Transcript
Page 1: TAS Installation instruction for shaft couplings of the types W | WLA

Shaft coupling of the types W | WLA | WLB

Installation instruction

Changes reserved

TAS Schäfer GmbH58300 Wetter

Germany

1/401/2012

Ch. Müller

Schutzvermerk nach DIN ISO 16016 beachten | Observe protection notices in accordance with DIN ISO 16016

GermanPhone: +49 (0) 2335 9781-0 E-Mail: [email protected] Internet: www.tas-schaefer.de

Page:Issue:

Name:Gen. language:

ATTENTION!

General warning!

Intended usage

• Mountinganddismountingofashaftcouplingmustberestrictedtoqualifiedpersonnel.

• Incorrecthandlingmaycauseinjurytopersonsanddamagetomachines!

• Atwork,withheavypartsandequipment,observeallsafetyinstructionsandwarnings.

• Read these instructions carefully and completely before first use. Familiarize yourself with thefunctioningandthenotesonsafetyindetail.Ifyouhaveanyquestions,pleasecontactusattheabovephonenumberoremail.

• Place these instructions available to all employees who work with our shaft couplings and payattentiontocompliancewiththespecifications!

Thegeneral,accidentpreventionregulations(UVV),thetradeassociationresponsibleforyourcompanyinGermanyor for your company valid regulations and lawsof the respective country.Youwill alsoreceivethefollowingsafetyinstructions:

• Makesurebefore installingandremovingtheshaftcoupling, theengineanddrivetrainhasbeensecuredagainstaccidentalactivation!Thismaydoneforexamplebyusingsigns,orbyremovingthefusesonthepowersupply(decommissioning).Rotatingpartsmaycauseseriousinjury.Alsofollowthenotesbelowundertheaspect„SafetyFirst“.

• Onlyusesuitable,approvedandtestedslingmeansfortransportingandinstallingtheshaftcoupling!Donotstayinthehazardousarea!

• Duringtransportoftheshaftcoupling,alongwithagearorsimilar,youhavetosecureitontheshafttopreventslipping,iftheshaftcouplingisnotfirmlymounted!!

• Withanuprightstorage,youhavetotakecare,thattheshaftcouplingcannotfalloverorroll.

• Neverstarttheclampingprocedurewithoutinsertedshaft!Thiscanresultindamagetothebushandthepressurerings!

Youonlyallowedtomount,dismantleandusetheshaftcouplingif:

• youhavecarefullyreadandunderstoodtheinstallationinstructions

• youhadtechnicaltraining

• yourcompanyauthorizedyoutodothat

You are only allowed to perform maintenance and repairs if you meet the above terms and arefamiliarizedwiththeproceduresused.Theshaftcouplingmustbeusedonlyinaccordancewiththeirtechnicaldata.Constructivemodifications,withoutourapproval,arenotpermitted.Foranyresultingdamageweacceptnoliability.Wereservethe right for technicalchanges, if theseserve todevelopmentor improvesafety.Theshaftcouplingdescribedhererepresentsthestateoftheartatthetimeofcreationofthismanual.

Page 2: TAS Installation instruction for shaft couplings of the types W | WLA

Shaft coupling of the types W | WLA | WLB

Installation instruction

Changes reserved

TAS Schäfer GmbH58300 Wetter

Germany

2/401/2012

Ch. Müller

Schutzvermerk nach DIN ISO 16016 beachten | Observe protection notices in accordance with DIN ISO 16016

GermanPhone: +49 (0) 2335 9781-0 E-Mail: [email protected] Internet: www.tas-schaefer.de

Page:Issue:

Name:Gen. language:

Shaft couplings of the types W | WLA | WLB

Overview of ComponentsPart Quantity Designation

1 1 Bush

2 1 Pressure ring D

3 1 Pressure ring G

4 see catalog Screw

Lubrication

Preferred tolerances and surface roughness

> ≤ FSmax

mmClearanceBush/Shaft

Rzµm

9 18 0,022 H6/h6 10

18 30 0,026 H6/h6 10

30 50 0,032 H6/h6 10

50 80 0,049 H7/h6 10

80 120 0,057 H7/h6 16

120 150 0,065 H7/h6 16

150 180 0,079 H7/g6 16

180 250 0,090 H7/g6 16

250 315 0,101 H7/g6 16

315 400 0,111 H7/g6 16

400 500 0,123 H7/g6 25

500 630 0,136 H7/g6 25

630 800 0,154 H7/g6 25

800 1000 0,172 H7/g6 25

Theshaftcouplingissuppliedreadyforinstallation.

The force is transmitted via a frictional connectionbetweenthefunctionalsurfacesofshaftandbush.

Payattentiononapropertighteningoftheclampingscrewsandtheconditionofthecontactsurfaces.

Thetolerancesforshaftandbushboreareobserved(see table).Fromtherecommendationdeviatingtolerancesaretofind on the order-relateddimensionsheet.

x

x

x

x

x

x

Shaft2

Shaft1

4

3

2

1

fig.type„W“

X

X

X

Theshaftcouplingislubricatedatthefactory.Afterdisassemblyoftheshaftcouplingtheproperlubricationhastobeexamined.Checkthelubricationoftheplacesmarkedwith X ,andthelubricationofthescrewthreadsandheadrests.Aslubricantmolybdenumdisulfide(MoS2)pasteisused.

Page 3: TAS Installation instruction for shaft couplings of the types W | WLA

Shaft coupling of the types W | WLA | WLB

Installation instruction

Changes reserved

TAS Schäfer GmbH58300 Wetter

Germany

3/401/2012

Ch. Müller

Schutzvermerk nach DIN ISO 16016 beachten | Observe protection notices in accordance with DIN ISO 16016

GermanPhone: +49 (0) 2335 9781-0 E-Mail: [email protected] Internet: www.tas-schaefer.de

Page:Issue:

Name:Gen. language:

•Thecontactsurfacesbetweenshaftandbush(bushbore)mustbegrease-free,dryandclean toensureasufficientlyhighcoefficientoffriction.

•Thefunctionalsurfacesoftheshaftcoupling,thescrewthreadandtheheadrestsarelubricatedatthefactory.

•Forshaftcouplingsthebushisopionallyprotectedwithoiledpaper.Thismustberemovedbeforeassembly.

Preparation

1.Positioningoftheshaftcouplingontheshaftasspecifiedintheassemblydrawing.Removepossiblypresenttransportlocksbetweenthepressurerings.Makesurethatthepressureringsarepositionedentirelyonthecontactsurfacesbetweenthebushandshafttoavoiddamagingofthecomponents.Tofacilitatetheassembly,shaftcouplingscanbedisassembled.

2.Hand-tightenthescrewsoftheshaftcouplinguntilitsitsfreeofclearanceontheshaft.Payattentiontotheparallelismofthepressurerings!

3.Duringfurtherclampingprocedureacircumferentiallyuniformgapsizebetweenthepressureringsistobeobserved.Forthispurposecheckthegapsizeatseveralpointsaroundthecircumference.

Installation

Design„W“

Design„WLA“

Design„WLB“

Page 4: TAS Installation instruction for shaft couplings of the types W | WLA

Shaft coupling of the types W | WLA | WLB

Installation instruction

Changes reserved

TAS Schäfer GmbH58300 Wetter

Germany

4/401/2012

Ch. Müller

Schutzvermerk nach DIN ISO 16016 beachten | Observe protection notices in accordance with DIN ISO 16016

GermanPhone: +49 (0) 2335 9781-0 E-Mail: [email protected] Internet: www.tas-schaefer.de

Page:Issue:

Name:Gen. language:

1.Loosenthescrewsevenlyoneaftertheother.Forthispurposeseveralcyclesarenecessarytoavoidanoverloadofthescrewwhenlooseningthepressurerings.Neverremovescrewsbeforetheshaftcouplingiscompletelyrelaxed.Otherwise there is a high risk of accidents due to overloading of one individual screw!

2.Iftheshaftcouplingcompletelyrelaxed,theshaftandbushcanbeseparatedfromeachother.

3.Pullofftheshaftcouplingfromtheshaft.

Dismantling

Beforereuse,cleantheshaftcouplingandchecktheperfectconditionofthecomponents.Cleanthepressureringsandthebushandchecktheperfectconditionofthecomponents.Alllubricationpointsmustbeprovidedwithnewlubricantsinaccordancewiththesemanual(see „Lubrication“).

Reuse of used shaft couplings

Defectshaftcouplingsmustbecleanedofgreaseandoilandbescrapped.

Ifyouareunsurewhetheryourshaftcouplingarestillusable,youcansendittousforreview/repair.Pleasecontactusinanycasebeforesending!

Repair / disposal

4.Forthefurthertighteningprocess,atorquewrenchorothersuitabletool/methodisused.Thescrewsareattractedinseveralcycles,step-by-step(25%, 50%, 75%, 100%).Thestandardtighteningtorque,see the shaft coupling and the corresponding dimension sheet. In special cases, the tighteningtorquemaybereduced,sothespecificationinthedimensionsheetismandatory!(if any)

5.Nowtightenthescrewsinorder. (The first stage can also be performed crosswise.)Aftereachcycleincreasetothenextstage.Isthemaximumtighteningtorqueofthescrewsreached,performano-ther2-3roundswiththesametorque.Istheproposedtighteningtorqueachievedatallscrews,theinstallationoftheshaftcouplingiscompleted.


Top Related