Mirza AscericMichael BentwoodCharles BonnierJoel DemelloAnthony GiuffridaEric HeffronDan KunysAndrew MorinWilliam Andreycak
Team Members
![Page 2: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/2.jpg)
What is a ROV?Remotely Operated (Submersible) VehicleControlled through a tetherManeuverableUnoccupiedPerforms tasks
![Page 3: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/3.jpg)
Applications of ROV’s?Recovery/Rescue
ShipwrecksPlanes(black box)People
Research/StudiesDeep sea discoveryAnalyze underwater environment
Commercial UseInspectionMaintenanceRepair
![Page 4: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/4.jpg)
Background (SeaCat 1.0)Placed 28th out of 30 at nationalsGood features
Durable Ballast system
ImprovementsSmaller sizeCode writing Propellers
![Page 5: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/5.jpg)
PurposeDesign and build an improved ROV that is able to compete in the:
Regional MATE ROV Competition National MATE ROV Competition
Use engineering tools to analyze possible designs
Apply our engineering knowledge in a real life project
![Page 6: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/6.jpg)
Team OrganizationPropulsion
Anthony Giuffrida (Sub Lead)Mirza Asceric
FrameJoel DeMello (Sub Lead)Michael Bentwood
ControlsWilliam Andreycak (ECE Lead)Charles Bonnier (Sub Lead)Eric Heffron (Team Lead)
Accessories/Specialty ItemsAndrew Morin (Sub Lead)Daniel Kunyz
![Page 7: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/7.jpg)
Technical Challenges3D Maneuverability Controls
PropulsionMotorsPositioning
VisionBuoyancy Systems
ROV Tether
ControllerShape and SizeErgonomic
Code WritingVariable motor speedsImprove time responseAccessories
Improve Electrical Calculations
![Page 8: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/8.jpg)
Technical Challenges (cont.)Frame Accessories
MaterialsPVCAluminum
ShapeRectangularRound
Smaller and Lighter than SeaCat 1.0
CamerasUnderwater camerasWaterproof web‐cams
LightsLEDHalogenFlashlight
SensorsOthers depending on competition requirements
![Page 9: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/9.jpg)
Timeline
5/17/2009 7/6/2009 8/25/200910/14/2009 12/3/2009 1/22/2010 3/13/2010
Deliverable 1
09 ROV Operational
Buy/Test/Select Propulsion
Initial Design
Tank Testing
Final Design
CompletedRemaining
![Page 10: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/10.jpg)
FacilitiesKingbury S172
MeetingPlanningConstructionStorage
Chase OE LaboratoryTow Tank TestingStorage
![Page 11: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/11.jpg)
Description: Projected Project Budget: Electronics $350.00Material Costs $690.00 Control $200.00
Aluminum Pipe $100.00Wiring(cat5/10ga
uge) $100.00PVC $100.00 Joy Stick $50.00
Hardware(nuts/bolts) $50.00 Teather $300.00Injection Foam $150.00 Foam Sheathing $100.00
glue/paint $50.00 Hardware $100.00Machine Pieces $200.00 Connectors $100.00Ballast System $40.00 Presentation $350.00
Propulsion $1,000.00 Copying $100.00
Poster $50.00
Shirts $200.00
Total Build Cost: $2,690.00
Budget
![Page 12: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/12.jpg)
Description: Projected travel Budget:Flight* $10,000.00
Room/Board** $5,000.00Food*** $500.00Shipping $1,000.00
Total Travel Cost: $16,500.00
Projected '09‐'10Expenses
$19,190.00
*Travel Expenses Estimated using a multiplier of 10
**Guidelines say MATE will be providing room and board***Food Costs Based on $15 per meal per person
Budget
![Page 13: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)](https://reader034.vdocument.in/reader034/viewer/2022051912/60033463ab94b01785292022/html5/thumbnails/13.jpg)
Questions