Training Your Customer
Petri Heiramo
Agile Coach, CST
Saturday, March 20, 2010
![Page 2: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/2.jpg)
2
We Are Looking at…
• How our customers can benefit from Agile
• How we can get customers understand Agility and its benefits
• How can we help them to be the PO’s they are supposed to be
Saturday, March 20, 2010
![Page 3: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/3.jpg)
3
Petri Heiramo
• Age: 38 today
• Own training and coaching company, Agilecraft Ltd, for about a month
• Almost 10 years career in SW development and process improvement at Digia
• Primary focus on processes and projectmanagement
• 6 years as process improvement manager• Agility and Scrum as main focus since
Fall 2005
Outside work– Home in Kotka
– Family – wife and little
daughter– Hobbies – games of
different kinds, if I
just have time
Saturday, March 20, 2010
![Page 4: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/4.jpg)
6
BENEFITS TO CUSTOMER
Saturday, March 20, 2010
![Page 5: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/5.jpg)
7
Key Benefits
• Better visibility on the reality of things• Knowing where you are is the first step to intelligent
response
• Better and continuous control on priorities, value and risks
• Faster feedback on new ideas
• Better control over their investments
Saturday, March 20, 2010
![Page 6: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/6.jpg)
8
Aspects of Agile We Can ”Sell”
• Better visibility through concrete frequent deliveries
• Better fit-for-use through fast feedback
• Flexibility in requirements, and faster response times to changes
• Also elimination of unnecessary features
• Peace of mind
• Earlier start, faster releases
Saturday, March 20, 2010
![Page 7: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/7.jpg)
9
Aspects ”Not Safe to Sell”
• Cost savings• When cost savings are the goal, the money is typically saved from the wrong place –
the beginning instead of end
• Higher quality• While true if you do Agile right, this might imply that you don’t do good quality now
• ”Agile is easy” – it isn’t
• Something you can’t deliver, e.g. error free code
• Agile practices if you don’t do them, e.g. TDD
• ”Scrum solves your problems”• It doesn’t, it merely exposes them
Saturday, March 20, 2010
![Page 8: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/8.jpg)
10
GE!ING CUSTOMER TO UNDERSTAND
Saturday, March 20, 2010
![Page 9: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/9.jpg)
11
1) Arrange Some Training
• Most customers are used to old way of buying• Hard to buy any other way
• Offer some free training or coaching• E.g. 2-3h introduction session
• Give basic understanding of what Agile is and what it isn’t
• Some training done before sale, some inclusive in the
project
Saturday, March 20, 2010
![Page 10: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/10.jpg)
12
1) Things I’ve Done
• Different sets for different occasions• 45 min What Agile Is About sessions• 2-3h introductory Agile sessions• 1d PO trainings
• Things I typically emphasize• Importance of vision as guide• Customer’s central role and benefits• Control mechanisms in empirical process control• Golf as iterative planning metaphor (next slide)• The importance of quality right from beginning
Saturday, March 20, 2010
![Page 11: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/11.jpg)
©Used with permission
Golf Metaphor
?
Saturday, March 20, 2010
![Page 12: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/12.jpg)
©Used with permission
Golf Metaphor
Saturday, March 20, 2010
![Page 13: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/13.jpg)
©Used with permission
Golf Metaphor
Saturday, March 20, 2010
![Page 14: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/14.jpg)
©Used with permission
Golf Metaphor
Saturday, March 20, 2010
![Page 15: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/15.jpg)
©Used with permission
Predictable Manufacturing New Product DevelopmentIt is possible to first complete specifications, and then build.
Rarely possible to create up-front unchanging and detailed specs.
Near the start, one can reliably estimate effort and cost.
Near the beginning, it is not possible. As empirical data emerge, it becomes increasingly possible to plan and estimate.
It is possible to identify, define, schedule, and order all the detailed activities.
Near the beginning, it is not possible. Adaptive steps driven by build-feedback cycles are required.
Adaptation to unpredictable change is not the norm, and change-rates are relatively low.
Creative adaptation to unpredictable change is the norm. Change rates are high.
Explaining “Two Process Worlds”
Saturday, March 20, 2010
![Page 16: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/16.jpg)
©Used with permission
Predictable Manufacturing New Product DevelopmentIt is possible to first complete specifications, and then build.
Rarely possible to create up-front unchanging and detailed specs.
Near the start, one can reliably estimate effort and cost.
Near the beginning, it is not possible. As empirical data emerge, it becomes increasingly possible to plan and estimate.
It is possible to identify, define, schedule, and order all the detailed activities.
Near the beginning, it is not possible. Adaptive steps driven by build-feedback cycles are required.
Adaptation to unpredictable change is not the norm, and change-rates are relatively low.
Creative adaptation to unpredictable change is the norm. Change rates are high.
Explaining “Two Process Worlds”
E.g. software engineeringE.g. phone manufacturing
Definedprocess
Empirical
process
Saturday, March 20, 2010
![Page 17: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/17.jpg)
©Used with permission
Predictable Manufacturing New Product DevelopmentIt is possible to first complete specifications, and then build.
Rarely possible to create up-front unchanging and detailed specs.
Near the start, one can reliably estimate effort and cost.
Near the beginning, it is not possible. As empirical data emerge, it becomes increasingly possible to plan and estimate.
It is possible to identify, define, schedule, and order all the detailed activities.
Near the beginning, it is not possible. Adaptive steps driven by build-feedback cycles are required.
Adaptation to unpredictable change is not the norm, and change-rates are relatively low.
Creative adaptation to unpredictable change is the norm. Change rates are high.
Explaining “Two Process Worlds”
E.g. software engineeringE.g. phone manufacturing
Definedprocess
Empirical
processWaterfall
Study – Plan – Act
Iterative
Try – Observe – Adjust
Waterfall model is fundamentally not suitable for software development
Saturday, March 20, 2010
![Page 18: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/18.jpg)
©Used with permission
Complexity and Causality
Peopleadd another level of complexity
Requ
irem
ents
TechnologySource: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development with Scrum by Ken Schwaber and Mike Beedle.
Saturday, March 20, 2010
![Page 19: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/19.jpg)
©Used with permission
Complexity and Causality
Peopleadd another level of complexity
Requ
irem
ents
TechnologySource: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development with Scrum by Ken Schwaber and Mike Beedle.
Water-fa"
Agile
Saturday, March 20, 2010
![Page 20: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/20.jpg)
©Used with permission
Complexity and Causality
Peopleadd another level of complexity
Requ
irem
ents
TechnologySource: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development with Scrum by Ken Schwaber and Mike Beedle.
Unknown, but
knowable linear
causality
Known linear
causality
Retrospective coherence
(Most SW Dev is here)
No known causality
Saturday, March 20, 2010
![Page 21: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/21.jpg)
17
2) Help Customer Feel Safe
• No amount of coaching will help if the customer
doesn’t feel safe
• Customers are most often afraid of…• Being forced to pay more then they budgeted
• Not getting what they wanted
• In that environment, ”We’re using Agile, we can’t
provide estimates” will lose you the case
Saturday, March 20, 2010
![Page 22: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/22.jpg)
18
2) Things I’ve Done
• Create confidence that customer can get what they want for the money they intend to spend
• Do some story writing with the team to understand project scope and priorities
• If the customer can participate in this, great
• Try to estimate reasonable cost & schedule• If all else fails, do some traditional planning and estimating,
and use those estimates as a base for commitment• That doesn’t mean you have to do the project the old way
• Negotiate target price contract that you can commit to
Saturday, March 20, 2010
![Page 23: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/23.jpg)
19
3) Help Create Vision
• Steer the discussion away from specific feature details• And into what the customer seeks to achieve
• Business goals• Key functionality at high level• Whose job is improved as a result
• Discuss and identify key constraints• Time, cost, available people, technology, …
• Formulate into simple release plan
• Requires that the customer can be ”lured” into this• Typically not possible in public tenders
Saturday, March 20, 2010
![Page 24: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/24.jpg)
20
3) Things I’ve Done
• I haven’t actually used this one !
• But I do see it as one option I could use to drive a contract between customer and provider
Saturday, March 20, 2010
![Page 25: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/25.jpg)
21
4) In Public Tendering
• If the request isn’t Agile, you can’t sell Agile
• You can sell ”Waterfall”, but made using Agile practices• Provide enough paper (based on real implementation) to pass
acceptance gates• Plan as you normally would in Agile, but publish ”Waterfallified”
docs to customer• After all, doing some implementation work is equivalent to doing a
prototype, isn’t it? !
• Contractual constraints reduce customer’s ability to make changes, but that’s their problem
• Traditional change control is needed
Saturday, March 20, 2010
![Page 26: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/26.jpg)
22
4) Things I’ve Done
• Never done this, either, always been able to convince the customer to actually accept Agile
• Maybe I haven’t just had the hardest cases
Saturday, March 20, 2010
![Page 27: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/27.jpg)
23
5) Don’t Hype
• Customers are wary of hype• There have been fads before, and they have faded
• Agile isn’t hype or a fad• It’s a process control framework for complex environments• It has always existed
• Agile doesn’t work everywhere• Don’t make it sound like a silver bullet• When asked, be forthright where it doesn’t work, e.g.
• Traditional engineering (for most part)• Organizations which don’t ”accept” Agile thinking• Very simple projects (ok, it works, but these are simple enough to be done with any
methodology)
Saturday, March 20, 2010
![Page 28: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/28.jpg)
24
HELPING THE CUSTOMER TO BE A G#D PO
Saturday, March 20, 2010
![Page 29: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/29.jpg)
25
1) Train More
• Provide more training, if you already didn’t do so in sales phase
• Some training can be sold as part of the project, so it doesn’t have to be free
• Study and develop skills & materials to do the training
• Should be ”standard SM stuff”
Saturday, March 20, 2010
![Page 30: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/30.jpg)
26
2) Make Things Easy
• It’s SM’s job to guide the PO through the process
• Tell what the PO should do (but not what decisions to make)
• Facilitate workshops for the PO
• Help PO to carry out his/her responsibilities
• Never assume PO responsibility!• Always emphasize that the PO is ultimately responsible for
business decision
Saturday, March 20, 2010
![Page 31: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/31.jpg)
27
3) Facilitate Backlog Management, Don’t Manage It
• Always keep in mind that the PO owns the product backlog• Even if there’s contractual restrictions to changing content• With fixed scope, it is usually possible to reprioritize
• Facilitate story writing workshops for PO• Also facilitate feedback gathering during iterations
• Facilitate grooming sessions with team and PO
• Suggest useful process issues, such as• Useful Product Backlog format (Excel, tool, cards, etc.)• Useful Product Backlog ”columns” (risk, value, release, etc.)• Tool choices• Useful scope for more detailed refinement
Saturday, March 20, 2010
![Page 32: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/32.jpg)
28
4) Help in Release Planning
• Most PO’s don’t know how to create meaningful release plans
• Facilitate workshops or other activities to create and maintain a release plan
• Remind, as necessary, to review iteration level progress against release plan
• Have the PO reprioritise or rescope, if release plan objectives cannot otherwise be met
Saturday, March 20, 2010
![Page 33: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/33.jpg)
29
5) Ensure Communication to PO
• Make sure that the PO has good information available about, e.g.
• Development velocity• Technical dependencies and risks• Technical debt
• Don’t tell them yourself (if you’re SM), have the team tell them
• Create trust and rapport between PO and team
• Big visible charts or dashboards
Saturday, March 20, 2010
![Page 34: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/34.jpg)
30
6) Help Removing Obstacles
• In most customer organizations, there are many obstacles to getting Agile accepted and running
• Help the PO in removing these, e.g.• Volunteer to do awareness events or training at customer
site• Collaboratively act to influence key individuals• Help find metrics or reports that ”prove” Agile is working• Make the PO look good in the organization’s metrics
Saturday, March 20, 2010
![Page 35: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/35.jpg)
31
7) Challenge the PO
• Continually challenge the PO to think PO stuff• What is value? Has it changed over time? Are we still headed for the
right goal?• Are there ideas that should be added to Backlog?• Are there items that could be dropped or done in simpler form?• How can we get better and faster feedback from stakeholder and
users?
• Make this in positive way• Genuinely seek higher business value for the customer
• Suggest ideas, but always let the PO decide
Saturday, March 20, 2010
![Page 36: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/36.jpg)
32
SU$ARY
Saturday, March 20, 2010
![Page 37: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/37.jpg)
33
Customer Understanding
• You need to provide training• Customers can’t buy what they don’t understand
• Help them feel safe in choosing Agility• Provide confidence against key risks
• Help create vision - goals over specific functionality
• Don’t hype – this is real work to real goals
• Agile can be disguised as Waterfall• Customer doesn’t understand, but you can do Agile
Saturday, March 20, 2010
![Page 38: Training Your Customer...obstacles to getting Agile accepted and running • Help the PO in removing these, e.g. • Volunteer to do awareness events or training at customer site •](https://reader036.vdocument.in/reader036/viewer/2022070917/5fb73246d198d31d150c9a8b/html5/thumbnails/38.jpg)
34
Helping Customer to Be a Good PO
• Train more
• Make things easy
• Facilitate Backlog management, don’t manage it
• Help in release planning, focus on project goals
• Ensure PO gets enough information
• Help in removing obstacles, also in customer organization
• Challenge the PO