Download - Tank 85 Foundation
![Page 1: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/1.jpg)
Tank 85 Foundation Tank 85 Foundation
View of poured auger pile.
Setting up for next pile.
This process repeated itself 310.
![Page 2: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/2.jpg)
Tank 85 FoundationTank 85 Foundation
Tying the cages for the poured piling.
Auger pile boring in progress.
New cage ready to place when gout is poured.
![Page 3: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/3.jpg)
Tank 85 Foundation
The grout in some piling settled and was repaired. Grout was chipped to a clean surface and re-poured.
Pouring the repair.
![Page 4: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/4.jpg)
Tank 85 FoundationTank 85 Foundation
Excavating to sub-grade for the mud slab.
Excavating continues while the mud slab is being poured.
![Page 5: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/5.jpg)
Tank 85 FoundationTank 85 Foundation
Mud slab complete and form setting in progress. Laying out support bars for re-bar work to begin.
Form setting for the slab well under way.
![Page 6: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/6.jpg)
Tank 85 FoundationTank 85 Foundation
First mat of re-bar placed Oct. 24/25,06
Placing top mat Oct. 26/27,06
![Page 7: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/7.jpg)
Tank 85 FoundationTank 85 Foundation
Re-bar is complete and ready for concrete pour Oct. 28, 06.
![Page 8: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/8.jpg)
Tank 85 FoundationTank 85 Foundation
Tying wall dowels and support dowels Oct 27, 06.
Water-stop placed so it can be repositioned while the concrete is being poured
![Page 9: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/9.jpg)
Tank 85 FoundationTank 85 Foundation
5AM Oct 28,06. First two loads of concrete.
Pouring with two pump trucks
![Page 10: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/10.jpg)
Tank 85 FoundationTank 85 Foundation
5:45 AM, pour well under way.
![Page 11: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/11.jpg)
Tank 85 FoundationTank 85 Foundation
Grading in progress prior to setting panels Nov. 2,06.
Preparing to set inner ring wall.
![Page 12: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/12.jpg)
Tank 85 Foundation
7AM Sat. anchor bolts set and checked, re-bar complete, ready to pour.
Pour approximately 40 % at 9:30 AM
![Page 13: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/13.jpg)
Tank 85 Foundation
Ring wall completely poured.
Ring wall stripped and grading for tank contractor started
![Page 14: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/14.jpg)
Tank 85 Foundation
Liner installation well under way.
Liner nearly completed.
![Page 15: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/15.jpg)
Tank 85 Foundation
Ramp in place for placing of sand and entrance of crane and materials. 11-13-06
First of many loads of sand, 11-14-06
![Page 16: Tank 85 Foundation](https://reader033.vdocument.in/reader033/viewer/2022061116/54653aeaaf795983338b4d2b/html5/thumbnails/16.jpg)
Tank 85 Foundation
Sand fill covered for the night. 11-15-06
Compacting first lift of sand. Tested at 105-108.