![Page 1: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/1.jpg)
SUMMER PREPAREDNESS 2015
April 30, 2015
Lisa M. BartonAEP Executive Vice President, Transmission; Acting I&M President and COO
Marc E. LewisI&M Vice President, Regulatory & External Affairs
Andrew J. WilliamsonDirector, Regulatory Services
![Page 2: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/2.jpg)
INDIANA MICHIGAN POWER
![Page 3: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/3.jpg)
I&M GENERATION PORTFOLIO
COAL
49.7%2,600 MW
Rockport 1
Rockport 2
WIND
8.6%450 MW
Wildcat
Fowler Ridge
NUCLEAR
41.3%2,160 MW
Cook 1
Cook 2
HYDRO
0.4%22.4 MW
Six Run-of-
River
Hydroelectric
Dams
SOLAR
~15 MW
To Be Built
2015-16
![Page 4: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/4.jpg)
I&M – PJM COORDINATION
Fixed Resource
Requirement: Load
Server secures
capacity to satisfy
their load obligation
I&M, as part of the
AEP FRR entity,
can meet the
capacity requirements
for its load obligations
Coordination
and Planning
![Page 5: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/5.jpg)
22 MW
Difference
3500
4500
4000
5000
PJM
UCAP
4,755
4436
PJM UCAP
Load ObligationInterruptible
Demand
M
E
G
A
W
A
T
T
S
Demand Supply
-319
SUMMER ENERGY OUTLOOKPJM Unforced Capacity (UCAP)
Net PJM UCAP
Load
Obligation
4414
![Page 6: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/6.jpg)
Rockport Plant
ENVIRONMENTAL IMPACT
Dry Sorbent Injection (DSI)
Selective Catalytic Reduction (SCR)
Tanners Creek
Retirement June 1st
MATS: Mercury and Air Toxin Standards
![Page 7: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/7.jpg)
7
GRID OF THE FUTUREDRIVERS OF TRANSMISSION INVESTMENT
Generation RetirementsLocal Reliability
Improvements
Aging InfrastructureNew Customer/ Generation
Interconnections
![Page 8: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/8.jpg)
8
GRID OF THE FUTURE – GENERATION DIVERSITY
Solar WindDistributed
Generation
Grid-Scale Battery
TechnologiesMicro Grids Demand Response
![Page 9: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/9.jpg)
9
GRID OF THE FUTURE – TECHNOLOGY INNOVATIONS
B O L DBreakthrough Overhead Line Design
V V OVolt VAR Optimization
Single Phase Switching
Static VAR Compensators
Asset Health Center
Interphase Spacers
Drop in Control Modules
![Page 10: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/10.jpg)
10
I&M VOLT VAR
I&M Volt VAR Program (VVO)
augments energy efficiency efforts
2014: One full year of experience
with VVO as EE
Initial (Draft) Results: independent
evaluation shows energy and
demand conservation is occurring
with VVO in operation
Conservation response is as
expected (1:1 response; 1%
voltage reduction equates to
1% energy conservation)
![Page 11: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/11.jpg)
DEMAND SIDE MANAGEMENT & ENERGY EFFICIENCY
Senate Bill 412
Energy
Efficiency Goals
I R PIntegrated Resource Plan
Stakeholder
Engagement
EE Plan
Stakeholder
Engagement
Commission Review
and Approval
Commission Review
and Critique
![Page 12: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/12.jpg)
SENATE BILL 412
Methodology for Energy Efficiency Goals
Methodology for Evaluation, Measurement and
Verification (EVM)
![Page 13: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/13.jpg)
13THE CUSTOMER EXPERIENCE
Serving customers the way they want to be served
Energy Efficiency AMR Meter Reading
Understanding
The Bill
Incident Command
Structure (ICS)
![Page 14: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/14.jpg)
14
An improved approach to
crisis management,
including storm
restoration
Proven ability to manage
events more effectively
and with better
communication
Training and preparation
prior to implementing
INCIDENT COMMAND SYSTEM
![Page 15: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/15.jpg)
CURRENTLY AVAILABLE:
• Outage alerts
COMING SOON:
• Customer billing
and account status
SIGN UP ONLINE AT:
IndianaMichiganPower.com
![Page 16: SUMMER PREPAREDNESS 2015 - IN.gov2).pdf · SUMMER PREPAREDNESS 2015 April 30, 2015 Lisa M. Barton AEP Executive Vice President, Transmission; Acting I&M President and COO Marc E](https://reader034.vdocument.in/reader034/viewer/2022042312/5edbc94aad6a402d66662c21/html5/thumbnails/16.jpg)
Questions and Discussion