Transcript
D
A
EL(-) 0.00 (CHART DATUM)
WHARF
AMC 1
B v AMC2
c
AMC3
v AMC4
AMC5
ELEVATIONS (METRES)
A B
3.6 (-)10.0
3.6 (-)10.0
3.6 (-)9.3
4.5 (-)12. 7
4.5 (-)8.0
c D
(-)11.0 8.0
(-)10.0 N/A
(-)9.3 N/A
(-)12.7 N/A
(-)8.0 N/A
AMC6 4.5 (-)8.0 (-)8.0 N/A
CUF North 4.5 (-)8.0 (-)8.0 N/A
WHARF ELEVATIONS (1-6, CUF NORTH)Figure No. 4
Rev 01 Date 02/08/16
AMC 1, AMC 2, AMC 3 WHARVESFigure No. 5
Rev 02 Date 18/12/2017
AMC 4 WHARFFigure No. 6
Rev 02 Date 28/09/2017
AMC 5 WHARFFigure No. 7
Rev 01 Date 02/08/16
AMC 6 WHARFFigure No. 8
Rev 01 Date 02/08/16