Update on the Escambia/Santa Rosa Regional Advanced Traffic Management
System (ATMS) Feasibility andImplementation Plan
Ben Faust, P.E.
Advanced Traffic Management System
Advanced Traffic Management System
Todays Presentation Agenda• Update on Traffic Signal System Operations
& Engineering Support Contract• Update on ATMS Phase I• Overview of ATMS Feasibility Study
• Project Schedule & Progress• ATMS Phase II – Future Funding
Update on Traffic Signal System Operations & Engineering Support Contract
DRMP - to work on Best Practices for Regional Traffic Operations Optimization:
– Regional Traffic Engineering Champion– Optimize Regional Signal Operations– Continue the Signal Retiming efforts– Manage and operate ATMS projects
Advanced Traffic Management System
FDOT Financial Project ID 428058-52-01Design-Build project 18 Intersections, fiber optic connection to signal controller and CCTV cameras
• Brent Lane & Bayou Boulevard from Highway 29 to 12th Avenue
• SR95 (N Palafox Street) from Brent Lane to Fairfield Drive
• Fairfield Drive from Texar Drive to North 9th Avenue
Staff training completed • in final test phase
The ATMS Phase 1 Project
• Monitors system-wide traffic conditions and devices
• Enables proactive management• Empowers users with data,
accessible via web enabled devices• Ensures system integrity through
data validation• Centralizes documentation and
inventory control
The ATMS Phase 1 Project
Escambia/Santa Rosa Regional Advanced Traffic Management System Feasibility
Study and Implementation Plan
ATMS Study
• City of Pensacola contracted with Atkins
• The results of this study will be used to develop a project or series of projects that will evolve the existing signal systems into a regional ATMS, and will identify immediate, intermediate, and future needs.
ATMS Study
• Notice to Proceed to Atkins: May 13, 2015• 3 Stakeholder meetings in June & July
• Develop ATMS Phase II RFP by December• Final Masterplan and Implementation Plan
completed by June 2016
ATMS Study Schedule
Existing Conditions
ATMS Framework
ATMS Study Schedule
ATMS Implementation Plan
Technology Review
Develop ATMS Requirements
TMC - Operations
Implementation Plan &RFP Development
• Meeting with FDOT October 22nd
– Provide Details on Masterplan to date– Discuss viable funding alternatives
• Develop Request for Proposal– Design Build for ATMS Phase II– Other deployment options
ATMS Study
DRAFT
ATMS Study
DRAFT
Questions?
Ben Faust, P.E.
Advanced Traffic Management System