team membersunh.edu/ece/department/senior projects/ece791_2009/projects/un… · improve time...

13
Mirza Asceric Michael Bentwood Charles Bonnier Joel Demello Anthony Giuffrida Eric Heffron Dan Kunys Andrew Morin William Andreycak Team Members

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Mirza AscericMichael BentwoodCharles BonnierJoel DemelloAnthony GiuffridaEric HeffronDan KunysAndrew MorinWilliam Andreycak

Team Members

Page 2: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

What is a ROV?Remotely Operated (Submersible) VehicleControlled through a tetherManeuverableUnoccupiedPerforms tasks

Page 3: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Applications of ROV’s?Recovery/Rescue

ShipwrecksPlanes(black box)People

Research/StudiesDeep sea discoveryAnalyze underwater  environment

Commercial UseInspectionMaintenanceRepair

Page 4: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Background (SeaCat 1.0)Placed 28th out of 30 at nationalsGood features

Durable Ballast system

ImprovementsSmaller sizeCode writing Propellers 

Page 5: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

PurposeDesign and build an improved ROV that is able to compete in the:

Regional MATE ROV Competition National MATE ROV Competition 

Use engineering tools to analyze  possible designs

Apply our engineering knowledge in a real life project

Page 6: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Team OrganizationPropulsion

Anthony Giuffrida (Sub Lead)Mirza Asceric

FrameJoel DeMello (Sub Lead)Michael Bentwood 

ControlsWilliam Andreycak (ECE Lead)Charles Bonnier  (Sub Lead)Eric Heffron (Team Lead)

Accessories/Specialty ItemsAndrew Morin  (Sub Lead)Daniel Kunyz

Page 7: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Technical Challenges3D Maneuverability Controls

PropulsionMotorsPositioning

VisionBuoyancy Systems

ROV Tether 

ControllerShape and SizeErgonomic

Code WritingVariable motor speedsImprove time responseAccessories

Improve Electrical Calculations

Page 8: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Technical Challenges (cont.)Frame Accessories

MaterialsPVCAluminum

ShapeRectangularRound

Smaller and Lighter than SeaCat 1.0

CamerasUnderwater camerasWaterproof web‐cams

LightsLEDHalogenFlashlight

SensorsOthers depending on competition requirements

Page 9: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Timeline

5/17/2009 7/6/2009 8/25/200910/14/2009 12/3/2009 1/22/2010 3/13/2010

Deliverable 1

09 ROV  Operational

Buy/Test/Select Propulsion

Initial Design 

Tank Testing

Final Design

CompletedRemaining

Page 10: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

FacilitiesKingbury S172

MeetingPlanningConstructionStorage

Chase OE LaboratoryTow Tank TestingStorage

Page 11: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Description: Projected Project Budget: Electronics $350.00Material Costs $690.00 Control $200.00

Aluminum Pipe $100.00Wiring(cat5/10ga

uge) $100.00PVC $100.00 Joy Stick $50.00

Hardware(nuts/bolts) $50.00 Teather $300.00Injection Foam $150.00 Foam Sheathing $100.00

glue/paint $50.00 Hardware $100.00Machine Pieces $200.00 Connectors $100.00Ballast System $40.00 Presentation $350.00

Propulsion $1,000.00 Copying $100.00

Poster $50.00

Shirts $200.00

Total Build Cost: $2,690.00

Budget

Page 12: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Description: Projected travel Budget:Flight* $10,000.00

Room/Board** $5,000.00Food*** $500.00Shipping $1,000.00

Total Travel Cost: $16,500.00

Projected '09‐'10Expenses

 $19,190.00

*Travel Expenses Estimated using a multiplier of 10

**Guidelines say MATE will be providing room and board***Food Costs Based on $15 per meal per person

Budget

Page 13: Team Membersunh.edu/ece/Department/Senior Projects/ECE791_2009/Projects/UN… · Improve time response y Accessories y Improve Electrical Calculations. Technical Challenges (cont.)

Questions