Page 1: WAIS DIVIDE PARENT BOREHOLE COMPLETED!...WAIS DIVIDE PARENT BOREHOLE COMPLETED! Ice Drilling Design and Operations •Assist with borehole logging • Install rooftop and slot-spanning

WAIS

DIVIDE

2011-2012

DISCDRILL

WAIS DIVIDE PARENT BOREHOLE COMPLETED!Ice Drilling Design and Operations

• Assistwithboreholelogging• Installrooftopandslot-spanningsheaves

• Removeold3,400mcablefromDISCDrillwinch• Spoolonnew4,200mcable• Terminatefiberoptics• Deepenthemainboreholeto~50mabovethebedattheChiefScientistsdirection

• Producehighqualityicecore• Adjustdrillingproceduresandtechniquestodrillanddeliverwarmice,ifencountered.

• TestReplicateCoringcapability

• ElizabethMortonservedasawinchoperatorwithGaryClowandFrankUrban• Firstroundofloggingcompletedbetween12/3/11-12/21/11• Secondroundofloggingcompletedbetween1/1/12-1/4/12• Fiveloggingtoolsdeployed

• Opticaldustlogger• Sonic‘snake’logger• Seismictool• Temperaturelogger• Sonicpinger

• TotalIDDOdaysatWAIS:73• 18daysforcrewarrival,Archwork,slotwork,loggingsetup• 9daysforcableoperations• 7daysfordrillstartupandotherArchprep• 2daysofboreholereaming• 6daysofdrilling(2shifts)

• Startingdepth:3,331.538m• Endingdepth:3,405.077m• Totalmetersdrilled:73.539• Trippingspeeds

• Descendedat1.0m/swiththepumprunning• Ascendedatupto2.0m/s

• CutterSpeed• 80rpmcontinuestobethesweetspot

• Penetrationrates• Variedwithiceconditions;between2.5-5.7mm/s

• Boreholefluiddensity• Densitywasmaintainedat.920@-31°Cthroughouttheseason• Fluidwasmixedto.935@-31°Ctocompensatefor141bloss

• 4,391L(1,160gal)ofdrillingfluidwereused• 3,140L(830gal)ofIsoparK• 1,251L(330gal)of141b

• Unspooled3,400mcableoffofthewinchdrumusingtheP05cablespooler

• Spooledonnew4,200mcableusingthePengocabletensioner• ItwasdifficulttogetenoughpickonthecranesduetothefloorheavinginthemiddleoftheArch

• Newfor2011-2012season• Real-timeviewingofthe

boreholefromthesurface

• SteffenBoHansen,fromtheCentreforIceandClimate(CIC)inCopenhagen,Denmark,visitedasadrillobserverfortwoweeksinJanuary

• Terminatedbothendsofthefiberopticcableoveraperiodof5days

• VeryacceptablelevelsofdBlossacrossallfibers

FINALBOREHOLEDEPTH:3,405.077meters

CABLEOPERATIONS:

BOREHOLECAMERA:

BOREHOLELOGGINGOPERATIONS:

SEASONGOALS:

DRILLINGOPERATIONS:

SPECIALVISITOR: