Cross Girders - at
bearing locations
• Expansion joints fully blocked - non
existence
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• Thick vegetative growth on side slopes
• Footpath slabs slightly damaged
• The Entire cantilever slab to be
rehabilitated for entire length on both
sides.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• The Girders / cross girders shall be
rehabilitated with Guniting / Grouting as
per requirement.
• Bearings shall be greased / repaired
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes
• Railings shall be reconstructed /
Repaired wherever required.
65.59
P2 - 19 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
76 Bel-34
CRN
SH
1
477.5
00
BR:S
H1:H
UK204:4
77.9
71
18-0
7-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Hukkeri
Hukkeri
Hid
kal Reserv
oir
1975
Hid
kal D
am
8.00 7.00
RC G
irder
16 12.20 195.20 Open
16.1
4572
74.6
5028
• Spalling, reinforcement exposed in
cantilever slab on both sides
• Honey combing / Spalling of concrete
observed in the Longitudinal Girders (in
spans 2 to 5)
• Reinforcement exposed at bottom of
Longitudinal girders in span-9 to span-
11
• Honey combing / Spalling of concrete
observed in the Cross Girders - at
bearing locations
• Expansion joints fully blocked - non
existence
• Drainage spouts blocked by debris, no
outlet pipes
• Expansion joint fully covered / blocked
• Thick vegetative growth on side slopes
and at expansion joint location on pier
cap
• Metallic steel plates bearing slightly
rusted at few locations.
• Stones dislodged in cut / ease water
location in pier P5, P6 and P7
• The Entire cantilever slab to be
rehabilitated for entire length on both
sides.
• The Girders / cross girders shall be
rehabilitated with Guniting / Grouting /
Shortcrete / Micro Concrete as per
requirement.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• The Girders / cross girders shall be
rehabilitated with Guniting / Grouting as
per requirement.
• Bearings shall be greased / repaired
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes
• Railings shall be reconstructed /
Repaired wherever required.
• Pointing to sub-structure to be done,
Cut water / Ease water to be
strengthened / repaired.
55.42
77 Bel-35
Non-C
RN
MD
R
14.5
00
HU
K214000913
05-0
5-2
018
Nort
h
Belg
aum
Chik
kodi
Belg
aum
Hukkeri
Hukkeri
Ghata
pra
bha
1985
Nogin
hal
8.50 7.50
RC S
lab
14 11.00 154.00 Open
16.1
8553
74.6
8198
• Water flowing full in all spans
• Minor Spalling, reinforcement exposed
in soffit of slab at edges
• Minor cracks at edges of slab
• Guard posts Damaged
• Expansion joint fully blocked
• Pointing slightly eroded in pier at few
locations
• Grouting / Gunitting to be carried out
for slab soffit
• Minor cracks to be sealed with epoxy
grout in slab soffit and at pier cap
locations
• Expansion joint to be repaired
• Drainage spout to be repaired
• Pitching on side slopes to be provided.
• Guard posts to be repaired 63.12
78 BJ-01
CRN
SH
41
100.7
00
BR:S
H41:B
BV2:1
01.2
61
10-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
B B
agevadi
B B
agevadi
Dona
1985
Satihal
8.20 7.20
RC S
lab
20 5.20 104.00 Open
16.7
3842
76.0
5814
• Entire super structure recently
replaced
• Drainage spouts to be Cleaned
• Pointing eroded at few places in pier
• Silt deposit in waterway
• Concrete wearing coat cracked at few
places
• Pointing to be done for sub structure
as per requirement.
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Pitching on side slopes to be provided.
• Silt to be removed form waterway
• Wearing coat to be repaired 62.06
79 BJ-02
CRN
SH
41
126.3
00
BR:S
H41:B
BV2:1
26.9
23
11-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
B B
agevadi
B B
agevadi
Nalla
1985
Sola
wadagi
8.50 7.50
RC B
ox
24 3.00 72.00 Open
16.5
1853
76.0
9243
• Structure in good condition
• Spalling / Honey combing observed in
Top slab and Mid Walls at few places
• Expansion joints fully clogged
• Drainage spouts - outlet pipe missing
• Silt / Vegetative growth blocking vents
• Top slab at edges, Mid walls shall be
plastered / grouted
• Vegetative growth to be removed on
side slopes
• Expansion Joint to be cleaned
• Drainage spouts to be cleaned
• Railings to be repaired
63.69
P2 - 20 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
80 BJ-03
Non-C
RN
MD
R
25.5
00
BBV007025985
10-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
B B
agevadi
B B
agevadi
Nalla
2005
Btw
Ukkali /
Masabin
al
12.00 11.00
RC B
ox
11 6.40 70.40 Open
16.6
9120
75.9
2268
• Structure in good condition
• Drainage spouts to be Cleaned
• Silt deposit / Thorny bushes in
waterway
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Pitching on side slopes to be provided.
• Silt to be removed form waterway
72.00
81 BJ-04
Non-C
RN
MD
R
37.9
00
BR:M
DR:B
BV009:3
6.3
61
24-0
3-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
B B
agevadi
B B
agevadi
Krishna (
Alm
att
i Backw
ate
rs)
2005
Alm
att
i
8.50 7.50
PSC I
Girder
12 42.00 504.00 Pile
16.3
5944
75.8
9868
• Girders in good condition
• Honey combing observed in Cross
Girders in Few spans
• Railings slightly damaged
• Drainage spouts to be cleaned /
repaired
• Cross Girders shall be grouted (with
Epoxy grout, Gunitting)
• Vegetative growth to be removed on
side slopes
• Railings shall be repaired wherever
required.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be repaired /
provided
• Bearings to be Greased.
76.50
82 BJ-05
Non-C
RN
MD
R
7.5
00
BBV012007729
11-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
B B
agevadi
B B
agevadi
Nalla
2010
K S
ala
wadagi
5.00 4.00
RC S
lab
12 5.00 60.00 Open
16.6
1668
76.1
0197
• Structure in good condition
• Structure Narrow
• Bridge Cum Barrage
• Recently constructed
• Guard posts to be repaired
• Structure narrow check if widening is
required as per traffic.
73.04
83 BJ-06
CRN
SH
12
16.5
00
BR:S
H12:B
JP4:1
6.9
25
08-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Dona
2003
Tora
vi
12.007.50 +
FP
RC G
irder
5 21.30 106.50 Pile
16.9
9874
75.9
9030
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Slight Leaching / Spalling observed on
the cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Railings Slightly Damaged
• Vents blocked by thick thorny bushes,
debris.
• The Cantilever Slab have to be
rehabilitated wherever required (by
Shortcrete / Guniting / Grouting)
• Expansion Joint to be replaced /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
• Debris / Vegetative Growth shall be
removed from the Waterway.
71.10
P2 - 21 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
84 BJ-07
CRN
SH
12
31.0
00
BR:S
H12:B
JP4:3
1.3
65
08-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Dona
1973
Honaw
ad
8.20 7.20
RC B
ox C
antile
ver
3 + 233.00 +
9.00117.00 Well
16.8
1810
75.4
6280
• The Entire super structure was
rehabilitated in year 2014, earlier to this
the existing condition was as follows
(The rehabilitation measures carried out
is for a strengthening the super
structure for short period only)
• Severe spalling and bending and shear
cracks, bulging in the external side walls
of spans S1, S2, S4 and S5.
• All Expansion joints damaged.
• Bearings damaged.
• Settlement in the super structure of
spans S2 and S4.
• Dirt walls of both abutments divided
into pieces.
• All piers and pier caps damaged.
• Vegetation from the expansion joints
of Box girder.
• Drainage spouts without gratings
ended at edge of curb
• The rehabilitation measures carried
out is for a strengthening the super
structure for short period only
• The Bridge shall be reconstructed
on alternate alignment
49.00
85 BJ-08
CRN
SH
34
312.9
00
BR:S
H34:B
JP201:3
14.3
4
08-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Nalla
1985
Nagath
an
8.20 7.20
RC S
lab
8 8.50 68.00 Open
16.9
2114
75.8
3252
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• Parapet damaged
• Drainage spouts to be repaired
• Approaches on curve
• The slab soffit to be rehabilitated by
grouting / guniting in all spans
• Vegetative growth to be removed on
side slopes
• Parapet to be reconstructed.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
• Check if the Bridge can be
widened on both sides to 12.0m
width.
61.58
86 BJ-09
CRN
SH
34
347.9
00
BR:S
H34:B
JP201:3
49.7
25
20-0
3-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Dona
1962
Sara
wad
7.50 6.50
RC G
irder
8 13.90 111.20 Open
16.7
1111
75.6
2930
• Longitudinal Girders soffit recently
rehabilitated / repaired
• Cross Girders soffit recently
rehabilitated / repaired
• Severe spalling, reinforcement
exposed and corroded in cantilever slab
on both sides in all spans
• Expansion joints fully blocked - non
existence
• Brick masonry parapet slightly
damaged
• The Entire cantilever slab to be
rehabilitated for entire length on both
sides.
• The Girders / cross girders shall be
provided with Guniting / Grouting as per
requirement.
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
• Alternate Option: Replace entire
super structure to 8.50m overall
width by retaining the sub-
structure.
49.46
87 BJ-10
Non-C
RN
MD
R
9.5
00
BJP
007009357
13-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Nalla
1985
Ukum
anal
8.40 7.40
RC S
lab
22 5.50 121.00 Open16.7
7989
75.8
1513
• Severe Spalling / Reinforcement
exposed in slab soffit at edges
• Cut water / Easewater cracked and
concrete spalling form pier
• concrete spalling form Abutment
• Severe Spalling / Reinforcement
exposed in Abutment cap / pier cap
• Silt deposit / Thorny bushes in
waterway
• Concrete wearing coat cracked at few
places
• Railings to be repaired /
Reconstructed.
• Slab soffit to be strengthened (by
grouting, gunitting, shortcrete etc.)
• Pier cap, abutment cap to be
strengthened (by grouting, gunitting,
shortcrete etc.)
• Pier and abutment to be strengthened
(by grouting, gunitting, shortcrete etc.)
• Drip course shall be provided along
both the edges of slab.
• Pitching on side slopes to be provided.
• Silt to be removed form waterway
• Wearing coat to be repaired
56.63
P2 - 22 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
88 BJ-11
Non-C
RN
MD
R
10.5
00
BJP
016010301
09-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Dona
2013
Btw
Tora
vi /
Tajp
ur
(Kanam
uchanal)
12.007.50 +
FP
RC S
lab
6 12.70 76.20 Open
16.7
4528
75.6
1422
• Structure recently constructed
• Structure in good condition
• Retain with routine maintenance
93.55
89 BJ-12
Non-C
RN
MD
R
10.2
00
BJP
078010143
09-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Nalla
1985
btw
Kodabagi /
Taja
pur
8.50 7.50
RC S
lab
7 10.80 75.60 Open
16.5
0298
75.5
7061
• Spalling / Honey combing in slab soffit
at edges
• Silt deposit / Thorny bushes in
waterway
• Concrete wearing coat cracked at few
places
• Railings fully damaged
• Slab soffit to be strengthened (by
grouting, gunitting, shortcrete etc.)
• Drip course shall be provided along
both the edges of slab.
• Railings to be reconstructed
• Pitching on side slopes to be provided.
• Silt to be removed form waterway
• Wearing coat to be repaired
62.20
90 BJ-13
Non-C
RN
MD
R
5.8
00
BJP
092005796
07-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Bijapur
Bijapur
Nalla
2010
Near
Manchanal Rly
stn
.
8.50 7.50
RC S
lab
7 8.40 58.80 Open
16.9
7527
75.8
1826
• Recently constructed.
• Slight honey combing observed at
edges
• Silt deposit / Thorny bushes in
waterway
• Grating on drainage spout missing
• Structure to be retained with routine
repairs
• Pitching on side slopes to be provided.
• Silt / thorny bushes to be removed
form waterway
• Drainage spout to be repaired
77.48
91 BJ-14
CRN
SH
34
253.5
00
BR:S
H34:I
ND
12:2
54.1
8
06-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Nalla
1980
Mars
analli /
Vib
hutihalli
8.00 7.00
RC S
lab
15 5.00 75.00 Open
17.0
9827
76.1
6838
• Around 6 to 7 spans in-accessible,
entire span filled with silt upto slab
bottom.
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• Railings slightly damaged
• Drainage spouts to be repaired
• The Silt in the entire waterway to be
removed upto bed level.
• The slab soffit to be rehabilitated by
grouting / guniting in all spans
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
55.35
P2 - 23 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
92 BJ-15
CRN
SH
34
261.0
50
BR:S
H34:I
ND
12:2
62.0
15
06-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Nalla
1980
Naad (
BK)
8.50 7.50
RC S
lab
26 5.30 137.80 Open
17.1
1971
76.0
9951
• Severe Spalling of Concrete at edges
on both sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• Railings slightly damaged
• Drainage spouts to be repaired
• Spalling of Pier cap in piers observed
• The slab soffit to be rehabilitated by
grouting / guniting in all spans
• Pier cap to be grouted
• Pointing to be done for sub structure
as per requirement.
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
54.84
93 BJ-16
CRN
SH
34
57.8
50
BR:S
H34:I
ND
12:2
90.7
25
06-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Nalla
1990
Rugi
8.40 7.40
RC S
lab
10 5.80 58.00 Open
17.0
8684
75.9
6775
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• MS Railings slightly damaged
• Drainage spouts to be repaired
Spalling of Pier cap in piers observed
• The slab soffit to be rehabilitated by
grouting / guniting in all spans
• Pier / Pier cap to be grouted
• Pointing to be done for sub structure
as per requirement.
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
• Pitching on side slopes to be provided.
59.54
94 BJ-17
CRN
SH
34
303.9
00
BR:S
H34:I
ND
12:3
05.3
05
07-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Nalla
2005
Ath
arg
a
12.007.50 +
FP
RC B
ox
13 6.00 78.00 Open
16.9
8289
75.8
8281
• Structure in good condition
• Slight Honey combing in mid walls
• Expansion joints fully clogged
• Mid walls shall be plastered / grouted
• Vegetative growth to be removed on
side slopes
• Expansion Joint to be cleaned
• Drainage spouts to be cleaned
71.65
95 BJ-18
CRN
SH
41
11.9
50
BR:S
H41:I
ND
2:1
2.1
2
04-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Bore
e r
ivie
r
1956
Chadchan
7.50 6.80
RC S
lab
28 7.00 196.00 Open
17.3
1165
75.6
6580
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• RC Railings slightly damaged
• Drainage spouts to be repaired
• Spalling of Pier cap in piers observed
• The slab soffit to be rehabilitated by
grouting / guniting in all spans
• Pier / Pier cap to be grouted
• Pointing to be done for sub structure
as per requirement.
• Vegetative growth to be removed on
side slopes
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
• Pitching on side slopes to be provided.
• Bridge in Town Limits, Widening
not feasible, Propose New High level
Bridge adjacent to existing Bridge
with Footpath
48.57
P2 - 24 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
96 BJ-19
CRN
SH
41
2.1
00
BR:S
H41:I
ND
2:2
.095
22-0
3-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Shirnandagi
1988
Shiradon
8.50 7.50
RC G
irder
8 13.00 104.00 Open
17.3
7302
75.6
0148
• Honey combing / Light spalling of
concrete observed in the Longitudinal
Girders.
• Severe spalling, Reinforcement
exposed and corroded in Slab between
Girders in Span 2.
• Leaching observed on the cantilever
portion of the slab on both sides.
• Expansion joints damaged
• Railings slightly damaged
• Drainage spouts to be repaired
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be repaired wherever
required.
• The Slab / Girders have to be
rehabilitated wherever required (by
Shortcrete / Guniting / Grouting / Micro
concrete)
• Exposed reinforcement shall be treated
with epoxy grouting.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be repaired /
provided
• Drainage spouts to be repaired /
provided
64.80
97 BJ-20
CRN
SH
41
67.6
00
BR:S
H41:I
ND
2:6
8.9
27
23-0
3-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Tam
ba n
ala
1995
Kanaknagar
8.50 7.50
RC G
irder
14 11.80 165.20 Open
16.9
9874
75.9
9030
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Railings Slightly Damaged
• Vents blocked by thick thorny bushes,
debris.
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
• Debris / Vegetative Growth shall be
removed from the Waterway.
68.65
98 BJ-21
Non-C
RN
MD
R
10.8
00
IND
206010754
04-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Shirnandagi
2000
Niv
arg
i
5.00 4.00
RC S
lab
17 5.00 85.00 Open
17.3
9891
75.6
6815
• Structure in good condition
• Structure Narrow
• Bridge Cum Barrage
• Guard posts damaged
• Pipe line on RHS of the Bridge
• Guard posts to be repaired
• Structure narrow check if widening is
required as per traffic.
72.30
99 BJ-22
Non-C
RN
MD
R
1.0
00
IND
207001002
07-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Indi
Indi
Nalla
2010
Near
Ath
arg
a
5.00 4.00
RC S
lab
15 5.00 75.00 Open
16.9
7966
75.8
8921
• Structure in good condition
• Structure Narrow
• Bridge Cum Barrage
• Recently constructed
• Guard posts to be repaired
• Structure narrow check if
widening is required as per traffic.
81.24
P2 - 25 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
100 BJ-23
Non-C
RN
MD
R
10.5
00
MD
D055010718
13-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Muddebih
al
Muddebih
al
Tributa
ry t
o K
rishna
2014
Near
Bala
batt
i
8.50 7.50
RC G
irder
5 17.00 85.00 Open
16.3
2256
75.9
7679
• Recently Constructed
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Vents blocked by thick thorny bushes,
debris.
• The Girders have to be Gunited /
Grouted at honey comb locations
• Vegetative growth to be removed on
side slopes and at pier cap locations
89.62
101 BJ-24
Non-C
RN
SH
60
15.5
00
BR:S
H60:M
DD
003:1
5.5
80
26-0
3-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Muddebih
al
Muddebih
al
Krishna
1985
Yem
mih
att
i
11.007.60 +
FP
PSC I
Girder
31 24.50 759.50 Well
16.1
9435
76.0
9768
• Girders in good condition
• Leaching observed on the cantilever
portion of the slab on both sides.
• Cracks observed at junction of Main
girder and Cross girder at few places,
Honey combing observed in few Cross
girders
• Reinforcement exposed and corroded
in few spans in Precast Cantilever slab
• Drainage spouts to be replaced /
repaired, outlet pipes missing
• Railings slightly damaged
• Expansion Joint non functional, fully
blocked by bitumen
• Pitching in front of abutment and in
side slopes slightly eroded / displaced.
• Existing Water pipe line running on
LHS Footpath, Water Leaking at valves
• Cantilever portion of Slab to be
grouted with epoxy
• Cross girders at junction of Main girder
to be grouted with epoxy grout
• Bearings to be Greased / repaired.
• Railings shall be repaired / replaced
wherever required.
• Expansion Joint to be replaced
• Drainage spouts to be repaired /
provided with proper outlet
• Stone pitching in front of abutment
and side slopes shall be re-instated
• Wearing Course shall be provided if
required.65.49
102 BJ-25
Non-C
RN
SH
60
47.8
00
MD
D003047800
12-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Muddebih
al
Muddebih
al
Tributa
ry t
o D
ona
1985
Mukih
al
8.00 7.00
Hum
e p
ipe (
Causew
ay)
4 0.75 dia 55.00 Open
16.4
4203
76.2
7934
• Causeway, HFL around 2.50m above
road level during rainy season
• The road gets blocked for 1 or 2 days
• Road surface fully worn-out
• Scour of around 1.0m on down stream
side
• Propose New High level Bridge
20.84
103 BJ-26
Non-C
RN
SH
60
52.4
00
MD
D003052400
12-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Muddebih
al
Muddebih
al
Dona
1985
Talikota
7.50 6.50
RC B
ox (
Causew
ay)
7 1.50 150.00 Open
16.4
7184
76.3
0535
• Causeway, overflows by around 2.50m
above road level during rainy season
• The road gets blocked for 1 or 2 days
• Road surface fully worn-out
• Scour of around 1.0m on downstream
side
• Severe honey combing observed in
Box structure
• Vegetative growth in water way
• Propose New High level Bridge
46.99
P2 - 26 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
104 BJ-27
Non-C
RN
MD
R
50.6
00
MD
D50600
12-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Muddebih
al
Muddebih
al
Tributa
ry t
o D
ona
1990
Mukih
al
8.40 7.40
RC G
irder
7 11.90 83.30 Open
16.4
4193
76.2
7203
• Slight Honey combing of concrete
observed in the Longitudinal Girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Railings Slightly Damaged
• Vents blocked by thick thorny bushes,
debris.
• Road Taken up for Improvement
by KRDCL
• The Girders have to be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting / Micro concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at pier cap locations
• Railings shall be reconstructed /
Repaired wherever required.
• Debris / Vegetative Growth shall be
removed from the Waterway.
62.95
105 BJ-28
CRN
SH
16
13.5
00
BR:S
H16:S
ND
2:1
3.8
95
05-0
4-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Sin
dgi
Sin
dgi
Nalla
1985
Yankanchi
8.50 7.50
RC S
lab
13 7.00 91.00 Open
16.8
6684
76.3
4123
• Spalling of Concrete at edges on both
sides in all spans.
• Reinforcement exposed at slab Edges
• Expansion joints fully clogged
• MS Railings slightly damaged
• Drainage spouts to be repaired
• The edges of slab to be rehabilitated
by grouting / guniting in all spans
• Vegetative growth to be removed on
side slopes
• Railings shall be repaired wherever
required.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
63.21
106 BJ-29
CRN
SH
34
232.5
00
BR:S
H34:S
ND
201:2
33.7
1
06-0
2-2
018
Nort
h
Belg
aum
Bijapur
Bijapur
Sin
dgi
Sin
dgi
Bheem
a
1970
Afz
alp
ur
8.20 7.20
RC A
rch
21 20.60 432.60 Open
17.1
7000
76.3
2680
• Vegetative Growth at Pier / Spandral
wall location.
• Thick Vegetative growth in the river at
Pier location.
• Railing damaged
• Road surface slightly worn out
• Drainage spouts / Outlet clogged
• Vegetative growth to be removed at
pier / Spandral wall location
• Thick Vegetative growth in the river at
Pier locations to be removed
• Railing shall be repaired wherever
required.
• The Pier / Abutment shall be repaired
and plastered as required.
• The Spandral wall shall be sealed with
Cement Grout at cracks and then it shall
be plastered wherever required.
• Drainage spouts shall be provided with
proper outlet pipes.
• As alternative, New 2 Lane High
level Bridge (for a total length of
around 430m) may be provided
adjacent to the existing Bridge.
57.88
107 BJ-30
CRN
SH
124
112.0
00
BR:S
H124:A
FZ62:1
11.8
1
05-0
4-2
018
Nort
h E
ast
Gulb
arg
a
Gulb
arg
a
Gulb
arg
a
Afz
alp
ur
Afz
alp
ur
Bheem
a
1990
Gatt
ara
gi
8.00 7.00
RC S
lab
110 3.00 330.00 Open
17.0
8850
76.4
1050
• Bridge cum Barrage over Bhima River
• Structure in good condition
• Expansion joints fully clogged
• RC Railings slightly damaged
• Drainage spouts to be repaired
• Road surface to be repaired.
• Expansion Joint to be cleaned
• Drainage spouts to be repaired /
provided
66.56
P2 - 27 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
108 Ra-01
CRN
SH
15
294.8
00
BR:S
H15:D
EV1:2
89.9
35
27-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Devadurg
a
Devadurg
a
Tributa
ry t
o K
rishna
2002
Sunkeshw
ara
hal
8.50 7.50
RC G
irder
5 12.30 61.50 Open
16.3
2065
77.1
0434
• Structure in good condition,
constructed by KRDCL
• Spalling, reinforcement exposed at
cantilever portion in 2 spans
• Spalling of Concrete, reinf. Exposed at
support location in main girders in 2
spans
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris for entire waterway
• Grating of Drainage spouts damaged.
• Cantilever slab, Girder shall be
rehabilitated as required (by Shortcrete
/ Grouting / Guniting)
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
72.04
109 Ra-02
CRN
SH
61
145.6
00
BR:S
H61:D
EV201:1
45.2
46
27-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Devadurg
a
Devadurg
a
Tributa
ry t
o K
rishna
2015
Navilgudda
12.007.50 +
FP
PSC I
Girder
4 32.00 128.00 Open
16.3
9085
76.8
4056
• Recently constructed, constructed
under KSHIP-II
• Drainage spouts clogged
• Vegetative growth on side slopes
• Structure retained with routine
maintenance
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be cleared.
95.08
110 Ra-03
Non-C
RN
SH
128
1.6
00
DEV202001655
27-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Devadurg
a
Devadurg
a
Tributa
ry t
o K
rishna
2017
Am
rapur
12.00 11.00
RC B
ox
18 4.20 75.60 Raft
16.3
7314
76.8
3756
• Newly constructed
• Structure in good condition
• Retain with routine maintenance
• Vegetative growth to be removed on
side slopes
94.26
111 Ra-04
CRN
SH
129
52.0
00
BR:S
H129:L
IN36:5
2.1
65
29-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Maski H
alla
2000
Ram
atn
al
8.00 7.00
MCPC
25 3.00m Dia 89.40 Raft
15.8
9487
76.3
0276
• Slight Honey combing of concrete
observed at bottom in the Pipes
• Vents slightly silted
• Scoured at central pipes
• Floor protection works slightly
damaged.
• Road surface worned out.
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Grouting of joints to be done
• New wearing coat shall be provided
64.02
P2 - 28 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
112 Ra-05
CRN
SH
41
186.4
00
BR:S
H41:L
IN5:1
86.6
11
21-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Tributa
ry t
o K
rishna
1980
Sunkal
7.30 6.30
RC S
lab
12 5.20 62.40 Open
16.2
0848
76.4
0382
• Structure Narrow.
• Slight Honey combing, spalling
observed at soffit in few slabs
• Clear vent height less
• Guard posts fully damaged
• Expansion joint damaged.
• Side slope pitching to be provided
• Vegetative growth blocking vents
• Slab to be rehabilitated (by Shortcrete
/ Gunitting / Grouting)
• Guard posts / Railings to be provided
• Expansion joint to be provided
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared
Widening not feasible, retain the
Bridge with repairs or propose for
Reconstruction by increasing the
vent Height.
55.56
113 Ra-06
CRN
SH
41
177.0
00
BR:S
H41:M
DD
1:1
78.5
03
03-1
0-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Krishna
2007
Nary
anapura
dam
12.007.50 +
FP
RC G
irder
63 18.65 1174.95 Open
16.2
2536
76.3
4969
• Structure in good condition, recently
constructed
• U/S side Basavasagara Dam
• Drainage spouts clogged
• Expansion joint filled with dust
• Road surface slightly worn out
• Side slope pitching eroded
• Railings slightly damaged
• Structure retained with routine repairs
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be cleared.
• Side slope pitching to be reinstated.
• Road surface to be repaired.
87.78
114 Ra-07
Non-C
RN
MD
R
5.2
00
LIN
006005442
28-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Tributa
ry t
o K
rishna
1960
Hatt
i
6.50 5.50
SM
Arc
h
22 2.35 51.70 Open
16.2
0627
76.6
1927
• Structure narrow, old structure
• Vegetative Growth at Pier / Spandrel
wall location.
• Thick Vegetative growth in the river at
Pier location.
• Pointing in arch eroded
• Scour of 0.50m at pier location.
• Guard posts damaged
• Road surface slightly worn out
• The Arch / Spandrel wall shall be
sealed with Cement Grout at cracks and
then it shall be plastered wherever
required.
• Vegetative growth to be removed at
pier / Spandrel wall location
• The Pier / Abutment shall be repaired
and plastered as required.
• The piers shall be strengthened at bed
level.
• Thick Vegetative growth in the river at
Pier locations to be removed
• Guard posts shall be provided
• Drainage spouts shall be provided with
proper outlet pipes.
Widening not Feasible, Propose for
Reconstruction for 8.50m wide or
retain the structure by
strengthening the structure.
44.30
115 Ra-08
Non-C
RN
MD
R
1.2
00
LIN
012001300
28-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Tributa
ry t
o K
rishna
2000
Benchald
oddi
8.50 7.50
RC S
lab
10 6.60 66.00 Open
16.2
7871
76.6
4618
• Structure in good condition
• Slight Honey combing observed at
soffit in few slabs
• Expansion joint damaged.
• Vegetative growth on pier cap location.
• Side slope pitching eroded
• Vegetative growth blocking vents
• Drainage spouts blocked
• Slab to be rehabilitated at edges
• Railings to be repaired
• Expansion joint to be provided
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared on
pier cap and in waterway.
• Drainage spouts to be cleaned /
repaired.
71.53
P2 - 29 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
116 Ra-09
Non-C
RN
MD
R
6.5
00
LIN
017006846
03-1
0-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Krishna
1985
Jala
durg
a
8.50 7.50
RC G
irder
8 19.50 156.00 Open
16.2
4741
76.4
2741
• Slight spalling of concrete / Honey
combing of concrete observed in the
Longitudinal Girders
• Leaching / Spalling observed on the
cantilever portion of the slab on both
sides.
• Expansion joints fully blocked by
debris
• Drainage spouts clogged
• RC railings damaged
• Thick Vegetative growth at end spans.
• Side slope pitching eroded
• The Cantilever slab / Girders have to
be rehabilitated wherever required (by
Shortcrete / Guniting / Grouting / Micro
concrete)
• Exposed reinforcement shall be treated
with anti-corrosive treatment.
• Drip course shall be provided along
both the edges of slab.
• Expansion Joint to be provided
• Drainage spouts to be repaired /
provided
• Vegetative growth to be removed on
side slopes and at end spans
• Railings to be replaced
• Wearing Coat to be re-laid
60.57
117 Ra-10
Non-C
RN
SH
29
11.0
00
LIN
003011081
28-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Lin
gsugur
Lin
gsugur
Maski H
alla
2014
Nagala
pura
12.007.50 +
FP
PSC I
Girder
3 + 232.00 +
31.50159.00 Open
15.9
3249
76.4
3813
• Recently constructed, constructed
under KSHIP-II
• Drainage spouts clogged
• Footpath slabs slightly damaged
• Structure retained with routine
maintenance
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Footpath slabs to be repaired /
replaced.
• Vegetative growth to be cleared. 94.61
118 Ra-11
CRN
SH
20
46.6
00
BR:S
H20:M
AN
1_B:4
6.6
77
22-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Tributa
ry t
o K
rishna
2002
Mala
t
8.50 7.50
RC S
lab
8 10.04 80.32 Open
16.1
3988
76.9
3368
• Structure in good condition,
constructed under KSHIP-1 Project
• Super structure replaced by retaining
the Steel Girders and SSM Sub-
structure.
• Expansion joint fully covered
• Side slope pitching eroded
• Vegetative growth blocking vents
• Drainage spouts blocked
• Railings slightly damaged
• Retain with routine repairs.
• Railings to be repaired
• Expansion joint to be cleaned /
repaired
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared on
pier cap and in waterway.
• Drainage spouts to be cleaned /
repaired. 72.99
119 Ra-12
CRN
SH
23
18.0
00
BR:S
H23:M
AN
2:1
8.3
5
24-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Tributa
ry t
o T
ungabhadra
2002
Kurd
i
12.00 11.00
RC G
irder
4 15.60 62.40 Open
16.0
8491
77.1
6253
• Structure in good condition,
constructed under KSHIP-I
• Drainage spouts clogged
• Road surface slightly worn out
• Side slope pitching eroded
• Railings slightly damaged
• Structure retained with routine
maintenance
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Railings to be repaired
• Vegetative growth to be cleared.
• Side slope pitching to be reinstated.
• Road surface to be repaired.
73.51
P2 - 30 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
120 Ra-13
CRN
SH
23
22.2
00
BR:S
H23:M
AN
2:2
2.5
55
24-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Tributa
ry t
o T
ungabhadra
2002
Kapgal
12.00 11.00
RC G
irder
4 15.60 62.40 Open
16.0
5268
77.1
4600
• Structure in good condition,
constructed under KSHIP-I
• Spalling, reinf exposed in Main Girders
at 4 to 5 locations
• Drainage spouts clogged
• Road surface slightly worn out
• Side slope pitching eroded
• Railings slightly damaged
• Girders to be grouted at 4 to 5
locations using Epoxy / cement Grout
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Railings to be repaired
• Vegetative growth to be cleared.
• Side slope pitching to be reinstated.
• Road surface to be repaired.
73.22
121 Ra-14
CRN
SH
23
41.8
00
BR:S
H23:M
AN
2:4
2.2
67
26-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Tributa
ry t
o T
ungabhadra
2002
Nasala
pur
12.007.50 +
FP
RC G
irder
7 15.60 109.20 Open
15.9
8860
76.9
9501
• Structure in good condition,
constructed under KSHIP-I
• Drainage spouts clogged
• Outlet pipes to be provided
• Road surface slightly worn out
• Side slope pitching eroded
• Railings slightly damaged
• Structure retained with routine repairs
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Railings to be repaired
• Vegetative growth to be cleared.
• Side slope pitching to be reinstated.
• Road surface to be repaired. 73.46
122 Ra-15
CRN
SH
23
56.4
00
BR:S
H23:M
AN
2:5
6.4
87
26-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Poth
nal N
alla
2002
Poth
nal
12.007.50 +
FP
RC G
irder
14 15.60 218.40 Open
15.9
2098
76.8
8696
• Structure in good condition,
constructed under KSHIP-I
• Drainage spouts clogged
• Outlet pipes to be provided
• Road surface slightly worn out
• Side slope pitching eroded
• Railings slightly damaged
• Structure retained with routine repairs
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Railings to be repaired
• Vegetative growth to be cleared.
• Side slope pitching to be reinstated.
• Road surface to be repaired. 73.45
123 Ra-16
CRN
SH
61
223.2
00
BR:S
H61:M
AN
202:2
23.4
04
24-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Nalla
1970
Gork
al
7.00 6.00
SM
Arc
h
43 2.70 116.10 Open
16.0
1071
77.1
6648
• Structure narrow, old structure
• Vegetative Growth at Pier / Spandral
wall location.
• Thick Vegetative growth in the river at
Pier location.
• Pointing in arch eroded
• Scour of 0.50m at pier location.
• Guard posts damaged
• The Arch / Spandral wall shall be
sealed with Cement Grout at cracks and
then it shall be plastered wherever
required.
• Vegetative growth to be removed at
pier / Spandral wall location
• The Pier / Abutment shall be repaired
and plastered as required.
• The piers shall be strengthened at bed
level.
• Thick Vegetative growth in the river at
Pier locations to be removed
• Guard posts shall be provided
• Drainage spouts shall be provided with
proper outlet pipes.
Widening not Feasible, Propose for
Reconstruction for 12.00m wide or
retain the structure by
strengthening the structure.
51.99
P2 - 31 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
124 Ra-17
Non-C
RN
SH
128
48.8
00
MAN
204049125
26-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Manvi
Manvi
Nalla
1985
Bagalw
ad
6.00 5.00
HP (
Causew
ay)
13 0.90m Dia 80.00 Open
16.0
4124
76.8
9528
• Causeway, HFL around 0.90m above
road level
• NP2 pipes cracked
• SSM Headwall damaged
• Scour of 0.60m on d/s side
• Floor protection works damaged.
• Road surface fully worned out.
• Proposed for Reconstruction
• High Level Bridge of 60.0m span
for 12.0m wide
24.78
125 Ra-18
CRN
SH
127
189.0
00
BR:S
H127:R
AI2
02:1
95.7
29
23-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Raic
hur
Raic
hur
Tributa
ry t
o T
ungabhadra
1980
Upra
l
7.50 6.50 HP 55 0.90m Dia 76.50 Raft
16.0
4136
77.3
6266
• NP2 Pipes.
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 10 pipes
• around 20 to 30 pipes 50% silted
• Road surface fully worned out.
• SSM Return wall pointing eroded.
• Submersible Bridge, Over flows by
around 0.90m during rainy season.
• Vegetative growth to be removed on
side slopes and in waterway
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Guard posts shall be repaired
wherever required.
• Wearing coat to be provided.
• Grouting of joints to be done for SSM
Headwall.
As an Alternative propose High level
Bridge of 80m length by increasing
the vent Height.
50.49
126 Ra-19
CRN
SH
127
193.4
00
BR:S
H127:R
AI2
02:2
00.7
04
23-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Raic
hur
Raic
hur
Tributa
ry t
o K
rishna
2010
Gunjh
alli (J
unction w
ith N
H 1
67)
8.50 7.50
RC S
lab
7 10.50 73.50 Open
16.0
4115
77.4
0717
• Structure in good condition,
constructed by KRDCL
• Expansion joint damaged.
• Vegetative growth on pier cap location.
• Side slope pitching eroded
• Vegetative growth blocking vents
• Drainage spouts blocked
• Railings slightly damaged
• Retain with routine repairs.
• Railings to be repaired
• Expansion joint to be provided
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared on
pier cap and in waterway.
• Drainage spouts to be cleaned /
repaired.
85.58
127 Ra-20
CRN
SH
61
250.0
00
BR:S
H61:R
AI2
01:2
49.6
06
23-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Raic
hur
Raic
hur
Tributa
ry t
o K
rishna
2010
Gille
sugur
12.00 11.00
RC S
lab
7 10.50 73.50 Open
15.9
7425
77.3
6255
• Structure in good condition,
constructed by KRDCL
• Expansion joint damaged.
• Vegetative growth on pier cap location.
• Side slope pitching eroded
• Vegetative growth blocking vents
• Drainage spouts blocked
• Railings slightly damaged
• Retain with routine repairs.
• Railings to be repaired
• Expansion joint to be provided
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared on
pier cap and in waterway.
• Drainage spouts to be cleaned /
repaired.
85.74
P2 - 32 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
128 Ra-21
Non-C
RN
SH
128
77.2
00
SIN
202077290
25-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Sin
dhanur
Sin
dhanur
Poth
nal N
alla
2000
Hulg
unchi
8.00 8.00
MCPC
45 2.50m dia 134.50 Raft
15.8
7259
77.0
0177
• Slight Honey combing of concrete
observed at bottom in the Pipes
• Guard posts damaged
• Vents slightly silted
• Scoured at central pipes
• Floor protection works damaged.
• Road surface slightly worned out.
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Guard posts shall be repaired
wherever required.
• Road surface to be repaired
• Grouting of joints to be done
64.07
129 Ra-22
Non-C
RN
SH
128
90.0
00
SIN
202090200
25-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Sin
dhanur
Sin
dhanur
Tributa
ry t
o T
ungabhadra
1985
Hedagin
al
8.00 7.00
MCPC
28 2.00m dia 69.50 Raft
15.7
9936
76.9
7165
• Slight Honey combing of concrete
observed at bottom in the Pipes
• Guard posts damaged
• Vents 50% silted
• Floor protection works damaged.
• Road surface worned out.
• Vegetative growth on side slopes and
at end spans
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes and in waterway
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Guard posts shall be repaired
wherever required.
• New wearing coat to be provided
• Grouting of joints to be done
57.44
130 Ra-23
Non-C
RN
SH
128
104.2
00
SIN
202104315
25-0
8-2
018
Nort
h E
ast
Gulb
arg
a
Raic
hur
Raic
hur
Sin
dhanur
Sin
dhanur
Sin
dhanur
Halla
1980
Ala
banur
7.50 6.50
MCPC
32 2.85m Dia 103.60 Raft
15.7
6085
76.8
6586
• Severe Honey combing of concrete
observed at bottom in the Pipes
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 10 pipes
• around 10 pipes slightly silted
• Floor protection works damaged.
• Road surface fully worned out.
• SSM Return wall cracked
• Submersible Bridge, Overflows by
around 0.50m
• Propose High level Bridge of 120m
length by increasing the vent
Height.
If Repaired / Retained
• The Pipes shall be rehabilitated fully /
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes and in waterway
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Guard posts shall be repaired
wherever required.
• Wearing coat to be provided.
• Returnwall to be reconstructed.
32.84
131 Ya-01
CRN
SH
149
22.0
00
BR:S
H149:C
TR202_A:1
9.7
45
09-0
8-2
018
Nort
h
Gulb
arg
a
Sedam
Gulb
arg
a
Chitapur
Chitapur
Bheem
a
2008
Sonth
i
8.50 7.50
RC S
lab
73 9.00 657.00 Open
16.8
3102
76.9
2902
• Bridge cum Barrage
• Structure in good condition
• Side slope pitching to be provided
• Wearing coat slightly damaged
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Railings to be repaired
• Wearing coat to be repaired
83.59
P2 - 33 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
132 Ya-02
Non-C
RN
MD
R
8.0
00
SED
044008000
10-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Sedam
Sedam
Nalla
2016
Rajo
lla(K
)
6.50 5.50
RC S
lab
6 8.90 53.40 Open
17.1
0467
77.4
0870
• Newly constructed
• Structure in good condition
• Side slope pitching to be provided
• Vegetative growth blocking vents
• Retained with routine repairs
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared
91.43
133 Ya-03
Non-C
RN
MD
R
11.4
00
SED
007011800
10-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Sedam
Sedam
Tributa
ry t
o K
rishna
1960
Malk
ed
8.00 7.00
SM
Arc
h
20 5.00 80.00 Open
17.1
8883
77.1
6111
• Structure in Good condition
• Vegetative Growth at Pier / Spandral
wall location.
• Thick Vegetative growth in the river at
Pier location.
• Stone Railing damaged
• Road surface worn out
• Vegetative growth to be removed at
pier / Spandral wall location
• Thick Vegetative growth in the river at
Pier locations to be removed
• Stone Railing shall be repaired
wherever required.
• The Pier / Abutment shall be repaired
and plastered as required.
• The Arch / Spandral wall shall be
sealed with Cement Grout at cracks and
then it shall be plastered wherever
required.
• Drainage spouts shall be provided with
proper outlet pipes.
As alternative, New 2 Lane Bridge
(for a total length of around 80m)
may be provided adjacent to the
existing Bridge.
49.23
134 Ya-04
Non-C
RN
MD
R
1.2
00
SED
010001350
10-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Sedam
Sedam
Kagin
a
2013
Sangavi
5.00 4.00
RC S
lab
30 5.30 159.00 Open
17.2
0904
77.1
6315
• Bridge cum Barrage
• Structure in good condition, newly
constructed
• Side slope pitching to be provided
• Retained with routine repairs
• Pitching on side slopes to be provided.
• Railings to be repaired
83.55
135 Ya-05
Non-C
RN
MD
R
29.0
00
SED
010029585
10-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Sedam
Sedam
Kagin
a
2008
Lohada
5.00 4.00
RC S
lab
70 3.00 210.00 Open
17.2
2136
77.3
7120
• Bridge cum Barrage
• Structure in good condition, newly
constructed
• Side slope pitching to be provided
• Retained with routine repairs
• Pitching on side slopes to be provided.
• Railings to be repaired
83.64
P2 - 34 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
136 Ya-06
CRN
SH
127
101.2
00
BR:S
H127:S
HA203:1
01.6
75
22-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shahpur
Shahpur
Krishna
2008
Googal
9.50
7.50 +
1.50
FP RC S
lab
80 10.00 800.00 Open
16.4
7787
77.1
4669
• Bridge cum Barrage
• Structure in good condition
• Side slope pitching to be provided
• Wearing coat slightly damaged
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Railings to be repaired
• Wearing coat to be repaired
83.66
137 Ya-07
CRN
SH
127
84.0
00
BR:S
H127:S
HA203:9
0.0
8
22-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shahpur
Shahpur
Bheem
a
2003
Gudur
8.50 6.50
RC S
lab
176 3.00 528.00 Open
16.4
8752
77.2
3471
• Bridge cum Barrage
• Structure in good condition
• Side slope pitching to be provided
• Wearing coat slightly damaged
• Pitching on side slopes to be provided.
• Expansion joint to be cleaned.
• Railings to be repaired
• Wearing coat to be repaired
73.27
138 Ya-08
CRN
SH
16
44.6
00
BR:S
H16:S
RP3:4
4.6
6
08-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shora
pur
Shora
pur
Tributa
ry t
o B
him
a
1970
Hadanuru
8.00 7.00
RC S
lab +
SM
Arc
h
18 + 9 3.90 105.30 Open
16.7
3540
76.5
4429
• 18 spans RC Slab + 9 spans SM Arch
• Slight spalling of concrete at edges in
soffit of slab
• Reinforcement slightly exposed at
edges.
• Arch Pointing Eroded slightly at few
places.
• Thick vegetative growth to be removed
from waterway at ends
• Road surface slightly cracked.
• Parapet slightly damaged.
• The slab soffit at edges to be
rehabilitated / grouted with epoxy grout
• pointing in arch to done using cement
grout
• Pier cap to be grouted, cracks to be
sealed with epoxy grout
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Road surface to be repaired
58.93
139 Ya-09
Non-C
RN
MD
R
11.0
00
SRP029011066
08-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shora
pur
Shora
pur
Tributa
ry t
o K
rishna
2011
Kachanoor
8.50 7.50
RC S
lab
5 11.10 55.50 Open
16.5
2747
76.5
8981
• Newly constructed
• Structure in good condition
• Thick vegetative growth to be removed
from waterway at ends
• Drainage spouts to be cleaned.
• Grating, outlet pipe to be provided.
• Vegetative growth to be removed on
side slopes
• Thick vegetative growth to be removed
from waterway at ends
• Pitching on side slopes to be provided.
• Drainage spouts to be cleaned, out let
pipes to be provided
• Expansion joint to be cleaned.
83.37
P2 - 35 of 36
Summary of Major Bridges Inspected - Phase II (Year 2018-19)
CRN /
Non-
CRNS
H /
MD
R
nu
mb
er
PW
D K
m
Ch
ain
ag
e
Brid
ge I
D
Date
of
In
sp
ecti
on
Zo
ne
Cir
cle
Div
isio
n
Dis
tric
t
Talu
k
Su
b-
div
isio
n
Nam
e o
f
Riv
er
Year of
Const.
Nearb
y
Pla
ce
OW
(m)
CW
(m)
Type of
Str.
Total
No.of
Spans
(No)
Span
Length
(m)
Overall
length of
Bridge
(m)
Type of
FdnLat Long Existing Details / Observation
Tentative Improvement
Proposal
Overall
BCIPhotoSl. No
Planning and Road Asset Management Center (PRAMC)
Government of Karnataka
140 Ya-10
Non-C
RN
MD
R
28.0
00
SRP013027238
08-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shora
pur
Shora
pur
Tributa
ry t
o K
rishna
2009
Manglo
or
8.50 7.50
RC G
irder
11 10.00 110.00 Open
16.5
5187
76.6
4041
• Structure in good condition
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Main girder and cross girder in good
condition
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris (end spans)
• Grating of Drainage spouts damaged.
• Expansion Joint to be repaired /
replaced
• Drainage spouts to be cleaned of
debris, grating, out-let pipe to be
provided.
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased
• Pointing to sub-structure to be done as
required.
81.28
141 Ya-11
Non-C
RN
MD
R
30.0
00
SRP045030257
21-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Shora
pur
Shora
pur
Dona
2003
Tangadbail
5.50 4.50
RC S
lab
15 9.30 139.50 Open
16.2
9112
76.4
2801
• Structure Narrow.
• Structure in good condition
• Slight Honey combing, spalling
observed at soffit in few slabs
• Railings slightly damaged
• Expansion joint damaged.
• Side slope pitching to be provided
• Vegetative growth blocking vents
• Slab to be rehabilitated (by Shortcrete
/ Guniting / Grouting)
• Railings to be repaired
• Expansion joint to be provided
• Pitching on side slopes to be provided.
• Vegetative growth to be cleared
• If required, the structure may be
widened.
69.12
142 Ya-12
CRN
SH
127
52.4
00
BR:S
H127:Y
DG
204:5
8.5
31
09-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Yadgir
Yadgir
Tributa
ry t
o G
hata
pra
bha
1975
Nandepalli
7.00 6.00
MCPC
80 1.60 167.50 Raft
16.6
9015
77.3
8733
• Severe Honey combing of concrete
observed at bottom in the Pipes
• Minor Cracks observed at top in few
pipes
• Guard posts damaged
• Scour of around 0.50m observed at
around 10 pipes
• around 30 to 40 pipes 50% silted
• Floor protection works damaged.
• Road surface slightly worned out.
• SSM Return wall pointing eroded.
• Structure Narrow.
• The Pipes shall be rehabilitated
wherever required (by Shortcrete /
Guniting / Grouting)
• Vegetative growth to be removed on
side slopes and in waterway
• Silt to be removed from all the pipes
• Floor Protection works shall be
provided as per requirement
• Guard posts shall be repaired
wherever required.
• Wearing coat to be provided.
• Grouting of joints to be done for SSM
returnwall
As an Alternative propose High level
Bridge of 160m length by increasing
the vent Height.
54.22
143 Ya-13
CRN
SH
15
207.2
00
BR:S
H15:Y
DG
1:2
07.1
08
09-0
8-2
018
Nort
h
Gulb
arg
a
Yadgir
Yadgir
Yadgir
Yadgir
Tributa
ry t
o B
him
a
2003
Yadgir
8.50 7.50
RC G
irder
5 12.50 62.50 Open
16.7
7509
77.1
3451
• Structure in good condition,
constructed by KRDCL
• Slight Leaching / Dampness observed
on the cantilever portion of the slab at
edges.
• Main girder and cross girder in good
condition
• Expansion joints fully blocked by silt /
debris
• Vents blocked by thick thorny bushes,
debris for entire waterway
• Grating of Drainage spouts damaged.3
• No access to underneath of Bridge due
to thick thorny bushes all around the
Bridge.
• Expansion Joint to be cleaned /
repaired
• Drainage spouts to be cleaned of
debris
• Vegetative growth to be removed on
side slopes
• Debris / Vegetative Growth shall be
removed from the Waterway.
• Bearings to be greased 73.21
P2 - 36 of 36